HOW TO APPLY FOR A BUILDING PERMITlakeorion.org/images/forms/pbz/Building Permit Application...
Transcript of HOW TO APPLY FOR A BUILDING PERMITlakeorion.org/images/forms/pbz/Building Permit Application...
Village of Lake Orion 21 E. Church Street Lake Orion, Michigan 48362 Tel 248.693.8391 Fax 248.693.5874 www.lakeorion.org
Page 1 of 2
HOW TO APPLY FOR A BUILDING PERMIT REVIEW AND APPROVAL PROCESS The following outlines the steps required to obtain a residential or non-residential building permit.
A. Submit all required documents and fees (listed below) to the Village Zoning Coordinator.
B. Application will be reviewed and a Village Zoning Compliance Permit will be issued for an application meeting all requirements of the Village Zoning Ordinance.
C. Those applications receiving a Village Zoning Compliance permit will have their Township building permit
application transmitted by Village staff to the Orion Township Building Department.
D. The Orion Township Building Department staff will contact you with any questions. When your application meets all applicable code requirements Orion Township will contact you stating your approved permit is available for pick up at Township Hall and with the amount due for review/inspection fees.
E. Please display your approved permits in a prominent location visible from the street.
REQUIRED DOCUMENTS The following lists all documents required for a complete submittal of a building permit application.
Failure to submit all required documents WILL DELAY processing your application.
1. Completed Village of Lake Orion Zoning Compliance Permit Application. (Must be signed by Property Owner)
2. Proof of Ownership of Property. (Required if different than current Tax Roll)
3. Detailed plot plan. (Two (2) copies of a plot plan or survey showing dimensions of the lot, existing structures, proposed structures, dimensions of all structures from the property lines and water’s edge, streets, drives, sidewalks, bodies of water and easements.)
4. Village fees for zoning compliance review.
5. Completed Orion Township Building Permit Application.
6. Detailed construction plans. (Three (3) copies for Residential – Four (4) copies for Non-residential)
7. Copy of Oakland County Soil Erosion Permit or Letter of Exemption. (if applicable)
8. Valid contractor license. (if applicable)
9. Digital copies of all documents. (For any documents larger than 11 in. x 17 in.)
Village of Lake Orion 21 E. Church Street Lake Orion, Michigan 48362 Tel 248.693.8391 Fax 248.693.5874 www.lakeorion.org
Page 2 of 2
REVIEW TIME AND WHERE TO OBTAIN APPLICATIONS The time required for Village of Lake Orion and Orion Township to review building permit applications varies depending upon the number of applications received prior to your submission. Be sure to provide sufficient information and allow sufficient time for review. The Village Zoning Ordinance and all Village permit application packets are available at the Village of Lake Orion office Monday through Friday from 9:00am to 4:30pm. They are also available online at www.lakeorion.org.
It is highly recommended that you review your project with the Village Planning and Zoning Department prior to submittal. Please contact the Village Zoning Coordinator with any questions at
(248) 693-8391 extension 107.
Village of Lake Orion 21 E. Church Street Lake Orion, Michigan 48362 Tel 248.693.8391 Fax 248.693.5874 www.lakeorion.org
PERMITS REQUIRED FOR YOUR CONSTRUCTION PROJECT
All construction projects located in the Village of Lake Orion must obtain a permit prior to beginning
construction. The type and number of permits you will need depends on the type of construction you will be performing. Please review the description of permits below to determine which permit you must apply for.
Village Zoning Compliance Permits are required for all new buildings or structures, including work that is exempt from
the requirements of the Construction Code. Projects that do not require a building permit listed belowstill require a Zoning Compliance Permit. Such projects include residential sheds that are less than 200 sq. ft. and under 10’ tall, above ground swimming pools over 24” deep, or accessory mechanical units.
Residential Building Permits are required for new residential construction or when any type of structural work is done on a dwelling/residence, constructing decks, swimming pools, additions, garages, detached sheds or structures over 200 sq. ft., foundation repairs, enlarging of the existing doors or windows, adding or changing interior walls, finishing interior attic or basement space. A building permit is NOT required for adding or changing the exterior siding or replacing roof shingles, up to two (2) layers. However, repairing a roof, including replacing plywood sheeting, does require a permit.
Commercial Building Permits are typically required for all interior and exterior projects. Please review requirements with the Village Planning and Zoning Department. New businesses must submit a Change of Use / Occupancy form to the Village Office prior to applying for a building permit and may be subject to further review requirements.
Soil Erosion Permits. Any construction project that is within 500 feet of the water’s edge of a lake or stream and/or disturbs one (1) or more acres of land must apply for a Soil Erosion Permit from the Oakland County Water Resources Commissioner. An approved permit or a Letter of Determination from Oakland County stating that a soil erosion permit is not necessary MUST be submitted for any project within 500 feet of the water’s edge that disturbs greater than 220 square feet of soil. The Village of Lake Orion will not accept a building permit application without one of these documents. Contact the Oakland County Water Resources Commissioner for instructions on how to fill out the application at 248-858-5389.
Sign or Fence Permits. The erection of any new fence or wall requires a Village fence permit. The repair or replacement of a section of an existing fence does not require permit provided the type of material, height or location does not change. Any change in material, height or location requires a Village fence permit. Erecting or replacing any sign will require a Village sign permit and a Township building permit. All applications for permits must be submitted to the Village for processing.
Electrical, Mechanical and Plumbing Permits. Any electrical, mechanical or plumbing construction that is NOT part of a structural construction project may obtain permits directly from Orion Township. If structural work is being performed a building permit must be obtained BEFORE going to Orion Township for electrical, mechanical or plumbing permits. Contact Orion Township Building Department for the list of the currently enforced construction codes. Applications may be obtained directly from the Orion Township Building Department website.
The Village Zoning Ordinance and all Village permit application packets are available at the Village of Lake Orion office Monday through Friday from 9:00am to 4:30pm. They are also available online at www.lakeorion.org.
It is highly recommended that you review your project with the Village Planning and Zoning Department prior to submittal. Please contact the Village Zoning Coordinator with any questions at
(248) 693-8391 extension 107.
Village of Lake Orion 21 E. Church Street Lake Orion, Michigan 48362 Tel 248.693.8391 Fax 248.693.5874 www.lakeorion.org
TO BE COMPLETED BY VILLAGE STAFF: Date Received: Fee: Receipt #: Rev 7/19/2016
ZONING COMPLIANCE PERMIT APPLICATION PROPERTY INFORMATION
Site Address: _________________________________________________________________
Parcel ID # (Refer to Tax Bill): _______________________________________ Zoning District: _____________________ OWNER INFORMATION
Property Owner Name: ________________________________ Address: __________________________________________
Property Owner Phone #: ____________________________ E-Mail: ______________________________________________
APPLICANT INFORMATION (If applicant is NOT property owner)
Applicant Name: ___________________________________ Address: ____________________________________________
Applicant Phone #: _________________________________ E-Mail: _____________________________________________
Applicant is: (i.e. contractor or business owner or architect, etc.) _________________________________________________ PROJECT DESCRIPTION
Describe Proposed Project: ______________________________________________________________________________ (i.e. New Residence, Addition, Detached Garage, Deck, Shed, Pool, Roof, Foundation Repair, etc.)
PLEASE REFER TO THE VILLAGE ZONING ORDINANCE TO ENSURE YOUR PROPOSED PROJECT IS IN COMPLIANCE WITH ALL APPLICABLE REQUIREMENTS AND REGULATIONS.
ADDITIONAL REQUIRED INFORMATION
1) Plot Plan: A dimensioned or scaled plan containing, at a minimum, the following information is required:
Dimensions of Lot
Dimension of Existing and Proposed Structures (all structures 8” above grade)
Proposed Structures Distance from Adjacent Property Lines (Include Waters Edge if applicable)
Streets, Sidewalks, Driveways and Bodies of Water 2) Additional Permits May Be Required: Your project may require additional permits for soil erosion by the Oakland County
Water Resources Commissioner or for structural, mechanical, electrical or plumbing work from Orion Township. Please refer to the Building Permit Instructions sheet in your packet to determine what you may need.
I, the undersigned, depose that the foregoing statements and drawings are true and correct to the best of my knowledge. I, the undersigned, hereby authorize the Village of Lake Orion or designated representative to enter the subject property in connection with this application, if necessary; Signature of Property Owner: _________________________________________________ Date: _____________________ Signature of Applicant/Contractor: _____________________________________________ Date: _____________________
Village of Lake Orion: Zoning Compliance Permit Page 2 of 2
**VILLAGE STAFF USE ONLY - DO NOT WRITE BELOW **
Village of Lake Orion Building Permit / Zoning Compliance Permit Worksheet Reviewed by: __________________ Date: __________________ Parcel #: __________________
Proof of Ownership Verified using: ___________________________________ Owner Signature(s): Yes / No
# Building Plan Copies Included: ______ # of Plot Plan Copies Included _____ Cost of Improvement $:_____________
Lot Dimensions: ________x ________ Area Sq. Ft. __________________ Lot Shape: __________________
Is Subject Property Adjacent to Different Zoning Districts? Yes / No If Yes, explain: __________________
Applicable? Existing: Proposed: Regulations: Compliant: Maximum Lot Coverage ________ ________ __________ Yes / No Height of Structure ________ ________ __________ Yes / No Front (street) Yard Setback N/A ________ ________ __________ Yes / No Water Front Setback N/A ________ ________ __________ Yes / No Rear Yard Setback N/A ________ ________ __________ Yes / No One Side Yard Setback N/A ________ ________ __________ Yes / No Other Side Yard Setback N/A ________ ________ __________ Yes / No Side Street Yard Setback N/A ________ ________ __________ Yes / No Corner Lot Visibility - Unobstructed triangular as formed by the street property lines at a line connecting them at points 25 feet from the intersection of the street lines. Yes / No N/A Driveway Visibility - Unobstructed area formed by the street lot line, the edge of the driveway and a line connecting them at points ten (10) feet from their intersection. Yes / No N/A FOR RV Districts: Established Front Setback Setback A ________ + Setback B ________ = ________ ÷ 2 = _______ EFS
FOR COMMERCIAL PROPERTY: Has it had Prior Site Plan Approval? Yes / No If yes, date: __________________
Has Property had prior BZA approvals? Yes / No If yes, date & result ______________________________Water Tap:
Easements: _____________________________________ Topographical Remarks: ______________________________
Existing / New / Disconnect / N/A Sewer Tap: Existing / New / Disconnect / N/A
If Disconnecting Water or Sewer, please circle one: Temporary Permanent
Existing Structures Conforming: Yes / No N/A Proposed Structure Conforming: Yes / No N/A
If Structural Alterations to a Non-Conforming Structure:
TCV of Building Only $ _________
Divide by 2 = $ _________ (permitted improvement amount)
Amount of Proposed Improvement $ _________
Difference $ _________ (over / under permitted amount)
Does the Application meet the Regulations of the Ordinance? Yes / No
Building Permit Required? Yes/ No SESC Permit or Exemption Attached? Yes / No N/A
Staked Survey or Additional Information Required: ____________________________________________________
Approval by: Zoning Administrator BZA PC VC Remarks: ____________________________________________________________________________________________