    HOW TO ACTIVATE MRP FOR MATERIALS

    1. SAP Support: Set up MRP Master Data & Activate

    a. Define MRP Controller(s)

    i. IMG -> Materials Management -> Consumption-Based Planning -> Master Data ->Define MRP Controllers

    ii. Double-click on desired plant

    iii. Update details as applicable & SAVE

  • 8/8/2019 How to activate MRP for materials

    2/11

    b. Check MRP Types

    i. IMG -> Materials Management -> Consumption-Based Planning -> Master Data ->Check MRP Types

    ii. Review MRP types that are applicable to current business processes

    iii. In V1 manual reorder point with external requirements:

  • 8/8/2019 How to activate MRP for materials

    3/11

    1. The indicator Include ext. rqmts.

    2. blank will ensure MRP does not take any reservations, etc., into accountduring execution

    3. 1 will look at reservations, etc., that have a requirement date within thetotal horizon (ie no end date)

    4. 2 will only look at reservations, etc., that have a requirement date duringthe replenishment lead time (ie procurement processing time + planneddelivery time + GR processing time)

    iv. In VB manual reorder point planning:

    1. The indicator Include ext. rqmts is set to blank to show External reqmtsare not taken into account

  • 8/8/2019 How to activate MRP for materials

    4/11

    2. MRP will generate requirements only up to the max stock level when thistype is used in the material masters

    c. IMG -> Materials Management -> Consumption-Based Planning -> Planning -> ActivateMaterials Requirements Planning

    i. MRP

    1. Select Materials Requirement Planning

  • 8/8/2019 How to activate MRP for materials

    5/11

    2. Set check mark for plants requiring MRP activation and SAVE

    ii. Planning Files

    1. Select Set up planning file

    2. Create variant for impacted plant & SAVE

  • 8/8/2019 How to activate MRP for materials

    6/11

    3. Execute planning file run

    a. Select variant

    b. Click Start immediately

    4. Display results by selecting Display Scheulding

    a. Select desired run & click Log for further details

    b. Review results

  • 8/8/2019 How to activate MRP for materials

    7/11

    d. IMG -> Materials Management -> Consumption-Based Planning -> Planning -> DefineScope of Planning for Total Planning

    i. Create Planning Scope

    ii. Add sequence of plants/MRP areas to scope and SAVE

    e. Define Planning Horizon

  • 8/8/2019 How to activate MRP for materials

    8/11

    i. Set planning horizon for each impacted plant

    ii. Default planning horizonis 100 days

    iii. Planning horizon definition: the length of time in days that the system will reviewto determine if there is any requirement for a material

    f. Skldfjg. Sdkfj

    h. Sskldjf

    i. Skldjf[

    j. skldfj

    2. SAP Support: Ensure specific material type is set up for MRP

    a. IMG -> Logistics-General -> Material Master -> Basic Settings -> Material Types -> DefineAttributes of Material Types

  • 8/8/2019 How to activate MRP for materials

    9/11

    b. Double-click on desired material type

    c. Select User department / MRP

    d. SAVE changes

  • 8/8/2019 How to activate MRP for materials

    10/11

    3. Ensure material master records have MRP tabs created:

    a. Sdkfj

    b. Should be able to use LSMW to extend existing material records to include MRP and GenPlant Data / Storage tabs

    c. Sdlkfj

    4. Determine desired MRP-relevant data

    a. MRP Profile (if applicable)

    b. MRP Type - key that determines whether and how the material is planned (ie manual reorder point, autoreorder point, forecast-based, etc)

  • 8/8/2019 How to activate MRP for materials

    11/11

    c. Reorder point - if stock falls below this point, a PR will be generated to replenish stock

    d. MRP Controller - The person responsible for a group of materials in MRP in a plant or company (Can begeneric "Ops MRP Controller" or can be associated w/ a specific person/group)

    e. Lot Size - setting that indicates how the system will calculate the quantity to be procured or produced(usually set to "HB" = replenish to max stock level)

    f. Min Lot Size - (optional) indicates minimum amount of stock to be procured at a time

    g. Max Lot Size - (optional) indicates max amount of stock to be procured at a time

    h. Max Stock Level - max amount of stock to be maintained automatically through MRPi. Planned Delivery Time - (optional) indicates how long the material generally takes to bedelivered; can be useful for items that require a long lead time

    j. Availability Check - usually set to "01" = Daily Requirements

    k. Sldkfj

    l. Sdlfjk

    m. Sdfljk

    5. Update data in material records

    a. Single record update

    i. MM01 enter material # to extend, select new tabs to create, enter applicabledata

    b. Mass record updatei. MM17 provides ability to update fields as long as the record has been extended

    with the appropriate tabs (ie MRP 1-4 tabs)

    ii. LSMW can be used to create new records / tabs & load applicable data

    c. kdfj

    6. askdjf

    7. aslodkfj