How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction...
Transcript of How much are unnecessary RFIs costing you? · Source: Impact & Control of RFIs on Construction...
How much are unnecessary RFIs costing you?
You could save over $30,000 per year on admin costs with ARC linked Mobile Project Dashboards
Hyp
erlinking
LOG NUMBER DESCRIPTION STATUS
00001 First Floor Mens and Womens Restroom Paint Color Closed
00002 Basement Structural Beam Measurement Changes Closed
00003 Building F 4th Floor Patio Floor and Decking Closed
00004 Floor Joist Gauge and Bearing Studs Closed
00005 Building H Tube Steel Columns below TOC @ SOG Closed
00006 Building H Concrete Stem Wall Closed
00007 Building H Patio SOMD Beams Closed
00008 Slab Dowels at Shear Walls Closed
00009 Building M Roof Mechanical Pads Closed
00010 Site Plumbing Subsurface Drainage Detail Closed
00011 Metal Deck at Roof Penthouses Closed
00012 Condiment Dispenser Closed
00013 Food Service Equipment with Casters and Stoveshoes Closed
RFI Log Sheet
UNION PLAZA240 0 Bedford Ave., Dallas, TX 7520 2
AS-BUILT
How much are unnecessary RFIs costing you?Saving as much as 2 hours daily, saves you over $30,000 in labor costs over the lifetime of the project!
Our discrepancy log will identify design and construction issues in the plan set, driving down the need
for RFIs later in the project.
Hyperlinking
Discrepancy logs find
errors in design and
construction documents
Identify issues earlier in
the project to reduce
the number of RFIs
Mobile Project
Dashboards increase
efficiency, saving 60-70
hours of review time
Mitigate your risk with ARC HyperlinkingFree up time to pre-plan and detect
issues early. Reduce risk and increase
compliance, while meeting project budget
and deadlines
Source: Impact & Control of RFIs on Construction Projects,
Navigant Construction Forum
$1,080AVG TOTAL COSTPER RFI REVIEW
& RESPONSE 9.7MEDIAN DAYS
FOR RFI RESPONSE
PERCENTAGE OF RFIs WITH NO
RESPONSE
21.9%
Eliminate delays by digitizing & linking all your project documents• ARC helps thousands of customers
save weeks on construction projects
by digitally linking useful information
like project plans, specifications, RFIs,
ASIs, As-Builts, bulletins, and critical
closeout project documentation
• Accessing these documents through
a powerful, yet user-friendly Mobile
Project Dashboard helps you access
the project information in seconds;
anywhere, anytime
Document Management
Hyperlinking Process
Dashboards
Deliverable
How it's doneThe simple stages to hyperlinking success!
1.2.3.4.
Complete file and document audit
Auto-hyperlink and correct files
Custom project dashboard created
Files uploaded to cloud
Hyperlinking
Mitigate risks
Reduce RFIs neededMake your project more compliant
Identify errors & omissions in a set
of plans
HYPE-PO-0618-01
To find out more about ARC linked Mobile Project Dashboardscall us today 855 500 0660
Copyright © ARC Document Solutions, LLC 2018.ARC, ARC Document Solutions and the ARC logo are registered trademarksof ARC Document Solutions, LLC in the U.S. and/or other countries.
e-arc.com