How it works the Kanban ? The definitive slideshow to understand how it works the Kanban Method Example 1 – Point of Use / Warehouse

Transcript of How it works Kanban - The definitive slideshow! - LeanLab

Page 1: How it works Kanban - The definitive slideshow! - LeanLab

How it works the Kanban ?

The definitive slideshow to understand how it works theKanban Method

Example 1 – Point of Use / Warehouse

Page 2: How it works Kanban - The definitive slideshow! - LeanLab

What you need prior to start ? (therotical aspects)

Why Use Kanban ?

Theory of Kanban

How to calculate the right number of Kanban

Visit

www.leanlab.name

Page 3: How it works Kanban - The definitive slideshow! - LeanLab

What you need prior to start ?

Define the Point of Use

A place to put Kanban

The right number of Kanban

A runner/collector of Kanban

Page 4: How it works Kanban - The definitive slideshow! - LeanLab

Real Example

A point of use (POU) needs balls in 6 pcs / boxes

Consumption is 18 balls / day

The runner pass every day at 10:00 am

The Lead Time to recieve from warehouse = 2 days

Safety Stock fixed at 20%

This means => 8 Kanban Cards in WIP

Page 5: How it works Kanban - The definitive slideshow! - LeanLab

Monday 8:00 AM – Start Work

POU

Warehouse

Page 6: How it works Kanban - The definitive slideshow! - LeanLab

Monday 8:00 AM – Start Work

POU

Warehouse

Kanban Container is Empty

Page 7: How it works Kanban - The definitive slideshow! - LeanLab

Monday 8:15 AM

POU

Warehouse

Page 8: How it works Kanban - The definitive slideshow! - LeanLab

Monday 8:15 AM

POU

Warehouse

First box of ballsis open for use

Page 9: How it works Kanban - The definitive slideshow! - LeanLab

Monday 8:17 AM

POU

Warehouse

First box of ballsIs open for use

Kanban is located in the collection

point

Page 10: How it works Kanban - The definitive slideshow! - LeanLab

Monday 9:00 AM

POU

Warehouse

Page 11: How it works Kanban - The definitive slideshow! - LeanLab

Monday 10:00 AM

POU

Warehouse

Page 12: How it works Kanban - The definitive slideshow! - LeanLab

Monday 10:00 AM

POU

Warehouse

The collector arrives

Page 13: How it works Kanban - The definitive slideshow! - LeanLab

Monday 10:15 AM

POU

Warehouse

Bring the Kanban to the Warehouse

Page 14: How it works Kanban - The definitive slideshow! - LeanLab

Monday 11:00 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 15: How it works Kanban - The definitive slideshow! - LeanLab

Monday 11:01 AM

POU

Warehouse

1st box is finished

In Process – Recieved Monday

at 10.15 AM

Page 16: How it works Kanban - The definitive slideshow! - LeanLab

Monday 11:05 AM

POU

Warehouse

2nd box is opened

Kanbanmoved

In Process – Recieved Monday

at 10.15 AM

Page 17: How it works Kanban - The definitive slideshow! - LeanLab

Monday 12:00 PM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 18: How it works Kanban - The definitive slideshow! - LeanLab

Monday 12:00 PM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 19: How it works Kanban - The definitive slideshow! - LeanLab

Monday 14:00 PM

POU

Warehouse

2nd box is finished

In Process – Recieved Monday

at 10.15 AM

Page 20: How it works Kanban - The definitive slideshow! - LeanLab

Monday 14:00 PM

POU

Warehouse

3rd box is opened

Kanban Moved

In Process – Recieved Monday

at 10.15 AM

Page 21: How it works Kanban - The definitive slideshow! - LeanLab

Monday 14:15 PM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 22: How it works Kanban - The definitive slideshow! - LeanLab

Monday 17:00 PM – End of Work

POU

Warehouse

3rd box isfinished

In Process – Recieved Monday

at 10.15 AM

Page 23: How it works Kanban - The definitive slideshow! - LeanLab

Tueday 8:00 AM – Start Work

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 24: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 8:15 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 25: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 9:00 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 26: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 10:00 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

The collector arrives

Page 27: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 10:15 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Bring Kanban to Warehouse

Page 28: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 10:30 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 29: How it works Kanban - The definitive slideshow! - LeanLab

Tuesday 17:00 PM – End of Work

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 30: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 8:00 AM – Start of Work

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 31: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 8:15 AM

POU

Warehouse

In Process – Recieved Monday

at 10.15 AM

Page 32: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 8:30 AM

POU

Warehouse

Stick Kanban on the box

Page 33: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 8:45 AM

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

Page 34: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 9:30 AM

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

Page 35: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 10:00 AM

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

The collector arrives

Page 36: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 10:15 AM

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

Bring Kanban to the Warehouse

Page 37: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 17:00 PM – End of Work

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

Empty in the POU – a warning to

warehouse is given

Page 38: How it works Kanban - The definitive slideshow! - LeanLab

Wednesday 17:00 PM – End of Work

POU

Warehouse

In Process – Recieved

Tuesday at 10.15 AM

EMPTY is always a Visual Warning

Page 39: How it works Kanban - The definitive slideshow! - LeanLab

Thursday 8:00 AM – Start of Work

POU

Warehouse

Because of warning the material in in POU

at 8:00 AM

Page 40: How it works Kanban - The definitive slideshow! - LeanLab

Thursday 8:15 AM

POU

Warehouse

Page 41: How it works Kanban - The definitive slideshow! - LeanLab

Thursday 8:30 AM

POU

Warehouse

Page 42: How it works Kanban - The definitive slideshow! - LeanLab

Thursday 10:00 AM

POU

Warehouse

The collector arrives

Page 43: How it works Kanban - The definitive slideshow! - LeanLab

Thursday 17:00 PM – End of Work

POU

Warehouse

Page 44: How it works Kanban - The definitive slideshow! - LeanLab

Friday 8:00 AM – Start of Work

POU

Warehouse

Page 45: How it works Kanban - The definitive slideshow! - LeanLab

Friday 17:00 PM – End of Work

POU

Warehouse

Next Week the same cycle ...

Page 46: How it works Kanban - The definitive slideshow! - LeanLab

Some Considerations

The WIP is under control (48 balls in 8 boxes)

Is the system too risky of stock-out in the POU and why? Looking carefully at the lead time, if the collector comes at 10.00 AM, the POU start at 8.00 AM and the warehouse brings the boxes at 9.00 AM the lead time to consider is not 2 days but 2 days and 3 hours.

In this case the correct lead time to use is round 2.5 days and the kanban system need is:

9 Kanban Cards rather than 8 Kanban Cards

Page 47: How it works Kanban - The definitive slideshow! - LeanLab

Some Considerations

At the beginning of Kanban Implemetation starts with a safe number of kanban cards and then reduced it when the system will be stable and reliable.