Transcript of How I Improve and Manage a Production Area
1
The short version with some examples
How I Quickly Improve and Manage A Production Area
Stephen Sikorski 2015
2Stephen Sikorski 2015
It has occurred to me that most of the times in my career that I have been given the added responsibility of another department to run, a pattern existed between those departments I would be given :
• The demand on the area far exceeded the current processes capabilities.
• The effectiveness & efficiency of the area were seriously in question.
• There were no measurement metrics in place.• Very few people understood the process despite the
process being well documented.• Change needed to come very very quickly. (Usually a matter
of weeks)
The following lays out the steps that I have taken a few times over in order to quickly succeed in managing a new department.
3Stephen Sikorski 2015
Step 1: Create a current state value stream map (If you are not sure how, I suggest reading the book Learning to See by Mike Rother and John Shook the book is very short yet very informative)
Example not actual
4Stephen Sikorski 2015
Step 2: Identify the area bottleneck(s) (constraint)• If it is not apparent from the current state map use the following:
Service or Product A B C D#1 0.5 0.6 2.0 1.5#2 2.0 0.0 3.0 4.0#3 0.0 3.0 4.0 2.0
Demand for week 1#1 20 10 12 40 30#2 15 30 0 45 60#3 25 0 75 100 50
Total Hours Reqd: 40 87 185 140Capacity Hours Available/Wk 40 80 160 160
Demand for week 2#1 30 15 18 60 45#2 30 60 0 90 120#3 0 0 0 0 0
Total Hours Reqd: 75 18 150 165Capacity Hours Available/Wk 40 80 160 160
(Requirements are hours per unit)Resources:
Calculated resources required (week)
Calculated resources required (week)
Create a constraint map in excel using the cycle time data collected from the value stream map.
Example not actual
5Stephen Sikorski 2015
Step 3: Address the constraints (For repeat bottlenecks Implement OEE and perform SMED)
To implement OEE
I. Brainstorm with equipment operator and maintenance personnel all of the reasons the equipment may stop.
II. Create the excel sheets on the following pages.
6Stephen Sikorski 2015
OEE Entry Sheet Machine: # Operator:
DatePart/Item NumberRun/Batch/
Lot Number
Start Time
End Time
Run Quantity
RejectsTotal Run
Time (min)
Stop Time
End Stop Time
Stopagge Reason
Total Stop Time (min)
0 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0
Operating Down
III. Have equipment operator begin filling in the form you made. (Make sure this excel sheet auto fills to and from the excel sheets on the following pages). Watch the left side of this page for variation in run times and the right side for variation in and types of stoppages.
7Stephen Sikorski 2015
Number Reason DateSum of
Operating Time (min)
Planned Production Time (min)
Down Time
Actual Down Time
A 0 0 0BCDEFG HI Categories Time(mins) PercentageJ Total Operational Time 0 #DIV/0!K Total Stoppage 0 #DIV/0!L 0 #DIV/0!M 0 #DIV/0!N 0 #DIV/0!O 0 #DIV/0!P 0 #DIV/0!Q 0 #DIV/0!
IV. This excel sheet should feed into and from the excel sheet and chart on the following pages.
8Stephen Sikorski 2015
Shift Length Hours = 0 MinutesShort Breaks Breaks @ 10 Minutes Each = 0 Minutes TotalLunch Break Breaks @ 30 Minutes Each = 0 Minutes TotalDown Time MinutesIdeal Run Rate PPM (Parts Per Minute)Total Parts 0 PartsReject Parts 0 Parts
Variables Calculation Result
Planned Production Time Shift Length - Breaks 10 MinutesOperating Time Planned Production Time - Down Time 0 MinutesGood Parts Total Parts - Reject Parts 0 Parts
Factors Calculation My OEE%Availability Operating Time / Planned Production TimePerformance (Total Parts / Operation Time) / Ideal Run RateQuality Good Parts / Total PartsOverall OEE Availability x Performance x Quality
SHIFT REPORT
V. This is the third OEE excel sheet (which tells your actual OEE)
9Stephen Sikorski 2015
VI. Address the top 80% of your stoppage drain. (This auto fills from your second excel sheet)
Total
Planned
Production
Total
Stoppag
e
Change
Blade
Sensor c
alibrati
on
Hair ali
gnmen
t
Blade d
ressin
g
Chuck Chan
ge
New Pro
gram
progra
m adjust
Maintan
ance
Change
Filter
s
meeting
Other
Lunch / Brea
k
Exmain
ed 1st
array
Warm Up
Vacuum Lo
ss
Tape C
hange
paper
work
packing &
clock
off
Strain
er cle
an0
100
200
300
400
500
0.00%20.00%
40.00%60.00%
80.00%100.00%
120.00%100.00%
27.21%
8.55%2.56%11.11%10.26%
0.00%0.00%
67.52%
0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00% 0.00% 0.00%
0.00%
Total Planned Production Time, Total Stoppage Time, and Subcategories of Stoppage Time
Time(mins)Percentage
Categories
min
s
Example not actual
10Stephen Sikorski 2015
SMED SETUP REDUCTION OBSERVATION FORM Stephen Sikorski
Dept. Required Setup Tools: Standard Setup Time :MachineOperrator
Actual Time Target TimeNo Task (P) (R) (L) (A) Internal External Improvement Internal External
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
( P)- Preperation- Actions performed to support the change over.( R)- Replacment -This includes mounting, replacing, securing, attaching tools or parts.( L)- Locating- Calibrations, measurments, setting, aligning.( A)- Adjusting- Actions repeted in order to attain correct machine setting.
VII. You will most likely have to perform a SMED (single minute exchange of dies) in order to get your changeovers under control
11Stephen Sikorski 2015
VIII. Use the daily pareto chart as an operator level metric. (Teach the constraint operator to identify variations in the data as he/she fills in the form and report them immediately).
IX. Congratulate and reward the operator we he/she has very low stoppage time and when he/she stops and points out variations.
12Stephen Sikorski 2015
Step 4: Create department level metricsI prefer the following formulas when creating my metrics:
[%]Where:T/T – takt time of the value stream
C/T – cycle time of the process
Passive Waste (Muri) metric shows the potential overload and underutilization of employees and equipment.
[%]
Where:
NVA – non-value added activity time
C/T – cycle time of a process
Shows (Muda) the percentage of non-value added activities being performed.
13Stephen Sikorski 2015
[%]Where:
A/T - daily available time
S/T - standard available time
Shows (Muri) actual over and underutilization of employees or equipment. I generally use this as a check of the OEE data.
𝜎𝑤𝑜𝑟𝑘𝑙𝑜𝑎𝑑𝑥𝑤𝑜𝑟𝑙𝑜𝑎𝑑 [% ]
Where: deviation in operators cycle times within the value stream
average operators cycle time within the value stream
Passive Waste (Mura) metric shows the variation in workload between operators in a single process or a value stream.
department level metrics
14Stephen Sikorski 2015
[%]
Where:
A/T – available time
DL – direct labor time
Shows the percent of time wasted on non-production activities.
𝑫𝑳−𝑺 /𝑻𝑫𝑳 [% ]
Where:
S/T – standard time
DL – direct labor time
Shows the percentage of time wasted due to poor efficiency of either man or machine.
department level metrics
15Stephen Sikorski 2015
[%]
Where:
SWIP – standard inventory in a process
WIP – actual inventory in a process
Shows how efficiently materials flow through a process.
[%]
Where:
R/T – time spent on rework
A/T – available time
Shows the percentage of time wasted on rework.
department level metrics
16Stephen Sikorski 2015
Step 5: Implement an Appropriate Response Plan.
Such as: DMAIC or PDCA To be used for:
• Response to reject• Response to variation in data• Removal of non-value added time• Removal of Muda, Mura, and Muri waste