7/30/2019 horz & ver
1/18
Road and Bridge design
1. INTRODUCTION
For rapid economic, industrial and cultural growth of any country, agood system of transportation is very essential. One of thetransportation systems that is economical for developing countries like
Ethiopia, is road. A well designed road network plays an importantroll in transporting people and other industrial products to anydirection with in short time. Roads, to satisfy their intended purpose,must be constructed to be safe, easy, and economical environmentallyfriendly and must full fill the needs of inhabitants. Being safe, thenumber of accidents that can occur will be minimized. Easinessdecreases operation cost, pollution and even time cost. Economicalroads assure their feasibility according to their plans and initiatefurther construction of roads; environmentally friendly roads avoidexcessive and unnecessary deforestation, agricultural land usage andpollution from high gradients. Schemes that do not satisfy the needs of
localities may not get the maximum utilization of the surplus manpower that is really to exit in the rural community and also itseconomical value may also decrease.
Semester Project1
-
7/30/2019 horz & ver
2/18
Road and Bridge design
2.GEOMETIC DESIGN
High way geometric design involves the design of geometric elementsof a high way fixation of standards with respect to various components.
Its dictated with in economic limitations to satisfy the requirement oftraffic in designing elements such as, cross section, horizontalalignment, vertical alignment, sight distance, lateral and verticalalignment, intersections, etcThe safety, efficiency and economic operation of a high way isgoverned to a large extent by the care with which the geometricdesign is worked out.The engineer has to consider the following points when selecting thedesign standards.
o Volume and composition of traffic in the design year should
be the basis of design.
o Faulty geometrics are costly to rectify at a later date.o The design should be consistent and the standards used for
the different elements should be compatible with oneanother.
o The design should embrace all aspects of design including
signs, markings, lightings, etco The road should be considered as an element of the total
environment and ats location and design should enhancerather than degrade the environment.
o The design should minimize the total transportation cost.
o Safety should be built in the design.
o The design should be enable all road users to use the facility
Semester Project2
-
7/30/2019 horz & ver
3/18
Road and Bridge design
3.HORIZONTAL ALIGNMENT
3.1.Details of the first horizontal curve
Available informationsDesign standard -Ds4Terrain classification flatFrom table 2-6 of ERA design manualSpeed = 85Km/hTransition curve is requiredMaximum supper elevation 8%
Rmin = VD2/(127(e+f)) =852/127(0.08+0.14) = 270m
3.1.1 Calculations of the horizontal curve setting out
information
1) Length of transtionLt= V3/(cR) = 853/(3.63*0.3*270) = 146.25m
C is radial acceleration and taken as 0.3m/s3
2) shift distance (s)S = Lt2/24R =3.3m
3) Tangent length
T= Lt/2 +(R+S) tan/2 =180.78m =43deg.
4) from the plan chianage of PI = 11+186.425) Station of TS = station of PI-T
= 11+186.42-180.78=11+005.64
o
CS
SC
=430
ch.TS =11+005.64 ch. PI = 11+186.42
Semester Project3
-
7/30/2019 horz & ver
4/18
Road and Bridge design
6) station of SC =ch.TS +Lt= 11+151.89m
offset calculation table for the first transtion curve of first
curve
deflection angle = 430
transtion curve length =146.25m
ch.TS =11+005.64m
ch.SC=11+151.89m
offset distance from the tangent to the curve is calculated as y=X3/(6RLt)where:
Y is offset distanceX is distance measured along the tangentLt is length of transition
R is the radius of the curve
Station X(m) Y(m)
TS 11+005.64 0.00 0.00
11+020 14.36 0.012
11+040 34.36 0.171
11+060 54.36 0.678
11+080 74.36 1.735
11+100 94.36 3.546
11+120 114.36 6.313
11+140 134.36 10.238
11+151.89 146.25 13.203
Offset calculation for the circular curve of the first curve
Semester Project4
-
7/30/2019 horz & ver
5/18
Road and Bridge design
Offset distancefrom long chord
-2
the angle subtended by the circular curve is -2but
=Lt/2R=1503131
-2= 1105658 length of the circular curve l=R(-2)/180
=56.3m
station of CS=Station of Sc+ l(curve length) = 11+151.89+56.3=11+208.19
station of ST = station of CS +Lt =11+208.19+146.25= 11+354.44
Half of the circular curve length = 56.3/2 =28.15
The chianage of the mid point of the curve= ch.SC+L/2 = 11+382.89
o Let l distance measured along the curve from N
o - angle subtended by lo X distance measured along long chord from E
o Y offset distance from long chord to cuve points
Semester Project5
-
7/30/2019 horz & ver
6/18
Road and Bridge design
From these formulae l = R/180 and X= 180l/R = Rsin
EN- offset distance = ON-OE = since ON =R=R-OE
R(1-cos(-2/2)But Y=(R2-X2) - OE
=(R2-X2) - R cos(-2)/2According to these formulas we have the following tables showingoffset distance from long chord.
Offset to the left of N
Chord length from SC to CS = 2Rsin (-2)/2)= 2*270 *sin(-2)/2)= 56m
L/2=28m
Curve lengthFrom N
I subtended byli(in deg.)
=180li/R
Xi= Rsin Offset from the longchord to curve points
Yi=(R2-X2)-Rcos(-2)/2)
2.59 003259.6 2.59 1.45
7.59 103641 7.59 1.36
12.59 204023 12.59 1.17
17.59 304405 17.58 0.89
22.59 40
4746 22.57 0.5228.0 505641 27.96 0.00
Offset to the right of N
Curve lengthFrom N
I subtended byli(in deg.)
=180li/R
Xi= Rsin Offset from the longchord to curve points
Yi=(R2-X2)-Rcos(-2)/2)
2.41 003042 2.41 1.46
7.41 10
3424 7.41 1.3612.41 203805 12.41 1.18
17.41 304147 17.40 0.90
22.41 404529 22.39 0.54
28.0 505641 27.96 0.00
Semester Project6
-
7/30/2019 horz & ver
7/18
Road and Bridge design
Offset calculation for the exit transtion curve of firstcurve
Station X(m) Y(m)
TS 11+354.44 0.00 0.00
11+340 14.44 0.013
11+320 34.44 0.172
11+300 54.44 0.681
11+280 74.44 1.741
11+260 94.44 3.555
11+240 114.44 6.326
11+220 134.44 10.256
11+208.19 146.25 13.203
3.1.2. Designing of widening on the curve
Design standard Ds4
terrian classifcation flat design speed 85Km/h R=270 km
Since R is > 195m no widening is required.
3.1.3.Design of supperelevation
Semester Project7
-
7/30/2019 horz & ver
8/18
Road and Bridge design
From table 8-1 of ERA manual e= 0.08B=6.7m (width of the road)Lt=146.25mE=e*B = 0.536
Raising of pavement due to super elevation
0.08 m/m (6.7m) =0.536m
Assuming rotation of super elevation about the center, raising of outer edge involved
= 0.536/2
=0.268m EUsing 2.5% camber slope
0.025X(3.35) =0.08m 2.5%
Total raising at the center 3.35m
0.08m + 0.268m = 0.348m
supper elevation ratio =E/Lt =0.536/146.25=1/272
-
7/30/2019 horz & ver
9/18
Road and Bridge design
Available informationsDesign standard -Ds4Terrian classification flatFrom table 2-6 of ERA design manualSpeed = 85Km/h
Transtion curve is requuredMaximum supper elevation 8%
Rmin = VD2/(127(e+f)) =852/127(0.08+0.14) = 270m
3.2.1. Calculations of the horizontal cutve setting outinformations
3) Length of transtionLt= V3/(cR) = 853/(3.63*0.3*270) = 146.25m
C is radial acceleration and taken as 0.3m/s3
4) shift distance (s)S = Lt2/24R =3.3m
3) tangent length
T= Lt/2 +(R+S)tan/2 =186.33m =45deg.
7) from the plan chianage of PI = 11+7048) Station of TS = station of PI-T
= 11+704-186.33=11+517.67
o
CS
SC
=450
ch.TS =11+517.67 ch. PI = 11+704
9) station of SC =ch.TS +Lt= 11+663.92
Semester Project9
-
7/30/2019 horz & ver
10/18
Road and Bridge design
offset calculation table for the first transtion curve of firstcurve
deflection angle = 450
transtion curve length =146.25m
ch.TS =11+517.67m ch.SC=11+663.92m
offset distance from the tangent to the curve is calculated as y=X3/(6RLt)where:
Y is offset distanceX is distance measured along the tangentLt is length of transtionR is the radius of the curve
Station X(m) Y(m)
TS 11+517.67 0.00 0.00
11+520 2.33 0.001
11+540 22.33 0.047
11+560 42.33 0.32
11+580 62.33 1.022
11+600 82.33 2.355
11+620 102.33 4.523
11+640 122.33 7.727
11+660 142.33 12.690
11+663.92 146.25 13.203
Offset calculation for the circular curve of the first curve
Offset distancefrom long chord
Semester Project10
-
7/30/2019 horz & ver
11/18
Road and Bridge design
-2
the angle subtended by the circular curve is -2but
=Lt/2R=1503131-2= 1305657 length of the circular curve l=R(-2)/180
=65.7m
station of CS=Station of Sc+ l(curve length) = 11+663.92+65.7=11+729.62
station of ST = station of CS +Lt =11+729.92+146.25= 11+875.87
Half of the circular curve length = 65.7/2 =32.85
The chianage of the mid point of the curve= ch.SC+L/2 = 11+696.77
o Let l distance measured along the curve from N
o - angle subtended by lo X distance measured along long chord from E
o Y offset distance from long chord to cuve points
Semester Project11
-
7/30/2019 horz & ver
12/18
Road and Bridge design
From these formulae l = R/180 and X= 180l/R = Rsin
EN- offset distance = ON-OE = since ON =R=R-OE
=R(1-cos(-2/2)
But Y=(R2-X2) - OE=(R2-X2) - R cos(-2)/2
According to these formulas we have the following tables showingoffset distance from long chord.
Offset to the left of N
Chord length from SC to CS = 2Rsin (-2)/2)= 2*270 *sin(-2)/2)= 65.6m
L/2=32.8m
Curve lengthFrom N
I subtended byli(in deg.)
=180li/R
Xi= Rsin Offset from the longchord to curve points
Yi=(R2-X2)-Rcos(-2)/2)
1.77 002233 1.77 2.00
6.77 102615 6.77 1.91
11.77 202956 11.77 1.74
16.77 303338 16.77 1.48
21.77 403719 21.76 1.12
26.77 504101 26.74 0.67
31.77 604443 31.71 0.13
32.8 605750 32.74 0.00
Offset to the right of N
Curve lengthFrom N
I subtended byli(in deg.)
=180li/R
Xi= Rsin Offset from the longchord to curve points
Yi=(R2-X2)-Rcos(-2)/2)
3.23 004109 0.00 1.98
8.23 104450 3.23 1.87
12.23 203641 8.23 1.72
Semester Project12
-
7/30/2019 horz & ver
13/18
Road and Bridge design
17.23 303929 12.23 1.45
22.23 404311 22.22 1.08
27.23 504653 27.20 0.624
32.80 605750 32.74 0.00
Offset calculation for the exit transtion curve of secondcurve
Station X(m) Y(m)
TS 11+875.87 0.00 0.00
11+860 15.87 0.017
11+840 35.87 0.195
11+820 55.87 0.736
11+800 75.87 1.843
11+780 95.87 3.719
11+760 115.87 6.567
11+740 135.87 10.587
11+729.62 146.25 13.2
3.2.2. Designing of widening on the curve
Design standard Ds4
Semester Project13
-
7/30/2019 horz & ver
14/18
Road and Bridge design
terrian classifcation flat design speed 85Km/h R=270 km
Since R is > 195m no widening is required.
3.2.3.Design of supperelevation
From table 8-1 of ERA manual e= 0.08B=6.7m (width of the road)Lt=146.25mE=e*B = 0.536
Raising of pavement due to super elevation
0.08 m/m (6.7m) =0.536mAssuming rotation of super elevation about the center, raising of outer edge involved
= 0.536/2=0.268m E
Using 2.5% camber slope
0.025X(3.35) =0.08m 2.5%
Total raising at the center 3.35m
0.08m + 0.268m = 0.348m
supper elevation ratio =E/Lt =0.536/146.25=1/272
-
7/30/2019 horz & ver
15/18
Road and Bridge design
In road alignment, when two different or contrary gradient meet theyform curve in the vertical plane called vertical curve.
Vertical curve are classified as
Summit( crest) curveSag curves
The first vertical curve curve is a sag curve with -3.88% and -1.96%gradientThe second curve is a crest curve with -1.96% and -2.63% gradient.And the third curve is a sag curve with -2.63% and -1.24%.
4.1.GRADIENT CALCULATIONS
TO CALCULATE THE FIRST GRADIENT
elevation of the first point =2454.186elevation of the second point =2441horizontal distance b/n the two points = 340m
h = -13.186slope (gradient) = elevation difference/H.Dslope (gradient) g1 = -3.88%
TO CALCULATE THE SECOND GRADIENT
elevation of the first point =2441elevation of the second point =2430horizontal distance b/n the two points = 560m
h = -11slope (gradient) = elevation difference/H.Dslope (gradient) g2 = -1.96%
TO CALCULATE THE THIRD GRADIENT
elevation of the first point =2430elevation of the second point =2420
horizontal distance b/n the two points = 380mh = -10
slope (gradient) = elevation difference/H.Dslope (gradient) g3 = -2.63%
TO CALCULATE THE FOURTH GRADIENT
elevation of the first point =2420
Semester Project15
-
7/30/2019 horz & ver
16/18
Road and Bridge design
elevation of the second point =2417.276horizontal distance b/n the two points =220m
h = -10slope (gradient) = elevation difference/H.Dslope (gradient) g4 = -1.24%
4.2. CALCULATION OF VERTICAL CURVE LENGTH
parameters
velocity (85Km/h)
gradiento For the first sag curve the change in gradient is -2.63 - (-1.96)
=0.67reading from ERA table which relates change in gradient withspeed the curve length of 50m is found.
o For the second crest curve the change in gradient is -1.96 - (-3.88)
=1.92 reading from ERA table which relates change in gradient with
speed the curve length of 100m is found.o For the third sag curve the change in gradient is -1.24 - (-2.63)
=1.39 reading from ERA table which relates change in gradient withspeed the curve length of 60m is found.
4.3.Calculation of vertical curve setting outinformations
The First sag curve
L=100mg1=-3.88%r = (g2-g1)/100Lr = 0.000192g2=-1.96%station of BVC = station of PVI - L/2
= 11+340 - 50 =11+290Elevation of BVC = EPVI - (g1*L/2)/100
= 2441-(-3.88*50)/100= 2442.94
STATION
LENGTH(X) m
g1*X
r/2(X2)
EBVC
Y (Elevationon the curve)
Semester Project16
-
7/30/2019 horz & ver
17/18
Road and Bridge design
11+290 0 0 0.00000000 2442.94 2442.940
11+300 10 -0.388 0.00960000 2442.94 2442.562
11+320 30 -1.164 0.08600000 2442.94 2441.862
11+340 50 -1.94 0.24000000 2442.94 2441.240
11+360 70 -2.716 0.47000000 2442.94 2440.694
11+380 90 -3.492 0.77700000 2442.94 2440.225
11+390 100 -3.88 0.96000000 2442.94 2440.020
The second crest curve
L=50mg1=-1.96%r = (g2-g1)/100Lr = - 0.000134g2=-2.63%
station of BVC = station of PVI - L/2= 11+900 - 25 =11+875Elevation of BVC = EPVI - (g1*L/2)/100
= 2430-(-1.96*25)/100= 2430.49
STATION
LENGTH(X) m
g1*X
r/2(X2)
EBVC
Y (Elevationon the curve)
11+875 0.000 0.000 0.000 2430.49 2430.490
11+880 5 -0.098 -0.001675 2430.49 2430.390
11+900 25 -0.49 -0.041875 2430.49 2429.95811+920 45 -0.882 -0.135675 2430.49 2429.472
11+925 50 -0.98 -0.1675 2430.49 2429.343
Third sag curve
L=60mg1=-2.63%r = (g2-g1)/100Lr = 0.000231667
g2=-1.24%station of BVC = station of PVI - L/2
= 12+280 - 30 =11+250Elevation of BVC = EPVI - (g1*L/2)/100
= 2420-(-2.63*30)= 2420.789
Semester Project17
-
7/30/2019 horz & ver
18/18
Road and Bridge design
STATION
LENGTH(X) m
g1*X
r/2(X2)
EBVC
Y (Elevationon the curve)
12+250 0.000 0.000 0.000 2420.789 2420.789
12+260 10 -0.263 0.012 2420.789 2420.538
12+280 30 -0.789 0.104 2420.789 2420.104
12+300 50 -1.315 0.290 2420.789 2419.764
12+310 60 -1.578 0.417 2420.789 2419.628
5.Calculation of crossectional area and volume
The calculations are calculated below in a tabular fashion.
Semester Project18