Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Page 3: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 4: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

LEAP for Automation Projects

3

Integrated solutions

increase value

of individual benefits!

Keep Automation off of the critical

path!

Eliminate activities that generate

rework!

Be virtually free from hardware

dependencies

Reduce travel costs by 70%

Gain 25% flexibility in your schedule

Reduce your MAC capital by 30%

Universal IO

VirtualizationCloud

Engineering

Page 5: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Late Binding is a LEAP Enabler

4

Off the

Critical Path

Define Design Manuf Config Test Install

Start FinishPhysical Functional

Late

Binding

Page 6: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

30% Capital Savings

5

MultiCore

Cables

Controller and IO Cabinet

Field Junction

BoxJunction

boxMarshalling

Cabinet

LER or RIE

Universal IO Standard Cabinet

Controller Cabinet

Page 7: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Getting Experion PKS Closer to the Process

6

Fiber Optic

Media

Convertors

Redundant

Power Supply

Fiber Optic

Termination

Universal I/O

Modules

Field Power and

Terminations

“VIPER”

Stainless Steel

Marine Cabinet

IP66

Marine Filters

(Marine Apps

Only)

Gland Entry

System

• Standard Cabinet Design

• Standard Power Supply

• Physical Characteristics

- 800mmW x 1200mmH x 300mmD

Painted Steel

316L Stainless Steel

- -40C to +55C External

-40C to +70C Internal

- Gland Plate

- IOL Fiber Optic Extender

Single Mode

Multi-Mode (future)

Leap Frog (Daisy Chain) Option

Page 8: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Expand Functionality for UIO

Connection

to the card

Marking

Channel

Field connectivity - 2 “Slices” per

channel/6 connection points:

Signal (+), Return (-), and Shield

two additional connections for

signal conditioning applications

Power –

additional “slices”

for:

-24V

-120V

Input/output accessories (IOAs):- Feed-through (2Q2017)

- Analog Protection (2Q2017)

- Digital Relay (estimated 3Q2017)

- Signal Conditioning (estimated 4Q2017)

- Safety Relay (Future)

- IS (Future)

7

Page 9: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

8

Instrument

Index

Build

Devices

Build CMs /

HMI / etc.

Test CMs /

HMI / etc.

Config

Acceptance Test

Virtual Engineering PlatformCloud Operations

Universal

Process

Cabinet

FT101

FT100

FT101

FT102

Interrogate

Configure

Detect

Match

Test Document

Page 10: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 11: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Superior HART Performance

10

Page 12: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Advanced Process Control Inside

11

Page 13: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

One Module – Multiple Protocols

12

I/O

Smart

Device

Redundant Experion

Server

Station

Device Tools

I/O

Level 1 Network

FTE Network

Smart

Device

Smart

Device

Smart

Device

C300

EIM

EIM

Page 14: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Experion as Electrical Control & Management System

13

I/O

IED

Redundant Experion

Server

Station

I/O

CDAFTE Network

IED IEDIED

C300

EIM

EIM IEC61850 Network

Page 15: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

14

I/O

EIP

Redundant Experion

ServerStation

Device

Tools

I/O

Ethernet IP Network

FTE Network

EIP EIPEIP

C300

EIM

EIM

CDA

Page 16: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Advanced Control in Embedded Controllers

15

nforcedesponse

Minimum Effort Move

Past Future

Assumed Values

CVPredicted Unforced Response

MV

T=0

Control Funnel

Optimal Response

Setpoint

Page 17: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Simplified Maintenance Schedules

16

Page 18: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 19: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Improve System Security

Page 20: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

19

Page 21: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Further Increase System Availability

20

Page 22: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Reduce Time Required for OPM

21

ACEServer B Server AFlex/Console

Experion Support and Maintenance

OPM Server B

OPM Server A OPM ACE

OPM Flex/Console

Production Cluster

Virtual Staging Area

ACE Replacement

Server B Replacement

Server A Replacement

Flex/Console Replacement

Pre-migration

Page 23: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

2

2

Page 24: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Select Best Theme for Situation

Page 25: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Limit Trend

Advanced Solution Pack Limit Help

Page 26: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 27: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Page 28: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Better Availability for Critical Infrastructure

27

Page 29: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Multiple User Support

28

Up to 12 concurrent Users

- LEAP Enabler

Plus Management of Change

- Who changed what when

- Compare to runtime

Quick Builder

Experion’s configuration

tool for SCADA points &

Equipment templating

Page 30: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

HMI Management of Change

29

HMIWeb Display

Builder

Experion’s configuration

tool for HMI Displays

Page 31: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Applying LEAP Principles

30

RTU2020

specific tabs

Data direct from

RTU2020

Page 32: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Eliminate Rework

31

Experion Quick Builder

DNP3 Controller

RTU Builder

Project

Page 33: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 34: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Leading The Industry Through Innovation

The Most Versatile Network For All Applications

2011Industry’s First Multi

Application Wireless

Network

2016Industry’s First

Multiprotocol Wireless I/O

& System

OneWireless™

OneWireless™ Network

- Multiprotocol Wireless IO

Page 35: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

The Best Got Even Better – With No Change!!

Delivering More Value on Investments

34

No

Hardware

Change

Software

Innovation

Field Upgradable

25%

Cost

Effective

50%

Cost

Effective

Page 36: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

The Multiprotocol Wireless IO & System

And Native Experion Integration

35

Page 37: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 38: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Integrated Tools Designed to Work Together

Page 39: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical
Page 40: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Page 41: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

2013

2012

2014

Experion R410300,000 SCADA Points

Improved ControlLogix Interface

OPC Non-scanned parameters

SCADA Point Processing

New Calculation Algos

Dynamic Alarm Suppression

Alarm Tracker

ACM Alarm Help

64-bit OS support

+++ much more

Experion R430Pan & Zoom Displays

Equipment Templating &

Displays

5,000 Controllers / RTUs

Scanning Sub-system

Enhancements

EFM Data Collection &

handoff

Gas Operations Suite 2017

2015

2016

Experion R500 *Configuration Management of Change

New SCADA Protocols for EFMs

IEC 61850 SCADA Interface Update

SCADA Point Enhancement

RTU2020 Integration

Third Party Package Configuration Efficiency

Operational Applications Suite Enhancements

Expansion I/O28 I/O (fixed mix)

8AI, 2AO, 10DI, 2PI, 6DO

HART Enabled

Integrated I/O Port

Power & IO Link

Supports 12 modules

Same environment specs

Add IECEx: RTU & IOM

RTU2020 Ø128 on board I/O, inc HART

Modular construction

Harsh environ. -40 to 75 C

Low power consumption

IEC 61131-3 programming

AGA function blocks

DNP3 & Modbus

FDM Integration

Redundant RTUSingle IOTA with positions

for 2 processors

2 Ethernet & 4 Serial ports

No onboard I/O

Uses same Expansion I/O

Same environment specs

Experion R431 New Protocols:

Flow-X EFM

Bristol Babcock EFM

IEC 61850 Configuration

Efficiencies

RTU2020 R110Expansion I/O

API 21.1 Support

AER Directive 17 validated

RTU Builder Improvements

RTU2020 R120Wireless I/O (ISA 100)

RTU Builder Improvements

RTU2020 R140Redundant RTU

* Not a commitment. Forward looking plans are

subject to change without notice.

Page 42: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Page 43: Honeywell - © 2016 by Honeywell International Inc. All ... · Honeywell - © 2016 by Honeywell International Inc. All rights reserved. Late Binding is a LEAP Enabler 4 Off the Critical

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.