Honda Supplier QualityManual06
-
Upload
memo-gonzalez-aleman -
Category
Documents
-
view
2.204 -
download
86
Transcript of Honda Supplier QualityManual06
Welcome to the Honda Supplier Quality Manual
(SQM)Choose a Language
English JapaneseComing Soon
SpanishComing Soon
Honda Supplier Quality ManualClick on a button to select a manual section
Cover PageLetter from
Honda Management
Table of Contents
General Information
Training Reference
Main Screen
Best Practices New Model
Appendix
Forms
Mass Production
HSQM Master List
Supplier
of ReceiptAcknowledgement
Honda Supplier Quality ManualClick on a button to select a form category
Forms3A
Coming Soon 5P CRF Data
DSPSComing Soon
Inspection Fixture IPPAAR/IPP Lot Control and
Traceability
MPR PFMEA PIS PPA
PQCT PV TestingStyling Parts
Guideline (SpeCla)
Tooling
Note – all forms have a blank version and most have an operation standard. Some have numbered versions to match the operation standard. Some forms do not have a numbered version, they have the operation standard filled in on the form.Return to Main Screen
Honda Supplier Quality ManualClick on a button to select
3A Forms
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
5P Form
5P - Blank 5P Operation Standard
5P ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
CRF Form
CRF - Blank
CRF Numbered to Match the Operation Standard
CRF Operation Standard
CRF ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
Data Sheets
Inspection Data Receiving Inspection Data Regulation Data
These are blank data sheets. There is currently no
operation standards or examples.
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
DSPS Forms
Coming Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
Inspection Fixture Forms
Inspection Fixture Concept - Blank
Inspection Fixture Concept Operation
Standard
Inspection Fixture Concept Example
Coming Soon
Inspection Fixture Approval - Blank
Inspection Fixture Approval Operation
Standard
Inspection Fixture Approval Example
Coming Soon
Gage R&R (Long Method) - Blank
Gage R&R (Short Method) - Blank
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
IPPAAR/IPP Forms
IPPAAR - BlankIPP Tag – Blankpdf version only – this form must be ordered from GBS
IPP Forms and Labels Order Form
View IPP Labels – must be ordered from GBS
IPPAAR Numbered to Match the Operation
Standard
IPP Tag Numbered to Match the Operation
Standard
IPPAAR Operation Standard
IPP Tag Operation Standard
IPPAAR ExampleComing Soon
IPP Tag ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
Lot Control and Traceability Forms
Blank LNDD LNDD Operation Standard
LNDD ExampleComing Soon
Lot Control Notification
This is an example notification that Honda issues when a part requires enhanced traceability. Various Honda plants will have different notification forms.
Process Display Form (PDF)
PDF Operation StandardComing Soon
PDF ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
MPR Checksheets
Casting General Heat Treatment
Injection Molding
Machining Painting PCB Stamping
Torque Weld Wire Harness Not Available
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
PFMEA Form
PFMEA - Blank
PFMEA Numbered to Match the Operation Standard
PFMEA Operation Standard
PFMEA ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
PIS Form
PIS - Blank
PIS Operation Standard
PIS ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
PPA Form
PPA Numbered to Match the Operation Standard
PPA Operation Standard
PPA ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
PQCT Form
PQCT - Blank
PQCT Numbered to Match the Operation Standard
PQCT Operation Standard
PQCT ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
PV Testing Form
PV Testing - Blank
PV Testing Numbered to Match the Operation
Standard (use 2nd tab)
PV TestingOperation Standard
PV Testing ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
Styling Parts Guideline (SpeCla) Forms
Electrode Review -Blank
Parts Appearance Coordination Document
(PACD) - Blank
PACD Numbered to Match the Operation Standard
PACDOperation Standard
PACD ExampleComing Soon
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select
Tooling Forms
Tooling and Equipment –Sign-off Sheet
Tooling and Equipment –Tool Release Form Blank
Tooling Summary Sheet (TSS) - Blank
Tooling and Equipment – Tool Release Form Numbered to
Match the Operation Standard
TSS Numbered to Match the Operation Standard
Tooling and Equipment – Tool Release Form Operation
Standard
TSSOperation Standard
Tool Trial History Sheet
Tooling and Equipment – Tool Release Form Example
Coming SoonTSS Example
Return to Main Screen Return to Forms Screen
Honda Supplier Quality ManualClick on a button to select a topic
Best Practices
A Message to Supplier Top Management SAP Team
PFMEA Team PQCT Team
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a topic
General Information
Factory Guest Engineer
Portal and PQTS Overview
Quality Assurance Visit
QualityControl
Regulations
Supplier Quality Performance
Rating
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a topic
New Model3A Audit
Coming SoonBar Code Standard CRF Data
Inspection Fixture Design
E-Requirements and E Timing Limit Sample Master Sample
Development
MPR NM Receiving Inspection NMR Part Approval
Part Maturation Expectations
Part Quality Standard PFMEA PIS
PPA PQCT PV Testing SAP
Styling Parts Guideline (SpeCla) TPR Traceability and
Lot Control Not Available
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a topic
3A Audit
3A Audit Procedure
Link to 3A Audit SheetsComing Soon
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Countermeasure Request Form
CRF Procedure
Link to CRF Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Data
DataProcedure
Link to Data Forms
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
E Requirements and E Timing
E-Requirements E-Timing
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Inspection Fixture Design
Inspection Fixture Design
Guideline
Link to Inspection
Fixture Related Forms
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Minimum Process Requirements
MPR Procedure Link to MPR Checksheets
Return to Main Screen Return toNew Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
PFMEA
PFMEAProcedure
Link to PFMEA Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
PIS
PISProcedure
Link to PIS Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
PPA
PPAProcedure
Link to PPA Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
PQCT
PQCTProcedure
Link to PQCT Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
PV Testing
PV TestingProcedure
Link to PV Testing Form
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Styling Parts Guideline (SpeCla)
Styling Parts Guideline (SpeCla)
Procedure
Link to SpeClaRelated Forms
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a topic
Traceability and Lot Control
Traceability and Lot ControlProcedure
Link to Traceability and Lot Control Related Forms
Return to Main Screen Return to New Model Screen
Honda Supplier Quality ManualClick on a button to select a manual section
Mass Production
5P Controlled Containment
Electronic Sort Label
Identification Control Index IPPAAR/IPP
Nonconforming Product
Regular Lot Control Tag Not Available
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a topic
5P
5PProcedure
Link to 5P Form
Return to Main Screen Return to Mass Production Screen
Honda Supplier Quality ManualClick on a button to select a topic
Electronic Sort Label
Electronic Sort Label Procedure
Link to Electronic Sort Label Training
Return to Main Screen Return to Mass Production Screen
Honda Supplier Quality ManualClick on a button to select
IPPAAR/IPP
IPP System Procedure
Ordering IPP Related Forms
and Labels
Link to IPP Related Forms
Return to Main Screen Return to Mass Production Screen
Honda Supplier Quality ManualClick on a button to select a manual section
Training Items
Electronic Sort Label
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a manual section
Reference
Supplier Part Schedule Tooling
Return to Main Screen
Honda Supplier Quality ManualClick on a button to select a manual section
Tooling
Tooling Release Process
Link to Tooling Related Forms
Return to Main Screen Return to Reference Screen
Honda Supplier Quality ManualClick on a button to select a manual section
Appendix
Definitions
Honda Addresses
Standards Information
Return to Main Screen