Hollies and Creamery Enclosure Scope
Transcript of Hollies and Creamery Enclosure Scope
December 28, 2018
Hollies and Creamery Enclosure Scope
January 4, 2019
| HDR
January 4, 2019
Proposed location of Holly Cluster and Creamery Fence Enclosure
2
Hollies and Creamery Enclosure
Character of proposed 8’
tall wood Interim Fencing
Site PlanInterim Fence
Existing Porch
January 4, 2019
Hollies and Creamery Documentation
▪ HSRs completed in 2010, updated in 2014
− HSRs identifies open wood porch (e.g. decking, beadboard ceiling, railing, standing seam metal roof, etc.) as Character-Defining Features.
▪ Bridging Documentation set prepared in 2015
− Porch replication documentation pages follows.
▪ HABS materials submitted in 2017
▪ Archaeology
− Stantec conducted Phase I survey and monitored engineering foundation test pits for the Holly Buildings. No archaeological resources were found during either investigation and no additional investigations were recommended.
− Stantec completed investigations around the Creamery in early December 2018 and are planning on preparing the management summary in January 2019. In short, the management summary will state that the work has exhausted the research potential at this area and will recommend no further work.
3
Hollies and Creamery Enclosure
January 4, 2019
Examples of HABS Documentation
4
Hollies and Creamery Enclosure
1. Building 29, north & south elevations 2. Creamery, east & west elevations
January 4, 2019
Hollies Porch Replication Bridging Documentation
5
Hollies and Creamery Enclosure
January 4, 2019
Hollies Porch Replication Bridging Documentation
6
Hollies and Creamery Enclosure
January 4, 2019
Hollies Porch Replication Bridging Documentation
7
Hollies and Creamery Enclosure
January 4, 2019
Holly Cluster and Creamery Scope Items
▪ In addition to dismantling the porches, additional scope includes:
− Provide temporary steps (assembled from pressure treated lumber) to each opening that is currently off of a porch to ensure safe access to the building
− Conduct pest control in both buildings to remove any living animals
8
Hollies and Creamery Enclosure
January 4, 2019
Holly Cluster Overall Views
9
Hollies and Creamery Enclosure
1. View of Bldg 30 looking
northeast
2. View of Bldgs 28 & 29
looking southeast
3. View of Bldg 28 looking
west
4. View of Bldg 30 looking
northwest
January 4, 2019
Scope Recommendations - Hollies
▪ Dismantle open wooden porches at Buildings 28 and 29, porch roofs (including wall flashing), concrete steps, and remove brick piers down to grade
10
Hollies and Creamery Enclosure
Bldg 28 – Porch at
northeast cornerBldg 28 – Porch on south
side
Bldg 28 – Porch on
west side
January 4, 2019
Scope Recommendations - Hollies
▪ Dismantle open wooden porches at Buildings 28 and 29 , porch roofs (including wall flashing), concrete steps, and remove brick piers to grade
11
Hollies and Creamery Enclosure
Bldg 29 – Southwest corner Bldg 29 – Collapsing
porch on south side
Bldg 29 – Collapsing porch
on east side
January 4, 2019
Holly Cluster Typical Porch Details
12
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Hollies
▪ Salvage existing painted metal stair and railing components and turn over to GSA for storage
▪ NOTE: Stairway rests on the existing wooden porch framing. Stairway appears to be character defining, see HSR p. 28
13
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Hollies
▪ Remove tree growing in areaway, remove ivy on façade and roof, & paint existing external metal stair dark brown
14
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Hollies
▪ At all masonry voids due to porch removal, install new self-adhesive waterproofing sheet membrane and new painted, pressure-treated plywood panels screwed into mortar joints
▪ At all existing blue tarp patches, remove existing tarp and plywood and install new patch material consistent with bulleted item above
▪ Install painted, pressure-treated plywood panels with screws at basement windows & remove overgrown tree in planter
15
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Hollies
▪ Salvage existing wood and metal benches (6 total) and turn over to GSA for storage, protect existing herringbone brick pavers to remain
16
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Hollies
▪ Remove all surface debris within fence boundary
▪ Remove and replace all downspouts with brown aluminum downspout and extend 5-feet away from existing walls
17
Hollies and Creamery Enclosure
January 4, 2019
Cottage #3
▪ Remove all existing fencing, barbeque pit and site improvements around Cottage #3
18
Hollies and Creamery Enclosure
January 4, 2019
Creamery
19
Hollies and Creamery Enclosure
1. View of Bldg 46 looking
southwest
2. View of Bldg 46 looking
northeast
3. View of Bldg 44 looking
northwest
4. View of Bldg 45 looking
west
January 4, 2019
Scope Recommendations - Creamery
▪ Remove low plant growth, repaint existing external metal stairs and structures dark brown
20
Hollies and Creamery Enclosure
January 4, 2019
Scope Recommendations - Creamery
▪ Existing steel and concrete porch at Building 46 to remain, paint metal elements dark brown
21
Hollies and Creamery Enclosure
View of Bldg 46 looking east
January 4, 2019
Scope Recommendations - Creamery
▪ Remove tree and dismantle porch assembly. Remove masonry knee wall (see yellow square below), secure building opening with painted, pressure-treated plywood panels
22
Hollies and Creamery Enclosure
View of Bldg 46 looking west View of Bldg 46
looking southeast
Closeup of Bldg 46
looking south
January 4, 2019
Scope Recommendations - Creamery
▪ Existing below grade “room” to remain, secure existing opening with new door. Existing guardrail to remain and paint dark brown.
▪ NOTE: A few sections of fence will not be able to posted into the ground due to concrete roof of “room”
23
Hollies and Creamery Enclosure
View along Bldg 44 looking east Closeup view of wall and entry door
January 4, 2019
▪ Remove and replace areas of warped/loose plywood (8 +/-locations). Paint brick red to match existing.
▪ At all existing blue tarp patches, remove existing tarp and plywood and install new self-adhesive waterproofing sheet membrane and new painted, pressure-treated plywood panels screwed into mortar joints or sheet metal.
▪ Secure all access openings with locked panels.
Scope Recommendations - Creamery
24
Hollies and Creamery Enclosure