1. DATE OF AUDIT : 19 SEP 2008 2. AUDITOR : HMI: SARAVANAKUMAR 3. IMPROVEMENT PLAN SUBMISSION DATE : 4. SIGNATURE BENCH MARK GAP ANALYSIS - HM AUTO INDUSTRIES (SL Lumax) HM AUTO SL LUMAX HMI

description

 

Transcript of Hm Auto Bench Mark Gap Analysis Report 19.09.08

Page 1: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

1. DATE OF AUDIT : 19 SEP 2008

2. AUDITOR :

HMI: SARAVANAKUMAR

3. IMPROVEMENT PLAN SUBMISSION DATE :

4. SIGNATURE

BENCH MARK GAP ANALYSIS - HM AUTO INDUSTRIES (SL Lumax)

BENCH MARK GAP ANALYSIS - HM AUTO INDUSTRIES (SL Lumax)

HM AUTO SL LUMAX HMI

Page 2: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

SL

NOCategory

Plan

Completed Remaining

Monthly Completion

Trend

Initial Added Total 09/08 10/08 11/08 12/08

1 Material

2 Machine

3 Method

4 Man

5 3C / 5S

Total

IMPROVEMENT STATUS

Page 3: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Functional Layout, no back and forth movement

Subsequent operations not linked

0101 FUNCTIONAL LAYOUTArea SHOP FLOOR

Resp Vijayakumar / Magesh

Target Date 15/11/08

Page 4: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Painted shop floor with effective 3C/5S activities

3C/5S (Press shop standards

not available)

0202 SHOP FLOOR PAINTINGArea SHOP FLOOR

Resp Vijayakumar/ Magesh/ Saleem

Target Date 15/11/08

Page 5: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Incoming Inspection area with trends display

Area not identified for Incoming Inspection

0303 SUPPLIER CONTROLArea INCOMING INSP.

Resp Magesh/ Saleem

Target Date 10/11/08

Page 6: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Incoming inspection flow chart displayedIncoming inspection flow chart

not available

0404 RECEIVING INSPECTIONArea INCOMING INSP.

Resp MAGESH

Target Date 20.10.08

Page 7: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Incoming Inspection as per Inspection Std

AOI not available with the sub supplier, Regular inspection not carried out

0505INCOMING INSPECTION

– CHILD PARTS

Area INCOMING INSP.

Resp MAGESH

Target Date 15.10.08

Page 8: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Raw material, child part master sample with validity

Master samples not available for

sub supplier parts

0606 MASTER SAMPLEArea INCOMING INSP.

Resp SALEEM / MAGESH

Target Date 1.11.08

MASTER SAMPLES

Page 9: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Packing standardized for incoming partsPacking not standardized for raw

material / sub supplier parts

0707 RECEIVING INSPECTIONArea INCOMING INSP.

Resp MAGESH

Target Date 10.11.08

Page 10: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Supplier rejections analyzed and

counter measures verifiedSupplier rejection reporting system and

proper procedure not available

0808 SUPPLIER REJ. ANALYSISArea INCOMING INSP.

Resp Magesh / Vijayakumar

Target Date 15.11.08

Page 11: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Storage area with FIFO racks for child parts

Storage area identified, FIFO not in practice

0909 CHILD PART STORAGEArea R/M STORES

Resp Vijayakumar / Magesh/ Saleem

Target Date 10.11.08

Page 12: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

R/m stock status with FIFO system FIFO Board displayed with alerts

1010INCOMING MATERIAL

STOCK WITH FIFO

Area R/M STORES

Resp Vijayakumar

Target Date 10.07.08

Page 13: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Coils stored properly with identification Keeping coils on to the floor

1111 R/M STORAGEArea R/M STORES

Resp Vijayakumar

Target Date 15.11.08

Page 14: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Chowel photo

Storage racks available for steel strips, location identified, stock monitored

Raw Material storage and FIFO system not in proper

1212 R/M STORAGEArea R/M STORES

Resp Vijayakumar

Target Date 15.11.08

Page 15: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Material identification well definedIdentification tag available for some raw materials, basic information not covered in tags

1313 R/M STORAGEArea R/M STORES

Resp Magesh / Vijayakumar

Target Date 15.11.08

Page 16: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Wooden support to eliminate damage Chances of scratch is more

1515 COIL STORAGEArea R/M STORES

Resp Vijayakumar

Target Date 15.11.08

Page 17: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Fork lift operator can move around easily

1717 MIRROR FOR SAFETYArea R/M GANG WAY

Resp Saleem

Target Date 30.10.08

Page 18: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Welding line organized with functional layout & visual controls

Welding line not organized properly

1818 WELDING LINE SET UPArea WELDING LINE

Resp Vijayakumar / Magesh/ Saleem

Target Date 25.11.08

Page 19: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Enough lighting, proper ventilation to avoid operator fatigue

Additional lighting & ventilation, proper ventilation to avoid operator

fatigue

1919 SAFETY MEASURESArea WELDING LINE

Resp Vijayakumar / Saleem

Target Date 25.11.08

Page 20: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

My Machine Concept will be introduced

2020 MY MACHINE CONCEPTArea Incoming Storage

Resp Vijayakumar

Target Date 20.11.08

Page 21: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Detailed machine preventive maintenance check sheet

Preventive maintenance check sheet not available

2121 MACHINE MAINTENANCEArea M/C TABLE

Resp Vijayakumar/ MAGESH

Target Date 10.11.08

Page 22: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Machine check points highlighted on the machine

2222 CHECK POINTS ON M/CArea MACHINE

Resp Vijayakumar/ MAGESH

Target Date 5.11.08

Page 23: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Critical spares list prepared and maintained

2323 M/C CRITICAL SPARESArea MACHINE

Resp Vijayakumar

Target Date 30.10.08

Page 24: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

2424PROCESS PARAMETER MONITORING

Area Machine

Resp Magesh

Target Date 30.10.08

Page 25: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

2525PROCESS PARAMETER MONITORING

Area Machine

Resp Magesh

Target Date 30.10.08

Page 26: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Work instruction and process parameters not displayed

2626PROCESS PARAMETER MONITORING

Area Machine

Resp Magesh

Target Date 15.11.08

Page 27: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Recommend to replace a single tank to parallel connection

2727PROCESS PARAMETER MONITORING

Area Incoming Storage

Resp Saleem

Target Date 30.11.08

Page 28: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Electrode coil not protected from atmosphere

2828PROCESS PARAMETER MONITORING

Area Machine

Resp Vijayakumar

Target Date 20.10.08

Page 29: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Unit description different

litre / min flow rate

2929PROCESS PARAMETER MONITORING

Area Incoming Storage

Resp Magesh

Target Date 7.10.08

Page 30: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

3030MACHINE STATUS – VISUAL DISPLAY

Area Machine

Resp Vijayakumar

Target Date 10.11.08

MACHINE STATUS DISPLAY

Page 31: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Welder certificate not available

3131 WELDER CERTIFICATIONArea Welding

Resp Vijayakumar / Saleem

Target Date 15.11.08

Page 32: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Welding parameter specification not available, refer to STD

3232 WELDER CERTIFICATIONArea Welding

Resp Magesh

Target Date 15.11.08

Page 33: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

3333 GRAVITY CHUTEArea Welding

Resp Vijayakumar / Saleem

Target Date 25.11.08

Page 34: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Recommended to install a gravity chute

3434 PRODUCTION LINE UPArea Welding

Resp Vijayakumar / Saleem

Target Date 25.11.08

CHUTE

Page 35: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

All types of safety wearing provided Poor man safety

3535 PERSONAL SAFETYArea Welding

Resp Saleem / Vijayakumar

Target Date 20.11.08

Page 36: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

3636 HANDLING OF WIP PARTArea Welding

Resp Vijayakumar

Target Date 25.11.08

Page 37: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Rubber sleeve provided at goose neck area

3737 WELDING – JOB REPORTArea Welding

Resp Vijayakumar

Target Date 30.10.08

RUBBER SLEEVE

Page 38: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

3838 NOZZLE CLEANINGArea Welding

Resp Vijayakumar

Target Date 30.10.08

Page 39: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Periodic jig maintenance, Inspection

(Plan Vs Actual)

3939 JIG MAINTENANCEArea MACHINE

Resp Vijayakumar/ MAGESH

Target Date 30.10.08

Page 40: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

4040 WIRE FEEDER GUIDEArea Welding

Resp Vijayakumar

Target Date 15.10.08

Page 41: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Poorly routed cable

4141 EARTH CABLE ROUTINGArea Welding

Resp Vijayakumar

Target Date 30.10.08

POOR EARTHING

Page 42: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

4242PROCESS MONITORING –

GAS FLOW METER

Area Welding

Resp Magesh

Target Date 30.10.08

GAS FLOW METER

Page 43: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

4343 WELDING – JOB REPORTArea Welding

Resp Magesh

Target Date 30.10.08

PARTITION

Page 44: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

4444CHIP REMOVAL

PROCEDURE

Area Welding

Resp MAGESH

Target Date 30.10.08

Page 45: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Master samples and defective samples not displayed

4545MASTER, DEFECTIVE, F/M/L SAMPLES DISPLAY

Area Incoming Storage

Resp Magesh/ Saleem

Target Date 15.11.08

Page 46: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

4646 WELDING – JOB REPORTArea Welding

Resp Magesh

Target Date 30.10.08

JOB REPORT

Page 47: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

4747REJECTION TREND DISPLAY – CELL WISE

Area Quality

Resp Magesh

Target Date 10.11.08

Page 48: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

1818 NC PART CONTROLArea Quality

Resp Magesh

Target Date 15.11.08

Page 49: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Poor 3C & 5S of rejected part bin

4949 REJECTION STORAGEArea Rejection

Resp Maesh

Target Date 15.11.08

Page 50: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

5050 NC PART HANDLINGArea Incoming Storage

Resp Vijayakumar / Magesh

Target Date 15.11.08

Page 51: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

5151 Q ALERT DISPLAY ON M/C Area Incoming Storage

Resp Magesh

Target Date 30.10.08

Q ALERTDISPLAY

Page 52: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

5252INSPECTION TABLE FOR ALL MACHINES

Area Incoming Storage

Resp Magesh / Saleem

Target Date 15.11.08

Page 53: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Clamping screw length oversize

5353INSPECTION TABLE FOR ALL MACHINES

Area Incoming Storage

Resp Vijauakumar

Target Date 30.9.08

Page 54: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Break down status monitored

5454 BREAK DOWN STATUSArea PRODUCTION

Resp Vijayakumar/ MAGESH

Target Date 10.11.08

Page 55: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Idle time monitored for all machines

5555MACHINE IDLE TIME

MONITORING

Area PRODUCTION

Resp Vijayakumar/ MAGESH

Target Date 10.11.08

Page 56: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Direction of flow marking with colour coding

5656FLOW MEDIUM / DIRECTION MARKING

Area WATER LINE

Resp Vijayakumar / SALEEM

Target Date 30.10.08

Page 57: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Material over stacking (WIP)

5757 IN-PROCESS STORAGEArea WIP

Resp Vijayakumar

Target Date 15.11.08

Page 58: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Material over stacking (WIP)

5858 IN-PROCESS STORAGEArea WIP

Resp Vijayakumar

Target Date 15.11.08

Page 59: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Big sized wooden bins used for

in-process

5959 WIP STORAGE & HANDLINGArea WIP

Resp Vijayakumar

Target Date 15.11.08

Page 60: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Over stacking, more chances of component damage

6060 WIP STORAGE & HANDLINGArea WIP

Resp Vijayakumar

Target Date 15.11.08

Page 61: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Rust on the component (awaiting for inspection)

6161DUST COVER FOR PLATED PARTS

Area WIP

Resp Vijayakumar

Target Date 15.11.08

Transparent LDPE Lid to avoid Dust

Page 62: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

TROLLIES WITH CASTERS FOR EASY HANDLING - WIP

6262TROLLIES FOR EASY

HANDLING

Area SHOP FLOOR

Resp SALEEM / MAGESH

Target Date 10.07.08

Page 63: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Fork lift for material handling to avoid fatigue

6363FORK LIFT FOR LOADING /

UNLOADING

Area SHOP FLOOR

Resp SALEEM / MAGESH

Target Date 10.07.08

Page 64: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

RED LINE PROVIDED IN TROLLIES FOR MAX. STACK HEIGHT

6464STACKING LEVEL IN

TROLLIES

Area SHOP FLOOR

Resp Vijayakumar

Target Date 25.10.08

Page 65: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Traceability not available from raw material incoming stage to F/G dispatch

6565 LOT TRACEABILITYArea Incoming Storage

Resp Magesh

Target Date 25.11.08

Page 66: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

6666 ASSY SHOP SET UPArea Incoming Storage

Resp Saleem / Vijayakumar / Magesh

Target Date 25.22.08

Page 67: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

6767 FINAL INSP. STANDARDArea Incoming Storage

Resp Magesh

Target Date 20.10.08

FINAL INSP STD

Page 68: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Inspection area needs more light

7070 FINAL INSP. AREA LIGHTINGArea Incoming Storage

Resp Saleem / Vijayakumar

Target Date 10.11.08

Page 69: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Master samples to be prepared with master list / due date /

location

6868 MASTER SAMPLESArea Incoming Storage

Resp Magesh / Saleem

Target Date 1.11.08

MASTER SAMPLES

Page 70: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

FINISHED GOODS STOCK STATUS WITH VISUAL CONTROLS

6969 F/G STOCK STATUSArea F/G STORAGE

Resp SALEEM / MAGESH

Target Date 10.07.08

Page 71: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Inspection area needs more light

7171 FINAL INSP. AREA LIGHTINGArea Incoming Storage

Resp Vijayakumar / Saleem

Target Date 10.11.08

Page 72: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Rack of Weld bead width

7272 FINAL INSP. AREA LIGHTINGArea Welding

Resp Vijayakumar

Target Date 20.10.08

Page 73: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

NG parts out going without any proper check

7373 FINAL INSP. AREA LIGHTINGArea Incoming Storage

Resp Magesh

Target Date 20.10.08

Page 74: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7474 REJECTION TREND DISPLAYArea Incoming Storage

Resp Magesh

Target Date 25.10.08

Page 75: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7575INSPECTION TABLE FOR DESTRUCTIVE TEST

Area Welding

Resp Vijayakumar / Saleem

Target Date 20.11.08

Page 76: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7676 SAMPLES RETAININGArea Incoming Storage

Resp Magesh

Target Date 20.11.08

Page 77: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7777 TRANING ROOMArea Incoming Storage

Resp Magesh / Saleem

Target Date 25.11.08

Page 78: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7878 CALIBRATION STICKERArea Incoming Storage

Resp Magesh

Target Date 30.10.08

Page 79: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

7979 CHECKER, JIG STORAGEArea Incoming Storage

Resp Magesh / Vijayakumar

Target Date 15.11.08

Page 80: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Testing facilities not sufficient (Hardness testing, welding penetration

testing & roughness testing not available)

8080 INSPECTION & TESTINGArea Incoming Storage

Resp Magesh / Saleem

Target Date 30.11.08

Page 81: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

8181 TOOL STORAGEArea Incoming Storage

Resp Vijayakumar / Magesh

Target Date 10.11.08

Page 82: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Tooling rack to be modified to minimize the area of contact bet. the tool and the rack

8282 TOOL STORAGEArea Incoming Storage

Resp

Target Date 7.10.08

Page 83: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

There is no place / identification for tools

8383 TOOL STORAGEArea Incoming Storage

Resp Vijayakumar / Magesh

Target Date 10.11.08

Page 84: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

Finished goods storage area not organized

8484 FINISHED GOODS STORAGEArea Incoming Storage

Resp Vijayakumar / Magesh

Target Date 10.11.08

Page 85: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H. M Auto Industries

No QC identification tag on the pallet

8585 FINISHED GOODS STORAGEArea Incoming Storage

Resp Magesh

Target Date 30.10.08

Page 86: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Improper bin leads more people to handle, Needs to improve size and type of bins

8686 RECEIVING INSPECTIONArea INCOMING INSP.

Resp MAGESH

Target Date 30.10.08

Page 87: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Sensors provided between ram & bed

to avoid accidentSensors Provided

8787 SAFETY MEASURESArea WATER LINE

Resp SALEEM / MAGESH

Target Date 25.06.08

Page 88: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

First, middle, last samples - top

Master, defective samples –second

Checker – bottom

8888 SAMPLES DISPLAYArea INSP. TABLE

Resp SALEEM / MAGESH

Target Date 15.11.08

Page 89: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Tool daily preventive maintenance

check sheet

8989 TOOL CHECK SHEETArea M/C TABLE

Resp Vijayakumar/ MAGESH

Target Date 25.10.08

Page 90: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

OPERATORS PROPERLY TRAINED AND CERTIFIED

9090 WELDER CERTIFICATIONArea MACHINE

Resp SALEEM / MAGESH

Target Date 15.11.08

Page 91: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Cover provided for welding coil to isolate it from surrounding

9191COVER FOR WELDING COIL

(MIG WELDING)

Area MACHINE

Resp Vijayakumar/ MAGESH

Target Date 30.09.08

Page 92: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Tool maintenance schedule displayed & followed

9292TOOL MAINTENANCE

SCHEDULE

Area MOULD STORAGE

Resp Vijayakumar/ MAGESH

Target Date 25.10.08

Page 93: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Tool layout display for traceability

9393 TOOL LAYOUTArea MOULD STORAGE

Resp Vijayakumar/ MAGESH

Target Date 25.10.08

Page 94: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Tool name plate provided on all tools

9494 TOOL IDENTIFICATIONArea MOULD STORAGE

Resp Vijayakumar/ MAGESH

Target Date 10.11.08

Page 95: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

9595TOOLING TABLE WITH

RUBBER MAT

Area MOULD STORAGE

Resp SALEEM / Vijayakumar

Target Date 30.10.08

Page 96: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

9696TOOL PAINTING – MODEL

WISE COLOUR

Area MOULD STORAGE

Resp SALEEM / Vijayakumar

Target Date 30.10.08

Page 97: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Critical spares list prepared and maintained

9797 TOOLING CRITICAL SPARESArea MACHINE

Resp Vijayakumar

Target Date 10.11.08

Page 98: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Detailed mould history card

9898 TOOL HISTORY CARDArea MOULD STORAGE

Resp MAGESH

Target Date 30.10.08

Page 99: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

All components revalidated periodically to monitor the process / tooling consistency

9999COMPONENT

REVALIDATION

Area SHOP FLOOR

Resp MAGESH

Target Date 25.10.08

Page 100: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

CHOWEL PHOTO

Weld penetration tested samples displayed

100100 FMEA SAMPLES DISPLAYArea SHOP FLOOR

Resp MAGESH

Target Date 20.11.08

Page 101: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Inspection plan based on quality issues

101101SAMPLING INSPECTION PLAN

Area FINAL INSP.

Resp MAGESH

Target Date 25.10.08

Page 102: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Inspection standard prepared with all quality check points

102102FINAL INSPECTION

STANDARD

Area FINAL INSP.

Resp MAGESH

Target Date 30.10.08

Page 103: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Control plan & work instruction in line with AOI

103103 INSPECTION AGREEMENTArea SHOP FLOOR

Resp MAGESH

Target Date 30.10.08

Page 104: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Quality check points for all parts

104104 PDI STANDARDArea PDI

Resp MAGESH

Target Date 30.10.08

Page 105: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Customer approved packing standard displayed in PDI area

Packing standards not available

105105 PACKING STANDARD AT PDIArea PDI

Resp MAGESH

Target Date 30.10.08

Page 106: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Trend charts displayed in shop floor

106106 PERFORMANCE DISPLAYSArea SHOP FLOOR

Resp MAGESH

Target Date 10.11.08

Page 107: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Customer complaint free days monitored

107107CUSTOMER COMPLAINT

MONITORING

Area SHOP FLOOR

Resp MAGESH

Target Date 30.10.08

Page 108: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Finished parts stored & identified properly

Proper location (layout) not yet identified for F/G storage

108108FINISHED PART FIFO/

IDENTIFICATION

Area F/G STORAGE

Resp Vijayakumar/ MAGESH

Target Date 15.11.08

Page 109: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

NC parts located on the customer complaint review area

Customer complaints not reviewed properly through daily meeting

109109CUSTOMER COMPLAINT

REVIEW

Area SHOP FLOOR

Resp SALEEM / MAGESH

Target Date 30.9.08

Page 110: Hm Auto  Bench Mark Gap Analysis Report 19.09.08

BENCHMARK COMPANY H.M AUTO INDUSTRIES

Plant safety status displayed Safety visual control not displayed

Area SHOP FLOOR

Resp Vijayakumar/ Saleem

Target Date 20.11.08110110

PLANT SAFETY STATUS DISPLAY