REVIEW OF
MAINTENANCE SCHEDULE FOR PSI TARGET GROUP: PSI MAINTENANCE STAFF (TRD)
REVIEW
OF MAINTENANCE SCHEDULE FOR PSI
QUALITY POLICY
“To develop safe, modern and cost
effective Railway Technology complying
with Statutory and Regulatory
requirements, through excellence in
Research, Designs and Standards and
Continual improvements in Quality
Management System to cater to
growing demand of passenger and
freight traffic on the railways”.
FOREWORD
Power Supply Installation (PSI) provides energy to electrically driven locomotives &
EMUs. For utmost utilization of traction assets, outage of PSI equipment should be
minimum. For this proper maintenance of PSI is essential to cater growing demand of
passenger and freight traffic on the Railways.
CAMTECH has prepared this handbook on “Review of Maintenance Schedule for PSI”
to achieve the above objective. This handbook contains details of various maintenance
schedules, schedule action plan and formats for submitting failures to RDSO used for these
schedules.
I hope this handbook will prove to be useful for the maintenance personnel working in
TrD/PSI (Power Supply Installation).
CAMTECH, Gwalior A.R.Tupe
Date: 23rd July 2014 Executive Director
PREFACE
Power Supply Installation (PSI) provides power to Over Head Equipment (OHE) to
cater power to electric locomotives & EMUs. PSI comprises lot of electrical equipment in
Traction Sub Stations (TSS), Sub Sectioning Post (SSP), and Sectioning Post (SP) with their
associated fittings, insulators and other attachments. For utmost utilization of traction assets,
outage of overhead equipment should be minimum and for this proper schedule maintenance
of PSI assets is essential.
This handbook on Review of Maintenance Schedule for PSI has been prepared by
CAMTECH with the objective of making PSI maintenance personnel aware of correct
maintenance procedure, schedule action plan and formats for submitting failures to RDSO
upkeep of records and repair techniques.
It is clarified that this handbook does not supersede any existing provisions laid down
by Railway Board, RDSO or AC Traction Manual (ACTM). This hand book is for guidance
only and it is not a statutory document.
I am sincerely thankful to TI Directorate, RDSO/Lucknow and also all field
personnel who helped us in preparing this handbook.
Technological up-gradation & learning is a continuous process. Please feel free to
write to us for any addition/ modification in this handbook. We shall highly appreciate your
contribution in this direction.
CAMTECH, Gwalior ( Peeyoosh Gupta) Date: 22nd July 2014 Director (Electrical) e - mail id : [email protected]
CONTENTS
Item Description Page No.
Foreword iii
Preface iv
Content v
Correction Slip ix
1.0 INTRODUCTION 1
2.0 OBJECTIVE OF MAINTENANCE 1
3.0 MAINTENANCE SCHEDULES 1
3.1 FORTNIGHTLY SCHEDULE 2
3.1.1 Battery & Battery Charger 2
3.2 MONTHLY SCHEDULE 3
3.2.1 General Works on TSS, SSP & SP 3
3.2.2 Power Transformer 4
3.2.3 Safety Precautions before Maintenance of Circuit Breaker/ Interrupter 5
3.2.4 25 kV Vacuum Circuit Breaker / Interrupter 5
3.2.5 132 kV SF-6 Circuit Breaker (120 SFM -32B) 7
3.2.6 25 kV SF-6 Circuit Breaker (50 SFGP-20A) 8
3.2.7 132/25 kV SF-6 Circuit Breaker (70 SFM- 32A
& 120 SFM -32A) 9
3.2.8 220 kV SF- 6 Circuit Breaker (ELF SL- 4-1) 12
3.2.9 25 kV SF-6, Circuit breaker/ Interrupter (EDF SK-1-1(S)
& EDF SK -1-1) 13
3.2.10 25 kV SF-6, Interrupter (30 SFGP-25A
& 25 SFGP-25A) 14
3.2.11 25 kV Minimum Oil Interrupter (HPGE 7/9A) 16
3.2.12 25 kV SF-6 Circuit Breaker (LTB 72.5 D1) 17
3.2.13 Auxiliary Transformer 18
3.2.14 220/132/25 kV Current Transformer 19
3.2.15 220/132 kV Isolator, Double pole & Triple pole 20
3.2.16 25 kV Isolator, Single pole, Double pole & Bipolar 20
3.2.17 198/120/42 kV Surge Arrester 21
3.2.18 Series Reactor (Oil Type) 21
3.2.19 Series Reactor (Dry Type) 22
3.2.20 Control and Relay Panel 23
Item Description Page No.
3.2.21 Battery Charger 23
3.2.22 25 kV Motorised Isolator, Single pole 24
3.3 QUARTERLY SCHEDULE 25
3.3.1 General Works on TSS, SSP & SP 25
3.3.2 Auxiliary Transformer 25
3.3.3 25 kV Potential Transformer 25
3.3.4 25 kV Motorised Isolator 26
3.3.5 198/120/42 kV Surge Arrester 27
3.3.6 Capacitor Bank 27
3.3.7 Battery Charger 27
3.3.8 AC/ DC Distribution Panel 28
3.4 HALF YEARLY SCHEDULE 29
3.4.1 General Works on TSS, SSP & SP 29
3.4.2 Power Transformer 29
3.4.3 25 kV Vacuum Circuit Breaker / Interrupter 30
3.4.4 132 kV SF-6 Circuit Breaker (120 SFM -32B) 31
3.4.5 25 kV SF-6 Circuit Breaker (50 SFGP-20A) 32
3.4.6 132/25 kV SF-6 Circuit Breaker (70 SFM- 32A
& 120 SFM -32A) 33
3.4.7 220 kV SF- 6 Circuit Breaker (ELF SL- 4-1) 34
3.4.8 25 kV SF-6, Circuit breaker/ Interrupter (EDF SK-1-1(S)
& EDF SK -1-1) 35
3.4.9 25 kV SF-6, Interrupter (30 SFGP-25A & 25 SFGP-25A) 36
3.4.10 25 kV Minimum Oil Interrupter (HPGE 7/9A) 37
3.4.11 25 kV SF-6 Circuit Breaker (LTB 72.5 D1) 38
3.4.12 Auxiliary Transformer 38
3.4.13 25 kV Potential Transformer 39
3.4.14 220/132/25 kV Current Transformer 39
3.4.15 220/132 kV Isolator 40
3.4.16 25 kV Isolator 40
3.4.17 25 kV Motorised Isolator 41
3.4.18 198/120/42 kV Surge Arrester 41
3.4.19 25 kV Capacitor Bank 42
3.4.20 Series Reactor (Oil Type) 42
3.4.21 Control and Relay Panel 42
3.4.22 Condition Based Maintenance through Thermo vision Camera (Traction Substation) 28th MSG TRD at
SCR on Feb 2011 item no. 28.19 43
3.4.23 Earthing & Bonding 44
Item Description Page No.
3.4.24 Battery Charger 44
3.4.25 AC/DC Distribution Panel 45
3.5 YEARLY SCHEDULE 45
3.5.1 General Works on TSS, SSP & SP 45
3.5.2 Power Transformer 45
3.5.3 25 kV Vacuum Circuit Breaker/ Interrupter 47
3.5.4 132 kV SF- 6 Circuit Breaker (120 SFM -32B) 48
3.5.5 25 kV SF- 6 Circuit Breaker (50 SFGP-20A) 49
3.5.6 132/25 kV SF-6 Circuit Breaker (70 SFM- 32A
& 120 SFM -32A) 50
3.5.7 220 kV SF-6 Circuit Breaker (ELF SL- 4-1) 51
3.5.8 25 kV SF-6, Circuit breaker/ Interrupter (EDF SK-1-1(S)
& EDF SK -1-1) 52
3.5.9 25 kV SF-6, Interrupter (30 SFGP-25A & 25 SFGP-25A) 53
3.5.10 25 kV Minimum Oil Interrupter (HPGE 7/9A) ` 54
3.5. 11 25 kV SF-6 Circuit Breaker (LTB 72.5 D1) 55
3.5.12 Auxiliary Transformer 56
3.5.13 25 kV Potential Transformer 56
3.5.14 220 kV/132 kV/25kV Current Transformer 57
3.5.15 220/132/ kV Isolator 57
3.5.16 25 kV Isolator 58
3.5.17 25 kV Motorised Isolator 58
3.5.18 198/120/25 kV Surge Arrester 59
3.5.19 Capacitor Bank 59
3.5.20 Series Reactor (Oil Type) 60
3.5.21 Series Reactor (Dry Type) 60
3.5.22 Control and Relay Panel 61
3.5.23 Condition Based Maintenance through Thermo- vision Camera (Traction Substation) 61
3.5.24 Earthing & Bonding 61
3.5.25 Battery Charger 61
3.5.26 AC/DC Distribution Panel 62
3.6 THREE YEARLY SCHEDULE 62
3.6.1 SF-6 Circuit Breaker & Interrupter 62
3.6.2 220/132/25 kV Current Transformer 62
3.7 AFTER 5 YEARS OR WHEN NEEDED 63
3.7.1 Power Transformer 63
3.7.2 Vacuum circuit Breaker & Interrupter 64
3.8 SIX YEARLY SCHEDULE 64
3.8.1 SF-6 Circuit Breaker & Interrupter 64
Item Description Page No.
3.9 PERIODIC OVERHAULING 65
3.9.1 Power Transformer 65
3.9.2 Auxiliary Transformer 70
3.9.3 Vacuum circuit Breaker & Interrupter 73
3.9.4 Battery Charger 73
3.10 PRE MANSOON AND PRE WINTER PRECAUTIONS 74
4.0 SCHEDULE ACTION PLAN 75
5.0 FORMATS FOR SUBMITTING FAILURES TO RDSO 77
TIF-0011 Rev. 0 PART-I - Protective Relay Data 77
TIF-0011 Rev. 0 PART-II - Tripping Data Relay Wise 77 TIF-0011 Rev. 0 PART-III - Tripping Data 78
TIF-0014 Rev. 0 PART-II - Make wise Breakup of Traction Transformers 78
TIF-0014 Rev.0 PART-III - Details of Testing Kit Available for Transformer Testing 79
TIF-0014 Rev.0 PART-IV - Failure Reporting of The Transformer 79
TIF-0015 Rev.0 PART-I - Performance of Capacitor Banks 80
TIF-0015 Rev.0 PART-II - Performance Monitoring of Series Reactor 80
TIF-0015 Rev. 0 PART-III - Details of Testing Kit Available for Testing 81
TIF 0015 Rev. 0 PART-IV - Failure Reporting of Shunt Capacitor Bank 81
TIF-0015 Rev. 0 PART-V - Details of the Protection Provided for Shunt Capacitor 82
TIF-0016 Rev. 0 PART- II - Year Wise and Make Wise Breakup of Circuit Breaker 82
TIF-0016 Rev. 0 PART III - Statistics of AC Circuit Breaker 83
TIF-0016 Rev. 0 PART V - Year Wise And Make Wise Breakup of Interrupter 83
TIF-0016 Rev.0 PART VI - Statistics of AC Interrupter 84
TIF-0017 Rev. 0 PART -I - Failure Format for SCADA 84
TIF-0017 Rev. 0 PART -II - Statement Showing Make Wise SCADA 85 TIF 0023 Rev.0 PART II - Information on Auxiliary Transformer System 85
TIF-0024 Rev 0, PART -I - Measurement of Resistive Leakage Current of Surge Arrestor. RDSO TI/MI/0041 Rev.1 86
ANNEXURE - I 87
ANNEXURE - II 88
ANNEXURE - III 89
ANNEXURE - IV 89
ANNEXURE - V 90
ANNEXURE - VI 91
ANNEXURE - VII 91
ANNEXURE - VIII 92
ANNEXURE – IX 93
REFERENCES 97
ISSUE OF CORRECTION SLIPS
The correction slips to be issued in future for this handbook will be numbered as
follows :
CAMTECH/E/14-15/PSI-Sch/C.S. # XX date---------
Where “XX” is the serial number of the concerned correction slip (starting from 01
onwards).
CORRECTION SLIPS ISSUED
Sr. No. Date of issue Page no. and Item no.
modified
Remarks
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
1
1.0 INTRODUCTION
Since the electric traction system depends upon continuous availability of power
supply, sub-stations and switching stations have to be kept in proper working condition at all
the time. To ensure this, the 25 kV feeder lines and traction transformers with associated
switchgear and control and relay panels are duplicated so that if one unit fails, the standby
unit can be brought into service to continue power supply. All switching operations are also
centralized and controlled by remote operation by a single authority namely Traction
Power Controller.
To achieve high reliability and zero defects on PSI assets, it is necessary to maintain
the PSI assets in perfect condition through proper schedule maintenance/checks on its
geometry and all parameters adopted in the design without compromising on safety of the
equipment as well as personnel.
No work of any kind shall be commenced on or in the vicinity of live equipment
unless power supply to the particular part has been switched off and all other prescribed
safety measures taken.
The maintenance schedule shall normally be adopted for trouble free service.
However these shall be reviewed periodically based on experience gained.
2.0 OBJECTIVE OF MAINTENANCE
The main objective of maintenance is to ensure trouble free operation of switchgear
by timely and adequate attention so that failure could be avoided through preventive and
periodical maintenance. This results in low down time and more availability of the
equipment.
Periodic review of the effectiveness of maintenance schedules shall be done.
3.0 MAINTENANCE SCHEDULES
Before starting maintenance of any switchgears, ensure that the instruction manual of
the equipment issued by the manufacturer have been fully studied and full knowledge of the
working of switchgears is available with the maintenance personnel. Otherwise there may be
adverse effect on the performance of switchgears and it may also endanger the safety of
working personnel.
The following maintenance schedules of Power Supply Installation assets are being
followed in Indian Railways:
1. Fortnightly Schedule
2. Monthly Schedule
3. Quarterly Schedule
4. Half yearly Schedule
5. Yearly Schedule
6. Three yearly schedule
7. Five yearly schedule
8. Six Yearly schedule
9. Periodic Overhaul (POH)
10. Pre- monsoon and Pre -winter precaution
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
2
3.1 FORTNIGHTLY SCHEDULE
3.1.1 Battery & Battery Charger
Sl.
No
Item Inspection And Work To Be Carried Out Remark
1. Specific
gravity
Check and record the specific gravity of
each cell.
1210 at 27°C
& discharge at
1150
2. Distilled water Check the level of electrolyte of the cells.
Top up, if necessary.
Up to maximum
mark
3. Temperature Check & record the temperature of each
cell.
Record
4. Sulphation Check & clean sulphation on terminal
connectors and apply petroleum jelly.
Clean
5. Condition of
plate
Check & clean physical condition such as
cracks, distortions and accumulation of
whitish deposit.
Clean and
replace defective
plate
6. Cell voltage Check & record the voltage of each the
cells.
2.0V to 2.2 V
7. Total voltage Check & record the total voltage of the
battery.
Not less than
110.0 V
8. Vent plugs Check the clear passage of gases. If hole
blocked, clean it.
Clean the hole
9. Sedimentation
and any internal
damage
Check the cells for undue sedimentation and
any internal damage. If observe clean it.
Without
sedimentation &
damage
10. Inter cell
connections
Check & clean with dry cloth. Replace
defective nuts, bolts & washers.
Tighten
a. AC and DC
panel Voltage
Check AC and DC voltage on panel and
record AC and DC voltage.
Record
11. Battery charger
Check smooth operation of all switches of
battery charger. Note charging rate and AC
& DC voltage in register.
Smooth
operation
12. Battery room Clean the room. Clean
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
3
3.2 MONTHLY SCHEDULE
3.2.1 General Works on TSS, SSP & SP
Sl.
No
Item Inspection And Work To Be Carried Out Remark
1. General
cleanliness
Check surface of the roadway, proper
drainage, rail access and pathways in the
substation. Roadway and pathway should be
firm and sufficiently elevated to prevent
water-logging and proper drainage.
Condition
fulfill
2. Vegetation Check & clean vegetation near around
equipment and yard.
Free from
vegetation
3. Tree and
branches
Check & trim tree branches likely to come in
the vicinity of live lines.
Cut or trim
4. Stored lubricating
or transformer oil
Check for security and fire risk. Keep oil
safe place and no combustible material is in
the vicinity of oil.
Secure
5. Caution, danger
board, shock
treatment chart
and other boards
Check & clean for damages, availability
and well secured, replace if damage.
Replace
6. Fire
extinguishers, fire
buckets and first
aid box
Check for expiry, fill up fine sand and
complete with necessary medicines.
Intact and
serviceable
7. Structure and
plant foundations
Check for any sinking or cracking and go
round the structural work for checking
tightness of various bolts and nuts.
No damages
8. All indication
lamps on control
panels
Check loose connections, fuse indication
etc. Tighten the same and replace the fuse
indication if required.
Tight &
replace
9. State electricity
board readings
Check & record meter reading, MD,
variation in voltage, frequency and power
factor and important data parameters.
Record
10. All jumpers &
other connections
Check visually for flash/ spark marks on
jumper, nuts & bolts. Tighten the respective
bi-metallic clamp/ connections. Replace if
required.
Check & tight
11. Discharge rod Check for cable strands broken and
damages. If strands 20% broken replace the
cable.
Replace
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
4
3.2.2 Power Transformer RDSO (TI/MI/00038 REV.1)
Sl.
No
Item Inspection And Work To Be
Carried Out
Remark
1. Maximum
temperature of
transformer oil on
dial indicator
Check and compare it with the
previous values. Abnormal change in
the temperature should be further
investigated and reset indicator.
Record and reset
2. Maximum
temperature of
transformer winding
on dial indicator
Check and compare it with the
previous values. Abnormal change in
the temperature should be further
investigated and reset indicator.
Record and reset
3. Oil level in
conservator (MOLG)
Check as per transformer oil
temperature indicator (OTI). If low,
top up with the filtered oil.
Top up if required
4. Buchholz Relay Check for gas collection. In case gas is
collected the same should be sent for
DGA.
As per RDSO
guide line for
DGA refer Annex.
2.04 of ACTM Vol
II, Part I.
5. Oil level in OIP
condenser bushing
Check for oil level with reference to the
oil level indicator :
In case of sealed bushing, if no
oil/less than minimum level
indication. Measure Tan- Delta &
capacitance and compare the test
values recorded earlier.
In case of oil filled bushing if any
leakage is observed, the same shall
be attended.
Max. allowable
Tan Delta - 0.007
and Capacitance
is 110% of the
factory set value
respectively
6. Tap changer Check & record the position of
standby and service transformer.
Record
7. Tank, Radiators,
Conservator, Bushing,
Oil level indicator,
gauges
Check & clean dirt deposits, leakage
and crack. If crack/leakage is
observed, replace /attend it.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
5
Sl.No Item Inspection And Work To Be Carried Out Remark
8. Dehydrating
breather
Check breather for choking due to insect
build /dirt. If breather is choked, remove
the dirt etc.
Check the intactness of gasket and color of
the silica gel. If gasket is damage and silica
gel is pink, replace the same, with new
gasket and dry silica gel or recondition the
old silica gel. If the silica gel is too wet
check the BDV of transformer oil.
Check oil level in the oil cup. Fill up oil in
cup if required.
If BDV is less
than 50 kV,
filter the oil till
it reaches 50 kV
9. Heater in
marshalling box
Check for proper functioning. In case not
working, the connection should be checked
and rectified.
Working
condition
10. Sound Check abnormal humming, observe arrest the
humming sound.
Find out the
reason
11. All external
connection
Check visually that all connections are normal
without any discoloration due to local heating.
In case of any sign of heating, clean and
tighten the bolts and nuts.
Take corrective
action
3.2.3 Safety Precautions before Maintenance of Circuit Breaker/ Interrupter
Switch off all the auxiliary supplies of the equipment.
Circuit/ Interrupter are in the open condition.
Circuit/ Interrupter and sequential isolators are fully open condition.
Discharge the spring.
3.2.4 25 kV Vacuum Circuit Breaker / Interrupter
Make - ALIND, Type –VSE/5/20
Make - BHEL, Type – PVTB/PVTI
Make - ABB, Type – FSK-II
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of porcelain
pole insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace &
clean
2. Magnetic actuator
operating
mechanism and
drive link
assembly, if
applicable
Check presence of dust, looseness of bolts
and distortion in the operating mechanism.
Clean the same with dry cloth tighten the
bolts and investigate the problem in
mechanism & rectify.
Check &
rectify
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
6
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
3. Counter reading
Check operation of counter and record
counter reading of CB/BM:
- Before maintenance
- After maintenance
Function
properly
4. Mechanism box Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason
and attend it.
Clean & apply
weather
sealant
material as per
annexure ‘V’
5. Heater, thermostat
& lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Function
properly
6. Position of
indicator
Check alignment and missing indicator.
In position
7. Control circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record
voltage and
proper lug &
ferule
8. Tripping
mechanism
Check & correct operation of tripping
mechanism.
Function
properly
9. Shaft of the pole
assembly
Check visibility of red band on the
shaft of the pole assembly.
Visible
10. Auxiliary circuits Check the connections & function of
auxiliary control circuit and supply voltage
is correct.
Connections
are according
to the diagram
11. Local/Remote
switch operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function
properly
12. Connections
Check loose/overheating connections.
Tight if found loose.
Tighten
13. Earth connections &
foundation bolts
Check & tight the earth connections &
foundation bolts.
Tighten
14. Condenser tripping
device for CB
Check the function of CTD proper
operation. If defective, attend the same.
Function
properly
15. Anti pumping
device for BM
Check the function of APD for proper
operation. If defective, attend the same.
Function
properly
16. Interlocking Check the function of interlock with
isolator.
Function
properly
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
7
3.2.5 132 kV SF-6 Circuit Breaker
Type - 120 SFM - 32B, Make - CGL
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace & clean
2. Counter
reading
Check operation of counter and record
counter reading of CB:
- Before maintenance
- After maintenance
Function
properly
3. Gas pressure Check & record gas pressure with
temperature.
7.0 kg/cm sq at
20 deg temp.
4. Mechanism
box
Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason
and attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
5. Heater,
thermostat &
lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Working &
setting of
thermostat is 25
– 30 deg. C
6. Control
circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record voltage
and proper size
lug & ferule
7. Local/Remote
switch
operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function
properly
8. Local and
remote switch
Check the function of local and remote
switch.
Function
properly
9. Position of
indicator
Check alignment and missing indicator.
In position
10. Shock
observer
Check the oil leakage from shock absorber.
Repair or replace, if necessary.
Repair or replace
11. Limit switch
& auxiliary
contact
Check & clean the function of auxiliary
limit switch, switches, contact and
connection for tightness.
Function properly
& tighten
connection
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
8
Sl. No. Item Inspection And Work To Be Carried Out Remark
12. Condenser
tripping device,
if provided.
Check the function of CTD proper operation.
If defective, attend the same.
Function
properly
13. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same.
Function
properly
14. Interlocking Check the function of interlock with isolator. Function
properly
3.2.6 25 kV SF-6 Circuit Breaker (GCB)
Type- 50 SFGP - 20A, Make CGL
Sl.No. Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace &
clean
2. Counter
reading
Check operation of counter and record
counter reading of CB:
Before maintenance
After maintenance
Function
properly
3. Gas pressure Check & record gas pressure and temperature. 5.0 kg/cm sq at
20 deg temp.
4. Space heater,
thermostat &
lamp
Check function of heater, thermostat & lamp.
If any defect attend it.
Working &
setting of
thermostat is 25
– 30 deg. C
5. Mechanism
box
Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason and
attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
6. Main terminal Check the main terminal for discoloration,
overheated & rusted nuts, bolts & washer.
Replaced, if required.
Replace
7. Shock
absorber
Check the oil leakage from shock absorber.
Repair or replace, if necessary.
Repair or
replace
8. Control circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record voltage
and proper size
lug & ferule
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
9
Sl.No. Item Inspection And Work To Be Carried
Out
Remark
9. Local/Remote
switch
operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function properly
10. Local and
remote switch
Check the function of local and remote
switch.
Function properly
11. Position of
indicator
Check alignment and missing indicator.
In position
12. Limit switch
& auxiliary
contact
Check & clean the function of auxiliary
limit switch, switches, contact and
connection for tightness.
Function properly
& tighten
connection
13. Earth
connections &
foundation
Check & tight the earth connections &
foundation bolts. If found loose.
Tighten
14. Condenser
tripping device
Check the function of CTD proper
operation. If defective, attend the same.
Function properly
15. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same
Function properly
16. Interlocking Check the function of interlock with
isolator.
Function properly
3.2.7 132/25 kV SF- 6 Circuit Breaker
Type- 70- SFM- 32A, MAKE - CGL
Type- 120- SFM -32A, MAKE - CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark,
chipping insulators. Replace if
required. Clean with dry cotton
cloth for dirtiness.
Replace & clean
2. Counter reading
Check operation of counter and
record counter reading of CB:
Before maintenance
After maintenance
Function properly
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
10
Sl.
No.
Item Inspection And Work To
Be Carried Out
Remark
3. Gas pressure Check & record gas pressure and temperature.
70 – SFM – 32A Gas pressure 5.0 kg/cm sq. at
20 deg C
120 – SFM – 32A Gas pressure 6.0 kg/cm sq. at
20 deg C
4. Air pressure Check & record air pressure with temperature as per OEM.
70 – SFM – 32A
Low air pressure alarm ON
13.2 ±0.3 kg/cm sq.
Low air pressure alarm OFF
14.2 ±0.3 kg/cm sq.
Low air pressure cutout switch
ON 12.00 ±0.3 kg/cm sq.
Low air pressure cutout switch
OFF
13.00 ± 0.3 kg/cm sq.
120 – SFM – 32A
Low air pressure alarm ON
13.5 ±0.3 kg/cm sq.
Low air pressure alarm OFF
14.5 ±0.3 kg/cm sq.
Low air pressure cutout
switch ON 13.00 ±0.3
kg/cm sq.
Low air pressure cutout
switch OFF
14.00 ±0.3 kg/cm sq.
5. Air leakage Check pneumatic system
such as valves, piping for
air leak sound.
No leakage
6. Compressor
setting
Check & record auto start / cut off compressor setting.
70 – SFM – 32A
Governor Switch ON-14.5
±0.3 kg/cm sq.
- Governor Switch OFF-15.5
±0.3 kg/cm sq.
120 – SFM – 32A
Governor Switch ON-14.8
±0.3 kg/cm sq.
- Governor Switch OFF-15.8
±0.3 kg/cm sq. as per manual
7. Compressor oil Check compressor oil. Top
up, if required.
Top up specified oil
8. Air reservoir
draining
Check & drain water from
air reservoir tank.
Drain water as & when
required
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
11
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
9. Space heater,
thermostat &
lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Working &
setting of
thermostat is 25 –
30 deg. C
10. Mechanism box Open the cover check & clean
mechanism box for condensation rain
water, gasket of door, dust and hinges.
Arrest the reason and attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
11. Main terminal Check the main terminal for
discoloration, overheated & rusted nuts,
bolts & washer. Replaced, if required.
Replaced
12. Control circuit
Check & record operating voltage,
control circuit wiring and connection
should have proper lugs and ferule
number in terminal box.
Record voltage
and proper size
lug & ferule
13. Local/Remote
switch operation
Check the operation of breaker on local
and remote switch. Breaker should
have open & close on selected position.
Function properly
14. Local and remote
switches
Check the function of local and remote
switch.
Function properly
15. Condenser
tripping device
Check the function of CTD proper
operation. If defective, attend the same
Function properly
16. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same
Function properly
17. Position of
indicator
Check alignment and missing indicator. In position
18. Auxiliary switch /
switch contact
and terminal
block.
Check & clean the function of auxiliary
limit switch, switches, contact,
connection and terminal block for
tightness.
Function properly
& tighten
connection
19. Interlocking Check the function of interlock with
isolator.
Function properly
20. Earth connections
& foundation
Check & tight the earth connections &
foundation bolts.
Tighten
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
12
3.2.8 220 kV SF- 6 Circuit Breaker
Type -ELF SL- 4-1 Double Pole/ Triple pole,
MAKE – ABB
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace & clean
2. Counter reading Check operation of counter and record
counter reading of CB:
Before maintenance
After maintenance
Functioning
3. Gas pressure Check & record gas pressure and
temperature.
Gas pressure 7.0
bar at 20° temp.
4. Air pressure Check & record air pressure with
temperature as per OEM Low air pressure
alarm ON 18.0 bar.
Pressure switch for
closing blocking 17.3
bar.
Pressure switch for
auto trip 17.0 bar.
Pressure switch for
tripping blocking
16.7 bar.
5. Air leakage Check pneumatic system such as valves,
piping for air leak sound.
No leakage
6. Compressor oil Check compressor oil. Top up, if required. Servo-150
7. Air reservoir
drainage
Check & drain water from air reservoir
tank.
Drain water as &
when required
8. Compressor
motor & ‘V’
belt
Check carbon brushes and clean
commutator with cotton cloth. Check
tension of belt.
Tension < 2 times
of belt diameter.
9. Space heater,
thermostat &
lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Function properly
10. Mechanism box Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason
and attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
13
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
11. Control circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record voltage
and proper size
lug & ferule
12. Local/Remote
switch
operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function properly
13. Local and
remote switches
Check the function of local and remote
switch.
Function properly
14. Condenser
tripping device
Check the function of CTD proper
operation. If defective, attend the same.
Function properly
15. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same.
Function properly
16. Interlocking Check the function of interlock with
isolator.
Function properly
17. Earth
connections &
foundation
Check & tight the earth connections &
foundation bolts. If found loose.
Tighten
3.2.9 25 kV SF- 6, Double Pole, Circuit Breaker/Interrupter
Type- EDF SK-1-1(S), MAKE - ABB
Type- EDF SK-1-1, MAKE - ABB
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace & clean
2. Counter
reading
Check operation of counter and record
counter reading of CB/BM:
Before maintenance
After maintenance
Function
properly
3. Gas pressure Check & record gas pressure and
temperature.
Gas pressure 7.0
bar at 20° temp.
4. Heater,
thermostat &
lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Working &
setting of
thermostat is 25
– 30 deg. C
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
14
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
5. Main terminal Check the main terminal for
discoloration, overheated & rusted nuts,
bolts & washer. Replace, if required.
Replace
6. Shock observer Check the oil leakage from shock
absorber.
Repair or replaced, if necessary.
Replace
7. Control circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record voltage
and proper size
lug & ferule
8. Local/Remote
switch
operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function properly
9. Local and
remote switches
Check the function of local and remote
switch.
Function properly
10. Position of
indicator
Check alignment and missing indicator. In position
11. Limit switch &
auxiliary contact
Check & clean the function of auxiliary
limit switch, switches, contact, connection
and terminal block for tightness.
Function properly
& tighten
connection
12. Density Monitor Check loose connection of cable and gas
leakage from non return valve.
Secured and no
leakage
13. Condenser
tripping device
for CB
Check the function of CTD proper
operation. If defective, attend the same
Function properly
14. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same.
Function properly
15. Interlocking Check the function of interlock with
isolator.
Function properly
16. Earth
connections &
foundation
Check & tighten the earth connections &
foundation bolts. If found loose.
Tighten
3.2.10 25 kV SF- 6, Interrupter ( Single & Double Pole)
Type- 30 SFGP – 25 A, MAKE – CGL
Type- 25 SFGP – 25 A, MAKE – CGL
S.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace &
clean
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
15
S.
No.
Item Inspection And Work To Be Carried Out Remark
3. Gas pressure Check & record gas pressure and
temperature.
Gas pressure
5.0 kg/cm2 at
20 deg temp.
4. Heater,
thermostat &
lamp
Check function of heater, thermostat &
lamp. If any defect attend it.
Working &
setting of
thermostat is
25 – 30 deg. C
5. Mechanism box Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason for
rain water and attend it.
Clean & apply
weather
sealant
material as per
annexure ‘V’
6. Main terminal Check the main terminal for discoloration,
overheated & rusted nuts, bolts & washer.
Replace, if required.
Replace
7. Shock observer Check oil leakage from shock observer.
Repair or replace, if required.
Replace
8. Control circuit
Check & record operating voltage, control
circuit wiring and connection should have
proper lugs and ferule number in terminal
box.
Record voltage
and proper lug &
ferule
9. Local/Remote
switch
operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function properly
& tighten
connection
10. Limit switch &
auxiliary
contact
Check & clean the function of auxiliary
limit switch, switches, contact, connection
and terminal block for tightness.
Function properly
11. Position of
indicator
Check alignment and missing indicator. In position
12. Snap ring and
locking nut
Check tightness of snap ring and locking
nut. Tighten if required.
Tight
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
16
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
14. Interlocking Check the function of interlock with
isolator.
Function
properly
15. Earth connections
& foundation
Check & tight the earth connections &
foundation bolts. If found loose.
Tighten
3.2.11 25 kV Minimum Oil Interrupter
Type- HPGE7/9A, MAKE - ALIND
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace &
clean
2. Bushing Check leakage of compound from top of the
bushing and take corrective action.
Attend
3. Counter reading Check operation of counter and record
counter reading of BM:
-Before maintenance
- After maintenance
Function
properly
4. Position of
indicator
Check alignment and missing indicator In position
5. Operation of the
equipment on
local control
Check & attend abnormal sound, binding of
leverages or any rubbing of parts. Find out
the reason and attend it.
Attend
6. Mechanism box Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason and
attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
7. Shock absorber Check shock absorber function properly
during tripping.
Smooth function
8. Operation of
plunger
Check operation of plunger in closing &
tripping coil.
9. Oil level Check the oil level in the dashpot pole unit.
Top up, if necessary
Top up
10. Oil leakage Check for any oil leakage. Attend
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
17
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
11. Commutator of
motor
Check & clean commutator with clean dry
cotton cloth
Clean
12. Carbon brushes Check the condition of carbon brushes.
Replace, if worn out replace it.
Replace worn
out brushes
13. Local/Remote
switch operation
Check the operation of breaker on local and
remote switch. Breaker should have open &
close on selected position.
Function
properly
14. Interlocking Check the function of interlock with isolator. Function
properly
15. Earth
connections &
foundation
Check & tight the earth connections &
foundation bolts. If found loose.
Tighten
3.2.12 25 kV SF- 6, Single Pole, Circuit Breaker
Type- LTB 72.5D1, MAKE - ABB
Sr.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain pole
insulator unit
Check for damages, flash mark, chipping
insulators. Replace if required. Clean with
dry cotton cloth for dirtiness.
Replace & clean
2. Counter reading Check operation of counter and record
counter reading of CB:
Before maintenance
After maintenance
Function
properly
3. Gas pressure Check & record gas pressure and
temperature.
Gas pressure 7.0
bar at 20° temp.
4. Heater,
thermostat &
lamp
Check function of heater, thermostat & lamp.
If any defect attend it.
Working &
setting of
thermostat is 25
– 30 deg. C
5. Mechanism box Open the cover check & clean mechanism
box for condensation rain water, gasket of
door, dust and hinges. Arrest the reason for
rain water and attend it.
Clean & apply
weather sealant
material as per
annexure ‘V’
6. Main terminal Check the main terminal for discoloration,
overheated & rusted nuts, bolts & washer.
Replace, if required.
Replace
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
18
Sr.
No.
Item Inspection And Work To Be Carried
Out
Remark
7. Shock observer Check the oil leakage from shock
absorber.
Repair or replaced, if necessary.
Replace
8. Local/Remote
switch operation
Check the operation of breaker on local
and remote switch. Breaker should have
open & close on selected position.
Function properly
9. Local and remote
switches
Check the function of local and remote
switch.
Function properly
10. Position of
indicator
Check alignment and missing indicator. In position
11. Limit switch &
auxiliary contact
Check & clean the function of auxiliary
limit switch, switches, contact, connection
and terminal block for tightness.
Function properly
& tighten
connection
12. Condenser
tripping device
Check the function of CTD proper
operation. If defective, attend the same
Function properly
13. Anti pumping
device
Check the function of APD for proper
operation. If defective, attend the same.
Function properly
14. Interlocking Check the function of interlock with
isolator.
Function properly
15. Earth connections
& foundation
Check & tighten the earth connections &
foundation bolts. If found loose.
Tighten
3.2.13 Auxiliary Transformer
Type - Double wound, single phase, oil immersed
natural air cooled and step down
transformer for outdoor installation
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Visual inspection
of transformer.
Check any sign of oil leakage, over heating. If
observe attend it.
Attend
2. Cleaning of
transformer
Clean the transformer externally conservator,
bushing and tank with clean cotton cloth.
Clean
3. Silica gel Check the condition of silica gel. If color is
pink reactivate/ replace.
Check oil in the cup of breather. Top up the
oil in cup if required.
Replace & top
up oil
4. Connections Check, clean & tight all connections of HT and
LT bushing terminals.
Tighten
5. Oil level in
conservator
Check & top up oil level in conservator with
new filtered oil up to mark, if required.
BDV of oil
more than 30
kV
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
19
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
6. AT enclosure Check & clean AT enclosure of vegetation and
other material.
Clean
7. Condition of pole
mounted ICDP
switch, control
panel and its
fuses
Check condition of pole mounted ICDP switch,
control panel and its fuses. Replace overheated
of lugs, fuses and tighten loose connections.
Use fuse wire
20 SWG for
34 Amp.
22 SWG for
24 Amp.
8. Caution board
and anti climbing
device
Check caution board and anti climbing device
for availability and conditions.
Available
9. Earthing
connections
Check & tight the earth connections. If found
loose.
Tighten
10. Arcing horn HV
bushing
Check flash mark on arcing horn. Attend if
flashover mark observe
Attend
3.2.14 220/132/25 kV Current Transformer
Type- Single phase, oil filled natural air cooled
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain
bushing
Check damages, flash mark, chipping insulators
replace, if required. Clean with dry cotton cloth
for dirtiness.
Clean &
replace
2. Terminal
connectors
Check overheated/rusted terminal connectors.
Replace if any sign of overheated/rusted.
Replace
3. Terminal bolts,
nuts & washers
Check tightness of terminal bolts, nuts &
washers. Replace if any sign of
rusting/oxidation.
Replace
4. Oil level Check oil level for leakage. Top up oil if
required and arrest the leakage.
Attend
5. Earthing
connections
Check & tight the earth connections. If found
loose.
Tighten
6. Arching horn,
if provided
Check flash mark on horn tips. Clean flash
mark
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
20
3.2.15 220/132 kV Isolator
Type – Double pole, Triple pole
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Isolator Check visually the conditions of the support
insulator. If observe any abnormality attend it.
Attend
2. Mechanism
& earthing
Check & clean mechanism, operation, tightness of
earthing connection and lubricate the moving parts.
Tighten &
lubricate
3. Operation of
Isolator
Check operation of the isolator for correct
adjustment of blade and smooth hand operation.
Free
movement
4. Interlock Check working of interlock without obstruction. Free
operation
5. Earthing
connections
Check & tight the earthing of the frame with its
fittings. Lead of earthing heel if provided
Tighten
3.2.16 25 kV Isolator
Type – Single pole, Double
Pole and Bipolar
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Isolator Check damages, flash mark, chipping insulators
replace, if required. Clean with dry cotton cloth for
dirtiness.
Clean &
replace
2. HV
connections
Check & tight HV connections for overheated
/rusted. Replace if required.
Replace
3. Operation
of Isolator
Check the hand operation of the isolator for correct
adjustment of blade and smooth hand operation.
Free
movement
4. Interlock Check operation of interlock and lubricate all
moving parts.
Free
operation
5. Earthing
connections
Check & tight the earthing of the frame with its
fittings.
Tighten
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
21
3.2.17 198/120/42 kV Surge Arrester
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Visual inspection of
lightning arrestor
Check sign of overheating if observe. Find
out the reason and attend it.
Attend
2. Surface of porcelain
bushing
Check damages, flash mark, chipping
insulators replaced, if required. Clean with
dry cotton cloth for dirtiness.
Clean &
replace
3. Surge counter, if
provided
Check & record the number of discharges of
surge counter, if meter is provided.
Record
3.2.18 Series Reactor (Oil Type)
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain
insulator
Check damages, flash mark, chipping insulators
replaced, if required. Clean with dry cotton cloth
for dirtiness.
Clean &
replace
2. Reactor tank
and cover plate
Check & attend damages, oil leakage/ seepage.
Find out the reason and rectify.
Attend
3. Oil label Check & top up oil level in reactor with new oil
up to mark, if required.
BDV more
than 40 kV
of oil
4. Silica gel Check the condition of silica gel. If color is
pink reactivate/ replace.
Check oil in the cup of breather. Top up the
oil in cup if required.
Replace &
top up oil
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
22
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
5. Connection on
bushing
Check the tightness of bolts and nuts. Replace
the rusty or overheated bolts and nuts if
necessary.
Replace
6. Earthing
connections
Check & tight the earth connections. If found
loose.
Attend
7. Terminal
Connector &
Bus-bar
connectors
Check & tight the bolts and nuts of top & bottom
connectors. Replace the rusty or overheated bolts
and nuts if necessary.
Replace
8. Buchholz Relay Check for gas collection. In case gas is collected
the same should be sent for DGA.
As per
RDSO
guide line
for DGA
refer
Annex. 2.04
of ACTM
Vol II, Part
I.
3.2.19 Series Reactor (Dry Type)
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain insulator
Check damages, flash mark, chipping
insulators replaced, if required. Clean with
dry cotton cloth for dirtiness.
Clean &
replace
2. Connection on
bushing
Check the tightness of bolts and nuts.
Replace the rusty or overheated bolts and
nuts if necessary.
Replace
3. Earthing
connections
Check & tight the earth connections. If found
loose.
Attend
4. Terminal
Connector & Bus-
bar connectors
Check & tight the bolts and nuts of top &
bottom connectors. Replace the rusty or
overheated bolts and nuts if necessary.
Replace
5. Coil Check visually of coil for warm. If warm find
out the reason and attend it.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
23
3.2.20 Control and Relay Panel
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Cleaning of
panel
Check & clean accumulated dust externally &
internally with dry cloth.
Clean
2. Indicating and
recording
instrument
Check all indicating and recording instrument
are working normally.
Working
normally
3. Relay Check & clean outer terminals of relay for any
abnormality.
Intact
4. Cable
connections
Check & tighten all cable connections, if found
loose.
Tighten
5. Terminal
board
Check & clean terminal board, cable damage
and cable leads with dry cotton cloth and attend
the damage cable.
Attend
6. Fuses Check all fuses for proper rating &
overheating, replace if necessary. Proper rating
7. Earthing
connections
Check & tight the earth connections. If found
loose.
Attend
8. Doors Check doors & hinges for intactness. Free
movement
9. Holes in panel Check & plug the holes to avoid entry of
moisture and insects.
Free from
holes
3.2.21 Battery Charger
Sl.
No
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to fortnightly schedule
2. Charger Check & clean the charger outside and
inside with dry cloth.
Clean
3. Voltmeter &
Ammeter
Check the proper function of voltmeter &
ammeter.
Working
satisfactory
4. Overheating Check any sign of overheating inside the
charger. Find out the reason and attend it.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
24
3.2.22 25 kV Motorised Isolator
Type – Single Pole
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Visual Visual checking of isolator for any
abnormality.
No
abnormality
2. Control box
Check & clean interior with dry cloth or
vacuum cleaner. Remove accumulated dust,
Plug the holes to avoid entry of moisture and
repair or replace the rusted parts.
Clean
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
25
3.3 QUARTERLY SCHEDULE
3.3.1 General Works on TSS, SSP & SP
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly schedule.
2. Bus bars, clamps
& connectors by
thermo vision
camera
Check nut, bolt & washers for
overheating. Replace, if necessary.
Replace
3.3.2 Auxiliary Transformer
Type- Double wound, single phase, oil immersed natural air cooled and step down
transformer for outdoor installation
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule.
2. Drop Out
(DO) fuse
Check condition of DO fuse barrel and fuse
element. Replace the breakage, overheating and
non standard fuse wire.
Use
standard
fuse wire
3. Sound of
equipment
Check any unusual sound of equipment.
soundless
3.3.3 25 kV Potential Transformer
S.
No.
Item Inspection And Work To Be Carried Out Remark
1. Inspection of
PT
Check oil leakage, chip or insulator broken and
any sign of overheating, if observe attend it.
Attend
2. Terminal Check any overheating of terminal. Replace if
found overheated.
Replace
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
26
S.
No.
Item Inspection And Work To Be Carried Out Remark
3. Terminal
bolts, nuts &
washers
Check & replace of terminal bolts, nuts and
washer. If found any sign of rusting/oxidation.
Replace
4. Oil level Check oil level in PT& top up with new oil up to
mark, if required.
BDV of oil
more than
40 kV
5. Fuse Check fuse and neutral link for proper rating and
tightness. Replace the fuse if necessary.
Replace
6. Earthing
connections
Check & tight the earth connections. If found
loose.
Attend
3.3.4 25 kV Motorised Isolator
Type – Single Pole
S.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule
2. Door gasket
and hinges
Check weather proof gasket & hinges
for good condition. Replace/ repair, if
damage.
Replace/rep
air
3. Manually
operation
Check the operation manually in local and
remote, keeping the control door open.
Observe whether the mechanism and operating
rod functions smoothly without any rubbing or
obstruction.
Smooth
operation
4. Electrically
operation
Check the operation electrically in local and
remote, keeping the control door open.
Observe whether the mechanism and operating
rod functions smoothly without any rubbing or
obstruction.
Smooth
operation
5. Wiring
connection
Check & tight wiring connections for loose,
overheating or any defect.
Attend
6. Relays and
contactors
Check & clean healthiness of relays,
contactors and its contacts.
Functioning
7. Heater Check working condition of heater, if
defective attend it.
Functioning
8. Grease and
lubrication
Check & clean and apply grease and lubricate
to all moving parts.
9. Earthing
connections
Check & tight the earth connections. If found
loose.
Attend
10. Locking
arrangement
Check working of locking arrangement
smoothly.
Smooth
functioning
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
27
3.3.5 198/120/42 kV Surge Arrester
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule.
2. Earthing terminal
& earthing strip
Check & tight earthing terminal & strip, tighten
if loose.
Attend
3. Guarding ring, if
provided
Check guarding ring connections, tighten if
loose.
Attend
3.3.6 Capacitor Bank (TI/MI/00026 Rev. 2)
Type- Single phase, oil filled natural air cooled.
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Surface of
porcelain insulator
Check damages, flash mark, chipping
insulators replaced, if required. Clean with dry
cotton cloth for dirtiness.
Clean &
replace
2. Dielectric Check dielectric leakage/ seepage
If leakage/seepage is found :
i. Minor seepage may be attended by M-seal
(fast drying type compound).
ii. Extent of leakage may be studied, attend it
or replace it.
Attend
or
replace
3. Birdcage in and
around the traction
sub station
Check & remove birdcage in and around the
traction substation to avoid bird electrocution.
Free from
birdcage
4. Temperature of the
capacitor units
Check physically for any abnormal
temperature rise of the capacitor units. If
abnormal temperature rise of the capacitor
units. Find out the reason and rectify.
Attend
3.3.7 Battery Charger
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to fortnightly & monthly schedule.
2. Terminal
connection
Check the terminal connection on the
disconnecting link. Replace any overheating of
terminal connectors, if found overheated or
rusted.
Replace
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
28
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
3. Earth terminals Check & tight the earth connections. If found
loose.
Attend
4. MCB Check visual operation for proper functioning
and rating.
Smooth
operation
5. Three pin plug
with socket
Check & replace overheating or defective three
pin plug/ socket.
Replace
6. Termination
ends of the
cable
Check & tight all termination ends of the cable,
if loose.
Tighten
3.3.8 AC/ DC Distribution Panel
S.
No.
Item Inspection And Work To Be Carried Out Remark
1. Distribution
panel
Check & clean the panel outside and inside
with dry cloth.
Clean
2. Voltmeter Check the function of voltmeter. working
satisfactory
3. Earth terminals Check & tight earth termination points on both
ends. Attend if any deficiency.
Attend
4. MCB Check visual operation for proper functioning
and rating.
Smooth
operation
5. Temperature at
termination
points
Measure & record the temperature at
termination points. If variation is more than 5
deg. with room temp, ensure the tightness.
Measure and
record
6. LED Check & replace the defective LED with tested
LED.
Replace
7. Fuses Check all fuses for proper rating & overheating,
replace if necessary.
Proper rating
8. Holes in panel Check & plug the holes to avoid entry of
moisture and insects.
Free from
holes
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
29
3.4 HALF YEARLY SCHEDULE
3.4.1 General Works on TSS, SSP & SP
S.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly and quarterly schedule.
2. Fencing Inspect all around switching station to
observe any abnormality. If seen attend the
same.
Attend
3. Door and bonding
between metal
fencing panels and
earth, lubricant the
door
Check hinges of all doors and bonding
between metal fencing panels and earth.
Lubricant the hinges of all doors.
If bonding deficient metal fencing panels and
earth, attend it.
Intact all
respect &
lubricate
4. Boards Check & painting of all caution, danger
board, shock treatment, schematic diagram,
key box and other boards, if faded.
Replace or
enamel
paint
5. Fire extinguisher,
buckets, first aid
boxes
Inspect expiry date of fire extinguisher,
buckets fill with sand, first aid boxes fill with
necessary medicine with valid date.
Intact all
respect
6. Oil sump, if
available
Check & clean oil sump for dirtiness. Clean
3.4.2 Power Transformer RDSO (TI/MI/00038 REV.1)
Sl. No. Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule.
2. Test oil
sample with
oil test kit.
Test for BDV and acidity. Compare and
take action as indicated in enclosed
ANNEXURE-I
Sample should
be taken
moving oil.
3.
Insulation
resistance of
winding and
polarization.
Index (PI)
with 2.5 kV
or 5 kV
megger for
HV-LV
HV-E
LV-E.
Insulation resistance is to be measured for
10 sec., 60 sec. and 600 sec. for HV-LV,
HV-E and LV-E. Calculate PI (Polarization
index) by the IR ratio of R60/R10 and
R600/ R60
Insulation resistance values should be
compared with the last recorded value.
Compare PI values with values at the
time of commissioning/ last recorded.
PI Insulation/ condition
< 1.0 Dangerous
1.0 - 1.1 Poor
1.1- 1.25 Questionable
1.25 - 2.0 Satisfactory
>2.0 Good
If PI value is less than 1.1, oil should be
filtered. In case the value does not
improve even after filtrations periodic
overhauling should be under taken.
Ensure that
transformer
is
disconnected
Ensure
bushings are
clean and
free from
moisture and
temperature
on which IR
is recorded
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
30
Sl. No. Item Inspection And Work To Be Carried Out Remark
4. PRD/
explosion
vent
Check & investigate for operation of PRD/
explosion vent for any damage and
presence of oil. Check connection and
operation of PRD/ explosion vent. Replace
the damage PRD with new PRD.
Replace the
damage PRD
3.4.3 25 kV Vacuum Circuit Breaker / Interrupter
Make - ALIND, Type –VSE/5/20
Make - BHEL, Type – PVTB/PVTI
Make - ABB, Type – FSK-II
Sl.No. Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule.
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and
latches.
Lubricate as per
annexure ‘VI’
3. All cir clip, split
clip and dowel pin
Check for availability and
damages. Replace, if damage.
Replace
4. Spring stroke Measure & record spring stroke
contact pressure.
Minimum 4 mm and 5
mm max.
5. Contact wear
indication
Check contact wear mark. If green
not seen, contacts are worn off.
Change bottle or
contact manufacturer.
6. Insulation
Resistance of pole
unit (when
breaker in open
position)
Check & record IR value of pole
unit as per OEM:
i Top-Bottom
ii Top- Earth
iii Bottom - Earth
Check with 2.5/5.0 kV megger.
-More than 5000 MΩ
-Record the make &
serial number of
megger.
7. Insulation
Resistance of pole
unit (when
breaker in close
position)
Check & record continuity & IR
value of pole unit as per OEM:
i. Top-bottom –for continuity
ii. Top & bottom - earth
Check with multimeter & 2.5/5
kV megger.
-Continuity zero
-More than 5000 MΩ
-Record the make &
serial number of
megger.
8. Insulation
Resistance of
i. Motor
ii. Closing coil
iii. Tripping coil
iv.AC& DC wiring
Check & record IR value of:
i. Motor
ii. Closing coil
iii. Tripping coil
iv. AC wiring & DC wiring
Check with 500 V megger
i. Motor – 2 MΩ
ii. Closing coil -2
MΩ
3.. Tripping
coil -2 MΩ
iv. AC & DC wiring
more than 2 MΩ
9. Motor, if
applicable
Check carbon brushes & clean
commutator. Replace carbon
brush if worn out.
Replace the brush
10. Top cover Check sealing of top cover for any
moisture trapping. Ensure
Sl.No. Item Inspection And Work To Be Remark
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
31
Carried Out
11. Wipe & Travel
measurement
Measure & record the wipe &
travel measurement as per
OEM.
Record
ALIND CB Wipe 8+/-0
Travel 22+2/-0
BM Wipe 8+1/-0
Travel 21+1/-0
BHEL BM Wipe 10
mm
Travel 22to2
4
ABB CB/BM Wipe 25+2/-
0
Travel
3.4.4 132 Kv SF-6 Circuit Breaker
Type – 120 SFM – 32B, Make – CGL
Sl.No. Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly schedule.
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and latches.
Lubricate as per
annexure ‘III’
3. Insulation
Resistance of
pole unit (when
breaker in open
position)
Check & record IR value of pole unit:
i Top-Bottom
ii Top- Earth
iii Bottom – Earth
Check with 2.5/5.0 Kv megger.
-More than 1500
MΩ
-Record the make &
serial number of
megger.
4. Insulation
Resistance of
pole unit (when
breaker in close
position)
Check & record continuity & IR value
of pole unit as per OEM:
i Top-bottom – for continuity
ii Top & bottom – earth
Check with multimeter & 2.5/5.0 kV
megger.
-Continuity zero
-More than 1500
MΩ
-Record the make &
serial number of
megger.
5. Insulation
resistance
between control
circuit to ground
Measure & record the insulation
resistance between control circuits to
ground by 500 V megger.
More than 2 MΩ
Record the make &
serial number of
megger.
6. Closing coil Check & record closing coil parameter:
i. Voltage
ii. Resistance
iii. I R Value
Check with measuring instrument (
megger & multimeter)
i. Voltage 110V
DC+/- 10%
ii. Resistance 32
ohm
iii. IR Value 2 MΩ
Sl.No Item Inspection And Work To Be Remark
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
32
Carried Out
7. Trip coil Check & record trip coil parameter:
i. Voltage
ii. Resistance
iii. I R Value
Check with measuring instrument(
Megger & multimeter)
i. Voltage 110V
DC+/- 10%
iii Resistance 32
ohm
iii. I R Value 2 MΩ
8. Mechanism box Check penetration of rain water, rust
and door hinges. Arrest the reason
and rectify.
Weather sealant as
per annexure ‘V’
9. Main terminal
connector
Check overheated & rusted nuts,
bolts, washers and bi- metallic strips.
Replace if required.
Replace and use
conducting
compound
10. Shock absorber Check for oil leakage, if leakages
attend it.
Attend or replace
11. Charging time
of closing spring
Check & record charging time of
closing spring.
15 Sec.
3.4.5 25 kV SF-6 Circuit Breaker (GCB)
TYPE- 50 SFGP – 20A, Make CGL
Sl.No. Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the linkage
in SF 6 gas & air mechanism.
Lubricate as per
annexure ‘III’
3. Insulation
Resistance of
pole unit (when
breaker in open
position)
Check & record IR value of pole unit
as per OEM:
i Top-Bottom
ii Top- Earth
iii Bottom – Earth
Check with 2.5/5.0 kV megger.
More than 10,000 M
Ohms
Record the make &
serial number of
megger.
4. Insulation
Resistance of pole
unit (when breaker
in close position)
Check & record continuity & IR
value of pole unit as per OEM:
i Top-bottom – for continuity
ii Top & bottom – earth
Check with multimeter & 2.5/5.0 kV
megger.
-Continuity zero
-More than 10,000
MΩ
-Record the make &
serial number of
megger.
5. Insulation
resistance
between control
circuit to ground
Measure & record the insulation
resistance between control circuits to
ground with 500 V megger.
More than 2 MΩ
Record the make &
serial number of
megger.
6. Tripping trigger
& roller
Check, adjust & record the gap
between tripping trigger & roller.
Within 0.3 to 0.7
mm. and record.
7. Gas pipe line Check pipe line & joints by gas
detector or soap water for leakage.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
33
Sl.No Item Inspection And Work To Be
Carried Out
Remark
8.
Mechanism box Check penetration of rain water, rust
and door hinges. Arrest the reason
and rectify.
Weather sealant as
per annexure ‘V’
9. Main terminal
connector
Check overheated & rusted nuts,
bolts, washers and bi- metallic strips.
Replace if required.
Replace and use
conducting
compound
10. Spring charging
motor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature and
lubricate. Replace bearing if jam.
Attend
3.4.6 25 kV SF-6 Circuit Breaker
Type – 70 SFM – 32 A, MAKE – CGL
Type – 120 SFM – 32 A, MAKE – CGL
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and latches.
Lubricate as per
annexure ‘III’
3. Insulation
Resistance of
pole unit (when
breaker in open
position)
Check & record IR value of pole unit as
per OEM:
i Top-Bottom
ii Top- Earth
iii Bottom – Earth
Check with 2.5/5.0 kV megger.
-More than 1500
MΩ
-Record the make
& serial number
of megger.
4. Insulation
Resistance of
pole unit (when
breaker in close
position)
Check & record continuity & IR value of
pole unit as per OEM:
iii Top-bottom – for continuity
iv Top & bottom – earth
Check with multimeter & 2.5/5.0 kV
megger.
-Continuity zero
-More than 1500
MΩ
-Record the make
& serial number
of megger.
5. Insulation
resistance
between control
circuit to ground
Measure & record the insulation
resistance between control circuits to
ground with 500 V megger.
-More than 10
MΩ
-Record the make
& serial number of
megger.
6. Closing coil Check & record closing coil parameter:
i. Voltage
ii. Resistance
iii. I R Value
Check with measuring instrument
(magger & millimeter)
i. Voltage
110V DC+/- 10%
ii. Resistance 20Ω
iii. IR Value 2 MΩ
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
34
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
7. Motor for air
compressor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature and
lubricate. Replace bearing if jam.
Replace worn out
carbon brushes &
jam bearing
8. Consumption of
air to open the
breaker
Check & record air pressure drop in one
operation. Create one operation and
check.
Drop less than 1.2
kg/cm2 and record
3.4.7 220 kV SF- 6 Circuit Breaker
Type -ELF SL- 4 - 1 Double Pole, MAKE – ABB
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and latches.
Lubricate as per
annexure ‘VI’
3. Insulation
Resistance of
pole unit (when
breaker in open
position)
Check & record IR value of pole unit
as per OEM:
i Top-Bottom
ii Top- Earth
iii Bottom - Earth
Check with 2.5/5.0 kV megger.
- More than 2000
MΩ
- Record the make
& serial number
of megger.
4. Insulation
Resistance of
pole unit (when
breaker in close
position)
Check & record continuity & IR value
of pole unit as per OEM:
i Top-bottom – for continuity
ii Top & bottom - earth
Check with multimeter & 2.5/5 kV
megger.
-Continuity zero
- More than 2000
MΩ
- Record the make
& serial number
of megger.
5. Insulation
resistance
between control
circuit to ground
Measure & record the insulation
resistance between control circuit to
ground by 500 V megger.
- More than 2 MΩ
- Record the make
& serial number
of megger.
6. Compressor
setting
Check & record auto start / cut off
compressor setting.
-Governor switch
ON-19.5 bar
-Governor Switch
OFF-20.5 bar
7. Motor for air
compressor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature and
lubricate. Replace bearing if jam.
Attend
8. Air pressure drop Check & record air pressure drop in
one operation. Create one operation and
check.
Drop maximum 1.0
bar.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
35
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
9. Air pressure
charging
Check & charging of time for pressure.
Measure the timing 0 bar to 20.5 bar.
Less than 75
minutes for 200 lit.
air reservoir
10. Air and gas pipe
line
Check pipe line & joints leakage of air
& gas by soap water for air and gas for
gas detector or soap water.
Attend
3.4.8 25 kV SF- 6 Circuit Breaker/Interrupter
Type - SF-6 EDF SK-1-1 (S), MAKE – ABB
Type - SF-6 EDF SK-1-1, MAKE – ABB
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and latches.
Lubricate as per
annexure VI & VII
3. Insulation
Resistance of pole
unit (when
breaker in open
position)
Check & record IR value of pole unit
as per OEM:
i Top-Bottom
ii Top- Earth
iii Bottom - Earth
Check with 2.5/5.0 kV megger.
- More than 2000
MΩ
- Record the make
& serial number
of megger.
4. Insulation
Resistance of pole
unit (when
breaker in close
position)
Check & record continuity & IR value
of pole unit as per OEM:
i. Top-bottom – for continuity
ii. Top & bottom - earth
Check with multimeter & 2.5/5.0 kV
megger.
-Continuity zero
- More than 2000
MΩ
- Record the make
& serial number
of megger.
5. Insulation
resistance between
control circuit to
ground
Measure & record the insulation
resistance between control circuits to
ground with 500 V megger.
- More than 2 MΩ
- Record the make
& serial number
of megger.
6. Gas pipe line Check pipe line & joints by gas
detector or soap water for leakage.
Attend
7. Spring charging
motor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature and
lubricate. Replace bearing if jam.
Replace worn out
carbon brushes &
bearing
8. Charging time of
spring
Check & record time for charging the
spring at nominal tension
Not more than
15sec.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
36
3.4.9 25 kV SF- 6, Interrupter (Single, Double Pole)
TYPE- 30 SFGP – 25 A, MAKE - CGL
TYPE- 25 SFGP – 25 A, MAKE – CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and
latches.
Apply lubricate as
per annexure ‘III’
3. Insulation
Resistance of
pole unit (when
breaker in open
position)
Check & record IR value of pole unit as per OEM:
i.Top-Bottom, ii. Top- Earth, iii. Bottom - Earth
Check with 2.5 kV megger.
30 SFGP – 25 A
More than 10,000
MΩ & record the
make & serial
number of megger.
25 SFGP – 25 A
More than 500 MΩ
& record the make &
serial number of
megger.
4. Insulation
Resistance of
pole unit (when
breaker in close
position)
Check & record continuity & IR value of pole unit as per
OEM: i.Top-bottom – for continuity, ii.Top & bottom -
earth
Check with multimeter & 2.5/5 kV megger.
30 SFGP – 25 A
-Continuity zero
-More than 10,000
MΩ & record the
make & serial
number of megger.
25 SFGP – 25 A
-Continuity zero
-More than 500 MΩ
& record the make
& serial number of
megger.
5. Insulation
resistance
between control
circuit to ground
Measure & record the insulation
resistance between control circuit to
ground with 500 V megger.
More than 2 MΩ
Record the make &
serial number of
megger.
6. Tripping trigger
& roller
Check, adjust & record the gap
between tripping trigger & roller.
Between 0.3 to 0.7
mm. and record.
7. Gas pipe line Check pipe line & joints by gas
detector or soap water for leakage.
Attend
8. Mechanism box Check penetration of rain water,
rust and door hinges. Arrest the
reason and rectify.
Apply weather
sealant as per
annexure ‘V’
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
37
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
9. Spring charging
motor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature
and lubricate. Replace bearing if
jam.
Attend
3.4.10 25 kV Minimum Oil Interrupter
Type- HPGE7/9A, MAKE - ALIND
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. Insulation
resistance of pole
unit (when breaker
in open position)
Check & record IR value of pole
unit:
i Top-Bottom
ii Top- Earth
iii Top & Bottom - Earth
Check with 2.5/5.0 kV megger.
More than 1000
MΩ
Record the make &
serial number of
megger.
3. Insulation
Resistance of pole
unit (when breaker
in close position)
Check & record continuity & IR
value of pole unit as per OEM:
i Top-bottom – for
continuity
ii Top & bottom - earth
Check with multimeter & 2.5/5.0
kV megger.
-Continuity zero
-More than 1000
MΩ
-Record the make &
serial number of
megger.
4. Insulation
resistance between
control circuit to
ground
Measure & record the insulation
resistance between control
circuit to ground with 500 V
megger.
More than 2 MΩ
Record the make &
serial number of
megger.
5. Test the oil sample Take oil sample from the pole,
before and after monsoon and
test the dielectric strength
(BDV) and excessive presence
of carbon. If BDV is low or
excessive presences of carbon in
oil then replace the oil with fresh
dry and tested oil.
BDV - 40 kV Min.
6. Arc quenching
chamber
Check condition & clean arc
quenching chamber with dry
cloth for its condition
No abnormality
7. Latches Check & lubricate all latches Lubricate
8. Spring charging
motor
Check & clean commutator,
carbon brushes size and spring
tension, free movement of
motor, temperature and
lubricate. Replace bearing if
jam.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
38
3.4.11 25 kV SF- 6, Single Pole, Circuit Breaker
Type- LTB 72.5D1, MAKE - ABB
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. All the moving
part of the
mechanism
Check, clean & lubricate the gear,
bearing cum shaft rollers and latches.
Lubricate as per
annexure ‘VI, &
‘VII’
3. Insulation
Resistance of pole
unit (when
breaker in open
position)
Check & record IR value of pole unit
as per OEM:
iv Top-Bottom
v Top- Earth
vi Bottom - Earth
Check with 2.5/5.0 kV megger.
- More than 2000
MΩ
- Record the make
& serial number
of megger.
4. Insulation
Resistance of pole
unit (when
breaker in close
position)
Check & record continuity & IR value
of pole unit as per OEM:
iii. Top-bottom – for continuity
iv. Top & bottom - earth
Check with multimeter & 2.5/5.0 kV
megger.
-Continuity zero
- More than 2000
MΩ
- Record the make
& serial number
of megger.
5. Insulation
resistance between
control circuit to
ground
Measure & record the insulation
resistance between control circuit to
ground with 500 V megger.
- More than 2 MΩ
- Record the make
& serial number
of megger.
6. Gas pipe line Check pipe line & joints by gas
detector or soap water for leakage.
Attend
7. Spring charging
motor
Check & clean commutator, carbon
brushes size and spring tension, free
movement of motor, temperature and
lubricate. Replace bearing if jam.
Attend
8. Charging time of
spring
Check & record time for charging the
spring at nominal tension
Not more than
15sec.
3.4.12 Auxiliary Transformer
TYPE- Double wound, single phase, oil immersed natural air cooled and step down
transformer for outdoor installation
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Check all points stated carried out in monthly and quarterly schedule
2. BDV of oil Take sample of oil from bottom
of tank and check the BDV of
oil with BDV tester.
BDV more than 30 kV (with
2.5 mm spindle gap)
3. Additional
arching horn
on fixed 9-
ton insulator
Check flash mark on arching
horn and measure the gap of
arching horn.
Gap maintain 165 mm (min)
& record
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
39
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
4. Measure & record insulation resistance between
5. HV- Earth 200 M ohm. Minimum (use 2.5 kV megger)
6. HV- LV 200 M ohm. Minimum (use 2.5 kV megger)
7. LV- Earth 2 M ohm minimum (use 500 V megger)
8. Earth
resistance
Check earth connections,
measure & record the earth
resistance by earth tester.
- Not more than 10 ohm.
- Record the make & serial
number of megger.
9. LT cable Check & replace damage,
overheating of wires, lugs
etc.of LT cable. Measure &
record IR value of cable:
i. i. Between AT to ICDP switch.
ii. Between ICDP switch to
control panel by 500 V
megger.
2 M ohm min. at 30
deg.tempreture and record
3.4.13 25 kV Potential Transformer
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Check all points stated carried out in quarterly schedule
2. Measure Insulation Resistance between:
3. HV- Earth, if possible 200 M ohm. Minimum (use 2.5 kV megger)
4. HV- LV 200 M ohm. Minimum (use 2.5 kV megger)
5. LV- Earth 2 M ohm minimum (use 500 V megger)
6. Rod gap, If provided Check & record rod gap setting Record
3.4.14 220/132/25 kV Current Transformer Type- Single phase, oil filled natural air cooled
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Check all points stated carried out in monthly schedule
2. Earth link Check & tight earth link in secondary box. Ensure for
tightness
3. Measure Insulation Resistance between:
4. HV- Earth i. 2000 MΩ min. for 220/132 kV (use 2.5 kV megger)
ii. 200 MΩ min. for 25 kV (use 2.5 kV megger)
HV- LV i. 2000 MΩ min. for 220/132 kV (use 2.5 kV megger)
ii. 200 MΩ min. for 25 kV (use 2.5 kV megger)
LV- Earth i. 200 MΩ Min. for 220/132 kV (use 2.5 kV megger)
ii. 2 MΩ min. for 25 kV (use 500 V megger)
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
40
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
5. Fuses Check fuse for proper rating & overheating,
replace if necessary.
Proper
rating
6. Arching horn, if
provided
Check arching horn for flash mark and measure
the gap of arching horn.
record
3.4.15 220/132 kV Isolator
Type – Double pole, Triple pole
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule
2. Isolator Check damages, flash mark, chipping insulators
replace, if required. Clean with dry cotton cloth
for dirtiness.
Clean &
replace
3. Small parts Check all nuts, bolts, split pins for good
condition. Replace if rusted or defective
Replace
4. Jaws Check the spring of jaws for proper gripping. Intact
5. Main contacts Check overheating and clean main contacts and
lightly wipe with petroleum jelly.
Apply
petroleum
jelly
6. Articulated
joints, sliding
and bearing
surface
Check & clean all articulated joints, sliding and
bearing surface with kerosene oil and lubricate.
SAE 40
7. Interlock Check operation of interlock and lubricate all
moving parts.
Free
operation
8. Arcing horn, if
provided
Check arcing horn for correct alignment.
Working satisfactory, if provided
Proper
alignment
9. HV connections Check & tight HV connections for overheated
/rusted. Replace if required.
10. Earthing of
operating handle
Check earthing of operating handle with copper
flexible wire.
Intact
3.4.16 25 kV Isolator
Type – Single pole, Double pole and Bipolar
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule
2. Main contacts Check overheating and clean main contacts and
lightly wipe with petroleum jelly.
Apply
petroleum
jelly
3. Small parts Check all nuts, bolts, split pins for good
condition. Replace if rusted or defective
Replace
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
41
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
4. Simultaneous
operation of
blades (double
pole)
Check & simultaneous operation of blade for
correct alignment. If variation adjust it.
Proper
alignment
5. Locking
arrangement
Check the condition of locking arrangements to the operating handle and provision of padlocks.
Pad lock
available
6. Arcing horn, if
provided
Check arcing horn for correct alignment. Working
satisfactory, if provided
Proper
alignment
7. Earthing of
operating handle
Check earthing of operating handle with copper
flexible wire.
Intact
3.4.17 Motorised Isolator, 25 kV Type – Single Pole
3.4.18 198/120/42 kV Surge Arrester
RDSO (TI/SPC/PSI/CLMNA/0030)
Sl.
No.
Item Inspection And Work To
Be Carried Out
Remark
1. Carry out following work in addition to monthly & quarterly schedule
2. Leakage current ,
if monitor
provided
Measure & record of leakage
current
Less than 500 Micro Amps
as per speciation no
TI/SPC/PSI/CLMNA/0030
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
3. Carry out following work in addition to quarterly schedule
4. Clearance of
blades in open
condition
Check, measure & record the distance between
male and female contact in fully open position.
Minimum 500
mm
5. Electrical
operation
Check the isolator for smooth operation and
correct alignment of male & female contacts.
Contact
properly
6. Alignment of
isolator
Check the correct alignment of isolator for its
firm grip while isolator in closed condition.
Attend if required.
Firm grip
7. Limit switches,
auxiliary
switches &
contacts
Check & clean limit switches, auxiliary
switches & contacts and function.
Functioning
8. Blade tips and
contact fingers
Check blade tips for overheating and contact
fingers and apply petroleum jelly on the contact
surface
Apply jelly
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
42
3.4.19 25 kV Capacitor Bank (TI/MI/00026 Rev. 2)
Type- Single phase, oil filled natural air cooled.
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to quarterly schedule
2. Tension on
connections
Check & release the excessive tension on the
connections. If required
Tension free
3. Corrosion on
metallic parts
Check & clean rust collection/corrosion mark
on the metallic part by cleaning agent.
Clean
4. Current and
voltage variation
Check, measure & record current and voltage
variation for the capacitor bank for at least 24
hrs and record.
Record
3.4.20 Series Reactor (Oil Type)
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule
2. BDV of oil Take sample of oil from bottom of tank and
check BDV with BDV tester. If low replace the
oil with fresh filtered oil
BDV more than
40 kV (with 2.5
mm rod gap).
3. Insulation
resistance
of winding
Measure & record insulation resistance:
Winding to earth (ambient temp also to be
recorded) with 2.5 kV megger.
Minimum 200 M
ohms
3.4.21 Control and Relay Panel
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly schedule
2. Indication and
recording
instrument
Check all indication and recording instrument
for healthiness. Replace if defective.
All
functioning
3. Relay Check & clean outer terminals of relay. Intact
4. Door gasket &
hinges
Check & replace gasket for damages. Replace
with new if necessary.
Replace
5. All connections Check & tight all connection. Tighten if loose Tighten
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
43
3.4.22 Condition Based Maintenance through Thermo vision Camera (Traction Substation)
28th MSG TRD at SCR on Feb 2011 item no. 28.19
1. AC TRD (Traction Sub- Station)
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. (For DC) Rectifier
Panel, Incoming &
out going bus
bar/cable
termination.
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
Variation in
temperature
following action
is to be taken:
i. Variation > 20
deg.-To be
attended
within 24 hrs
ii. 10 deg. <
variation < 20
deg. To be
attended
within 10 days
iii. 5 deg. <
variation < 10
deg. To be
attended
within a
month
iv. Variation < 5
deg. Normal
2. Cable Termination of
cable isolators ends
connection
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
3. All joints,
connections
terminals, jumpers,
PG clamps of
incoming switch
yard and out going
switch gear
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
4. Transformer bushing
connection
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
5. Bus bar joints
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
6. LA, CT, PT
connections from bus
bar and PG clamps.
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
7. HV side bi-polar
isolators, Single pole
isolator contact and
bus bar.
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
8. Power cable
terminations and
joints provided in
sub-stations.
-Check thermal scanning by thermo
vision camera.
-The temperature of hot spots is
compared with adjacent/nearby
similar components.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
44
3.4.23 Earthing & Bonding
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Bonding &
earth connection
with structure
Check physically soundness & tightness
of bonding & earth connection with
structure, lightning arrestor, and electrical
equipment inter panel connection.
Intact
2. Earth resistance
of electrical
equipment
body, fencing
and structure
with electrode
Measure & record the earth resistance of
electrical equipment body, fencing,
structures by earth tester.
-Less than 10 ohms
-Record the make
& serial number of
megger.
3. Shielding wire Check termination of shielding wire
condition and bonding with structures.
Intact
4. Earth resistance
of each
electrode after
disconnection
Measure & record the earth resistance of
each electrode after disconnecting it from
common earth system by earth tester.
-Less than 10 ohms
-Record the make
& serial number of
megger.
5. Combined earth
resistance of
TSS/SP/SSP
with rail
Measure & record the earth resistance of
combined electrode without
disconnecting it from common earth
system by earth tester.
For TSS < 0.5
and SP and SSP <
2.0
3.4.24 Battery Charger
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly and quarterly schedule
2. Equipments and
wire
Check and clean equipments and wires with
soft wire brush.
Clean
3. Electrolyte
condenser
Visual checking. If observe abnormality then
replace it.
Replace
4. i. Rectifier,
ii. Coarse/ fine
control switch,
iii. Trickle/Boost
change over
switch
Check & tight connection of all terminal
connectors and working:
i. Rectifier,
ii. Coarse/fine control switch
iii. Trickle/Boost change over switch
working
smoothly
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
45
3.4.25 AC/DC Distribution Panel
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition quarterly schedule
2. Panel Check & Clean the panel inside and outside by
soft brush.
Clean
3. MCB, rotary
switches
Check and clean smooth operation & working
without obstruction.
Working
satisfactory
4. Tightness Check & tight cable termination of MCBs, rotary
switch and bus bar.
No loose
connection
3.5 YEARLY SCHEDULE
3.5.1 General Works on TSS, SSP & SP
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly, quarterly and half yearly schedule
2. Building Check for roof cleaning, leakage and condition
of building. Complain to civil dept, if any
deficiency.
Attend
3. Lightning screen Check & tight strain clamp of wire. If observe
any defect attend it.
Attend
4. Structure and
fencing
Check structure and fencing for soundness.
Intact
5. Trenches Open and clean trenches for possibility of
lizard and other insects entry in control panels /
equipments.
Clean
6. Tree & branches Check & prune the tree branches near to live
conductor as required.
Maintain
clearance
3.5.2 Power Transformer RDSO (TI/MI/00038 REV.1)
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule:
2. Transformer
tank, bushings,
taps changer,
radiator and
connection joints
Check infrared temperature scanning.
Infrared temperature scanning is to
be done preferably at the time of full
load to find any over heating.
The infrared scan
results are compared
with previous results
3. OIP condenser
bushing
Measure, record & compare the test
for Tan-delta, capacitance and IR
(Shearing bridge may be used for tan
delta & capacitance). Compare with
earlier value. In case of deviation in
reading from standard value, replace
or consult manufacturer.
- Bushing should be
cleaned for dust and
moisture.
- Test should be done
on sunny day.
- Max allowable Tan-
delta is 0.007
- Max allowable
capacitance 110%
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
46
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
4. Gasket joints of
transformer
Check & tight the bolts evenly to avoid
uneven pressure in case of leakage
only.
Tightening of the bolts
has to be done in
proper sequence
5. Rod gap setting
of bushing
Check rod gap setting. Adjust if
required
6. Test oil in
transformer
Test oil as per the ANNEXTURE -1
The oil sample is tested as per conform
to IS-1866-2000. If the oil value does
not meet the requirement oil to be
replace.
Replace with new oil.
Refer Annexure-I
giving Annexure-2.03
B of ACTM Vol. II,
Part-I (As per latest IS
1866-2000)
7. Dissolved gas
analysis (DGA)
on oil
Oil sample taken for DGA as per
RDSO guide line at Annexure 2.04 of
ACTM Vol.-II Part-I.
Test result compare with the RDSO
guideline and action taken accordingly.
Refer Annexure 2.04
of ACTM, Vol.II, Part
I. in case of abnormal
DGA values in the
past, DGA test has to
be done frequently i.e.
every six-months
8. Working of tap
changer switch
Move the tap setting switch up and
down full range so that by self-wiping
action good contacts are assured.
Set the tap finally at
the correct position
9. Relays, alarm &
their circuits
Check relay and alarm contacts, their
operation, fuses etc. and relay
accessories.
Clean the components, replace contacts
and fuses if necessary. Change the relay
setting if necessary.
Operation & setting
10. Control boxes &
Terminal boxes/
cable
Check for water tightness of boxes &
terminal boxes. Replace gasket, if
required.
Replace
11. Temperature
indicators
Check for pockets, holding
thermometer oil to be replenished, if
required.
Attend
12. Dial type oil
gauge
Check pointer for free movement.
Adjust, if required.
Attend
13. Earth resistance Measure & record earth resistance by
earth tester. Take suitable action, if
earth resistance is high.
-Less than 10 ohms
-Record the make &
serial number of
megger.
14. Buchholz relay Check operation and measure the
insulation resistance by 500V megger
and continuity test for contacts with
test lock screw set as 5°.
IR not less than 20
mega ohm.
On continuity test
relay shall operate.
15. Voltage ration
test with wheat
stone bridge,
voltmeter
Precautions to be taken as per normal
practice being followed for
measurements with wheat stone bridge.
Compare the trends of the ratio with
reference to pre commissioning/ factory
value/ earlier test.
The sudden variation
in ratio from the last
measured value should
call for further
investigation.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
47
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
16. Winding
resistance test
with wheat stone
bridge voltmeter
– ammeter
The test conducted on principal tap by
applying DC current. The measured
value should be converted to 75°C for
conversion.
Compare the value with the pre-
commissioning/ factory test values.
Deviation in absolute value should be
less than ± 5% of pre-commissioning or
factory set value.
This test shall be last
test on winding to
avoid DC flux
remaining in core
resulting incorrect
values in the other
test.
3.5.3 25 kV Vacuum Circuit Breaker / Interrupter
Make - ALIND, Type –VSE/5/20
Make - BHEL, Type – PVTB/PVTI
Make - ABB, Type – FSK-II
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Auxiliary
switches
connected in
conjunction with
mechanism
Check for correct position of the aux.
switches and carry out few close & open
operations. Signals occurred correctly and
driving level is correctly positioned auxiliary
switch.
Working
satisfactory
3. Cable glands Check tightness of the fairleads and locked.
The free fairleads must be covered with
relative plate and blocked.
Secured
4. Terminal
Connectors
Check & clean connector, nuts, bolt, washer
and bimetallic strip. Polish the surface and
freely place bimetallic strip properly, If
provided.
Clean &
apply
conducting
grease
5.
6. Measure & record the Closing and Tripping timing by timer in mili second as per
OEM:
ALIND(BEL VAC bottle) CB Closing < 150
Tripping < 65
BM Closing < 120
Tripping < 80
BHEL BM Closing < 120
Tripping < 80
ABB CB/BM Closing < 65
Tripping < 45
7. Measure the Contact resistance in Micro ohms as per OEM:
ALIND(BEL VAC bottle) < 50
BHEL < 80
ABB < 50
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
48
3.5.4 132 kV SF- 6 Circuit Breaker
Type - 120 SFM – 32 B, Make - CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Plunger Check & clean free movement of
trip & close plunger.
Free
movement
3. Anti pumping pin Check & clean free movement of
plunger.
Free
movement
4. Shock proof mounting Check for broken. Replace if
broken
Replace
5. Operation timing Check & record closing &
opening timing with timer as per
OEM:
i. Closing
time <
130 ms
ii. Opening
time < 32
ms
6. Contact resistance (CB
close position)
Check & record contact resistance
of fixed & moving contact with
contact resistance meter.
< 50
7. Check & record measurement of dimensions of Circuit Breaker as per OEM:
8. Dimension Measure the following
dimensions.
i. Stroke of moving core of trip
coil
ii Gap between plunger of trip
coil and trip trigger.
iii. Difference between stroke
(ST) and gap (GT).
iv. Stroke of moving core of
closing coil.
v. Gap between Anti pumping
lever and closing trigger.
vi. Difference between stroke
(SC) and gap G.C1).
vii. Gap between anti pumping
lever and anti pumping pin.
viii. Gap between anti pumping
lever and closing trigger
2.8 – 3.2 mm
1.0 -1.4 mm
1.6 – 2.4 mm
4.5-5.5mm
2.0-3.0 mm
2.5-3.5 mm
1.0-2.0 mm
2.3-3.0 mm
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
49
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
ix. Stroke of spring operating mechanism.
x. Gap between roller and cam (G).
100 mm ±3 mm
1.4 mm ±3 mm
9. Checking of gas pressure setting:
10. Gas pressure Normal 7.0 kg/cm2
Alarm 6.5 kg/cm2
Lockout 6.0 kg/cm2
3.5.5 25 kV SF- 6 Circuit Breaker (GCB)
Type - 50 SFGP - 20A, Make CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts, bolt,
washer and bimetallic strip. Polish the
surface and freely place bimetallic
strip properly, If provided.
Clean
3. Operation
timing
Check & record closing & opening
timing with timer.
i. Closing time < 100 ms
ii. Opening time < 43 ms
4. Closing coil Check & record closing coil parameter
as per OEM:
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument (500
v magger & millimeter)
i. Voltage 110V DC+/- 10%
ii. Resistance 22.28
iii. IR Value 20 M 2 MΩ
5. Trip coil Check & record trip coil parameter as
per OEM
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument
(500 V magger & millimeter)
i. Voltage 110V DC+/- 10%
ii. Resistance 22.28
iii. IR Value 2 MΩ
6. Spring
charging
motor
Check & record spring charging motor
parameter as per OEM:
i Voltage
ii I R Value
Check with measuring instrument (500
V magger & millimeter).
i. Voltage 110V DC+/- 10%
ii. I R Value 2 MΩ
7. Contact
resistance (CB
close position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter.
< 50
8. Checking of gas pressure setting:
Gas Pressure Normal 5.0 kg/cm2
Alarm 4.5 kg/cm2
Lockout 4.0 kg/cm2
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
50
3.5.6 132/25 kV SF-6 Circuit Breaker
Type - 70 – SFM – 32A, MAKE - CGL
Type -120 – SFM – 32A, MAKE – CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Surface of
rollers and
sliding
Check & lubricate the bearing surface
of rollers and sliding surfaces of
lever.
Lubricate as per annexure
‘III’
3. Mechanism Check manual operation of
mechanism slowly at 80% of normal
voltage. Ensure that link and lever
should move freely.
Operate at 88% Volt DC
4. Tripping
mechanism
Check the clearance ST (solenoid
magnet stroke) between armature and
core by feeler gauge.
Between armature and core
2.0 to 2.4 mm
Check & record the clearance GT
between plunger and trigger by feeler
gauge.
0.5 to 0.9 mm
Check the clearance & record of ST,
GT
1.5 to 1.7 mm
5. Closing
Mechanism
Check the clearance SC (solenoid
magnet between Armature and core
SC
4.5 to 5.5 mm
Check the pumping prevention pin to
latch distance clearance “p” between
anti pumping Pin and latch
P=1 to 2 mm
6. Pole and Mechanism setting
Check & record mechanism setting of interrupter & operating mechanism:
Operating
Mechanism
Check over stroke “SO” completely
open position to stop position.
6± 1mm (B2 – B1)
Interrupter Measure the stroke and contact wipe
between fix contact and moving
contact of pole
Stroke (A1) – (A3)
=180 + 2 mm, -5 mm
Wipe (A2- A3)
= 36 ±2mm
Operating Mechanism Stroke:- Check
stroke “S” from closed portion to
completing opened position.
Stroke (B3-B2) = 40 + 1
mm – 3 mm
7. DC motor:
i. Inlet
filter
Check & clean inlet filter. Replace, if
damaged.
Replace
ii.Carbon
brushes
Check & clean condition of carbon
brush and commutator. Replace, if
defective carbon brush.
Replace
iii.‘V’ Belt
of motor
Check condition and tension of belt
motor to compressor. Replace the
belt, if defective or loose.
Tension < 2 times of belt
diameter.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
51
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
8.
Operation
timing
Check & record
closing &
opening timing
with timer.
70-SFM-32A i. Closing time < 100 ms
ii.Opening time < 30 ms
120-SFM-32A i. Closing time < 100 ms
ii. Opening time < 30 ms
9. Contact
resistance
(CB close
position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter.
< 50
10. Safety
valves
Check the control valve for air
leakage and safety valve for function.
Working condition
11. Air pressure
charging
time
Check & measure charging of time
for pressure at 0.0 kg/cm2 to 15
kg/cm2
Less than 20 minutes for
70 lit. air reservoir and
record
12. Checking of setting of
70-SFM-32A 120-SFM-32A
Air pressure Alarm 13.2 kg/cm2 13.5 kg/cm
2
Trip 12.0 kg/cm2 13.0 kg/cm
2
Gas
pressure
Normal 5.0 kgf/cm2 6.0 kgf/cm
2
Alarm 4.5 kgf/cm2 5.5 kgf/cm
2
Lockout 4.0 kgf/cm2 5.0 kgf/cm
2
3.5.7 220 kV SF-6 Circuit Breaker
Type -ELF SL- 4 - 1 Double Pole, MAKE – ABB
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts, bolt,
washer and bimetallic strip. Polish
the surface and freely place
bimetallic strip properly, If provided.
Clean
3. Operation
timing
Check & record closing & opening
timing with timer as per OEM.
i. Closing time < 130 ms
ii.Opening time < 35 ms
4. Closing coil Check & record closing coil
parameter a per OEM:
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument (
500 V magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. Resistanc 20.07 Ohm
iii. I R Value 2 MΩ
5. Trip coil Check & record trip coil parameter as
per OEM :
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument
(500 V Magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. Resistance 20.07 Ohm
iii. IR Value 2 MΩ
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
52
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
6. a. Compressor
motor
b. Motor
bearing
Check & record compressor motor
parameter:
i. Voltage
ii. Power
iii. I R Value
Check with measuring instrument (
500 V Magger & millimeter)
Check bearing for free movement,
lubrication. Replace, if bearing jam,
and lubricate.
a.
i. Voltage 110V DC+/-
10%
ii. 2 HP, 16.5 Amp.
iii. IR Value 2 MΩ
b. Replace bearing
7. Checking of setting and record as per OEM
Gas Pressure Normal 7.0 bar
Alarm 6.2 bar
Lockout 6.0 bar
Air Pressure Normal 20.5 bar
Alarm 18.0 bar
Lockout 17.0 bar
8. Contact
resistance (CB
close position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter as per OEM
< 51 at 20deg.C
3.5.8 25 kV SF-6 Circuit Breaker/Interrupter
Type - SF-6 EDF SK-1-1 (S), MAKE – ABB
Type - SF-6 EDF SK-1-1, MAKE – ABB
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts, bolt,
washer and bimetallic strip. Polish the
surface and freely place bimetallic strip
properly, If provided.
Clean
3. Operation
timing
Check & record closing & opening timing
with timer as per OEM.
i. Closing time < 60 ms
ii. Opening time < 35 ms
4. Closing coil Check & record closing coil parameter as
per OEM:
i Voltage
ii Power
iii I R Value
Check with measuring instrument (500 V
magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. 500 W
iii. IR Value 2 MΩ
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
53
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
5. Spring
charging
motor
Check & record spring charging motor
parameter as per OEM:
i Voltage
ii Power
iii I R Value
Check with measuring instrument (500
V magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. 750 W
iii. IR Value 2 MΩ
6. Contact
resistance
(CB close
position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter.
< 42 at 20 deg. C
7. Checking of setting of
8.
Gas Pressure
Normal 7.0 bar
Alarm 6.2 bar
Lockout 6.0 bar
3.5.9 25 kV SF- 6, Interrupter (Single, Double Pole)
Type- 30 SFGP – 25 A, MAKE - CGL
Type- 25 SFGP – 25 A, MAKE - CGL
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts,
bolt, washer and bimetallic strip.
Polish the surface and freely place
bimetallic strip properly, If
provided.
Apply electrical joint
compound as per annexure
‘IV’
3. Operation
timing
Check & record closing & opening timing with timer.
30 SFGP – 25 A i. Closing time < 100ms
ii. Opening time < 50 ms
25 SFGP – 25 A i. Closing time < 100ms
ii. Opening time < 60 ms
4. Closing coil Check & record closing coil
parameter as per OEM:
i. Voltage
ii. Resistance
iii. I R Value
Check with measuring instrument
(500 v magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. Resistance 22.28
iii. IR Value 20 M 2 MΩ
5. Trip coil Check & record trip coil
parameter as per OEM:
i. Voltage
ii Resistance
iii I R Value
Check with measuring instrument
(500 V magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. Resistance 22.28
iii. IR Value 2 MΩ
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
54
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
6. Spring
charging
motor
Check & record spring charging
motor parameter as per OEM:
i. Voltage
ii. Current
iii. I R Value
Check with measuring instrument
(500 V magger & millimeter).
i. Voltage 110V
DC+/- 10%
ii. 5.2A
iii. I R Value 2 MΩ
7. Contact
resistance
(CB close
position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter.
< 50
8. Checking of gas pressure setting:
Gas Pressure
Normal 5.0 kg/cm2
Alarm 4.5 kg/cm2
Lockout 4.0 kg/cm2
3.5.10 25 kV Minimum Oil Interrupter
Type- HPGE7/9A, MAKE - ALIND
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts, bolt,
washer and bimetallic strip. Polish the
surface and freely place bimetallic strip
properly, If provided.
Clean
3. Mechanism Check manual operation of mechanism
slowly at 80% of normal voltage. Ensure
that link and lever should move freely.
Operate at 88% Volt DC
4. Operation
timing
Check & record closing & opening
timing with timer.
i. Closing time < 120 ms
ii. Opening time < 80 ms
5. Closing coil Check & record closing coil parameter
as per OEM:
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument( 500
V magger & millimeter)
i. Voltage 110V DC + /-
10%
ii. Resistance 15
iii. IR Value 2 MΩ
6. Trip coil Check & record trip coil parameter as
per OEM:
i Voltage
ii Resistance
iii I R Value
Check with measuring instrument (500
V magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. Resistance 15
iii. IR Value 2 MΩ
7. Spring
charging
motor
Drain oil from gear box of the spring
charging motor and refill the oil up to
the mark.
Replace the oil
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
55
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
8. Contact
resistance (CB
close position)
Check & record contact resistance of
fixed & moving contact with contact
resistance meter.
< 50
9. Linear stroke Measure & record the linear stroke of:
Closing spring
Tripping spring
-Closing spring 108 mm
-Tripping spring138 mm
10. Contact rod Measure & record the travel of moving
contract rod.
275 + 2.5 mm
11. Fuses Check & replace defective fuses. Replace
3.5.11 25 kV SF- 6, Single Pole, Circuit Breaker
Type- LTB 72.5D1, MAKE - ABB
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Connector Check & clean connector, nuts, bolt,
washer and bimetallic strip. Polish the
surface and freely place bimetallic strip
properly, If provided.
Clean
3. Operation
timing
Check & record closing & opening timing
with timer as per OEM.
i. Closing time < 65 ms
ii. Opening time < 45 ms
4. Closing coil Check & record closing coil parameter as
per OEM:
i Voltage
ii Watt
iii I R Value
Check with measuring instrument (500 V
magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. 500 W
iii. IR Value 2 MΩ
5. Trip coil Check & record trip coil parameter as per
OEM :
i Voltage
ii Watt
iii I R Value
Check with measuring instrument (500 V
magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. 500 W
iii. IR Value 2 MΩ
6. Spring
charging
motor
Check & record spring charging motor
parameter as per OEM:
i. Voltage
ii. Watt
iii. I R Value
Check with measuring instrument (500 V
magger & millimeter)
i. Voltage 110V DC+/-
10%
ii. 735 W
iii. IR Value 2 MΩ
7. Contact
resistance
(CB close
position)
Check & record contact resistance of fixed
& moving contact with contact resistance
meter.
< 42 at 20 deg. C
8. Checking of setting of
9.
Gas Pressure
Normal 7.0 bar
Alarm 6.2 bar
Lockout 6.0 bar
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
56
3.5.12 Auxiliary Transformer Type - Double wound, single phase, oil immersed natural air cooled and step down
transformer for outdoor installation
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly, quarterly & half yearly
schedule
2. Winding
continuity
Measure & Record winding continuity
on all tapings with multimeter/500 V
megger.
Zero
3. Tap changer Check the smooth operation of tap
changer on all tapings.
No obstruction during
operation
4. Acidity of oil Check the acidity of transformer oil. Maximum 0.5 mg
KOH/gm
5. Ratio test Conduct ratio test by applying AC
supply to HV winding and measure the
voltage at LV side winding.
Record & compare
with previous reading
6. Jumpers Check HT and LT jumpers & lugs for
loose & flash mark. Replace if loose &
flash.
Replace
7. Painting Paint to be done, if color of tank is
faded/ rusted.
Painted with epoxy
and polyurethane
paints as per A & C
slip no. 8 to the RDSO
specification
no.ETI/PSI/118
(10/93)
8. DO fuse wire Replace the fuse wire with new one. Replace
3.5.13 25 kV Potential Transformer
Sr. Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to quarterly & half yearly schedule
2. Duplicate
earthing
Check duplicate earth conditions for
broken & loose. Attend the same.
3. Oil testing if
possible
Test the oil with BDV tester. If possible. Permissible limit
4. Ratio test Conduct ratio test by applying AC
supply to HV winding and measure the
voltage at LV side winding.
Record & compare
with previous reading
5. Painting Paint to be done, if color of tank is
faded/ rusted.
painted with epoxy and
polyurethane paints as
per A & C slip no. 8 to
the RDSO specification
no.ETI/PSI/118 (10/93)
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
57
3.5.14 Current Transformer 220 kV/132 kV/25kV
Type- Single phase, oil filled natural air cooled.
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly & half yearly schedule
2. Arching horn
gap If provided
Check & measure arching horn gap
as required.
Record
3. Oil testing, if
possible
Test the oil with BDV tester. BDV more than 40 kV
4. Painting Check for painting, if color of tank is
faded/ rusted.
painted with epoxy and
polyurethane paints as
per A & C slip no. 8 to
the RDSO specification
no.ETI/PSI/118 (10/93)
5. Polarity test Conduct polarity test and check the
direction of current.
Reverse
6. Ratio test Conduct ratio test by applying
current to HV winding and measure
the current LV side winding.
Record & compare with
previous reading
3.5.15 220/132/ kV Isolator
Type – Double pole, Triple pole
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly & half yearly schedule:
2. Operation of
isolator( Double
& Triple pole)
Check the operation of isolator slowly and
check for simultaneous operation of blades on
the poles and correct alignment of blade tips
in the fixed contact jaws of the poles.
Correct
alignment
3. Insulation
resistance
Measure & record IR values of pedestal and
tie rod insulators with 2.5 kV megger.
More than
1000 M
4. Operating handle
of main blade
and earth blade,
if provided
Check the locking arrangement to the
operating handle of main blades and earth
blade.
Working
satisfactory
5. Bearing Check & clean the bearings of rotating
bushings of insulator and lubricate with
grease.
Lubricate
with grease
6. Bus connections
and bimetallic
strips
Check & clean for tightness, sign of
oxidation on bus connections and bimetallic
strips correct if necessary. Replace
bimetallic, if required
Replace
7. Paint Check & replace rusted parts and paint the on
rusted parts, if any
Cold
galvanizing
paint
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
58
3.5.16 25 kV Isolator
Type – Single pole, Double pole, and Bipolar
3.5.17 Motorised Isolator, 25 kV
Type – Single Pole
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to quarterly & half yearly schedule:
2. Insulation
resistance of
motor
Measure & record insulation resistance of
winding with 500V megger
More than 2
M
3. Commutator Check & clean commutator with dry cotton
cloth.
Clean
4. Carbon brushes Check carbon brushes for under size. Replace
if necessary
Replace
5. Arching horn, if
provided
Check correct setting and alignment of arcing
horn. Adjust if required
Correct
alignment
Sl.
No.
Item Inspection And Work To Be Carried Out Standard
Value
Carry out following work in addition to monthly & half yearly schedule:
Operation of
isolator( Double
pole)
Check the operation of isolator slowly and
check for simultaneous operation of blades on
the poles and correct alignment of blade tips
in the fixed contact jaws of the poles.
Correct
alignment
Interlocking
operation
Check & clean interlocking operation with
circuit breaker.
Working
satisfactory
Blade tips and
fixed contact
fingers
Check the condition of the blade tips and fixed
contact fingers for any sign of over heating
and presents of buffs. Clean the buffs.
Clearances of
blade
Measure the clearances of blade in open
position. Measure and record and adjust if
necessary.
Minimum
500 mm
Insulation
resistance
Measure & record IR values of pedestal and
tie rod insulators with 2.5 kV megger.
More than
1000 M
Bus connections
and bimetallic
strips
Check & clean for tightness, sign of
oxidation on bus connections and bimetallic
strips correct if necessary. Replace
bimetallic, if required
Replace
Paint Check & replace rusted parts and paint the on
rusted parts, if any
Cold
galvanizing
paint
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
59
3.5.18 198/120/42 kV Surge Arrester Ref: TI/MI 0041 REV - 0
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly, quarterly & half yearly schedule:
2. Lightning arrestor
(LV side) HT-E
Check, measure & record insulation
resistance of each unit of lightning arrestor
with by 2.5/5.0 kV megger.
IR value more
than 1000 M
ohms
3. Lightning arrestor
(HV side) )HT-E
Check, measure & record insulation
resistance of each unit of lightning arrestor
with by 2.5/5.0 kV megger.
IR value more
than 10,000 M
ohms
4. Earth resistance Check & record the earth resistance of
each earth connection with earth resistance
meter.
Not more than 0.5
ohms
5. Lightning arrestor
details
Check & record the following:
i. location
ii. rating
iii. make
iv. Sr no
v. date of Mfg
vi. date of commission
vii. date of measurement
viii. IR value
ix. THRC value of leakage current,
x. No of surges passed
Measure and record
Record
6. THRC leakage
current value
Check & record leakage current before
and after cleaning of LA with THRC
meter.
If the leakage
current between
350 – 500 μA,
keep it under
close observation
& beyond 500
μA, remove from
service
3.5.19 Capacitor Bank (TI/MI/00026 Rev. 2)
Sl.
No
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to quarterly & half yearly schedule:
2. Tan Delta
(Dielectric
loss angle)
Measure & record the ten delta of the
capacitor units with the help of a standard
shearing bridge.
Dielectric loss
angle not more
than 0.0005
3. Capacitance
value of
capacitor
Measure & record the readings of the
capacitance upto the first decimal value by
digital multimeter. Changes in values beyond
6% indicate that the capacitor bank is likely to
fail.
Replace the
capacitor if
value beyond
6%
4. Protective
relays
Check record of functioning of protective
relays and setting.
Working
satisfactory
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
60
Sl.
No
Item Inspection And Work To Be Carried
Out
Remark
5. NCT setting Check & record the NCT relay
setting and change in the NCT relay
settings are required to be examine.
as per RDSO
guidelines
6. Fasteners and
the connectors
Check proper tightening of the fasteners
and the connectors. Tighten, if loose.
Tighten
7. Temperature of
capacitor
Check & record the temperature rise in
24 hrs of the capacitor unit with by
suitable thermometer on the can of the
capacitor bank.
The temperature
should not raise 15
deg. above the
ambient temperature
3.5.20 Series Reactor (Oil Type)
Sl.
No.
Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly schedule
2. Oil
condition
Check the condition such as less
BDV, oil color, and sludge in oil.
Centrifuge the oil, if necessary.
Centrifuge
3. Painting
Paint to be done, if color of tank is
faded/ rusted.
painted with epoxy and
polyurethane paints as
per A & C slip no. 8 to
the RDSO specification
no.ETI/PSI/118 (10/93)
3.5.21 Series Reactor (Dry Type)
Sr. Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition to monthly and half yearly schedule
2. Insulation
resistance of
winding
Check insulation resistance &
record:
Winding to earth (ambient temp
also to be recorded) with 2.5 kV
megger.
Minimum 200 M ohms
3. Painting
Paint to be done, if color of body
is faded.
painted with epoxy and
polyurethane paints as per
A & C slip no. 8 to the
RDSO specification
no.ETI/PSI/118 (10/93)
4. Earthing
connections
Check & tighten earthing
connections. Replace the rusty or
overheated bolts and nuts if
necessary.
Replace
5. Terminal
Connector &
Bus-bar
connectors
Check & tighten of bolts and
nuts of top & bottom. Replace
the rusty or overheated bolts and
nuts if necessary.
Replace
6. Coil Check coil for warm and find out
the reason and attend it.
Attend
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
61
3.5.22 Control and Relay Panel
Sr. Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly and half
yearly schedule
2. Operation of
relay
Check & record operation of all relays.
Working
satisfactory
3. Testing of
relay
Conduct relay testing by testing instrument
and record.
Compare as
per setting
4. Contactors,
push button,
switches
Check & clean all contactors, push button
and switches for burnt, carbonize or corroded
marks. Replace if defective.
Replace
5. Check voltage Check & record voltage between + (ve) to
Earth & - (ve) to Earth. If observe more
differ and take action.
Check circuit
3.5.23 Condition Based Maintenance through Thermo vision Camera (Traction Substation)
1. AC TRD (Traction Sub-station, SP and SSP)
Sl. No. Item Inspection And Work To Be Carried Out Standard Value
1. Carry out all work in half yearly schedule
3.5.24 Earthing & Bonding
Sl. No. Item Inspection And Work To Be Carried Out Remark
1. Carry out all work in half yearly schedule
2. Buried
rail
Check condition of connections rail to buried rail and
mat to buried rail. Clean & tighten all connections
Intact
connection
3.5.25 Battery Charger
Sl. No. Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly , quarterly and half yearly
schedule
2. Transformer
winding
Measure & record the insulation resistance of
winding at room temperature with 500 V
megger.
More than 2 M
3. Electrolyte
condenser
Measure & record the capacitance value with
LCR meter. Replace if open circuited/ short
circuited.
Replace
4. Cable
glands
Check cable holes and unwanted holes. Provide
proper size of glands, close unwanted holes and
gaps.
Cork gasket and
HOLDITE
compound
5. Cable ends Check for crimping of cable ends with
connectors/lugs and cable ends crimped with
suitable size of connectors/lugs.
Proper crimped
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
62
3.5.26 AC/DC Distribution Panel
S. No. Item Inspection And Work To Be
Carried Out
Remark
1. Carry out following work in addition quarterly and half yearly schedule
2. Cable
glands
Check cable holes and unwanted holes.
Provide proper size of glands, close
unwanted holes and gaps.
Cork gasket and HOLDITE
compound
3. Cable
ends
Check for crimping of cable ends with
connectors/lugs and cable ends crimped
with suitable size of connectors/lugs.
Proper crimped
4. Insulation
resistance
of cable
Measure & record the insulation
resistance of cable at room
temperature with 500 V megger.
More than 2 M
5. Stickers/
paint
Check stickers/ paint to MCBs/rotary
switch. Paste new sticker/paint to
MCBs/rotary switch, if faded.
Replace
6. Painting Paint to be done, if color of panel is
faded/ rusted.
painted with epoxy and
polyurethane paints as per A
& C slip no. 8 to the RDSO
specification no.ETI/PSI/118
(10/93)
3.6 THREE YEARLY SCHEDULE 3.6.1 SF-6 Circuit Breaker & Interrupter for M/s. ABB & CGL
Sl.
No.
Item Inspection And Work To Be Carried Out Remark
1. Carry out following work in addition to monthly, half yearly & yearly schedule
2. Mechanical
travels
Measurement & record of mechanical
travels. Adjust if required.
As per
maintenance
manual
3. Door gasket &
hinges
Replace & check the door gasket of the
operating mechanism and hinges for
damages. Replace with new one.
Replace
4. Movement of
rollers
Check the free movement of rollers. If not
free, replace the same.
Replace
5. Contact
resistance
Measure the value of contact resistance of
pole between upper terminal and lower
terminal. If value is more than 120% of the
design value specified in maintenance
manual contact manufacturer.
Approach the
manufacturer for
rectification
3.6.2 220 kV/132 kV/25kV Current Transformer
Sl. No. Item Inspection And Work To Be Carried Out Remark
1. Primary
injection
test
Conduct primary injection test and record
the reading.
Compare with pre-
commissioning
rest
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
63
3.7 AFTER 5 YEARS OR WHEN NEED
3.7.1 Power Transformer
Sn. Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly, half yearly & yearly schedule
2. Painting of
transformer
tank,
conservator
radiator and
other exposed
parts
Clean the exposed parts thoroughly.
Transformer tank and other parts should
be painted with epoxy and polyurethane
paints as per A & C slip no. 8 to the
RDSO specification no.ETI/PSI/118
(10/93)
- In case of previous
enamel paints, the
repainting may be
carried out after 3
years polluted area.
- In case of previous
epoxy and
polyurethane paints
the repair painting
may be carried out
after 5 years.
3. Pipe work Check for any damages, misalignment
and leakages. If any misalignment the
pipe should be realigned and joint
made.
--
4. Test oil in
transformer
Measure the inhibitor content in the oil.
In the new oil it has to be within 0.25 –
0.30% by total weight of oil.
If the inhibitor content in the oil reduces
to 0.15% it should be re-inhibited by
adding required amount of DBPC (2,6
Ditertiary Bytyl para Cresol)
5. Magnetizing
current test
with
voltmeter,
ammeter and
lamp.
Check by applying 230 V AC supply
preferably on LV side with series lamp.
Compare the value with respect to pre
commissioning value. Any abnormal
increase to the order of 50 times
indicates that these are a fault inside.
Ensure that the
comparison is done to
the value taken at LV
side only.
6. Winding
resistance test
with wheat
stone bridge,
voltmeter and
ammeter.
The test conducted on principal tap by
applying DC current. The measured
value should be converted to 75°C.
Compare the value with the pre-
commissioning/ factory test values.
Deviation in absolute value shall be less
than ± 5% of pre-commissioning or
factory test value.
This test should be last
the test on winding to
avoid DC flux remaining
in core resulting
erroneous value in the
other test.
7. Impedance
test with
voltmeter and
ammeter.
Test to be conducted on principal tap
applying 230V single-phase AC to the
HV side with LV side shorted and
calculate V/I and convert to percentage
impedance.
Compare the value with respect to pre-
commissioning value, any deviation
beyond 5% calls for further analysis.
Any deviation beyond
2% from the earlier
values shall be
considered for keeping
watch on the
transformer.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
64
3.7.2 Vacuum Circuit Breaker & Interrupter
The operating mechanism should be Checked/attended (without dismantling the
circuit breaker/interrupter) if circuit breaker has completed 5 years of service or 10,000
electrical switching operations.
3.8 SIX YEARLY SCHEDULE 3.8.1 SF-6 Circuit Breaker & Interrupter, Make-ABB & CGL
The following items should be checked/attended (without dismantling the circuit
breaker/interrupter) if circuit breaker has completed 6 years of service or 2000 electrical
switching operations or 5000 mechanical CO operations.
In case of interrupter, if it has completed 6 years of service or 5000 Electrical/
Mechanical CO operations.
Sl.
No.
Item Inspection And Work To Be Carried
Out
Remark
1. Carry out following work in addition to monthly, half yearly, yearly, three yearly
schedule
2. Inspection and
re-adjustment of
Operating
mechanism
Measurement of mechanism dimension,
Lubricating the mechanism, Leakage
check of dash pot oil, Looseness of
circlips and nuts, Check free movement of
antipumping pin and trip & closing
plungers, Replacement of some parts of
mechanism.
3. Connecting rod
end joint and
Bellows
Check the crack of connecting rod end
joint and bellows. Replace, if crack
Replace
4. Lubricate the
mechanism
linkages
Check & clean lubricating mechanism
linkage with dry cotton cloth.
As per annexure
5. Contacts and
nozzle of
interrupting pole
Check contacts and nozzle. Renew them,
if required.
As per
maintenance
manual
6. Absorbent Check absorbent for SF6 gas by-products.
Renew the absorbent for SF6 gas by-
products
Renew
7. Moisture sealant Check moisture sealant to all cemented
joints of porcelain. Apply moisture
sealant to all cemented joints of porcelain.
Apply moisture
sealant
8. Shock absorber Replace shock absorber Replace
9. Gas system Check setting of gas density switch. As per maintenance
manual
10. Compressor Take out the compressor after every six
year refit the items which are damaged
Replace the
defective items
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
65
3.9 PERIODIC OVERHAULING
3.9.1 Power Transformer (TI/MI/00039 Rev 1)
Overhauling of a transformer is normally undertaken either if it is faulty (internal) or
at the end of 10 - 12 years of its service by way of periodic maintenance. It is necessary to
review and analyze the periodical DGA values to check any abnormal variation and
healthiness of the transformer. The procedure for periodic overhauling of transformer dealt
herewith is applicable for bell type tank construction transformers. Periodical overhauling
(POH) of transformer can be done either at site (TSS) or in traction repair shop or through
trade. The transformer should not be opened during rainy /cloudy weather for
inspection/repair/overhaul.
Tests Prior To Undertaking POH
Following tests should be conducted on traction transformer before
undertaking POH.
a) Measure dielectric strength (BDV), acidity, water content (ppm) & tan delta of
transformer oil.
b) Dissolved gas analysis (DGA) of transformer oil.
c) Measurement of winding resistance on all taps.
d) Measure the insulation resistance of winding and polarization index.
e) Measurement of tan delta and capacitance of condenser bushing.
Insulation resistance & polarization index of the windings and BDV, acidity
& DGA of transformer oil and the values of various tests shall be recorded. The
same shall be compared with the values recorded after the completion of
overhauling.
Steps For Overhauling
Untanking of Transformer
Commencing the work, drain out the oil, disconnect all leads and remove
manhole covers, accessories, conservator, breather, radiator, fittings, HV, LV
bushings and store them in a safe place. One set of gaskets of standard quality shall
be available for replacement during POH as per annexure IX. The bell tank shall be
removed by suitable crane/winch carefully so that the bell tank does not damage the
active parts during dismantling. Defects observed during inspection/ test schedule for
the subject transformer shall be recorded and taken into account and defects like
leakage in tank, conservators and radiators etc. shall be attended and rectified
permanently during POH of transformer.
Items To Be Checked / Attended
Following items are required to be checked/ attended during overhauling
Insulating oil of the transformer main tank
Transformer windings & internal parts of transformer and tank.
Conservator, radiators and other metal parts including associated pipes.
Check the drain valve, oil-sampling valve, filter valves etc.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
66
Check insulation blocks, permali wood packing, spacers, wedge and keyed
blocks and insulating rings with securing arrangement in the winding for their
displacement due to frequent & repeated short circuit during service.
Check the pressure screws with belleville washers and pressure cup for its
intactness along with permali wood packing.
Check the top and bottom yoke bolts and check ferrule insulation tube and
dielectric strength by 2kV ac for 1 minute.
Check electrical joints, earth connections, between core to core & tank, lead
connections for tap changer and transformer for tightness and intactness.
Check clearances of the active part form the tank body.
The contacts of off-circuit tap changer.
Check the operation of off- circuit tap changer.
Check the tightness of all fasteners, core bolts and core with tank fasteners etc.
Check the condenser bushing for correct oil level, crack and leakage, if any.
Transformer tank, conservator, radiators, pipe work and other associated parts.
Checking of control cables for its condition.
Tanking of Transformer
Finally put back the bell tank, assemble the bushings, check tightness of all
internal connections, and provide new gaskets. The insulating oil has to be
checked/tested as per IS: 1866-2000 and its replacement has to be done on its
condition basis.
Drying-Out/Filtration of Transformer
Vacuum drying of the transformer is to be done generally as per IS 1866:
2000 and by maintaining the pressure less than 0.10 torr and maximum temperature
of 600 C. During filtration/drying out process, the reading of temperatures and IR
value shall be recorded every two hours form commencement till full operation is
completed. The filtration/ drying out shall be done as per para 20208/20210 of
ACTM - Vol. II, Part I
To ensure that the moisture has been removed from the transformer, the PI
value after drying has to be measured and it should preferably be achieved equal to
or more than 2. The following table is to be used as guideline reference for the PI
value of the windings.
Item to be
inspected/tested
Inspection/Testing Action required / acceptance norms
IR of winding and
Polarization Index
(PI) with 5kV megger
for:
HV-LV,
HV-LV,E,
LV-HV,E
Insulation resistance
to be measured for
10 sec, 60 sec and
600 sec. Calculate PI
as R60/R10 and as
R600/R60.
Compare with values at the time of
commissioning/ last recorded.
PI Insulation condition.
< 1.0 Dangerous
1.0 – 1.1 Poor
1.1 – 1.25 Questionable
1.25 – 2.0 Satisfactory
> 2.0 Good
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
67
Precautions
The tools like spanners and foreign objects like washers, pieces of cloth, etc.
are sometimes inadvertently left behind in the transformer which present hazard of
short circuits. It is, therefore, important that the tools, etc. used during overhauling
shall be listed out at the beginning and accounted for at the end of the work.
Checks / Tests After Overhauling
After completion of overhauling of transformer test/ checks shall be done:-
i) Voltage ratio test with Voltmeter, Ammeter and Lamp or with ratio meter.
ii) Winding resistance test with Whetstone bridge or voltmeter, ammeter method.
iii) Magnetizing current test with voltmeter, ammeter and lamp.
iv) IR of windings and polarization Index with motorised 5 kV Megger.
v) Tests on transformer oil for BDV, ppm, tan delta and acidity.
vi) Checking of protection equipment for their working i.e. buchholz, PRD,
MOLG, WTI and OTI.
vii) All gasket joints for any leakage.
viii) Check relay and alarm contacts for their operation.
ix) Check control boxes, terminal boxes etc. for water tightness against ingress of
moisture and if required replace gasket.
x) Check dial type OTI and WTI for freedom of pointer.
xi) Check the IR value and the secondary winding resistance of bushing CTs.
xii) Bushing: tan delta and capacitance test should be conducted to ensure its
health and tallied with its prior test values. Max. allowable Tan Delta and
capacitance is 0.007 and 110% of the factory set value respectively.
xiii) TC is to be checked for its proper /required operation such as
(a) Manual
(b) Local operation (electrical)
(c) Remote electrical operation
xiv) (a) Check oil level in transformer tank, conservator, condenser bushing, and
TC etc.
(b) Check OTI and WTI pockets and breather oil cup and replenish the oil if
required.
(c) Arcing horn gap as per drawing
xv) Check that all earthing connections of various parts/points are made properly
as per diagram plate.
xvi) Check wherever provided, air delivery cooler fan are sufficient and working
in right direction.
xvii) Ensure silica-gel in breather active and blue and oil is upto correct level in the
cup.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
68
xviii) Check the thermometer oil pockets on tank top and header etc. filled properly.
xix) Remove/clear all the tools and other associated equipments used in the POH
from transformer.
xx) Lock the roller to prevent the movement on rail.
xxi) Release the trapped air through air release plugs and valves.
Commissioning of Transformer
The Commissioning of traction transformer after POH shall be done as per
para20905/20906/20907 of ACTM - Vol. II, Part I
CONCLUSION
Performance of transformer after POH shall be evaluated by comparing the
result of insulation resistance & polarization index of windings and BDV, water
content (ppm), tan delta, acidity & DGA of transformer oil. All these values shall be
kept in records for monitoring the performance in service.
ITEMS REQUIRING REPLACEMENT WITHOUT FAIL DURING PERIODIC
OVERHAUL OF TRACTION POWER TRANSFORMER.
1. Insulating oil
2. Gasket and rubber items as per annexure IX
3. Pre compressed board used to insulate bottom of tank with active parts.
4. Silica gel
Items Requiring Replacement During POH On Condition Based
Insulation Material
Permali wood packing in coil clamping and locking box welded to tank and core packing
etc..
Coil clamping screws and plate Belleville washer, permali wood packing used in with
hydraulic jacks for clamping coil at required pressure.
Radial paper covered insulation over leads from windings to tap changer.
Radial paper covered insulation over leads to bushing with clamping arrangement
permali wood / PCP board.
Radial paper covered insulation between winding sections of both legs.
Fiber glass ferrule and insulating core/yoke bolts with permali washers and PCP board
(used to insulate yoke with core stud)
Items used in Winding
Locking spacers and plain spacers.
Keyed blocks for tapping windings.
Keyed blocks for HV and LV winding.
Core packing of PCB /Perma wood.
Top/bottom common washers of PCB.
Top /bottom clamping ring of PCB etc.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
69
Other Items
Cable clamps /securing arrangement
Cable glands, cable lugs, nut bolts and LED/Bulbs etc.
Relays/ switches, push buttons, capillary tubes with bulbs etc.
Items /parts relating tap changer (OCTC)
Bakelite phase board and selector ring
Brass slip rings and brass fixed contacts,
Copper brush assembly and electrolytic copper moving contacts,
Gears and bearing in driving mechanism,
Paper covered copper connection cable with socket (between fixed contact and terminal
stud),
Flexible braid of electrolytic copper to connect moving contact and copper brush.
Spring in moving contact holder for contact pressure
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
70
3.9.2 AUXILIARY TRANSFORMER
Overhauling of a transformer is normally undertaken either if it is faulty or at the end
of 7 to 10 years of service. Overhauling (POH) of transformer can be done either in repair
shop or through trade. Following steps shall be followed for POH overhauling.
General cleaning
First of all remove as much dirt as possible particularly around the transformer
tank, radiator, conservator, HV & LV bushing, neutral link block covers etc. Blow the
dust of transformer & radiator with compressed air.
Activities to be done during POH
The items which are required to be checked/ attended during overhauling are given
below:
a. Record brief history of the equipment.
b. Visual Inspection:
Check the complete tank for any deformation and crack.
Check HV & LV bushing for any cracks/chipped discs.
Check condition of silica gel container and silica gel.
Check the oil leakage from auxiliary transformer tank, oil pipes, flange joints,
conservator, drain plugs and vent plugs.
Check the thread condition of filter inlet and out let valves, drain plug and
breather socket.
Check condition of all gaskets/washers.
Check conservator tank, oil level indicator glass.
Check condition of arcing horn.
Note all the defects and deficiencies.
Before opening of equipment
The following test to be carried out on transformer before opening of transformer.
a. Insulation resistance
Check the insulation resistance of windings between.
a. H V winding to earth by 2.5 kV megger.
b. L V winding to earth by 500V megger.
c. H V winding to L V winding by 2.5 kV megger.
b. Continuity Test
Check the continuity of the following windings with the help of multimeter.
Primary winding
Secondary windings
c. Tap changer
Check the condition and operation of tap changer at all tap positions.
d. BDV of transformer oil
Measure the BDV of transformer oil by automatic break down voltage kit.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
71
e. Polarization ratio
The test consists of applying dc high voltage 2500V, with the help of a
megger, continuously between winding and earth, and noting the insulation
resistance at the end of 10sec, 60sec.
f. DGA of transformer oil
Dissolved gas analysis (DGA) of the oil of a transformer is a very useful
technique to assess the internal condition of the transformer.
g. Test on transformer oil
Measure the specific resistance (resistivity), water contents, dielectric
dissipation factor (Tan delta), flash point, neutralization value, sludge etc of
transformer oil.
h. Ratio test
Conduct ratio test of auxiliary transformer.
i . Before carrying out the work, the following works to be carried out.
Drain out the transformer oil from tank.
Disconnect all leads and remove tank top cover, accessories, conservator,
fitting etc.
Disconnect HV & LV bushings and store them in a safe place.
Disconnect the earth leads from the transformer primary earth bushing
terminal link block.
Disconnect all the power cable connection from secondary winding side
bushing.
After opening the transformer
a. Measure Insulation Resistance of winding.
b. Check all core support bolts for any cracks and replace them if required.
c. Check condition of core, winding and lamination.
d. Check for accumulation of water content/ sludge inside the tank.
e. Check earth connections.
f. Check condition of soldered joints.
g. Check the insulation paper for any damage and reinsulated if necessary.
h. Check the condition of tap changer contact tips at all tap positions.
Details of Work to be Carried Out
a. Clean winding and core with new filtered oil.
b. Tighten core bolts and other fasteners to secure the core and winding
properly and replace by new one if worn out.
c. Bake the winding and core by keeping in oven at a temperature of 60 °C.
d. Observe daily improvement in IR values of winding.
e. Clean the tank thoroughly from inside and outside.
f. Check visually inside of tank for any flash mark, hit mark, damage etc.
g. Do the varnishing of the tank inside area with copal varnish.
h. Paint the tank from out side with battleship gray paint.
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
72
i. Check the oil drain cocks and change washers by a new one, tight and lock them.
j. Check the secondary terminal blocks fixing studs for tightness and they should be oil
leak proof.
k. Check the HV bushing fitting surface, it should be clean and plain.
l. Check the inlet and outlet valves for their proper working and check for oil leakage.
m. Replace all gaskets, oil seal, ‘O’ ring or other rubber/ neoprene items.
n. Tighten earth connection of the equipment.
o. Replace worn out contacts of tap changer.
p. Replace oil level indication glass, if required.
Inspection of Fittings
a. Silica Gel Breather
Check the silica gel breather visually for any abnormality/ damage.
Reactivate silica gel by heating in a shallow pan at a temperature of 150 °C to
200 °C for two or three hours until the crystals should have regained their
original blue tint.
Clean and dry all parts of the breather before filling the container with silica
gel.
Fill the fresh or reactivated silica gel crystals.
Verify that the oil level in the oil cup is correct after reassembly.
b. Radiator
Clean the radiator tubes thoroughly by compressed air and high pressure water
jet if applicable.
Check radiator tubes and fins for any damage if applicable.
c. Conservator
Clean conservator and glass indicator thoroughly.
Check the conservator for any damage, intactness of indicator glass and
condition of glass.
Reassemble after Drying Out the Winding
a Replace all gaskets with new one as per annexure IX before assemble the equipment.
b. Fill the new filtered oil with 60 kV BDV in the tank.
c. Assemble the equipment and connect all winding connections of HV, LV bushings,
tap changer and HV earthing connection.
d. Check, clean and re-fit all accessories of the transformer.
Testing of Aux. Transformer after Assembling
Carry out the following tests on the auxiliary transformer after assembling of
winding and core in tank.
Insulation resistance
Continuity test.
Ratio test.
Voltage out put at different taps.
Magnetising current.
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
73
Final Checking
Check visually for any oil leakage from any point, coupling, joints etc.
Check any unusual sound of equipment.
Check and ensure oil level in conservator, it should be maximum mark.
Release air from top screw of HV bushing.
Measure final IR values and compare with previous recorded values.
Measure BDV of oil and moisture content (ppm).
Check arcing horn gap.
3.9.3 Vacuum (Circuit Breaker & Interrupter)
Complete overhauling of the circuit breaker/ interrupter operating mechanism and
magnetic actuator shall be done after 20,000 operations or 10 years, whichever is earlier.
3.9.4 Battery Charger
Overhauling of a battery charger is normally undertaken either if it is faulty or at the
end of 10 years of its service by way of periodic maintenance. The following parts shall be
replaced during POH.
1. Replace the MCB.
2. Replace the electrolyte condenser.
3. Replace the any defective parts
4. Paint the charger
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
74
3.10 PRE MANSOON AND PRE WINTER PRECAUTIONS
Before onset of monsoon and winter season, it should be ensure that no maintenance
schedule is overdue for equipment. In the schedule inspection just preceding the monsoon,
special attention should be paid to the vulnerable points likely to permit ingress of moisture
resulting in reduction in dielectric strength of the equipment and rusting of parts.
Sl. No. Item to be check Action taken Remark, if any
1.0 POWER TRANSFORMER
1.1 BDV of oil
1.2 Leakage/Seepage
1.3 Worm Proofing
1.4 Arching horn gap
1.5 IR value
1.6 Silica gel
2.0 CLS AT
2.1 Arching horn gap
2.2 BDV of oil
2.3 IR value
2.4 Leakage/Seepage
2.5 Silica gel
2.6 Oil level
2.7 Checking of un authorized connection from AT
3.0 OIL CB/BM
3.1 BDV of oil
3.2 Leakage/Seepage
3.3 Oil level
3.4 Silica gel
4.0 GAS CB/BM
4.1 Checking of gas pressure
4.2 Checking of air pressure
5.0 CT/PT
5.1 Leakage/Seepage
5.3 IR value
CAMTECH/E/14-15/Sch-PSI/1.0
Review of Maintenance Schedule for PSI July, 2014
75
4.0 SCHEDULE ACTION PLAN
Sl.
No.
Name of Equipment Schedule to be followed
F/ly M/ly Q/ly H/ly y/ly 3y/ly (ABB/CGL)
5y/ly POH
6y/ly (ABB/CGL)
POH
(10 yly)
1. Batteries & Battery
Charger
2. Battery Charger
3. General Works of TSS,
SSP & SP
4. Power Transformer
5. 25 kV Vacuum Circuit
Breaker / Interrupter
6. 132 kV SF-6 Circuit
Breaker 120 SFM-32B
7. 25 kV SF-6 Circuit
Breaker 50 SFGP-20A
8. 132/25 kV SF- 6
Circuit Breaker 70
SFM- 32A & 120-
SFM-32A
9. 220 kV SF- 6 Circuit
Breaker (ELF SL- 4-1
Double Pole)
10. 25 kV SF-6, D/P
Circuit
breaker/Interrupter
EDF SK-1-1(S) &
EDF-SK-1-1
11. 25 kV SF-6, Interrupter
30 SFGP – 25 A & 25
SFGP – 25A
12. 25 kV Minimum Oil
Interrupter
(HPGE7/9A)
13. 25 kV Single pole SF6
Circuit breaker LTB
72.5 D1
14. Auxiliary Transformer
15. Current Transformer,
220 /132/25 kV
CAMTECH/E/14-15/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
76
16. 25kV Potential
Transformer
17. 220/132 kV Isolator
18. 25 kV Isolator
19. 25 kV Motorised
Isolator
20. Surge Arrester
21. Series Reactor (Oil Type)
22. Series Reactor (Dry Type)
23. Capacitor Bank
24. Control and Relay Panel
25. AC/DC Distribution Panel
26. Battery Charger
27. Condition Based
Maintenance Through
thermo vision camera
AC TRD (Traction Sub
– station)
28. Earthing & Bonding
29. Buried rail
5.0 FORMATS FOR SUBMITTING FAILURES TO RDSO
Railway……….
Division ……….
Depot…..
Ref: TIF-0011 Rev. ‘0’ (Period - October to September)
Submitted to RDSO Annually – 1st November.
PART-I - PROTECTIVE RELAY DATA
TSS FEED
ER CB
No.
CT
Ratio
Transformer
rating (MVA)
Feeder CB Relay operating time (ms)
Type Opening
time (ms)
DPR
(ms)
WPC
(ms)
Inst. OCR
(ms)
Auto recloser
(sec)
Delta-I Panto
flashover
MTR
(ms)
Railway……….
Division ……….
Depot…..
Ref: TIF-0011 Rev. ‘0’ (Period - April to September & October to March)
Submitted to RDSO Half Yearly – 1st May &1
st Nov.
PART-II - TRIPPING DATA RELAY WISE
TSS Feeder
CB No.
Tripping
Target
Tripping in
six month
Auto recloser Action Relay Tripped in This Six Month Period
Trip & Close Lock out DPR WPC Inst./O/C Delta- I Panto Flashover
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
77
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
July, 2
01
4
Railway……….
Division ……….
Depot…..
Ref: TIF-0011 Rev. 0 (PERIOD - April to September & October To March)
Submitted to RDSO Half Yearly – 1st May &1
st Nov.
PART-III - TRIPPING DATA
Tss For CB
No
Tripping
Target
Load
encroa
chment
Tree
Fault
Bird
Nest
Loco
Fault
Flash Over
to Less
clearance
Insulator
Flash
over
Grease
Deposit
at PTFE
External
Object
Tripping
Due to
Control
Flash
Over at
TSS
IOL
Voilation
at NS
Cross
Tripping
at TSS
Other
Specify
Railway……….
Division ……….
Depot…..
Ref : TIF-0014 Rev.0 (Period – November to October)
Submitted to RDSO Annually –15th
November.
PART-II - MAKEWISE BREAK UP OF TRACTION TRANSFORMERS
Sl.No. Division Number of Transformers
in service
Details of the transformers Remarks
MVA Rating Type of cooling ONAN/ONAF
Voltage
ratings
Date of
commissioning
78
C
AM
TE
CH
/E/1
4-1
5/P
SI-S
ch./1
.0
July, 2
01
4
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
Railway……….
Division ……….
Depot…..
Ref : TIF-0014 Rev.0 ( Period – November to October)
Submitted to RDSO Annually –15th
November.
PART-III - DETAILS OF TESTING KIT AVAILABLE FOR TRANSFORMER TESTING
Name of the Testing kit Numbers Available Working/ Defective Make Range
Railway……….
Division ……….
Depot…..
Ref : TIF-0014 Rev.0( PERIOD – ( April to September and October To March )
Submitted to RDSO Half yearly – 1st May and 1
st Nov.
PART-IV - FAILURE REPORTING OF THE TRANSFORMER
Sl.
No.
Div TSS
Loc
Make Voltage
Rating
MVA
Rating
Year of
Manufacture
Year of
Commissioning
Date of
Failure
Date & type
of last
maintenance
Details of
failure/Defects
including condition
i.e. on load or off
load
Action taken
by Railway to
rectify the
defect
Remarks
including
Details of past
failure, if any
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
July, 2
01
4
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
79
Railway……….
Division ……….
Depot…..
Ref : TIF-0015 Rev.0 ( Period – November to October)
Submitted to RDSO Annually –15th
November.
PART-I - PERFORMANCE OF CAPACITOR BANKS
Div TSS
Loc.
Total
Kvar
capacity
Total
units
Break up of total units Number of
units in
service
Make of the
Capacitor
bank
Average age of
the Capacitor
bank
Whether
provided with
13% reactor No of
units
Each unit
Kvar
Each unit
voltage
Railway……….
Division ……….
Depot…..
Ref : TIF-0015 Rev.0 ( Period – November to October)
Submitted to RDSO Annually –15th
November.
PART-II - PERFORMANCE MONITERING OF SERIES REACTOR
Div. TSS
Loc.
Total Kvar
capacity
% of the
Capacitor
bank capacity
Air/Oil
Type
Make of the
Reactor
Age of
The Series
Reactor
Failures if any With date of failure, Probable
reason of failure, corrective & preventive action
suggested etc
80
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
July, 2
01
4
R
eview o
f Ma
inten
an
ce Sch
edu
le for P
SI
Railway……….
Division ……….
Depot…..
Ref : TIF-0015 Rev.0 ( Period – November to October)
Submitted to RDSO Annually –15th
November.
PART-III - DETAILS OF TESTING KIT AVAILABLE FOR TESTING
Div PSI depot Name of the
Testing kit
Numbers
available
Working Defective Make Range
Railway……….
Division ……….
Depot…..
REF- TIF 0015 Rev 0 PART IV( PERIOD – April To September and October To March
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART-IV : FAILURE REPORTING OF SHUNT CAPACITOR BANK
Division TSS Make Date of
Comm.
Date of
Failure
Details of
Failure
Probable
Reason of
Failure
Action
Taken
Corrective / Preventive Action
Suggested By Railway
Remarks
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
July, 2
01
4
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
81
Railway……….
Division ……….
Depot…..
Ref : TIF-0015 Rev.0( PERIOD – April To September and October To March)
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART-V : DETAILS OF THE PROTECTION PROVIDED FOR SHUNT CAPAVCITOR.
Railway……….
Division ……….
Depot…..
REF- TIF-0016 Rev 0, PART II (PERIOD – November to October)
Submitted to RDSO Annually – 15th
November
PART- II : YEAR WISE AND MAKE WISE BREAK UP OF CIRCUIT BREAKER
Sl.
No.
Year 220 kV 132 kV 25 kV
BHEL CGL ABB ALIND BHEL CGL ABB ALIND BHEL CGL ABB ALIND MG DP TP DP TP DP TP DP TP DP TP DP TP DP TP DP TP DP TP SP TP DP SP DP TP SP TP DP SP DP TP SP
DIVISION TSS Relay Make Relay Type CT Ratio Time delay (sec)
82
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
July, 2
01
4
Review
of M
ain
tena
nce S
ched
ule fo
r PSI
Railway……….
Division ……….
Depot……..
Ref : TIF-0016 Rev.0 ( PERIOD – April To September and October To March)
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART III - STATISTICS OF AC CIRCUIT BREAKER
Sl.
No.
Make Rated
voltage &
type
Serial No. &
year of
Manufacturing
Date of
commissioning
Date of
failure
No. of operation
before Failure/
Defect
Details of failure
/defect & location
of installation
Action taken by
Railway to
rectify the defect
Remarks
Railway……….
Division ……….
Depot…..
REF- TIF-0016 Rev 0, (PERIOD – November to October)
Submitted to RDSO Annually – 15th
November
PART V - YEAR WISE AND MAKE WISE BREAK UP OF INTERRUPTOR
Sl.
No.
Year 220 kV 132 kV 25 kV
BHEL CGL ABB ALIND BHEL CGL ABB ALIND BHEL CGL ABB ALIND MG DP TP DP TP DP TP DP TP DP TP DP TP DP TP DP TP DP TP SP TP DP SP DP TP SP TP DP SP DP TP SP
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
July, 2
01
4
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
83
Railway……….
Division ……….
Depot…..
Ref : TIF-0016 Rev.0 (PERIOD – April To September and October To March)
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART VI - STATISTICS OF AC INTERRUPTOR
SN Make Rated
voltage
& type
Serial No. &
year of
Manufacturing
Date of
commissioning
Date of
failure
No. of operation
before Failure/
Defect
Details of failure
/defect & location
of installation
Action taken by
Railway to rectify
the defect
Remarks
Railway……….
Division ……….
Depot…..
REF- TIF-0017 Rev 0, (PERIOD – April To September and October To March)
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART -I - FAILURE FORMAT FOR SCADA
RLY DIV Section
with
TKM
Make Age of
Install-
-ation
Nos OF FAILURES (RTU) Nos OF RCC FAILURE Failure Rate Per 1000
TKM Per Month MODEM &
MIM Power
Supply
Per Month
I/o Cards
Master
Cards (CPU
Cards)
Synergy UPS Present 06
Month
Average
Previous
Year
Average Soft
Ware
Hard
Ware
5KVA
84
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
July, 2
01
4
R
eview o
f Ma
inten
an
ce Sch
edu
le for P
SI
Railway……….
Division ……….
Depot…..…..
REF- TIF-0017 Rev 0, (PERIOD – November to October)
Submitted to RDSO Annually – 15th
November
PART -II - STATEMENT SHOWING MAKE WISE SCADA SYSTEM
Zone /
Div
Section
TKM
Supplier Year of
commis
sioning
Nos of RTU'S
RKM RCC PROFILE UPS
Make &
Rating Master Details PC / PDP / MP
FEP Details PC/ PDP/ MP
Work Station Details PC / PDP / MP
Operating
System
Railway……….
Division ……….
Depot…..
REF- TIF 0023 Rev.0 ( PERIOD – April To September and October To March)
Submitted to RDSO Half Yearly – 1st Nov and 1
st May.
PART II - INFORMATION ON AUXILIARY TRANSFORMER
S.N. Location Make KVA
Rating
S.N.&
year of
manufa
cturing
Date of
commissi
-oning
Date of
failure
Max
load in
amp on
AT
Last
maintenance
Detail of failure/
defect including
the value of
IR/BDV after
failure
Weather
condition
at the
time of
failure
Action taken
by railway to
rectify the
defect
Remarks
including
details of
past failure,
if any
Date IR/BDV
value
Review
of M
ain
tena
nce S
ched
ule fo
r PS
I
July, 2
01
4
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
85
Railway……….
Division ……….
Depot…..
REF- TIF-0024 Rev 0, (PERIOD – November to October)
Submitted to RDSO Annually – 15th
November
PART -I - MEASUREMENT OF RESISTIVE LEAKAGE CURRENT OF SURGE ARRESTOR
As per RDSO TI/MI/0041 Rev. 1
Railway
Division Name of TSS/GSS
Voltage
class of LA
Make & year
of
manufacturing
of LA
Make & Year of
manufacturing of
equipment used for
measurement of resistive
leakage current
Voltage at the
time of each
measurement
Itotal Total
Leakage
current
(mA)
I3t Ir
86
CA
MT
EC
H/E
/14
-15
/PS
I-Sch
./1.0
July, 2
01
4
R
eview o
f Ma
inten
an
ce Sch
edu
le for P
SI
CAMTECH/E/11-12/Sch-PSI/1.0 87
Review of Maintenance Schedule for PSI July, 2014
ANNEXURE-I
Para 20207 of ACTM Vol. II Part-I
(The values from latest IS: 1866-2000 has been taken while ACTM table is having the values
from IS: 1866-1983)
APPLICATION AND INTERPRETATION OF TESTS ON TRANSFORMER OIL IN
SERVICE
S.
No.
Tests Value as per IS:
1866-2000
permissible limits
To be re-
conditioned
To be
replaced.
1. Electric strength
(Breakdown voltage)
Below 72.5 kV
72.5 kV and less than 145 kV
145 kV and above
Min.
30 kV
40 kV
50 kV
Less than the
value
specified
--
2. Specific resistance
(Resistivity) Ohm-cm at
90°C
Above
1x 1012
Between
0.1 x 1012
to
1 x 1012
Below
0.1 x 1012
3. Water content
Below 145 kV
Above 145 kV
Max.
40 ppm
20 ppm
Greater than
the value
specified in
column 3
--
4. Dielectric dissipation factor,
Tan delta at 90 0C
0.2 or less -- Above 0.2
5. Neutralisation value mg
KOH/ g of oil.
0.3 or less -- Above 0.3
6. Interfacial tension N/ m 0.015 or more -- Below 0.015
7. Flash point in 0 C 140 or more 125 and above
but below 140
Below 125
8. Sludge Non- detectable,
Results below
0.02% by mass
may be neglected
Sediment Perceptible
sludge
9. Dissolved Gas Analysis
(DGA)
Refer Annexure
2.04 of ACTM
Vol.II Part-I
88 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
ANNEXURE-II
` PHYSICAL PROPERTY OF SF6 GAS
1. Molecular weight 146.07
2. Melting point -50.7 deg. C
3. Sublimation Temperature -63.8 deg.C
4. Critical Temperature 45.547 +0.003
5. Critical pressure 38.55kgf/cm2
6. Critical dencity 0.730 g/cm2
7. Dielectric constant at 25 deg.C 1atm 1.002
8. Thermal conductivity 3.36x10-5
9. Specific heat ratio 1.07
10. Density at 20 deg.C
at 0 kgf.cm2 - g 6.25gm/lit
at 1 kgf.cm2 - g 12.3
at 5 kgf.cm2 - g 38.2
at 10 kgf.cm2 - g 75.6
at 15 kgf.cm2 - g 119.0
11. Solubility
In oil 0.297 CC/CC
In H20 0.001 CC/CC
of H20 0.035 + 0.01
at 30 deg.C gm/gm
12. Cp 23.22 Cal/Mole deg.C
CAMTECH/E/11-12/Sch-PSI/1.0 89
Review of Maintenance Schedule for PSI July, 2014
ANNEXURE ‘III’
LUBRICATION FOR CGL CIRCUIT BREAKER/INTERRUPTER
The correct lubricant should be applied and used during maintenance schedule.
1. Application of lubricants
Dariana Grease #2 Linkage in SF6 gas & air
Shell oil co. Mechanism
Microcarbon grease Interrupter contacts
Kyodo oil Co.
2. Procedure
a. Clean the various parts of the switchgear to be greased. Remove the former
grease oil, water and dust.
b. Keep the lubricants and greases clean and free of contaminants. This can be
confirmly by feeling the grease between the fingers.
c. Apply the grease thinly and uniformly to the parts.
d. Assemble the parts before the greases or parts become contaminated with dust
or dirt.
ANNEXURE ‘IV’
APPLICATION OF ELECRTRICAL JOINT COMPOUND FOR CGL CIRCUIT
BREAKER/ INTERRUPTER
This application is electrical joint compound to connect high voltage connections
made of aluminium.
1. Joint compound material : Jointal-Z (Green)
2. Aluminium forms a thin film of oxide on its surface when exposed to air, and very
quickly develops the film. This oxide film protects the metal from further
corrosion, however, the film of oxide has a high value of resistance and acts as an
insulator. The oxide film must be removed and joint compound should be applied
to the connection surfaces in order to maintain the efficiency of the metals as a
connector. The joint compound also helps in penetrating the film of oxide during
the cleaning process.
3. Procedure
Apply a coat of the joint compound to the connecting surfaces of the
connectors.
Remove the oxide film with ‘Scotch-Brite’ or nonmetallic abrasive paper.
Wipe off the joint compound that contains metal particles.
Apply new joint compound thinly to the connecting surfaces within three
minutes after the previous compound is removed. Bolt any connectors together.
Remove any excessive joint compound.
Note : Do not use a brush or abrasive paper on silver plated or thin plated
connectors.
Lightly buff the surfaces to a bright finish.
90 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
ANNEXURE ‘V’
WEATHERING SEALING FOR CGL CIRCUIT BREAKER/ INTERRUPTER
This instruction is cover weather sealing of joints and hardware to prevent corrosion of
the equipment. Outdoor high voltage circuit breaker is exposed to all kinds of weather. Moisture
and other pollutants react to cause serious damage to the equipment. The following weather
sealing procedure is recommended to reduce the corrosion and extend the life of the equipment.
1. Weather sealant material anabond 680
2. Application
The weather sealant should be applied sufficiently to the entire area to eliminate the
penetration of moisture into the joints.
The surface and parts to be sealed should be clean – and free from any deposit of the
solvent used for cleaning.
Where the sealant is applied between mating surfaces, the assembly of parts should be
completed within one hour before the sealant hardens. The minimum set time is one hour for
1mm (0.025in) layer.
3. General cautions
Do not mix the weather sealant with any other grease or water.
Smooth out the weather sealant which extrudes from flange surfaces.
Replace the cap to the tube of weather sealant before storing.
4. External joints
The joint between the flanges and the hardware, particularly in the horizontal
position, should be sealed with the weather sealant.
ANNEXURE ‘VI’
LUBRICATION FOR ABB CIRCUIT BREAKER / INTERRUPTER
The correct lubricant should be applied and used during maintenance schedule.
Oil ‘A’ Mobil 1(481127) 5w-30:
Thin lubricating oil is use for precision parts in operating mechanism and air-blast
circuit breaker and also for re-lubricating of bearing, which can not be lubricated with grease
G without dismounting -e.g. links and link gears. Viscosity at 400C: 62-65 cSt.
Oil ‘C’Energal ISH -V:
Circuit-breaker oil with viscosity~17 cSt at +200C. It is suitable only for temperature
> -100.
Oil ‘D’ Circuit Breaker oil Unlvolt 42 (44):
Circuit-breaker oil with viscosity~6.0 cSt. at +200C. It is used as oil in dashpots. For
dashpots with the letter “S” stamped on the cover - oil “S” should be used.
Oil ‘S’ DC 200 Fluid 200CS:
Silicon oil intended for oil dashpots in heavy operating mechanisms. Only dashpots
with the letter “S” stamped on the cover should be filled with this oil.
CAMTECH/E/11-12/Sch-PSI/1.0 91
Review of Maintenance Schedule for PSI July, 2014
ANNEXURE ‘VII’
GREASE FOR ABB CIRCUIT BREAKER / INTERRUPTER
The following types of lubricant grease are used during maintenance schedule.
Grease ‘G’ 71 BEP Synthetlc grease:
Low temperature grease is use for all types of bearings, gears and worm gears as well as
valves in air-blast circuit-breakers and also suitable for lubrication of silver plated contacts in air
(e.g. contacts in dis- connectors).
Also used when greasing O-rings made from nitrile rubber and as a crevice corrosion
prevention.
Grease ‘N’ Fomblin OT 20:
The lubrication of moving contacts in SF6 circuit breakers is used (e.g. puffer cylinders). A
very thin layer of the grease shall be rubbed on the sliding surface of the contacts.
Grease ‘L’ ASEOLSYLITEA 4- 108:
Low temperature grease specially suitable for lubricating of fine mechanics-e.g. catch devices
in operating mechanism which shall operate in strong cold.
Grease ‘M’ Isoflex Topas NB 62:
Low temperature grease for long-duration and permanent lubrication is used in worm gears
and other machine elements. It is prevents wear and corrosion.
Grease ‘P’ Shell Vaseline B401:
Vaseline for treatment of contact surfaces in current conductor joints.
Grease ‘R’ Molykole Longterm 2 Plus:
EP-grease is used for heavily-loaded roller bearings, slide bearings, cam discs and catches
(Lithium grease. Solvent refined mineral oil with lithium soaps and molybdenum disulphide) in
operating mechanisms type FSA.
Grease ‘S’ FS- 3451No:
Fluoro-silicone grease for greasing of O-ring made from EPDM and as a corrosion
prevention of gaps in circuit-breakers type ED.
Grease ‘SV’ Electrical Grease :
Grease for lubricating moving contacts, silver plated connections and brushed aluminium
surfaces in fixed joints outdoors.
92 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
ANNEXURE ‘VIII’
AN APPROACH TO EQUIPMENT FAILURE INVESTIGATION
i. On Failure Aspects
1. Occurrence
2. Date of occurrence
3. Past similar occurrences if any
4. Analysis of failure i.e. why did it happen?
5. Whether the rate of failure is worse than other installations?
ii. On Maintenance Aspects
1. Whether schedule maintenance & required testing have been carried out on the failed
equipment as per norms stipulated?
2. Does the frequency of maintenance require change?
3. Was the work properly supervised?
4. Was any RDSO modification required to be done?
5. Is any modification possible to avoid failure?
iii. About Staff
1. Is the quality of work done satisfactorily?
2. Is the skilled staff properly trained to carry out the work?
3. Is the SMI available with them?
4. Are proper tools available with the staff?
iv. About Material
1. Is the material received from approved source?
2. Whether the material is as per approved specification?
3. Can a better material be used?
vi. About Testing
1. Is the testing equipment available?
2. Could testing procedure be improved to weed out the failures?
3. Whether testing equipment are calibrated?
vii. General Points
Whether following points were checked / performed properly?
1. Proper contact
2. Clearances
3. Capacity
4. Proper contact pressure
5. Crack detections
6. Cleaning
7. Proper connections/alignment
8. Cross checks/super checks
viii. Any other Findings not covered in the above
CAMTECH/E/11-12/Sch-PSI/1.0 93
Review of Maintenance Schedule for PSI July, 2014
ANNEXURE ‘IX’
RUBBERISED CORK GASKET & RUBBER ITEM USED IN TRD
Different types of Rubberized Cork gaskets/components are used in the Power Supply Installation
(PSI) mainly in transformers. It is generally agreed that bad quality & improper fitment of Gaskets in
the transformers is un-desirable because of various long term adverse effects on dielectric integrity
such as:
Reduction in dielectric strength of oil.
Accelerated ageing of insulation
Bubble generation in the solid insulation during overloads
Ageing factor
The problem of oil leakage from the transformer bushings and covers are also mainly due to use of
non standard/ non specified gaskets/ ‘O’ rings during assembly. To prevent the problem RDSO has
issued a technical circular no. ELRS/TC/0076/ Rev. ‘0’ dtd. 17.09.2002 and its Rev.1 dtd.
22.02.2013.
In Nitrile bonded cork gasket, the size of cork granules shall be of ‘fine’ category as mentioned in
clause 3.2 of IS 4253 (Pt.2) 2008. The NBC gasket shall be of type RC70-C. The characteristics of
RC70C and their values are given below as given in TC 76 Rev. 1:
S.No. Characteristics Value Test Method
1. Hardness (IRHD) Shore A 70 ± 5 IS 3400 (part 2) 1995
2. Dimensional changes, percent, Max. 1.5
IS 4253 (part 2) 2008
3. Tensile strength, kPa Min. 1550
4. Compressibility (%)
(at 2800 kPa) percentage
25 - 35
5. Recovery, percent, Min. 80
6. Compression set, percent, Max. 85
7. Chemical test on water extract
(a) pH, where applicable
(b) Chloride content (as chloride ion)
(c) Sulphate content (as sulphate ion)
5.0 – 8.5
0.2 percent, Max.
0.2 percent, Max.
8. Volume change in transformer oil as
per IEC 60296, 70h/ 100°C
Max. 8
CORK COMPOSITION SHEET AND SOME CHECKS
(Ref: IS 4253, part 2, 2008)
Cork composition sheets for gasket are made by the compounding of granular cork with natural or
synthetic rubber.
94 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
Types of Cork sheet : Three types
Type ‘A’ - Non oil resistant
Type ‘B’ - Good resistance to oil
Type ‘C’ - Very good resistance to oils & petrol
Further each type is classified in three grades, i.e. RC50, RC70,
RC80 according to hardness. Hardness can be checked by Brinell
hardness tester, it shall be within specified limit i.e. designed
hardness ± 5 .
The cork sheet shall be free from cracks or pinholes and shall be
capable of being cut or punched without cracking or tearing.
For fine grain size : Cork granules passing through 1.00 mm IS
Sieve and retained on 425 micron IS Sieve.
The permissible variation in thickness at any point of the sheet
shall be ± 10 percent for thickness upto 2.50 mm and ±0.25 mm
for thickness above 2.50 mm.
For checking flexibility: Three test specimens where possible 25 mm wide and of suitable
length shall be cut from each sheet in the sample from widely separated position. The test
specimens shall be bent through 180° round a mandrel of diameter 3 times the thickness of
the specimens for materials upto 3 mm thickness, or 4 times the thickness of the specimen for
material over 3 mm thick. The flexing being carried out at a rate of 1minute through 180°
using finger pressure at ambient temperature. There shall be no breakage through the
granules of cork or separation of the granules.
For fluid resistance test: For type ‘C’ required in electrical industry, immersion test may be
conducted in transformer oil as per IS 335 for 70 hrs. at 90 degree C to 100 degree C, in such
cases change in volume should not exceed 8 percent.
FOR MORE DETAILS ABOUT OTHER TESTS, PLEASE REFER IS 4253, PART 2, 2008
MARKING
Cork composition sheets shall be marked with the following:
• Manufacturer’s name or trade mark
• Date of manufacture
• Grade
CAMTECH/E/11-12/Sch-PSI/1.0 95
Review of Maintenance Schedule for PSI July, 2014
PACKING
Cork composition sheets/ gaskets shall be suitably packed to prevent damage. Preferably shall be
kept in HDP (high density polythene) bags.
STORAGE
Cork composition sheet shall not be stored under conditions of temperature, humidity or for
reasonable period of time, which are likely to cause deterioration.
Knowledge about storage conditions of rubberized cork items will be useful to avoid
premature failure.
Many rubberized cork products and components are stored for a period before being put into
service and thus it is important that they are stored in conditions that minimize unwanted
changes in properties. Such changes may result degradation such as excessive hardening,
softening, cracking, crazing and other surface effects. Other changes may be because of
deformation, contamination or mechanical damage.
GASKET SELECTION
• Always use a good quality gasket from a RDSO approved manufacturer/ supplier, because
the cost of a gasket is insignificant when compared to the cost of failure or safety
consideration.
• Cutting of Gaskets: Use a good cutter
• Never try to cut out a gasket by hammering material against flange.
• Ensure the gasket is of the correct size.
• Cut (preferably punching) the bolt holes slightly larger than the bolt shaft diameter.
• Ensure that the inside diameter of the gasket is not less than the inside diameter of the process
line.
HANDLING OF GASKETS AND GASKET MATERIALS
• Carry Gaskets Carefully, Ideally with some form of protective cover.
• Do not Bend or Buckle.
• Do not damage the Gasket surface.
CONCLUSION
• A gasket must create a seal and hold it over a long period of time.
• It is prudent to include gasket testing in the quality assurance programme.
• It is not only good gasket but proper installation techniques are key requirements.
REMEMBER
During any activity by the shed/ shop involving opening of the transformer tank cover or
removal of bushings, the old gaskets has to be necessarily removed and replaced by a new
gasket. (Ref: RDSO L.No. EL/3.2.1 dtd. 03.05.2001)
Always use a good quality rubberized cork item from a RDSO approved manufacturer
to ensure long life of gasket, because the cost of a rubberized cork item is insignificant
when compared to the cost of traffic block due to a supply failure.
96 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
As per TC 076 (Rev.1- dtd 22.02.2013) the cork sheet gasket material shall be NBC -
Nitrile bonded cork Gasket as per IS:4253 (Part 2): 2008 and following are the sources of
supply for NBC gaskets for locomotive transformers:
1. Cortica Mfg.(I) Pvt.Ltd.
Plot No. 105, Sidco Inds Estate, Thirumazhisai. Madras
2. NU-Cork Products (P) Ltd., E-370,
Phase-I, RIICO Indl. Area, Bhiwadi - 301019.
3. Talbros Pvt. Ltd.
Plot No. 60, Sector 6, Faridabad
4. Bharat Corrub Industries LLP
749/8 GIDC Industrial Estate, Makarpur, Baroda 390010
5. Indian Cork Industries, Khasara No. 33A, Modern Indistrial Estate, opp, Bahadurgarh
Chamber of Commerce, Delhi Rohtak Road, Distt- Jhajjar(Haryana)
CAMTECH/E/11-12/Sch-PSI/1.0 97
Review of Maintenance Schedule for PSI July, 2014
REFERENCES
1. Manual of AC Traction Maintenance and Operation Volume II (Part–I)
Fixed Installations 1994
2. RDSO’sSpecificationsno.TI/MI/00038REV.1,TI/MI/00026Rev.2,
TI/SPC/PSI/CLMNA/0030, TI/MI 0041 REV – 0, TI/MI/00039 Rev 1
3. Comments & Suggestion received from participant during seminar held on
05th May 2014 at CAMTECH Gwalior.
4. Study of maintenance practices in the field.
5. Maintenance Schedules received from various Railways WR, CR, WCR
SCR, SR etc.
6. Details of Thermo Vision Camera 28th MSG TRD at SCR on Feb 2011
item no. 28.19
7. Instructions maintenance manual of M/s. CGL Ltd., ABB Ltd. and Allind
8. Presentation given by M/s. Nu Cork Product Pvt. Ltd Bhiwadi during
seminar held on 05th May 2014 at CAMTECH Gwalior.
98 CAMTECH/E/11-12/Sch-PSI/1.0
July, 2014 Review of Maintenance Schedule for PSI
To upgrade maintenance technologies and
methodologies and achieve improvement in
productivity, performance of all Railway
assets and manpower which inter-alia
would cover reliability, availability,
utilisation and efficiency.
If you have any suggestions and any specific
Comments please write to us.
Contact person : Director (Elect.) Postal Address : Indian Railways
Centre for Advanced Maintenance technology, Maharajpur, Gwalior. Pin code – 474 005
Phone : 0751 – 2470740
0751 – 2470803 Fax : 0751 – 2470841 Email : [email protected]
OUR OBJECTIVE