    ENGINEERING CORRESPONDENCE REQUEST HISTORY

    --- On Fri, 4/3/09, Clif Schneider wrote:

    From: Clif Schneider

    Subject: Cape Vincent Sound Studies Correspondence

    To: "Kris Dimmick"

    Cc: "Tom Rienbeck" , "Gregory C."

    Date: Friday, April 3, 2009, 11:59 AM

    Hi Kris,

    I spoke with Supervisor Rhienbeck this morning regarding my request for material

    related to wind developer sound studies in Cape Vincent and the recent draft wind law.

    Supervisor Rhienbeck has agreed to let me see copies of the material, but he also

    requested that you send copies to him as well. Apparently he has not seen all of the

    documents associated with the noise and sound issues.

    My mailing address:

    Clif Schneider

    PO Box 165

    Cape Vincent, NY 13618 (I presume you have Supervisor Rhienbeck's address)

    Specifically, I would like copies of all the correspondence between you and your sound

    consultant, Cavanaugh Tocci, Inc. This would include sound issues as it related to both

    wind projects and the drafting of the wind law.

    I would also like to see any technical correspondence related to sound between you and

    the CV Planning Board. I am interested in any reviews, comments, correspondence, or

    emails related to the technical issue of wind turbine sound.

    Thank you for your help and assistance.

    Regards,

    Clif Schneider

  • 8/8/2019 History of FOILED Engineering Requests

    2/13

    RE: Cape Vincent Sound Studies CorrespondenceMonday, April 13, 2009 3:45 PM

    From: "Kris Dimmick"

    To: "Clif Schneider"

    Cc: "Mathes, Todd" , [email protected]

    Clif

    I spoke with both Tom and Todd about your request. The Town would like to follow aconsistent process of releasing information through their attorney for all requests.

    Please contact Mr. Todd Mathes directly at 518 487 7666.

    Kris

  • 8/8/2019 History of FOILED Engineering Requests

    3/13

    Cape Vincent Foil requestMonday, April 20, 2009 9:47 AM

    From: "Mathes, Todd" View contact details

    To: "'[email protected]'"

    Cc: "'supervisor'" ,

    "'[email protected]'"

    Message contains attachments3 Files (514KB) | Download AllSCAN0104_000.pdf

    Ltr to St Lawrence re Completeness 021209.pdf

    Ltr to Planning Board re Completeness 032309.doc.pdf

    Cliff

    In response to your FOIL request to the Town of Cape Vincent (attached), I have

    contacted The Bernier Carr Group and Cavanaugh Tocci & Associates to obtain

    responsive materials. At this point it appears that the attached materials are the only

    materials responsive to your request which were submitted to the Towns Planning

    Board and that the remainder of the materials in the Towns possession are either not

    responsive to your request or are intra-agency or inter-agency correspondence exempt

    from FOILs disclosure requirements pursuant to section 87(2)(g) of the Law. The Town

    will continue to inventory materials responsive to your FOIL request which were

    supplied by Cavanaugh Tocci & Associates either directly to or through The Bernier Carr

    Group to the Towns Planning Board and/or Wind Law Committee.

    Thank you.

    Todd M. Mathes

    Whiteman Osterman & Hanna LLPOne Commerce Plaza

    Albany, New York 12260

  • 8/8/2019 History of FOILED Engineering Requests

    4/13

    [email protected], April 21, 2009 2:15 PM

    From: Clif Schneider [mailto:[email protected]]

    Sent: Tuesday, April 21, 2009 2:15 PM

    To: Gregory C. Tocci

    Subject: Reviews and recommendations for Cape Vincent

    Hello Greg,

    I am currently beginning my review of the St. Lawrence Wind Farm supplemental DEIS. I

    have spoken with Todd Mathes, attorney representing the Town of Cape Vincent,

    regarding having access to any reviews or sound reports and recommendations to the

    Town regarding a wind law. Mathes told me I would have to FOIL for any internal

    documents and further added he would consider privileged material anything your

    company prepared for the Town's engineering consultant or the Planning Board. I

    mentioned I already had a copy your first review of the BP sound study by Hessler, but

    would like to see other material.

    I mentioned to him I would be contacting you, not to request copies of the material you

    prepared, but rather just to understand the extent of material you prepared for the

    Town.

    I have the copies of the following material you prepared for the Towns of Cape Vincent

    and Clayton: 1) Jan. 30, 2008 review of BP's DEIS for Cape Vincent, 2) March 14, 2008

    draft wind ordinance for the Town of Clayton, and 3) April 25, 2008 review of the Clayton

    Wind farm noise study.

    Mathes also provided me with a summary of what occurred with sound and other issuesleading up to the acceptance of the SDEIS. I saw a number of unresolved issues that

    were presented in a memo from Kris Dimmick. However, in another memo provided by

    Mathes he shows what changes were made, but the substantive issues Kris (and I

    assume your company, too) highlighted were not addressed to my satisfaction. I doubt if

    your were totally satisfied as well.

    My question: Aside from the material I have from your company outlined above, are

    there other reviews/reports that I should go to lengths to acquire, or do those

    documents I note above provide your major points of concern?

    I don't want to put you in an uncomfortable position, I just don't want to waste time

    going after some of the additional reviews and recommendations your company has

    made, if there isn't much more there than what I currently have.

    As I mentioned, I've told Mathes that I'd contact you, not to request the reports, but to

    have a better understanding of what reports are "out there." I also said I've been

    supportive of the advice you and Bernier & Carr have provided the Town and all I want

    mailto:[email protected]:[email protected]:[email protected]
  • 8/8/2019 History of FOILED Engineering Requests

    5/13

    to do is support the Town's consultants if your recommendations are challenged by

    Hessler, BP and AES-Acciona. Mathes wasn't impressed with my helpful sincereity.

    Thanks for any information you can provide. I also won't be offended if you tell me my

    request is out of bounds.

    Regards,

    Clif Schneider

    P.S. I'll be presenting a paper on background sound levels in Cape Vincent at this

    summer's INCE InterNoise conference in Ottawa. My data show the lowest levels near

    the floor of my meter, e.g., 25 dBA. I also show that atmospheric stability (from my own

    DIY met tower) are more common than wind developers would have us believe (67% of

    nights from June-October). These results paint a different sound picture of Cape Vincent

    compared to Hessler's studies.

  • 8/8/2019 History of FOILED Engineering Requests

    6/13

    FW: Reviews and recommendations for Cape Vincent Wednesday, April 22, 2009 3:55

    PM

    From: "Kris Dimmick" View contact details

    To: "Clif Schneider"

    Cc: "Gregory C. Tocci" , "Mathes, Todd"

    Cliff

    Greg and I discussed your request and agreed it would be best for this request to also go

    through the towns legal council.

    Congratulations on the conference presentation.

    Kris

  • 8/8/2019 History of FOILED Engineering Requests

    7/13

    FUCILLO EMAIL - Sunday, May 24, 2009 8:52 PM

    From: Clif Schneider [mailto:[email protected]]

    Sent: Sunday, May 24, 2009 8:52 PM

    To: Thomas Fucillo

    Subject: Fw: Cape Vincent Foil request

    Tom,

    Yes I asked in writing and got the response below from Todd Mathes

    .

    Check out the Ltr to Planning Bd. See memo from Kris Dimmick (Bernier Carr consulting

    engineer to town) regarding his and Cavanaugh-Tocci (consulting acoustic engineers)

    concerns regarding the SLW SDEIS. There are ten points they wanted addressed, but see

    all the non responses listed beside the issues. Also, review memo sent from Mathes

    (town atty) to SLW asking them to semi-address only one item, instead of striking use of

    LEQ, big Todd says, revise the language. Some big issues were identified, too. Like

    Hessler can't use the regression technique to estimate background noise, and they can't

    use 0.5 as a ground absorption coefficient in their modeling. These aren't little things,

    but Todd chose to forget about them.

    I confronted Todd and PB at last saturday's hearing saying they were not listening to

    their paid advisors. Todd handed me some BS and I ended up sending him another

    letter asking again for the material and asking what basis are you exempting Tocci's

    reviews of Hessler's work?

    Now you can see why I think it might be a good tactical move to insist on having

    Dimmick and Tocci review Schomer's report and mine (I've attached a copy) and relate

    to what Hessler is saying. My guess, todd won't want tocci doing anthing -- he probablywants him on the payroll and thereby can tell him to sit tight be quiet until this project is

    approved. Perhaps I'm a bit too paranoid.

    Sorry for the long treatise on a Sunday night

    Got to go watch Orlando beat the Cavaliers!

    Clif

  • 8/8/2019 History of FOILED Engineering Requests

    8/13

    FUCILLO RESPONSE - Tuesday, May 26, 2009, 11:08 AM

    From: Thomas Fucillo

    Subject: RE: Cape Vincent Foil request

    To: "Clif Schneider"

    Date: Tuesday, May 26, 2009, 11:08 AM

    Clif, I hadn't seen these before. Did the applicant ever respond? If not, how did the

    Planning Board get from the point of asking for additional information to the point of

    scheduling a hearing and requesting comments.

  • 8/8/2019 History of FOILED Engineering Requests

    9/13

    Tuesday, May 26, 2009 11:46 AM

    From: Clif Schneider [mailto:[email protected]]

    Sent: Tuesday, May 26, 2009 11:46 AM

    To: Thomas Fucillo

    Subject: RE: Cape Vincent Foil request

    Tom,

    No, the applicant never responded, but I didn't think they were obligated to respond. I

    first went to Tom Rhienbeck around April and asked to see all the material related to

    noise issues that was provided by Greg Tocci to the Planning Board and also the Town's

    wind law committee. After some initial reluctance, Rhienbeck agreed to let me see the

    documents. He added that he hadn't seen them either. I said I'd contact Tocci and

    Dimmick let them know you agreed to let me see the material and I'll request they send

    copies to you, too. I got responses back from both Tocci and Dimmick that I would have

    to contact Todd Mathes for any of these materials. Todd of course told me I'd have to

    FOIL the reports and even then he'd consider them exempt from FOIL laws.

    Going from a request for additional materials to scheduling a hearing was all

    orchestrated by Mathes. As you can see from the memos provided me by Mathes, he

    never passed along the substantive questions from Tocci/Dimmick to the developers --

    he gave them a free pass. This was the point I made at the public hearing -- of ten items

    requested by your technical experts you required developers to respond to none of

    them. I believe I said, why pay the experts if you aren't going to listen to their advice.

    Clif

  • 8/8/2019 History of FOILED Engineering Requests

    10/13

    RE: Cape Vincent Foil requestTuesday, May 26, 2009 1:08 PM

    From: "Thomas Fucillo" View contact details

    To: "Clif Schneider"

    Doesn't make any sense to me. I am going to make a short supplemental comment

    based upon the memos you provided.

  • 8/8/2019 History of FOILED Engineering Requests

    11/13

    0035

  • 8/8/2019 History of FOILED Engineering Requests

    12/13

    0035

  • 8/8/2019 History of FOILED Engineering Requests

    13/13

    December 2, 2010

    Ms. Michelle Bouchard Town ClerkTown of Cape Vincent

    1964 NYS Rte. 12E

    Cape Vincent, NY 13618 FOIL REQUEST

    Dear Michelle:

    This letter is a FOIL request for copies of documents that pertain to any communication

    from 2007 to present between the town and its consulting engineers (Bernier-Carr and

    Cavanaugh-Tocci) regarding the noise issue, as it pertains to wind project proposals.

    I would also like a copy of the town's insurance policy that deals with Directors and

    Officers.

    I will compensate your office for any costs associated with complying with my request.

    Thank you.

    Sincerely yours,

    Clifford Schneider

    PO Box 165

    Cape Vincent, NY 13618