Page 1: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Historic Rehabilitation

NYT Engineering

507 Main façade, 2019

Page 2: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Project Scope Design Elements Phasing Conclusions and Recommendations

Presentation Outline

Page 3: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Project Scope

Page 4: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Project Scope

Page 5: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Project Scope

Page 6: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Project Scope

Page 7: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Front Façade

Page 8: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Steel Frame for Bracing andLeveling the Veneer Wall

Page 9: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Base Plate Location on Sidewalk

Plan view Elevation view

Page 10: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Recommended Brick Removal Locations

Page 11: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Lateral Connections (Anchors)

Page 12: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Concrete Brick Ledge

Page 13: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Roof

Page 14: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Roof Design

Page 15: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Foundation Columns and First Floor Framing

Page 16: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Foundation Columns and First Floor Framing Design

Page 17: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Wood Framing Connections6x6" 12-Guage Galvanized

Adjustable Post Base 4x8 U46 Joist Hanger

Joist to Wall Connection

CC66 Column Cap

Page 18: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Second Floor Framing

Page 19: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Second Floor Framing

Page 20: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Second Floor Framing

Page 21: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Brick Column Connection

Page 22: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

InteriorDesign

Page 23: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Interior Design

Page 24: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Design Methods

Page 25: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Cost Estimation and Phasing Phase 1 External wall (facade)

Steel Framing and wall leveling........$ 10,175Brick removal and installation ..........$ 28,690Installing concrete ledge....................$ 5,953

Phase 1 total......... $44,818Phase 2 Roof

Roof Removal ..................................$ 10,000Roof Installation ..............................$ 25,029

Phase 2 total...........$ 35,029

Phase 3 Main Floor Floor Removal...................................$ 6,555Floor installation...............................$ 52,000Other installations.............................$ 29,061

Phase 3 total..............$ 87,616

Phase 4 Second Floor Floor and walls Removal...................$ 4,160Floor and walls installation...............$ 12,406

Phase 4 total..............$ 16,566Contingencies..........................................$ 18,402Administration........................................$ 36,805 Total Project cost.............................. $239,235

2019 NATIONAL CONSTRUCTION ESTIMATOR RS-MEANS HEAVY CONSTRUCTION CONST MANUAL FOR 2016

Page 26: Historic Rehabilitation...Presentation Outline. Project Scope. Project Scope. Project Scope. Project Scope. Front Façade. Steel Frame for Bracing and Leveling the Veneer Wall . Base

Conclusions, Recommendations, and Questions