HINZ CORPORATION

38
HINZ CORPORATION ENGINEERS & CONTRACTORS HVAC & R MECHANICAL ELECTRICAL PLUMBING ESCALATORS & ELEVATORS SOLAR SYSTEM Office # FF-01, DIVINE CENTER, New Airport Road Lahore- Cantt LAHORE- PAKISTAN Email: [email protected] Web: www.hinzcorp.pk

Transcript of HINZ CORPORATION

Page 1: HINZ CORPORATION

HINZ CORPORATION ENGINEERS & CONTRACTORS

❖ HVAC & R ❖ MECHANICAL ❖ ELECTRICAL ❖ PLUMBING ❖ ESCALATORS &

ELEVATORS ❖ SOLAR SYSTEM

Office # FF-01, DIVINE CENTER, New Airport Road Lahore- Cantt LAHORE- PAKISTAN Email: [email protected] Web: www.hinzcorp.pk

Page 2: HINZ CORPORATION

HINZ CORPORATION is well renowned for its capability to execute

"Turnkey " projects in variety of HVAC & MEP Applications. Elevators &

Escalators, Solar Power Systems & Solar water Pumps. We have complete

in house facilities for Detail Design, Equipment Procurement and Installation,

followed by strong after sales services. We have competent staff comprising

of qualified Engineers and skilled Technicians who execute each and every

project with great devotion. We enjoy a long list of satisfied clients from all

sectors of life

Page 3: HINZ CORPORATION

NAME: HINZ CORPORATION

ADDRESS:

Office # FF-01, Divine Centre, New Airport Road Lahore- Cantt Lahore-Pakistan

E-mail: [email protected] Website: www.hinzcorp.pk STATUS PROPRIETORSHIP NAME OF PROPRIETOR:

• ABDUL HAMID TABASSUM Cell: 0321-4461244

BANK REFERENCE: MEEZAN BANK LIMITED Q-BLOCK,DEFENCE BRANCH LAHORE

INCOM TAX NO. 7559808-6

Sales Tax No. 32-7787-616895-9 L.C.C.I MEMBERSHIP NO. 100602-A ASHRAE MEMBERSHIP NO. 8373978 PAKISTAN HVACR SOCIETY MEMBERSHIP NO. 042-2-0873 (LIFE MEMBER)

Page 4: HINZ CORPORATION

Turnkey " projects in variety of SUPPLY AND INSTALLATION OF

HEATING VENTILATION AIR CONDITIONING SYSTEM, MECHANICAL,

ELECTRICAL and PLUMBING Applications, Escalators, Elevators &

Travellators. Solar Power systems (Domestic, commercial to Industrial

levels). Solar Water Pumps

Page 5: HINZ CORPORATION

What we Offer HINZ CORPORATION offers single a source responsibility for design and installation of HVAC projects. Our

professional engineering staff works closely with architects, consultants, building managers, general

contractors and building owners to evaluate their specific needs for each project.

General Maintenance / Trouble Shooting Our engineering staff utilizes their experience and expertise to analyze the existing mechanical system, identify problems and provide effective solution. Our staff also provides energy analysis and retrofits and

work with building owners on indoor air quality to provide a healthy working environment.

Turnkey Projects & Services HINZ CORPORATION is a team of professional managers, supervisors and technicians who are fully trained

to complete your HVAC projects, test and commission, operate and maintained it. After project completion

we provide a preventive maintenance program to meet your needs. Our preventive maintenance program

provides scheduled maintenance to protect your investment help preventive costly breakdown, extend the life of equipment and save energy cost. Fact: People can thank Air-conditioning for prolonged life

expectancy and the world changing advances in medicine. Without cool, controllable environments, certain medicines could never have been created and certain illnesses could never have been cured.

Why Choose us?

Complete Peace of Mind Our service includes complete system status checkup, fault tracing, calibration & maintenance, the

replacement of wearing parts & maintaining all the necessary data for reference to be used by the client in

future. The service is available on-site. We ensure that it lowers life-cycle costs of equipment by increasing

the quality of measurement data.

Preventive Maintenance During the annual Preventive Maintenance our qualified technician will perform complete maintenance in accordance with the latest procedures and value added recommendations and suggestions will be provided

for upgrading and enhancing system performance.

Customize able Contractual Services AMOC (Annual Maintenance / Operational Contracts) – customized annual contracts for better care of the

your HVAC Equipment at economical price. The Preventive Maintenance requires a service contract. Tasks

and schedule can be agreed beforehand, because every customers need is different. We can structure our

offer in order to help each customer according to his requirement. It helps the customer to plan his possible downtime and lets MIA manage its capacity.

Page 6: HINZ CORPORATION

What you gain?

Trouble-free Operation and Performance Regular preventive maintenance is the best way to endure trouble-free operation and peak performance of

your HVAC equipment. Pre-season maintenance is also important. It can help to avoid a system failure in

severe hot or cold weather when you need it most and provide a quality installation by experienced

craftsmen.

Improvement in Product Life Cycle Both life cycle and product uptime can be improved with Safe operation & regular preventive maintenance,

decreasing the need for unforeseen repairs and use of spare parts. Our Preventive maintenance service also

alleviates the customer’s need to invest in competent staff or equipment, and it ensures a continual supply

of high quality after Sales Services.

Complete System Replacement If you’re thinking about replacing an aging system, your MIA Comfort Specialist can advise you a cost

effective and Energy efficient HVAC product an alternate solution to meet your requirement. He can also

provide you detail preventative maintenance, annual maintenance services. You’ll also want to inquire about MIA’s Optional Extended Warranties.

Scope of Maintenance

Maintenance Cycles Our round the clock service & Customized AMOC (Annual Maintenance / Operational Contracts) for better

care of your HVAC Equipment at economical price plan will ensure that your system runs as efficiently as

possible. We provide this AMOC on short term/long term plans as per your need such as On call basis, Weekly basis, Fortnightly, Monthly, Quarterly as well as 24 Hrs. Operation & General Maintenance Services.

Bi-annual Maintenance & Operational Cycle Our HVAC Comfort Specialist shall:

1. Do a complete system’s operation check on both cooling and heating modes.

2. Check the equipment efficiency.

3. Check all other major components and safety devices.

4. Service both indoor and outdoor air conditioner coils.

Page 7: HINZ CORPORATION

1- MR. ZEESHAN MANZOOR B.Sc Mechanical Engineer (MECH/31068) 3 Years experience

2- MR. HANAN HAMID B.Sc (ELECT) ENGINEER 3 Year Experience 4- Mr. NAVEED SHAHZAD B. Tech (HON)HVAC ENGINEER 6 YEARS EXPERIENCE 5- MR. BABAR AHMED B. TECH (PASS) HVAC ENGINEER 21 YEARS EXPERIENCE 6- M. HASSAN KHAWAR B.TECH PASS ENGINEER 4 YEARS EXPERIENCE 7- MR. SHAHZAD AKRAM ASSOCIATE ENGINEER 7 YEARS EXPERIENCE 8- MR. MUHAMMAD NAEEM ASSOCIATE ENGINEER 3 YEARS EXPERIENCE 9- MR. MEHTAB TAJ DUCT FOREMAN 12 YEARS EXPERIENCE 10- MR.MOHAMMAD IQBAL DUCT FOREMAN 15 YEARS EXPERIENCE 11- MR.ABID HUSSAIN PIPE SUPERVISOR 12 YEARS EXPERIENCE 12- DUCT FABRICATORS 6 NOS. 13- PIPE FITTER 6 NOS. 14- ELECTRICIANS 4 NOS. 15- A/C MECHANICS 4 NOS. 16- ASSTTS. & HELPERS 10 NOS. 17- PURCHASER 02 NOS. 18- LABOUR FOR DUCTING ETC. SUFFICIENT.

Page 8: HINZ CORPORATION

1- MR. ABDUL HAMID TABASSUM C.E.O 31 years Experience 2- MR. ABID USMAN MANAGER ACCOUNTS 27 years Experience 3- Mr. ABDUL QUDOOS Admn Officer 8 years Experience 4- Mr. Ali Asad Purchaser 7 Years Experience 5- Mr. FAYSAL KHAN Accountant 6- Mr. M. MUMRAIZ Office Assistant 7- IJAZ AHMED Office Assistant

Page 9: HINZ CORPORATION

S.NO. MACHNIERY / EQUIPMENT QUANTITY

1 AUTOMATIC DUCT FABRICATION MACHINE AUTOLINE III 1 SET

2 AUTOMATIC FLANGE TDF MAKING MACHINE 1

3 PITSBURG LOCK FORMING MACHINE 1

4 CORNER PLATE MAKING DIES AND POWER PRESS MACHINE 1

5 DIFFERENT TYPE DRILLING MACHINES 2

6 GAS/SPOT ELECTRIC WELDING PLANTS 5

7 SHEET CUTTER AND SHEET BENDING MACHINE 3

8 HYDRAULIC PRESS 1

9 VACUUM PUMPS

1

10 REFRIGERANT CHARGING & TESTING KITS 4

11 LEAK DETECTOR 1

12 ELECTRICAL TESTING EQUIPMENT 2

13 AIR VELOCITY METERS 2

14 PRESSURE GAUGES 3

15 FLOW METER 2

16 TONG TESTER 3

17 TOOL BOXES COMPLETE 3

18 TIN/SHEET CUTTERS 4

19 HOIST TACKLE 2

20 MENO METERS 2

Page 10: HINZ CORPORATION

21 RPM METER 2

22 WATT METER 1

23 BELT TENSION TESTER 1

24 SOUND METER 1

25 SMOKE TEST MACHINE 1

26 FREON GAS CYLINDERS NITROGEN GAS CYLINDER AND OTHER

NECESSARY TOOLS

1

Page 11: HINZ CORPORATION
Page 12: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT REGIONAL

DISTRIBUTION OFFICE SUI NORTHERN GAS PIPE LINES LTD,

HAYATABAD PESHAWAR

CLIENT: SUI NORTHERN GAS PIPELINES LTD, 21-KASHMIR ROAD, LAHORE

CONSULTANT: ACS ENGINEERING CONCERN – LAHORE

CAPACITY: 300 TONS

SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-

• 2 X 150 ABSORPTION TYPE CHILLERS (BROAD-CHINA)

• 6 NOS. AIR HANDLING UNITS (FYROGENIS 0- GREECE_

• 1 NO. COOLING TOWER OF MATCHING CAPACITY

(ROYWO – HONG KONG)

• 6 NOS. HUMIDIFIERS (CONDAIR – SWITZERLAND)

• 6 NOS. KSB PUMPS

• SCHEDULE 40 M.S PIPING

• G.I. SHEET METAL DUCTING

• AIR DEVICES

• AUTOMATIC CONTROLS SYSTEM

STATUS: SUCCESSFULLY COMPLETED, COMISSIONED, OPERATED AND

MAINTAINED FOR ONE YEAR.

Page 13: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT McDONALDS,

RESTAURANT, F-9 PARK, ISLAMABAD

CLIENT: SIZA FOODS (PVT) LTD-KARACHI

CONSULTANT: S. MEHBOOB & COMPANY – KARACHI

CAPACITY: 120 TONS

SYSTEM: SELF CONTAINED PACKAGED TYPE UNITS:-

• 8 NOS. PACKAGED TYPE UNITS OF DIFFERENT CAPACITIES

(MAKE: YORK)

• COPPER PIPING (REFRIGERANT PIPING)

• G.I. SHEET METAL DUCTING

• AIR DEVICES

STATUS: SUCCESSFULLY COMPLETED, AND COMISSIONED,

Page 14: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT 2ND ADDITIOANL

FLOOR OVER EXISTING 1ST FLOOR OF NIBAF (NATIONAL

INSTITUTE OF BANKING AND FINANC) H-8 SECTOR, ISLAMABAD

CLIENT: STATE BANK OF PAKISTAN, KARACHI

CAPACITY: 160 TONS

SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-

• 2 X 80 ABSORPTION MODULAR TYPE CHILLERS WITH

BUILTIN COOLING TOWERS AND PUMPS ETC. (SANYO-

CHINA)

• 2 NOS. AIR HANDLING UNITS (INTERKALIMA - GREECE_

• SCHEDULE 40 M.S PIPING

• G.I. SHEET METAL DUCTING

• AIR DEVICES

• AUTOMATIC CONTROLS SYSTEM

STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION

AND MAINTENANCE IN PROGRESS TILL JULY 2009

Page 15: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT REKO

PHARMCALS (PVT) LTD LAHORE

CLIENT: REKO PHARMACALS (PVT) LTD, 13-K.M, MULTAN ROAD, LAHORE

CAPACITY: 200 TONS

SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-

• 1 X 200 ABSORPTION TYPE CHILLER (SANYO-CHINA)

• 12 NOS. AIR HANDLING UNITS (McQUAY-MALAYSIA)

• 1 NO. COOLING TOWER OF MATCHING CAPACITY (MARLEY

MALAYSIA)

• 6 NOS DUST COLLECTORS

• 4 NOS. KSB PUMPS

• SCHEDULE 40 M.S PIPING

• G.I. SHEET METAL DUCTING

• AIR DEVICES

STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION

BY CLIENT HIMSELF.

Page 16: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT STANLEY

PHARMACEUTICAL (PVT) LTD, PESHAWAR

CLIENT: STANLEY PHARMACEUTICALS (PVT) LTD, 82-B, INDUSTRIAL

ESTATE, JAMRUD ROAD, PESHAWAR

CONSULTANT: A.A. CONSULTANTS, LAHORE

CAPACITY: 200 TONS

SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-

• 1 X 200 ABSORPTION TYPE CHILLER (CENTURY - KOREA)

• 12 NOS. AIR HANDLING UNITS (SABRO – PAKISTAN)

• 1 NO. COOLING TOWER OF MATCHING CAPACITY (MARLEY

MALAYSIA)

• 6 NOS DUST COLLECTORS (AEROTEK – PAKISTAN)

• 4 NOS. KSB PUMPS

• SCHEDULE 40 M.S PIPING

• G.I. SHEET METAL DUCING

• AIR DEVICES

STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION

BY CLIENT HIMSELF.

Page 17: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT NORTHWEST

GENERAL HOSPITAL, HAYATABAD - PESHAWAR

CLIENT: ALLIANCE HEALTHCARE (PVT) LTD, HAYATABAD, PHASE-V,

PESHAWAR

CAPACITY: 720 TONS + 120 TONS + 35 TONS +30 TONS ( TOTAL 905 TONS)

CONTD…….P/2

Page 18: HINZ CORPORATION

SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-

• 3 X 240 ABSORPTION TYPE CHILLER (SANYO-CHINA)

• 12 NOS. AIR HANDLING UNITS (McQUAY-MALAYSIA)

• 2 NOS. COOLING TOWERS OF MATCHING CAPACITIES

(EBARA- CHINA)

• 11 NOS ENERGY RECOVERY VENTILATORS (ERV) BRYAIR-

MALAYSIA

• 112 NOS. FAN COIL UNITS (McQUAY- MALAYSIA)

• 30 NOS. SPLIT TYPE UNITS OF DIFFERENT CAPACITIES

(ACSON – MALAYSIA

• 05 NOS. DUCT CONNECT SPLIT UNITS

• 6 NOS. KSB PUMPS

• 8 TERMINAL FILTERATION SYSTEM (TMFS) FOR OPERATION

THEATORS (FCR – ITALY)

• EXHAUST AND FRESH AIR FANS OF DIFFERENT CAPACITIES

• 2 NOS. HOT WATER GENERATORS

• FAN FIILTRATION UNITS

• SCHEDULE 40 M.S PIPING

• G.I. SHEET METAL DUCTING

• AIR DEVICES

• COMPLETE BMS (AUTOMATIC CONTOLS) SYSTEM

(JONHONSON CONTROLS)

STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION

& MAINTENANCE IN PROGRESS UPTILL AUGUST 2009.

Page 19: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT TRICON CORPORATE CENTER, GULBERG, LAHORE

CONSULTANT: ACS ENGINEERING CONCERN - LAHORE

CLIENT: TRICON DEVELOPERS , 8-K, MAIN BOULEVAR, GULBERG, LAHORE

VALUE: Rs:91.7 Million (MAJOR EQUIPMENT WILL BE SUPPLIED BY

CLIENT)

CAPACITY: 2450 TONS

SYSTEM: WATER COLLED PACAKGED TYPE AIRCONDITIONING UNITS AND

SCREW CHILLERS COMPRISING OF:-

• 2 X 60 TR WATER COOLED SCREW TYPE WATER CHILLERS

• 74 NOS. WATER COOLED PACKAGED UNITS OF DIFFERENT

CAPACITIES

• 3 NOS. COOLING TOWERS OF MATCHING CAPACITIES

• 57 NOS FAN COIL UNITS OF DIFFERENT CAPACITIES

• 13 NOS. CENTRIFUGAL WATER PUMPS

• 17 NOS. EXHAUST FANS OF SYSTEM AIR- BRAND

TRICON CORPORATE

CENTER

LAHORE

Page 20: HINZ CORPORATION

• G.I.SHEET METAL DUCT WORKS OF APPROXIMATELY

265761 SQFT

• CONDENSER WATER PIPING FROM 2” TO 18” DIA

• AIR DISTRIBUTION SYSTEM (AIR DEVICES)

• GATE, GLOBE VALVES, STRAINERS ETC. COMPLETE IN ALL

RESPECTS

• PRESSRUE GAUGES, TEMPERATURE GUAGES ETC.

• AIR SEPARATOR

• EXPANSION TANK

• CHEMICAL FEEDERS AND CHEMICAL

Page 21: HINZ CORPORATION

PROJECT INSTALLATION OF HVAC SYSTEM AT SHALAMAR MEDICAL & DENTAL COLLEGE, SHALAMAR HOSPITAL, LAHORE

CONSULTANT: ACS ENGINEERING CONCERN - LAHORE

CLIENT: BUSINESSMEN HOSPITALTRUST (SHALAMAR HOSPITAL) LAHORE

VALUE: Rs:39.97 Million (Installation work only. (Equipment supplied by

others)

CAPACITY: 620 TONS

SYSTEM: DIRECT GAS FIRED ABSORPTION TYPE SYSTEM COMPRISING OF:-

• 2 X 310 TR DIRECT GAS FIRED ABSORPTION CHILLERS

• 3 NOS. MATCHING CAPACITIES COOLING TOWERS

• 20 NOS. MINI AIR HANDLING UNITS OF DIFFERENT

CAPACITIES

• 151 NOS. FAN COIL UNITS OF DIFFERENT CAPACITIES

• 06 NOS. CENTRIFUGAL PUMPS

• EXPANSION TANK

• AIR SEPARATOR

• 2 NOS. EVAPORATIVE COOLING UNITS

• 03 NOS. ENERGY RECOVERY VENTILATORS

• EXHAUST AND FRESH AIR FANS

• CHEMICAL FEEDERS AND WATER SOFTENING CHEMICALS

Page 22: HINZ CORPORATION

• G.I. SHEET METAL DUCT WORKS

• M.S. SCHEDULE 40 CHILLED/HOT AND CONDENSER WATER

PIPING WORKS

• AIR DEVICES

• GATE, GLOBE & CHECK VALVES

• STRAINERS

• CIRCUIT SETTER TYPE BALANCING VALVES

• ELECTRICAL PANELS

• ELECTRICAL CABLING

• AUTOMATIC CONTROLS

STATUS: COMPLETED

Page 23: HINZ CORPORATION

PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT DIN TOWER

RAIWIND ROAD, LAHORE

CLIENT: DIN GROUP, 16 M, MODEL TOWN , LAHORE

CAPACITY: 240 TONS

SYSTEM: WATER COOLED PACKAGED A/C UNITS SYSTEM COMPRISING OF:-

• 8 X 30 TONS WATER COOLED PACAKAGED TYPE A./C

UNITS (McQUAY-MALAYSIA)

• 2 NOS. COOLING TOWER OF MACHING CAPACITIES (BKK –

THAILAND)

• 1 NO. HOT WATER GENERATOR

• 2 NOS. GRUNDFOSS PUMPS

• SCHEDULE 40 M.S PIPING

• PRE-INSULATED DUCTILE SYSTEM (PIRALU – SPAIN)

(Newly introduced pre-insulated duct system comprising of

Polysocynorate insulated sandwiched with aluminum layers)

• AIR DEVICES

• AUTOMATIC CONTROLS

STATUS: COMPLETED.

Page 24: HINZ CORPORATION

PTA LOTTE, PROJECT, KARACHI WITH DESCON ENGINEERING LIMITED

Execution of the Project meeting all HSE standards according to Client’s requirements successfully.

➢ Installation of owner supplied HVAC units ➢ Supply, fabrication and installation of SS Duct ➢ Supply & installation of Air Devices ➢ Installation of Controls with Dampers ➢ Installation of Exhaust Fans

Page 25: HINZ CORPORATION

PROCTER & GAMBLE PAKISTAN (PVT) LTD

HVAC WORKS AT DRY LAUNDRY UNIT, KARACHI

Execution of the Project meeting all HSE standards according to P & G requirements successfully.

➢ Supply & Installation of Fan coil Units ➢ Supply & Installation of Centrifugal Pumps ➢ Supply and installation of M.S Sch. 40 Piping ➢ Supply & Installation of Valves and strainers ➢ Supply & Installation of Split type units ➢ Supply, & installation of machine made G.I & S.S Duct ➢ Supply & installation of Air Devices ➢ Installation of Controls with Dampers ➢ Installation of Exhaust Fans

Page 26: HINZ CORPORATION

ALFATAH SHOPPING MALL, LAHORE

HVAC WORKS

CAPACITY: 640 TR (Rs:110.23 million)

Page 27: HINZ CORPORATION

TONY & GUY – ISLAMABAD

HEATING AND AIR CONTIOING AT TONY & GUY

SALOON – ISLAMABAD (Rs:7.85 million)

Page 28: HINZ CORPORATION

S.NO DESCRIPTION CAPACITY TONS

VALUE IN MILLIONS

1 Supply, Installation, testing and commissioning of HVAC works at PIA Flight Kitchen Karachi Airport KARACHI

450 70.00

2 Supply, Installation, Testing & commissioning of HVAC works Highnoon Laboratores, Multan Road Lahore

320 5.50

3 Supply, Installation, Testing & commission of HVAC SYSTEM at STATE CEMENT RESEARCH INSTITUTE BUILDING, KOT LAKHPAT, LAHORE

240 6.30

4 Supply, installation, testing and commissioning Gas fired Chiller at Sui Northern Gas pipelines, Gurumangat, Lahore

300 9.30

5 Supply, installation, Testing Commission of Cooling Towers at SNGPL, Faisalabad

120 0.63

6 Supply, Installation, Testing and commissioning of HVAC works at SNGPL, Gurumangat, Lahore

160 1.73

7 Supply, Installation, Testing and commissioning of split type Air Conditioners SNGPL, Gurumangat, Lahore

30 0.73

8 Supply, Installation, Testing and Commissioning of HVAC System at H. KARIM BUKHSH, Liberty Branch, Lahore

80 1.70

9 Supply of Airconditioning Equipment, and spares Including compressors of 60 H.P and other plant Equipment and spares to KOT ADDU POWER COMPANY KAPCO, KOT ADDU

(list of Purchase orders available on request)

YEARS 1991-1998

32.70

10 Supply, Installation, testing and commissioning of Air-conditioning system at Auditorium and theater Building of LAHORE AMERICAN SCHOOL, Lahore

160 3.24

Page 29: HINZ CORPORATION

11 Supply & Installation of HVAC System and Plumbing works of MCDONALD’S Bank Square, The Mall, LAHORE

60 3.40

12 Supply, installation, testing and commissioning of HVAC system at DMC CENTER KHARIAN – CANTT

60 0.65

13 Supply, Installation, Testing and commission of HVAC works at Medipak Limited, Kot Lakhpat Lahore

240 6.40

14 Supply, installation, testing and commissioning of HVAC system at Jamia Mosque Kharian – Cantt

60 5.63

15 Supply of HVAC Equipment to PMO (ADVANCE COMPUTING SOLUTIONS) –Rawalpindi

80 6.60

16 Supply & installation of HAVC system at SNGPL, GURUMANGAT Gulberg-Lahore

YEAR 2003 1.50

17 Supply of spare part of 132 KV circuit breakers to LESCO, WPADA Lahore.

180 24.14

18 Supply, Installation, Testing and commissioning of HVAC System at NANDO’S RESTAURANT, GULBERG LAHORE.

120 2.50

19 Supply of various Mechanical, Electrical, Instrumentation, Electronics etc. equipment and spares for Power Generation sector like KPACO, WAPDA, RAILWAYS, and other private as well as public sector industry

YEAR 2002-2004

70.00

20 SUPPLY INSTALLATION , TESTING & COMMISSIONING OF HVAC SYSTEM AT SNGPL, REGIONAL DISTRIBUTION OFFICE BUILDING, HAYATABAD, PESHAWAR

300 29.20

21 Supply of spare parts of 132 KV circuit breaker to LESCO, WAPDA LAHORE

YEAR 2004 15.14

22 SUPPLY, INSTALLATION AND COMMISSIONING OF HVAC SYSTEM AT DFID BUILDING, BRITISH EMBASSY, ISLAMABAD

120 15.20

23 SUPPLY INSTALLATION, TESTING AND COMMISSIONING OF HVAC SYSTEM AT ALLIANCE HEALTH CARE HOSPITAL, HYATABAD, PESHAWER + ADDITIONAL HVAC WORKS AT EXTENSION

905 78.25

24 SUPPLY AND INSTALLATION OF HVAC SYSTEM AT NIBAF BUILDING, STATE BANK OF PAKISATN – ISLAMABAD

160 21.62

Page 30: HINZ CORPORATION

25 SUPPLY INSTALLATION, TESTING AND COMMISSIONING OF HVAC SSYTEM AT STANLEY PHARMACEUTICALS (PVT) LTD, JAMRUD ROAD, PESHAWAR

200 11.70

26 SUPPLY, INSTALLATION, TESTING COMMISSIONING OF HVAC SYSTEM AT REKO PHARMA, MULTAN ROAD, LAHORE

200 12.07

27 SUPPLY & INSTALLATION OF HVAC SYSTEM AT McDONALDS RESTAURANT, F-9 PARK, ISLAMABAD

YEAR 2009-10

5.20

28 DESIGN, SUPPLY, INSTALLATION AND COMMISIONG OF HVAC SYSTEM AT EDEN CITY BOOKING OFFICE BUILDING, LAHORE.

120 14.12

29 SUPPLY OF SPARES FOR PNEUMATICE DRIVE SF-6 CIRCUIT BREAKERS FOR LESCO LTD, LAHORE

YEAR 2011 19.54

30 TONY & GUY – ISLAMABAD HEATING AND AIR CONTIOING AT TONY & GUY SALOON – ISLAMABAD

60 6.68

31 Installation of HVAC system at Alfatah Shopping Mall, Gulberg- Lahore

640 42.17

32 HVAC works at McDonlad’s Restaurant , Garrision Club, Peshawar

125 6.5 (Equipment supplied by

owner)

33 Supply & Installation of HVAC system at Headoffice Building DIN Group, Lahore

240 35.91

34 Supply & installation of HVAC works at New Power House control building LOTTE PTA, Bin Qasim, Karachi

300 78.2

35 Supply & Installation of HVAC system at Dry Laundry Area Proctor & Gamble Pakistan, Bin Qasim, Karachi

160 32.62

36 HVAC Works at New Benazir Bhutto International Airport, Islamabad (Installation of equipment and allied works only)

6000

Page 31: HINZ CORPORATION

NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT,

ISLAMABAD (Rs:213.42 million)

Page 32: HINZ CORPORATION

VARIOLINE INTERCOOL, KAHNA KACCHA,

LAHORE (Rs:40.12 million)

Page 33: HINZ CORPORATION

AHMED PHARMA GRAH MORE, KHANEWAL

CAPACITY 1040 TONS (Rs: 91.35 millions)

Page 34: HINZ CORPORATION

CINEPAX

11 Cinemas at Packages Mall, Lahore

Capacity: 800 Tons

➢ Installation of Air Handling Units

➢ Supply and Installation of M.S Piping for chilled water lines to AHUs, and FCU

➢ Supply and Installation of Sheet Metal machine made Ducting with Air devices,

➢ Supply and Installation of Sound Attenuators

➢ Supply and Installation of Dehumidifires

➢ Supply and installation of complete BMS control system

➢ Supply and installation of smoke exhaust Fan and complete auto system.

➢ Supply & installation of Kitchen Exhaust Hoods,

Page 35: HINZ CORPORATION

CINEPAX

06 Cinemas at WTC GIGA MALL, ISLAMABAD

Capacity: 580 Tons

➢ Supply and installation of Air Handling Units

➢ Supply and Installation of M.S Piping for chilled water lines to AHUs, and FCU

➢ Supply and Installation of Sheet Metal machine made Ducting with Air devices,

➢ Supply and Installation of Dehumidifires

➢ Supply and installation of complete BMS control system

➢ Supply & installation of Kitchen Exhaust Hoods

Page 36: HINZ CORPORATION

We represent

( Top Elevator of china)

Page 37: HINZ CORPORATION

WELLIFT ELEVATORS / ESCALATORS IN PAKISTAN

S. # PROJECT NAME LOCATION/CITY TYPE FLOORS CAPACITY

1 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 1600 Kgs

2 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 1600 Kgs

3 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs

4 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs

5 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs

6 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs

7 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1000 Kgs

8 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 15 1000 Kgs

9 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 800 Kgs

10 Hallay Tower D.H.A LAHORE ESCALATORS 10 Nos.

11 S.T PLAZA, BAHRIA TOWN RAWALPINDI ESCALATORS 02 Nos.

12 ALFLAH TOWER Bahria Town

KARACHI PASSENGER ELEVATOR 16 1000 Kgs

13 ALFLAH TOWER Bahria Town

KARACHI PASSENGER ELEVATOR 17 1150 Kgs

14 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS

15 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS

16 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS

17 Mr. Azhar Bhatti D.H.A LAHORE PASSENGER ELEVATOR 6 650 KGS

18 Midway Plaza, Bahria Town KARACHI PASSENGER ELEVATOR 12 1000 KGS

Page 38: HINZ CORPORATION

FROM DOMESTIC TO INDUSTRIAL LEVEL, SOLAR PUMPS