Highways Asset Management in Birmingham LoTAG 17 March 2017
-
Upload
teresa-jolley -
Category
Presentations & Public Speaking
-
view
536 -
download
0
Transcript of Highways Asset Management in Birmingham LoTAG 17 March 2017
![Page 1: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/1.jpg)
Highways Asset Management in Birmingham
Teresa Jolley, Creative Director, DEFT153 Ltd
London Technical Advisers Group
17 March 2017
Delivering Efficiency for Transport, for the 153 local authorities in England
![Page 2: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/2.jpg)
![Page 3: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/3.jpg)
![Page 4: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/4.jpg)
• Formerly West Midlands Integrated Transport Authority, then Centro
• Now a devolved Sub-Regional Transport Body
• Scope increased from Public Transport to include Roads and Highways
• We’re getting a Midlands Mayor in May 2017
![Page 5: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/5.jpg)
10 year logistical nightmare.....
• High Speed 2, (HS2) Phase 1: with significant rail, local road and motorway interfaces and diversion works
• Delivery of the Government’s Road Investment Strategy periods 1 and 2 (RIS1 and 2) running to 2021 and 2026 respectively, being delivered by Highways England
• Network Rail’s investment in a number of capacity upgrades on the network around Birmingham
• West Midland’s Combined Authority’s own investment in HS2 connectivity, Midland Metro, and local transport
• Investment in major maintenance and utilities works• Major development in Birmingham City Centre and other locations such
as Cannock
![Page 6: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/6.jpg)
![Page 7: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/7.jpg)
![Page 8: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/8.jpg)
Big risks if not co-ordinated well...
• Congestion• Delays• Negative impact / costs to businesses, local
economy and tourism• Blue light services getting through – risk to life• Angry/frustrated travellers• Time spent dealing with complaints instead of
work
![Page 9: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/9.jpg)
Share, publish and use open data between agencies and the public....
• Connect and optimise Urban Traffic Monitoring and Control systems across local authorities and with Highways England
• Optimise construction planning and scheduling in and between partners
• Drive joined-up public information through multiple communication channels
• Support LEP priorities incl. economic growth by encouraging SME’s and universities to help solve challenges
![Page 10: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/10.jpg)
Partners:
Projects:•Birmingham in Real Time (BiRT)• Big Data Corridor
SME’s:
Innovation Engine
SMESME
SME
SME’s
Transport Incubator, iCentrum
Challenges
Funders:
• Engage SME’s
• Evidence collaboration
• Innovate
Transport organisations
• Support economic growth
• Encourage Innovation
Funding bodies
wanting to:
+
-Events-Training-Networking-Collaboration-Media support-Workshops
SME’s, challenges, datahub, national networks
Facilitation of national, open, collaborative UK-wide standards for highways data (HighwaysAPI)Regional prototype in West Midlands
Venue, support
SME
Towards a Centre of Excellence for Highways and Transport Innovation in West Midlands
Plus you and others.....
![Page 11: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/11.jpg)
#brumdatahackRecap, Results, Resolutions
Teresa Jolley, Creative Director, DEFT153 Ltd
![Page 12: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/12.jpg)
• Have live traffic flow and journey time data across Birmingham City council at 5 minute intervals, based on Urban Traffic Management and Control (UTMC) data, live car parking data and automatic detection of traffic incidents.
• Want to publish openly, and build on work already done on open standards through European funded projects (Opticities, Open Transport Net).
• Need to understand priorities for use and application of this data, to plan evolution of open source platform, and prioritise what data is published.
![Page 13: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/13.jpg)
• Have access to public transport information, working in partnership with the public transport operators.
• Want to understand impacts on the road network during incidents, scheduled maintenance and HS2 construction work. Use this to help encourage modal shift.
• Need to bring together datasets to estimate journey time impacts to develop targeted communication to the network users.
![Page 14: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/14.jpg)
• Have detailed plans of vehicle movements during the construction phase of HS2.
• Want to understand what other public or private projects may impact the road network that HS2 must take account of, for example – tram extension, motorway upgrades.
• Need to find out what data sets are useful to share to reach HS2’s goals and how the results can be presented visually.
![Page 15: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/15.jpg)
We asked organisations to donate their datasets and expertise...
http://deft153.com/birmingham-highways-data-challenge-2016/datasets/
![Page 16: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/16.jpg)
5 prototype solutions1. Birmingham City Open Data
Under Threat 2. HS2 HGV Traffic Heat Map3. Brake-Thru4. A Breath of Fresh Air5. Birmingham Bus Tracker
http://deft153.com/birmingham-highways-data-challenge-2016/hack-teams/
![Page 17: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/17.jpg)
• Take the data into universities, with a masterclass approach to help students connect with real life challenges, and identify skillsets (e.g. developers) to work with industry on future collaborations.
• Create a regional hub for West Midlands data and open, collaborative working, where individuals and organisations (universities, SME’s, corporates, professional institutions) can access the data and learn skills in data visualisation, coding and analysis and collaborate to solve the region’s key transport challenges.
• Prototype the basis for a national (UK wide) ongoing sustainable model for the exchange of highways data (HighwaysAPI), and establish foundations for its shared public / private / community not-for-profit management and direction.
Next steps...
![Page 18: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/18.jpg)
Data Discovery Centre
![Page 19: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/19.jpg)
![Page 20: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/20.jpg)
Value of accurate, standardised Highways asset and inventory data
• Key enabler for V2V / V2i / CAV’s / MaaS• Robust evidence-base for additional £ funding• Improve efficiency of gritting / inspection routes• Feeds journey route planning apps and
services. More accurate data makes for better more accurate, reliable, informed journeys
• This in turn reduces risk of violence and abuse to highway workers – HTMA safety campaign
• Improve public transport routes and journeys
![Page 21: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/21.jpg)
Single open resource for Highways Asset Inventory and Condition data...?
![Page 22: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/22.jpg)
Can Open Street Map Deliver?• Worldwide coverage• Open, free and editable by all• Uses latitude / longitude geo-referencing• Updated instantly• Engages community groups• One single searchable database• Powers many routing apps, location services• ...Volunteers / incomplete / what use for us?
![Page 23: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/23.jpg)
How to find stuff / know what’s there...
• Tagging and classification definitions in a ‘wiki’– Keys - wiki.openstreetmap.org/wiki/Key:highway
• Key:lanes• Key:traffic_calming• Key:turn• Key:crossing• Key:maxspeed
– Information wiki.openstreetmap.org/wiki/Restrictions
• Lanes• Bus_stop• Bicycle• Road_signs_in_the_United_Kingdom
![Page 24: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/24.jpg)
![Page 25: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/25.jpg)
How to see stuff on a map....Use: overpass-turbo.eu
2. The Wizard is the simplest way to search content on Open Street Map (OSM)
Highway=bus_stop
4. Click build and run query
3. Enter your search term
1. Find the location you want to view
![Page 26: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/26.jpg)
(around Birmingham) railway:proposed
![Page 27: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/27.jpg)
highway:secondary
![Page 28: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/28.jpg)
highway:bus_stop
![Page 29: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/29.jpg)
highway:traffic_signals
![Page 30: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/30.jpg)
Monitoring=traffic
![Page 31: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/31.jpg)
Open data releases via Amey (PFI contract Birmingham City Council)
![Page 32: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/32.jpg)
Online routing tools / machines for business, freight and personal use
![Page 33: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/33.jpg)
Highways asset and condition data is crucial for accuracy of routing tools
![Page 34: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/34.jpg)
![Page 35: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/35.jpg)
Summary• Share highways asset condition and inventory
data in multiple ways, including Open Street Map (lat/long georeferenced)
• Accuracy and availability of data improves by making it open
• Engage colleagues in other teams, companies public to contribute to asset inventory / condition data capture
• Open resource of highways data in OSM fuels SME’s and local economy
![Page 36: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/36.jpg)
Action steps• Identify people in your teams, GIS / IT, suppliers,
Open Street Map, uni’s, SME’s, who get this and help them collaborate to make this happen
• Expose yourself to new thinking from Catapults (Transport Systems / Future Cities / Digital)
• Act, don’t wait. Small steps are good. Make change happen.
• Prioritise according to your needs and those of others
• Learn and do stuff yourself. Make time!
![Page 37: Highways Asset Management in Birmingham LoTAG 17 March 2017](https://reader035.fdocuments.net/reader035/viewer/2022062900/58e73b4f1a28ab49038b51cb/html5/thumbnails/37.jpg)
[email protected]: 07835 219864Twitter: @teresacjolleyWeb: deft153.com