    Welcome to the Public Information Session for the Malahat VillageFour Laning and Safety Improvement Project

    Aspen Road to Shawnigan Lake Road

    WELCOME

    1

    1

    1

    1

    1

    1

    1

    PROJECT LOCATION

    N5km

  • HIGHWAY 1 - MALAHAT

    4414 160916

    Since 2001 over $33M has been spent on improvements to the Malahat Segment of Highway 1.

    In 2007 the “Trans-Canada Highway 1 – Malahat Corridor Study” report was prepared which developed a long-term transportation strategy for the Corridor.

    In 2012 a safety review of the corridor was conducted, and the report “Malahat Highway No. 1 Safety Review – Proposed Highway Improvements” was prepared which identified several short term and long term safety improvements for the Corridor.

    The findings from the two reports form the basis of the safety improvements works that have been ongoing on the corridor since summer 2012. In 2015, this Malahat Village section was the area of the corridor identified as the next priority in B.C. on the Move. The above reports can be found at: www.gov.bc.ca/malahatsafetyimprovements

    HISTORICAL REPORTS

  • HIGHWAY 1 - MALAHAT

    4414 160916

    The Malahat section of the Trans-Canada Highway is approximately 20 km long, generally beginning near the Leigh Road Interchange in Langford and ending around the Bamberton Overpass near Mill Bay.

    It is the main highway corridor on Vancouver Island that connects the communities of southern Vancouver Island with the communities of central and northern Vancouver Island.

    The current annual average daily traffic along the corridor is 24,000 vehicles per day making this one of the most important transportation corridors on the island.

    The Malahat Village project will enhance the safety of the corridor while also improving corridor reliability and mobility, by providing:• Over 3 km of new median barrier• 5 km of four-laning• Numerous access and intersection improvements

    The estimated total project cost is $34M. The Province of BC will be contributing $20M to the project and the Government of Canada will be contributing $14M.

    BACKGROUND

  • HIGHWAY 1 - MALAHAT

    4414 160916

    Phase 1 of the Malahat Safety Improvement Works was completed in 2013, and included the following improvements:

    • Installation of seven sections of new concrete median barrier totalling 5.8 km• Upgrades at Finlayson Arm Road, Shawnigan Lake Road, the area near Leigh Road and the south boundary of Goldstream Park, and the Malahat village intersections• Additional RCMP enforcement pullout areas• Installation of an advanced weather advisory system• Improved lighting, signage and roadside delineation

    PREVIOUS WORK ON THE MALAHAT CORRIDOR

    Phase 2 of the Malahat Safety Improvement Works was completed in 2015 and included the following improvements:

    • Installation of an additional 2.3 km of median barrier from Shawnigan Lake Road to the Malahat Summit weather station to address safety concerns in the area known locally as “NASCAR Corner”• A 1 km southbound passing lane extension• Improvements to the Whittaker Road and Holker Place intersections

  • HIGHWAY 1 - MALAHAT

    4414 160916

    Collision History• The Aspen Road to Shawnigan Lake segment has a collision rate of 0.45 collisions per million vehicle kilometres which is 41% higher than the provincial average of 0.32 collisions per million vehicle kilometres• Three fatalities have occurred along this section of the highway within the last 14 months

    EXISTING CONDITIONS

    Reliability• The Malahat section of Highway 1 has a history of closures due to collisions and natural hazards. On average, the Malahat highway segment has unplanned closures 10.5 times per year• The closure times range from less than 1 hour to 20 hours with the average closure duration being just over 1 hour• These closures are of great concern as no reasonable alternate detour routes are available south of Shawnigan Lake Road

    MobilityThe average travel time through the corridor in the southbound direction is approximately 15% longer on a typical weekday PM Peak and over 30% longer on a typical weekend PM Peak compared to the northbound direction.

    Average Travel Time Between Aspen Road and Shawnigan Lake Road

    230

    220

    210

    200

    190

    180

    170

    160

    150Weekday AM Peak Weekday PM Peak Weekend PM Peak Weekend PM Peak

    Southbound

    Northbound

  • HIGHWAY 1 - MALAHAT

    4414 160916

    STRATEGIES FOR IMPROVEMENT

    Cross Over Collisions

    Intersection Collisions

    Narrow Paved Shoulders

    High access density along corridor

    Lack of southbound passing opportunities

    Southbound Travel Time Delays

    Highway Closures along corridor

    Installation of an additional 3.0 km of median barrier which will reduce the severity of collisions.

    Converting the Malahat Village and Aspen Road intersections to right-in / right-out and left-in configurations. Converting McCurdy Road intersection to right-in / right out, as well as effectively relocating Okotoks Road intersection and converting it to right-in / right-out only. These improvements to the intersections will reduce the number and severity of collisions.

    Increasing the paved shoulder width to 2.0 m will benefit cyclists and provide more refuge area for a stalled vehicle to pull over.

    Consolidation of accesses and the construction of backage / frontage roads will reduce the overall number of access points along the corridor and improve safety and mobility.

    Construction of 5 km of an additional southbound lane will improve the ability to pass a slow moving vehicle and help reduce the occurrences of aggressive passing maneuvers often seen on shorter passing facilities.

    Construction of 5 km of an additional southbound lane will improve travel time and reduce traffic queues behind slow moving vehicles.

    Installation of median barriers will reduce the severity of collisions and by extension the duration of any closure caused by a collision. The wider shoulder and the additional southbound lane will provide more width to bypass a collision or stalled vehicle. Also, with the additional southbound lane, crews will be able to implement temporary 2 way traffic to keep people moving around an incident.

    IDENTIFIED PROBLEM PROPOSED SOLUTION

  • HIGHWAY 1 - MALAHAT

    4414 160916

    Making a left turn movement from a side road onto a high volume high speed four-lane highway is difficult

    Heavy volumes, high speed and limited visibility along Highway 1 all contribute to the drivers inability to safely judge gaps in traffic for left turning movements onto the highway

    As the delays on the side roads increase, drivers begin to get frustrated and are willing to accept shorter and shorter gaps to make their turning movements

    This willingness to accept shorter gaps increases the likelihood of angle type collisions which are generally of high severity

    Eliminating the left-out movement at an unsignalized T-Intersection reduces the conflict points from 11 to 6 as represented in the adjacent graphics (the 5 eliminated conflict points are shown in red).

    Eliminating the left-out movement at high speed and high volume intersections is a widely accepted safety improvement

    PROVIDING SAFER ACCESS

    LEGENDDirection of travelRemaining con�ict point Eliminated con�ict point

    BEFORE

    AFTER

    LEGENDDirection of travelRemaining con�ict point Eliminated con�ict point

    BEFORE

    AFTER

  • 1

    2

    5

    34

    1

    LEGENDWindows can be viewed in higher detail on separate story boards

    • All new and improved intersections to include improved overhead lighting at night.• Increased paved shoulder width to 2.0m

    A new right-in / right-out intersection will be provided north of the Malahat Village to provide access to a new frontage road to service properties west of the highway and north of the Malahat Village

    Addition of approximately 3 km of median barrier from the existing U-Turn at Aspen Roadto the existing median barrier near McCurdy Road. Completing an 11km segment of continuous median barrier from Finlayson Arm Road to the Malahat Summit Weather Station.

    Conversion of McCurdy Road to a right-in / right-out con�guration with acceleration and deceleration lanes

    Improved pavement surface and markingswithin the Malahat Village area

    Improvements to the Malahat Village centre access by converting it to a left-in only con�guration to improve safety

    A new right-in / right-out intersection will be provided just south of the Malahat Village to provide access to a new backage road and existing businesses on the west side of the highway

    A new right-in / right-out and left-in intersection will be located approximately 800m north of Aspen Road. The intersection will provide access to a new northbound to southbound U-turn facility that will replace the current facility. It will also provide access to a new backage road and short frontage road to service the properties south of the Malahat Village and west of the highway.

    Improvements to the Aspen Road intersection include increasing the length of the southbound left turn bay into Aspen Road and the addition of a northbound right turn acceleration lane

    HIGHWAY 1 - MALAHAT SAFETY IMPROVEMENTS : ASPEN ROAD TO SHAWNIGAN LAKE ROAD

    Addition of a second southbound lane starting from Shawnigan Lake Road, connecting into the existing dual southbound lanes located just south of Aspen Road.

  • HT

    HT

    HT

    X

    X

    X

    X

    X

    X X X XX

    XX

    X XX

    XX

    XX

    XX

    XX

    X

    X

    X

    3.27M x 30

    0MMØ

    CSP

    OUTLET=

    177.52M

    INLET=

    177.53M

    9.2M

    600MMØ

    CSP

    INLE

    T=17

    9.89M

    OUTLET=

    177.23M

    31.7M x 600M

    CSPINL

    ET=

    177.16

    M

    OUTLE

    T=

    175.92

    M

    OUTLE

    T=

    179.33

    M

    200MM

    Ø

    PVC

    37.2M x 600M

    CSP

    INLET

    =

    176.09

    M

    OUTLE

    T=

    175.11

    M

    30.5M x 900M

    PVC

    INLET

    =

    180.54

    M

    OUTLE

    T=

    179.99

    M

    INLET

    =

    193.65

    M

    200MM

    ØC

    SP

    35.41M x 600M

    OUTLE

    T=

    191.64M

    OUTLET=185.17M

    20.23M x 600M

    CSP

    INLET=217.14M

    OUTLET=216.98M

    INLET=217.82M

    CRUSHED

    & PLUGGED

    CSP

    8.48M300MMØCSP

    INLE

    T=22

    0.77

    M

    9.07M300MMØCSPOU

    TLET=

    218.04M

    19.46M x 600M

    CSP

    CUL K

    INK=

    214.09

    M

    BASE OF ROCK

    SOLID

    ROCK

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    BASE O

    F ROC

    K

    BASE

    OF RO

    CK

    TOP O

    F ROC

    K

    TOP O

    F ROC

    K

    TOP OF

    ROCK

    TOP OF ROCK

    BASE OF

    ROCK

    BASE

    OF S

    LOPE

    BASE

    OF

    SLO

    PE

    BASE

    OF SL

    OPE

    BASE

    OF SL

    OPE

    BASE

    OF SL

    OPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE O

    F SLOPE

    BASE

    OF

    SLO

    PE

    GRAVEL RO

    AD

    GRAVEL ROAD

    CONCRETE ROAD

    GRAVEL ROAD

    GR

    AVEL

    RO

    AD

    GRAVEL ROAD

    2T

    2T

    2P,1

    C

    3HT,1P,1C

    2T

    2T

    2T

    2T

    3HT,1

    P,1C

    1TRAN

    S.

    3HT,1

    P,1C

    3HT,1

    P,1C

    3HT,1

    P,1C

    2T

    3HT,1

    P,1C

    2T

    1TRAN

    S

    1P

    RUSTE

    D

    BOTTO

    M

    OF CS

    P

    2T,2

    GU

    Y

    2T

    3T

    3T

    3T

    3T

    SOLID ROCK

    3T,1GU

    Y

    HOUSE

    WOOD RAILWOOD RAIL GRAVEL ROAD

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3T

    3HT,1P,1C

    3T

    HOUS

    E

    HOUSE

    DECK

    3HT,1P,1C

    3HT,1P,1C

    1GUY,1T

    1TRANS

    3HT,1P,1C

    3HT,1P,1C

    3T

    3T

    3T

    3HT,1P,1C

    3T

    3T

    3T

    3T

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    SHED

    SHED

    HOUSE

    SUNDECK

    ROCK

    ROCK

    SIDEWALK

    3HT,1P,1C

    2T

    2T

    SEPTICTANK

    CO

    NC

    .

    SEPTIC FIELDAPPROX. SIZE

    TOP OF ROCK

    TOP OF ROCKBASE OF ROCK

    BASE OF SLOPE

    BASE

    OF S

    LOPE

    BASE

    OF SL

    OPE

    TOP OF ROCK

    BASE OF ROCK

    HOUSE

    PROPOSEDFUTURE BUILDING

    PROPOSED FUTURE BUILDING

    PUMPHOUS

    ESHED

    SHED

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    RO

    CK W

    ALLDIRT

    PAD

    3HT,1P,1C

    3HT,1P,1C

    HOUSE

    TEL BOX

    2T

    X

    X

    55

    0.8MØFIR

    0.8MØCEDAR

    0.8MØFIR

    0.1MØ

    0.05MØ

    0.1MØ

    APPLE

    0.2MØ

    0.8MØFIR

    WO

    OD

    SEPTIC FIELD

    WAT

    ERFE

    ATUR

    E

    MULTIPLE LIGHTSALONG TRAIL

    GARAGEDOOR

    CONCRETE

    ROCKX

    X

    X

    X

    X

    X

    X

    X

    XX

    XX

    5616

    56195619

    56155615

    5619

    5616

    5619

    0.4MØFIR

    0.4MØFIR

    0.4MØFIR

    0.4MØCEDAR0.4MØ

    CEDAR0.4MØ

    CEDAR0.4MØARBUTUS

    0.3MØARBUTUS

    0.3MØFIR0.4MØFIR

    2x0.4MØCEDAR

    0.4MØFIR

    GRAV

    EL

    215

    170

    220

    155

    220

    130

    145

    145

    185

    165

    185

    225

    255

    195

    240

    215

    180

    205

    180

    235

    215

    180

    185

    240

    250

    215

    145

    215

    130

    180

    240

    135

    190

    245

    175

    95

    120

    260

    145

    195

    105

    200

    235

    220

    235

    165

    220

    220

    125

    150

    200

    160

    205

    235

    190

    195

    225

    230

    155

    175

    155

    160

    115

    200

    235

    240

    160

    165

    250

    245

    175

    205

    250

    160

    165

    200

    105

    145

    230

    160

    230

    60

    235

    150

    235

    160

    170

    230

    215

    150

    250

    195

    100

    185

    160

    60

    250

    235

    130

    145

    105

    100

    235

    120

    180

    165

    180

    140

    90

    175 150

    130

    55

    150

    225

    260

    135

    150

    220

    70

    185

    135

    135

    105

    45

    190

    145

    145

    225

    185

    165

    110

    230

    75

    115

    150

    255

    185

    175

    185

    180

    170

    125

    130

    235

    125

    200

    225

    170

    185

    190

    160

    180

    195

    210

    115

    230

    110

    150

    145

    220

    90

    225

    245

    165

    85

    210

    240

    75

    130

    120

    185

    165

    115

    105

    210

    160

    160

    220

    140

    230

    195

    220

    170

    65

    175

    185

    265

    75

    170

    155

    125

    180

    220

    190

    140

    160

    80

    210

    70

    90

    100

    135

    80

    135

    165

    195

    235

    230

    95

    125

    125180

    125

    170

    175

    225

    215

    215

    175

    115

    205

    130

    100

    145

    170

    85

    190

    190

    215

    120

    210

    85

    155

    205

    165

    85

    160

    220

    185

    105

    155

    95

    125

    115

    170

    230

    130

    185

    140

    110

    145

    195

    230

    70

    120

    105

    225

    205

    105

    145

    170

    190

    100

    165

    115

    120

    120

    110

    90

    250

    120

    200

    160

    140

    170

    200

    140

    150

    245

    220

    170

    195

    140

    175

    75

    160

    110

    50

    220

    85

    110

    180

    65

    220

    160

    135

    150

    185

    95

    200

    100

    170

    115

    240

    255

    80

    175

    105

    195

    250

    185

    115

    200

    135

    190

    165

    105

    225

    160

    95

    150

    245

    155

    135

    185

    130

    205

    145

    225

    195

    105

    45

    230

    180

    125

    185

    245

    140

    220

    135

    100

    85

    155

    155

    220

    200

    180

    110

    125

    165

    235

    170

    180

    110

    205

    170

    155

    85

    95125

    150

    210

    175

    185

    200

    185

    190

    70

    150

    215

    240

    160

    130

    160

    165

    80

    235

    145

    200

    70

    125

    195

    145

    85

    250

    130

    210

    200

    165

    190

    115

    90

    140

    60

    205

    185

    190

    235

    190

    195

    150

    165

    90

    80

    135

    185

    85

    185

    190

    80

    195

    245

    110

    180

    195

    195

    180

    100

    180

    225

    175

    75

    95

    210

    90

    170

    115

    215

    175

    220

    170

    210

    230

    225

    180

    120

    205

    195

    115

    210

    205

    100

    215

    200

    190

    205

    110

    215

    140

    215

    230

    200

    150

    200

    75

    205

    175

    205

    210

    210

    220

    155

    150

    195

    170

    155

    200

    55

    195

    220

    175

    210

    155

    155

    120

    215

    55

    95

    180

    130

    190

    235

    120

    185

    210

    65

    220

    170

    130

    180

    255

    155

    230

    175

    205

    175

    160

    195

    170

    195

    150

    220

    215

    225

    185

    180

    115

    165

    145

    185

    215

    90

    205

    215

    190

    225

    175

    185

    100

    180

    200

    190

    215

    185

    220

    90

    250

    155

    180

    180

    180

    165

    200

    210

    220

    250

    195

    220

    225

    150

    190

    235

    220

    160

    255

    170

    210

    155

    200

    180

    170

    255

    175

    230

    165

    165

    175

    255

    125

    210

    210

    155

    210

    170

    225

    225

    205

    245

    165

    190

    200

    185

    145

    190

    240

    205

    185

    175

    160

    190

    255

    230

    245

    155

    265

    105

    150120

    150

    225

    175

    110

    220

    140

    150

    140

    210

    170

    230

    175

    200

    220

    225

    150

    205

    170

    190

    240

    145

    120

    240

    80

    160

    110

    200

    145

    185

    155

    145

    220

    210

    210

    165

    65

    50

    145

    130

    165

    140

    225

    45

    160135

    220

    195

    215

    215

    195

    155130

    205

    225

    220

    200

    165

    220

    160

    220

    50

    210

    145

    235

    125

    185

    135

    135 175

    155

    235

    180

    220

    185

    205

    175

    165

    180

    140

    200

    175

    150

    65

    165

    235

    245

    210

    220

    210

    155

    215

    205

    215

    190

    140

    215

    205

    190

    245

    160

    185

    160

    185

    150

    175

    175

    235

    130

    175

    255

    245

    225

    135

    170240

    95

    205

    210

    205

    180

    200

    180

    140

    160

    180

    190

    STA

    IRS

    SA

    NS

    AN

    SAN

    SAN

    SAN

    SAN

    SAN

    SANSAN

    SAN

    SAN

    SAN

    110

    114

    32

    3334

    108

    109

    107

    103

    115

    104

    119

    118

    117

    116

    120

    121

    122

    105

    106

    HIGHWAY 1 - MALAHAT

    4414 160916

    OUTSET #1 - REVISED ASPEN ROAD INTERSECTION

    1

    1 : 500

  • HIGHWAY 1 - MALAHAT

    4414 160916

    OUTSET #2 - NEW INTERSECTION TO ACCESS THE NEW BACKAGE ROADS AND TURNAROUND FACILITY

    HT

    HT

    HT

    HT

    X

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    X

    X

    X

    X

    X

    X

    XX

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X X XX

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X X

    X

    INLET

    =

    193.65

    M

    200MM

    ØC

    SP

    35.41M x 600M

    CSP

    INLET=

    192.92M

    OUTLE

    T=

    191.64M

    INLET=191.64M

    OUTLET=185.17M

    57.8M x 1200m

    m C

    ON

    C.

    INLET=200.62M

    200MM

    ØC

    SP

    INLET=205.83M

    200MM

    ØC

    SP

    42.4M x 600MMØ CSP

    INLET=209.57M

    OUTLET=204.19M

    9.0M x

    450MMØ

    OUTLET=

    203.88MINLET=204.40M

    CSP

    SOLID ROCK

    BASE

    OF SL

    OPE

    BASE

    OF S

    LOPE

    BASE

    OF S

    LOPE

    BASE

    OF SL

    OPE

    BASE OF SLOPE

    BASE OF SL

    OPE

    BASE OF

    SLOPE

    BASE OF SLOPE

    BASE

    OF

    SLO

    PE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLO

    PE

    BASE OF SLOPE

    BASE OF SLOPE

    GRAVEL ROAD

    GR

    AVEL

    RO

    AD

    GRAVEL ROAD

    GRAVE

    L ROA

    DGRAVEL ROAD

    GR

    AVEL RO

    AD

    GRAVEL RO

    AD

    GR

    AVEL RO

    AD

    GRAVEL ROAD

    GRAV

    EL R

    OAD

    3HT,1

    P,1C

    2T

    1TRAN

    S

    1T

    1T

    RUSTE

    D

    BOTTO

    M

    OF CS

    P

    3HT,1P

    ,1C

    3HT,1P,1C

    3HT,3P,1C

    1T,2

    GU

    Y

    2T,2

    GU

    Y

    1T,1

    GU

    Y

    1T

    46.6M x 600MMØ CSP

    3HT,1P,1C

    3T

    2T

    3T

    3T

    3T

    3T

    3T

    3T

    SOLID ROCK

    3T,1GU

    Y

    HOUSE

    WOOD RAILWOOD RAIL GRAVEL ROAD

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3T

    3HT,1P,1C

    3T

    HOUSE

    DECK

    3HT,1P,1C

    1TRANS

    3T

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    SAND

    BAGS

    SAND

    BAGS

    SANDBAGS

    SHED

    SEPTICTANK

    CO

    NC

    .

    SEPTIC FIELDAPPROX. SIZE

    EW

    EW

    EW

    EW

    EW

    BASE OF SLO

    PE

    BASE O

    F SLOP

    E

    EW

    X

    X

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EW

    HT

    HT

    HT

    BASE OF SLOPE

    TOP OF ROCK

    BASE OF ROCK

    HOUSE

    PROPOSEDFUTURE BUILDING

    PROPOSED FUTURE BUILDING

    PUMPHOUS

    ESHED

    SHED

    PROPOSEDFUTURE BUILDING

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    SOLID ROCK

    PAD

    GATE

    ROCKWALL

    ROCK

    WAL

    L

    ROCK

    WAL

    L

    OUTL

    ET=

    201.78

    M

    INLE

    T=20

    4.08

    M

    150MM

    ØPV

    C12.3M

    x

    RO

    CK W

    ALLG

    RAVEL R

    OAD

    RO

    CK W

    ALLSRIPRAP

    INLET=

    201.57M

    1MMINUS

    WALL EXTENDSUNDER EARTH

    GR

    AVEL

    OUTLET=

    201.17M

    12.0M x

    1500MMØ

    CSP

    900MMØ

    CSP

    OUTLET=

    199.95M

    TOP OFROCK

    CONC.PAD

    3HT,1P,1C

    3HT,1P,1C

    BUILDING

    GARAGE

    I-BEAMI-BEAM

    GR

    AVEL

    WOODBOARD

    1TRANS.

    55

    1

    23

    4

    5

    6

    7

    8

    9

    10

    215

    220

    245

    245

    245

    240

    220

    250

    240

    260

    240

    250

    210

    205

    235

    215

    245

    220

    245

    220

    215

    215

    220

    230

    250

    215

    225

    230

    235

    240

    250

    245

    255

    250

    205

    210

    230

    220

    235

    230

    210

    250

    235

    245

    215

    245

    210

    235

    180

    260

    220

    190

    215

    225

    200

    255

    185

    225

    185

    195

    225

    245

    220

    200

    240

    185

    220

    210

    205

    230

    195

    220

    265

    220

    220

    205

    190

    230

    215

    205

    190

    210

    240

    245

    210

    230

    225

    215

    235

    210

    245

    200

    240

    230

    200

    170

    195

    220

    255

    180175

    210

    185

    200

    225

    225

    245

    200

    205

    195

    220

    200

    215

    240

    210

    215

    250

    240

    210

    200

    215

    190

    225

    195

    245

    180

    250

    210

    220

    235

    230

    225

    200

    205

    220

    205

    245

    215

    225

    240

    225

    215

    215

    255

    230

    200

    205

    250

    210

    230

    205

    250

    210

    195

    245

    250

    220

    200

    215

    230

    260

    180

    215

    235

    235

    225

    210

    195

    220

    220

    195

    255

    220

    260

    210

    215

    265

    185

    240

    180

    245

    230

    215

    205

    205

    225

    235

    190

    185

    235

    215

    250

    240

    210

    220

    240

    250

    220

    190

    220

    220

    195

    235

    255

    170

    210

    200

    230

    180

    255

    175

    245

    175

    215

    255

    240

    230

    225

    255

    220

    235

    250

    245

    210

    210

    225

    240

    225

    245

    225

    190

    205

    245245

    205

    215

    240

    205

    205

    185

    255

    245

    245

    265

    205

    230

    225

    215

    230

    220

    200

    215

    210

    230

    200

    205

    210

    250

    240

    235

    245

    205

    235

    220

    210

    225220

    200

    215

    215

    225

    220

    220

    240

    210

    240

    235

    225

    235

    220

    185

    205

    220

    225

    200

    245

    245 220

    210

    245

    225

    210

    110

    114

    28

    29

    30

    31

    32

    3334

    35111

    115

    112

    118

    117

    116

    113

    2

    1 : 750

  • X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    XX

    X

    X

    XX

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    XX

    X X XX X

    XX

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    5.58M

    200MMØ

    CSP

    KINK?

    221.49M

    OUTLE

    T=

    220.73

    M

    37.70M x 900M

    CO

    NC

    .

    INLET=

    204.80M

    OUTLET=

    203.53M

    9.3M x

    200MM

    ØC

    SP

    INLET=211.87M

    KINK205.27M

    OUTLE

    T=

    203.48M

    13.5M x

    200MM

    Ø

    CSP3.1M

    x

    200MM

    Ø

    CSPINL

    ET=

    213.03M

    KINK

    210.

    10M

    9.1M x200MMØCSP

    KIN

    K20

    4.84

    M5.

    1M x

    200M

    CSP

    OU

    TLET

    =20

    3.99

    M

    PIPE 1PIPE 2

    PIPE 3

    PIPE 1:

    INLET = 201.66M

    OUTLET = 201.36M

    5.2M X 750M

    CONC.

    PIPE 2:

    INLET = 201.68M

    OUTLET = 201.45M

    5.2M X 750M

    CONC.

    PIPE 3:

    INLET = 201.69M

    OUTLET = 201.43M

    5.2M X 750M

    CONC.

    5.21M x 200MMØCSP

    INLET=212.26M

    OU

    TLET=

    209.22M

    34.6M x 600MMØCSP

    OU

    TLET

    =21

    3.41

    M

    INLET=214.49M

    3.50

    M60

    0MM

    ØCS

    P

    OUTLET=

    212.00M

    INLET=213.41M

    6.2M x

    200MMØ

    PVC

    OUTLET=

    225.56M

    226.12M

    INLET=

    225.56M

    200MMØ B

    IG-O

    450MMØPVC

    OUTLET=217.33M

    450MM

    ØPV

    C

    INLET

    =

    226.71

    M

    LOO

    SE R

    OCK

    SOLID

    ROCK

    SOLID

    ROCK

    BASE

    OF SL

    OPE

    BASE

    OF S

    LOPE

    BASE O

    F SLOP

    E

    BASE

    OF SL

    OPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLO

    PE

    BASE OF SLO

    PE

    BASE OF SLOPE

    GR

    AVEL RO

    AD

    GRAVEL ROAD

    GRAVEL ROAD

    3HT,1P

    ,1C

    3T

    3T

    3HT,1P

    ,1C

    2P,1GUY

    1P

    3T

    1TRAN

    S

    3HT,1P

    ,1C

    3T

    HOUSE

    HOUSE

    HOUSE

    HOUS

    E

    BUILD

    ING

    HOUSE

    HOUSE

    HOUSE

    GAR

    AGE

    HOUS

    E

    HOUSE

    HOUSE

    HOUSE

    HOTEL

    RESTAURANT

    HOUSE

    HOUSEHOUSE

    GAS

    HOUSE

    HO

    USE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUS

    E

    HO

    USE

    CABIN

    HOUSE

    CABIN

    #11

    CABIN

    #12

    HO

    US

    EH

    OU

    SE

    HOUS

    E

    CABI

    N

    STATION

    3HT,1P

    ,1C

    3HT,1P,1C

    LS

    1HT,1P,2G

    UY

    1HT,1P

    ELECTRIC

    AL

    METER

    1T,1C1T,1C

    1HT

    3HT,2P,1C

    3HT,1P,1C

    3HT,2P,1C

    LS

    3TRANSLS

    3HT,1P,1C

    1P

    1P

    3HT,2P,2C

    LS

    BOARD

    3HT,2P,1C

    LS

    1HT,1P,2G

    UY

    1HT,1P

    1T

    3HT,1P,1C

    LS

    1T,1GU

    Y

    3T

    3T

    1P

    3P

    1P

    3T

    INLET=

    29.48

    M x 6

    00MM

    Ø

    CSP

    OUTL

    ET=

    221.8

    3M

    500MMØ CSP

    500MMØ CSP

    500MMØ CSP

    500MMØ CSP

    HOUSE

    POOL

    SHED

    HO

    USEWO

    OD

    DEC

    K

    WELL?

    HOUSE

    HOUSE

    SHED

    0.6MØ FIR

    0.6MØ FIR0.6MØ FIR

    0.9MØ FIR

    0.7MØ FIR 0.8MØ FIR

    1.1MØ FIR

    1.2MØ FIR

    1.0MØ FIR

    3x0.5MØ FIR

    1TRA

    NS

    2x1.0MØ FIR

    1.0MØ FIR

    BASE

    OF SLOPE

    1.5MØ FIR

    1.0MØ FIR

    1.0MØ FIR0.8MØ FIR

    0.9MØ FIR

    0.8MØ FIR

    1.2M

    Ø F

    IR

    1.0M

    Ø F

    IR1.

    1MØ

    FIR

    1.5MØ FIR

    1.2MØ FIR1.0MØ FIR

    WO

    OD

    BOAR

    D

    WOOD BOARD

    WOOD BOARDDILAPITATED

    WO

    OD

    BOAR

    D

    CONCRETEPAD

    2T

    MET

    AL

    BLDG

    METAL

    BASE OF SLOPE

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    HO

    USE

    LIMIT OF

    SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EWEW

    EW

    EW

    EW

    EWEW

    EW

    EWEW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EW

    EWEW

    EW

    EW

    EW

    X

    X

    X

    X

    X

    XCORR

    UGAT

    ED

    META

    L

    WOOD BOARD

    BLDG CO

    NC

    .

    BLDG

    FIELD PERIMETERDRAIN OUTLET=226.37M

    0.07MØ

    PVC

    SEPTIC FIELDAPPROX. SIZE

    PER

    IMET

    ER D

    RAI

    N

    APPR

    OX.

    LO

    CAT

    ION

    OUTLET=228.11M

    INLET=228.18M

    4.3Mx

    500MMØCSP

    0.4MØFRUIT

    0.3MØFRUIT

    0.3MØFRUIT

    0.2MØFRUIT

    0.3MØFRUIT

    POND

    8.0M x

    200MMØ

    STEEL

    OUTLET=

    229.30M

    INLET=229.61M

    ROCK

    D.L. BO

    UNDARY

    APPRO

    X. ONLY

    D.L. BOUNDARY APPROX. ONLY

    26.0

    M x

    600

    MM

    ØC

    MP

    D.L. BOUNDARYAPPROX. ONLY SLOPEBASE OF

    PR

    OP

    OS

    ED

    FUTU

    RE

    BU

    ILDIN

    G

    1356

    4485

    1356

    4485

    GRAVEL

    GR

    AVEL

    GRAV

    EL

    GRAVEL

    MOBILE T

    RAILER

    DIR

    T

    DIRT

    DIR

    T

    250

    170

    220

    155

    130

    230

    210

    255

    240

    145

    255

    220

    215

    165

    245

    185

    210

    215

    240

    180

    175

    205

    185

    190

    190

    255

    240

    235

    230

    195

    195

    130

    250

    235

    135

    250

    120

    235

    145

    225

    255

    240

    105

    245

    220

    235

    255

    210

    125

    255

    205

    235

    240

    245

    115

    160

    250

    230

    215

    255

    175

    235

    245

    180

    255

    235

    225

    105

    225

    160

    245

    230

    225

    225

    240

    175

    165

    130

    245

    100

    235

    130

    230

    210

    250

    245

    145

    225

    115

    260

    160

    150

    210

    225

    85

    235

    120

    245

    140

    170

    195

    135

    165

    240

    125

    215

    230

    115

    100

    190

    155

    170

    145

    120

    105

    240

    145

    110

    255

    230

    260

    255

    140

    160

    110

    200

    95

    180

    135

    125

    140

    135

    210

    125

    245

    210

    85

    170

    185

    205

    185

    130

    125

    225

    205

    260

    195

    165

    215

    200

    195

    180

    190

    175

    240

    210

    170

    240

    250

    220

    230

    115

    215

    110

    215

    250

    225

    205

    220

    150

    245

    230

    235

    120

    220

    185

    155

    150

    240

    115 90

    235100

    210

    225

    235

    225

    90

    155

    190

    230

    230

    215

    230

    235

    125

    210

    230

    215

    245

    215

    220

    210

    235

    215

    245

    200

    170

    155

    200

    235

    105

    150

    245

    180

    185

    120

    150

    250

    110

    235

    175

    205

    235

    150

    235

    140

    240

    195

    250

    150

    205

    170

    240

    120

    80

    200

    160

    230

    235

    110

    165

    205

    145

    225

    250

    220

    240

    155

    145

    190

    215

    200

    155

    175

    165

    245

    180

    145

    160

    220

    130

    165

    210

    140

    250

    170

    160135

    235

    195

    155130

    180

    230

    160

    230

    235

    205

    145

    220

    125

    240

    135

    215

    245

    185

    175

    230

    210

    165

    180

    185

    215

    140

    200

    235

    150

    215

    165

    190

    155

    235

    190

    140

    215

    235

    195

    200

    185

    235

    150

    175

    220

    175

    215

    195

    225

    255

    135

    170

    95

    225

    180

    140

    200

    240

    160

    230

    190

    52

    53

    54 59

    4142

    434544

    123

    124

    125

    126

    127

    128

    130

    131132

    129

    HIGHWAY 1 - MALAHAT

    4414 160916

    OUTSET #3 - MALAHAT VILLAGE AREA AND NEW SOUTHBOUND RIGHT-IN / RIGHT-OUT INTERSECTION

    1 : 750

    3

  • HT

    X

    XX

    XX

    X

    X X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    EW

    EW

    EW

    EW

    EW

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    XX

    X

    X X

    X

    X

    X

    6.2M x200MMØPVC

    OUTLET=225.56M

    226.12M

    INLET=225.56M200MMØ BIG-O

    40.5M x

    INLET=

    225.57M

    OUTLET=

    224.63M

    9.8M x

    900MM

    ØC

    SP

    INLET=

    226.42M

    OU

    TLET=

    226.25M

    12.2M x500MMØCSP

    OUTLET=231.37M

    INLET=231.66M

    7.6M300MM

    ØCSP

    OUTLET=237.64M

    INLET=

    237.65M

    6.7M x

    300MM

    Ø

    CSP

    INLET=

    250.02M

    OUTLET=

    250.07M

    22.6M x 600M

    CSP

    INLET=

    245.45M

    OU

    TLET=244.29M

    OUTLET=252.44M

    200MM

    Ø

    30.1M x 600M

    CS

    P

    INLET=251.00M

    OUTLET=250.14M

    OUTLET=255.26M

    200MM

    Ø

    28.4M x 600M

    CS

    P

    INLET=255.12M

    OUTLET=254.48M

    35.8M

    x 60

    0MMØ

    CSP

    OUTL

    ET=

    254.8

    7M

    INLE

    T=25

    5.89M

    36.0M

    x 60

    0MMØ

    CSP

    OUTL

    ET=

    254.8

    6M

    INLE

    T=25

    5.92M

    25.8M x 600MMØ

    CSP

    OUTLET=

    269.39M

    INLET=

    270.78M

    OUTLET=

    289.42M

    200MMØ

    PVC

    36.5M x 600MMØ

    CSP

    INLET=

    288.77M

    OUTLET=

    288.01M

    35.32M x 600MMØ CSP

    INLET=

    297.93M

    OUTLET=

    297.41M

    41.8M x 600MMØ CSP

    INLET=

    298.48M

    OUTLET=

    297.22M

    40.3M x 750M

    PVC

    OUTLET=

    302.01M

    INLET=

    304.72M

    OUTLET=302.99M

    200MM

    ØC

    SP

    600MM

    ØC

    SP

    OU

    TLET=

    301.89M

    450MMØPVC

    INLET=226.71M

    BASE OF ROCK

    TOP OF ROCK

    TOP OF ROCK

    TOP OF ROCK

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF S

    LOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BA

    SE

    OF S

    LOP

    E

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPEBASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BA

    SE

    OF S

    LOP

    E

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    BASE OF SLOPE

    GR

    AVEL

    RO

    AD

    GRAVEL

    ROAD

    GR

    AVELR

    OAD

    GRAVEL

    ROAD

    GRAVEL RO

    AD

    GR

    AVEL RO

    AD

    GRAVEL ROAD

    GRAVEL ROAD

    GRAVEL ROAD

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    BUILDING

    BUILDING

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUS

    E

    HOUS

    E

    CABIN

    HOUSE

    CABIN#11

    CABIN #12

    HO

    USE

    HOUS

    E

    HOUS

    E

    CABIN

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    BLDG

    HO

    USE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    HOUSE

    3HT,2P,2C

    LS

    BOARD

    3HT,2P,1C

    LS

    3HT,2P,1C 1TRANSLS

    2P,2G

    UY

    3HT,2P,1C

    LS

    1HT,2P,1C750MM

    Ø CONCRETE

    1000MM

    Ø CSP

    1TRANS

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C 1TRANS3HT,1P 2P,1C

    1C 3HT,1P 3TRANS

    3HT,1P,1C 1TRANS3HT,1P,1C1P 3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    3HT,1P,1C

    2HT,2P,3C

    3HT,1P,3C

    3HT,1P,3C

    1T

    1T

    1P

    3HT,2P,3C

    w/ 2 ELECT.

    BOX

    w/ CONTROLLER

    2T

    2T

    1HT,

    1P

    2T

    2T

    2T2T

    2T

    2T

    1HT,1P

    ,1T

    2T2T

    1HT,1P,2G

    UY

    1HT,1P

    1T

    3HT,1P,1C

    LS

    3T

    INLET=

    29.48M

    x 600MM

    Ø

    CSP

    HOUS

    E

    WOOD DECK

    WELL?

    HOUSE

    HOUSE

    SHED

    0.6MØ FIR

    0.6MØ FIR0.6MØ FIR

    0.9MØ FIR

    0.7MØ FIR

    0.8MØ FIR

    1.1MØ FIR

    1.2MØ FIR

    1.0MØ FIR

    3x0.5MØ FIR

    1TRA

    NS

    2x1.0MØ FIR1.0MØ FIR

    BASEO

    FSLOPE

    1.5MØ FIR

    1.0MØ FIR

    1.0MØ FIR0.8MØ FIR

    0.9MØ FIR0.8MØ FIR

    1.2MØ

    FIR

    1.0MØ

    FIR

    1.1MØ

    FIR

    1.5MØ FIR1.2MØ FIR

    1.0MØ FIR 0.7MØ FIR

    0.4MØ FIR0.8MØ FIR

    0.9MØ FIR

    0.9MØ FIR

    0.7MØ FIR0.5MØ FIR

    0.6MØ FIR0.5MØ FIR

    0.5MØ FIR0.7MØ FIR

    0.4MØ FIR

    SQUARE

    CONC PIPE

    WO

    OD BO

    ARD

    WOOD BOARD

    WOOD BOARD

    DILAPITATED

    WO

    OD BO

    ARD

    CONCRETEPAD

    RIPRA

    P

    BOTTO

    M FILLED

    w/ D

    EBRIS

    RIPRAP

    WOOD BOA

    RD

    WOOD BOARD

    SHED

    SHED

    RIP RAP

    WOOD BOARD

    CEDAR HEDGE - 0.2MØ

    BASEOF

    SLOPE

    SHED

    0.5MØ CEDARMETALGATE

    0.5MØCEDARWOOD P

    ANEL

    WOOD BOARD

    RIP RAP

    0.2MØ FRUIT

    0.1MØ FRUIT

    GARDEN

    RIP RAP

    RIP R

    AP

    SMALLRIP RAP

    SOLIDROCK

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    2T

    GARAGE

    HOUS

    E

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEYLIMIT OF SURVEY LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT O

    F SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT O

    F SUR

    VEY

    LIM

    IT O

    F S

    URVE

    Y

    LIMIT

    OF

    SUR

    VEY

    LIMIT

    OF

    SUR

    VEY

    X

    EW

    EW

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    XX

    SEPTIC FIELDAPPROX. SIZE

    0.9MØCEDAR

    0.2MØFRUIT

    0.3MØFRUIT

    0.9MØCEDAR 0.5MØ

    CEDAR

    0.4MØCEDAR0.4MØ

    FRUIT

    3x0.3MØ

    CE

    DA

    RS

    2T

    2T

    2T

    DEBR

    IS

    LIM

    IT O

    F S

    URVE

    Y

    SLOPE

    BASEOF

    GROUNDSEEPAGE

    OUTLET=

    235.50M500MMØ CSP

    234.36MINLE

    T=

    OUTLET=

    234.05M

    19.7M x 500

    MMØ CSP

    13.3M x 1.15M

    x 2.0M C

    ON

    CR

    ETE

    OU

    TLET=261.96M

    INLET=

    262.79M

    6.9M x 900MMØCMP

    INLET=222.11MOUTLET=

    221.68M

    215

    290

    255

    170

    220

    260

    210

    255

    320

    245

    260

    250

    280

    305

    295

    185

    185

    260

    285

    215

    255

    195

    255

    240

    235

    215

    245

    180

    265

    240

    295

    255

    255

    315

    230

    245

    180

    220

    275

    270

    250

    225

    240

    230

    230

    285

    310

    305

    265

    230

    250

    230

    300

    260

    275

    230

    240

    310

    310

    235

    245

    250

    305

    280

    295

    275

    260

    265

    260

    280

    260

    270

    305

    280

    265

    255

    240

    275

    245

    280

    315

    225

    310

    230

    280

    230

    255

    275

    270

    250

    250

    240

    275

    240

    305

    250

    275

    280

    285

    300

    280

    240

    285

    305

    310

    235

    265

    270

    270

    305

    280

    300

    235

    230

    275

    245

    265

    270

    270

    275

    295

    290

    280

    280

    230

    230

    265

    215

    265

    265

    295

    280

    255

    210

    230

    290

    270

    280

    235

    245

    275

    295

    225

    245

    310

    305

    255

    290

    275

    250

    225

    290

    225

    290

    285

    290

    240

    295

    275

    255

    235

    260

    265

    240

    255

    285

    280

    280

    285

    230

    275

    235

    260

    240

    300

    275

    285

    260

    295

    295

    230

    265

    290

    230

    290

    280

    300

    270

    290

    305

    280

    270

    305

    245

    225

    275

    275

    260

    300

    260

    280

    285

    280

    270

    295

    270

    240

    265

    315

    300

    280

    235

    255

    285

    300

    210

    275

    300

    295

    260

    295

    260

    275

    215

    295

    235

    295

    265

    275

    290

    270

    280

    265

    295

    290

    260

    215

    280

    305

    265

    265

    285295

    210

    245

    240

    215

    285

    260

    230

    260

    265

    245

    285

    265

    235

    250

    240

    250

    305

    290

    265

    240

    205

    300

    265

    260

    195

    235

    240

    250

    300

    225

    205

    280

    305

    250

    300

    285

    265

    275

    290

    305

    255

    250

    255

    280

    250

    240

    320

    250

    290

    260

    220

    275

    250

    290

    250

    285

    275

    285

    225

    230

    285

    285

    275

    240

    285

    285

    200

    250

    245

    235

    280

    245

    275

    220

    270

    235

    300

    250

    295

    270

    230

    230

    250

    250

    250

    310

    230

    300

    270

    215

    230

    285

    280

    230

    245

    275

    240

    240

    275

    280

    220

    280

    270

    235

    240

    270

    230

    280

    260

    210

    245

    290

    235

    235

    270

    245

    305

    280

    240

    235

    285

    270

    285

    295

    295225

    255

    305

    255

    235

    320

    300255

    215

    290

    255

    250

    275

    200

    250

    285

    275

    270

    250

    240

    290

    310

    265

    270

    310

    300

    255

    275

    270

    235

    265

    240

    265

    230

    285

    285

    290

    245

    285

    240

    225

    265

    280

    290

    235

    290

    290

    245

    195

    220

    300

    300

    225

    270

    220

    285

    250

    290

    285

    255

    260

    315

    275

    280

    235

    270

    305

    250

    245

    285

    205

    280

    280

    300

    245

    255

    260

    235

    230

    280

    220

    250

    295

    325

    275

    270

    305

    270

    245

    285

    275

    295

    280

    255

    305

    255

    295

    265

    280

    305

    245

    255

    255

    295

    225

    235

    210

    235

    250

    245

    275

    275280

    205

    280

    300

    210

    190

    245

    270

    275

    300

    285

    265

    245

    270

    280

    310

    205

    250

    210

    215

    285

    250

    255

    245

    275

    230

    270

    255

    310

    290

    295

    265

    230

    250

    295

    255

    290

    245

    250

    240

    295

    235

    260

    245

    250

    225

    280

    245

    305

    230

    320

    275

    260

    250

    245

    235

    285

    305

    235

    250

    235

    245

    310

    275

    315

    265

    260

    200

    270

    300

    265

    325

    235

    230

    260

    310

    245

    170

    245

    275

    285

    235

    220

    310

    190

    205

    190

    240

    295

    265

    275

    280

    255

    245

    310

    280

    230

    255

    285

    285

    290

    275

    295

    195

    300

    245

    240

    285

    280

    240

    310

    255

    200

    285

    230

    275

    205

    245

    250

    310

    250

    290

    275

    245

    285

    255

    240

    285

    255

    275

    280

    255

    290

    205

    245

    240

    195

    195

    265

    250

    255

    200

    240

    165

    310

    220

    260

    280

    290

    245

    315

    305

    245

    210

    260

    235

    180

    255

    255

    290

    205

    295

    280

    200

    275

    175

    305

    260

    230

    235

    240

    260

    240

    260

    210

    235

    265

    280

    240

    205

    190

    200

    250

    215

    240

    190

    160

    275

    185

    265

    280

    270

    235

    175

    250

    220

    275

    255

    250

    255

    225

    250

    255

    300

    280

    210

    245

    200

    315

    320

    240

    255

    260

    295

    260

    61

    62

    63

    64 65

    59

    60

    148

    142

    131

    132

    133

    134

    135

    136 137138

    139140

    141

    143

    144

    145

    146

    147

    149

    HIGHWAY 1 - MALAHAT

    4414 160916

    OUTSET #4 - REVISED McCURDY ROAD INTERSECTION, AND NEW SOUTHBOUND RIGHT-IN / RIGHT-OUT INTERSECTION

    1 : 750

    4

  • HIGHWAY 1 - MALAHAT

    4414 160916

    OUTSET #5 - REVISED SHAWNIGAN LAKE ROAD INTERSECTIONHT

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    X

    XX

    X

    X

    X

    X

    X

    XX

    X

    X

    25.8M x 600MMØCSP

    OUTLET=269.39M INLET=270.78M

    OUTLET=289.42M

    200MM

    ØP

    VC

    36.5M x 600M

    CSP

    INLET=288.77M

    OUTLET=288.01M

    35.32M x 600M

    CSP

    INLET=

    297.93M

    OU

    TLET=297.41M

    41.8M x 600M

    CSP

    INLET=

    298.48M

    OU

    TLET=297.22M

    40.3M x 750MMØ PVC

    OUTLET=302.01M

    INLET=304.72MOU

    TLET=

    302.99

    M

    200MM

    ØCSP

    600MMØCSP OUTLET=301.89M

    BASE OF ROCKTOP OF RO

    CKTOP OF ROCK

    TOP OF ROCK

    BASE OF SL

    OPE

    BASE OF SLOPE

    BASE O

    F SLOPE

    BASE

    OF S

    LOPE

    BASE OF SLOPE

    BASE OF SLOPE

    GRAVELROAD

    GRAVELROAD

    HOUS

    E

    HOUS

    E

    HOUS

    E

    HOUS

    E

    HOUS

    E

    HOUS

    E

    3HT,1P,1C

    3HT,1P,1C3HT,1P,1C

    3HT,1P,1C

    2HT,

    2P,3

    C

    3HT,1P,3C3HT,1P,3C

    1T

    1T

    1P

    3HT,2P,3C

    w/ 2

    ELE

    CT.B

    OX

    w/ C

    ONTR

    OLLE

    R

    RIP

    RAP

    SMALLRIP RAP

    SOLID

    ROCK

    2T2T2T2T

    2T2T

    2T

    LIMIT

    OF S

    URVE

    Y

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY LIMIT OF SURVEY LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SURVEY

    LIMIT OF SU

    RVEY

    LIMIT OF SURVEYLIMIT OF SURVEY

    320

    305

    295

    260

    295

    255

    315

    275

    270

    250

    285

    310

    305

    275

    310

    310

    280

    295

    275

    260

    260

    270

    305

    265275

    315

    310

    275

    270

    250

    275

    305

    275

    285

    305

    310

    305

    300

    275

    270

    290

    265

    295

    305

    290

    285

    265

    240

    295

    295

    305

    280

    305

    275

    275

    300

    285

    270

    275

    280

    245

    285

    260

    265

    285

    250

    280

    305

    300

    290

    280

    320

    275

    285

    245

    270

    270

    285

    275

    280

    270

    270

    245

    270

    305

    285

    270

    285

    295

    320

    300

    290

    255

    250

    275

    275

    270

    290

    310

    265

    310

    275

    265

    265

    285

    240

    265

    280

    290

    300

    290

    315

    270

    305

    250

    280

    280

    260

    280

    270

    285

    255

    305

    255

    295

    265

    305

    255

    295

    235

    245

    275

    280

    280

    300

    270

    275

    300

    285

    265

    270

    310

    250

    275

    270

    255

    310

    290

    295

    265

    295

    255

    290

    245

    295

    305

    320

    285

    305

    245

    310

    315

    270

    300

    325

    260

    310

    285

    310

    295

    265

    275

    310

    280

    255

    285

    290

    275

    300

    285

    280

    310

    285

    275

    290

    285

    255

    285

    280

    310

    260

    290

    305

    260

    255

    290

    295

    280

    275

    305

    260

    260265

    280

    275

    265

    280

    270

    300

    295

    260

    148144145 146 147

    149

    5

    1 : 750

  • HIGHWAY 1 - MALAHAT

    4414 160916

    Tender the construction contract in December 2016

    Start construction in early 2017 through late summer 2018

    Ministry of Transportation and Infrastructure staff will be monitoring traffic 24/7 during construction to ensure delays are kept minimal.

    A minimum of one lane in each direction will always remain open to traffic, with the exception of brief stoppages for blasting, tree falling, and equipment crossings, all generally occurring outside peak commuter periods.

    Regular updates and advance notification will be provided as needed through DriveBC, social media, traffic advisories, changeable message signs, and on the project website.

    NEXT STEPS

    Public Information Session

    November 2016

    WE ARE HERE

    Design Complete and Project Tendered

    December 2016

    Construction Start

    Early 2017

    Project Completion

    Summer 2018

    Thank You for Coming!

    Please remember to provide us with your feedback by:

    • Completing a feedback form and leaving it with our team, or

    • Sending an email to: [email protected]

    Planning, Design and Startup

    Summer 2015

    Project Announcement