Welcome to the Public Information Session for the Malahat VillageFour Laning and Safety Improvement Project
Aspen Road to Shawnigan Lake Road
WELCOME
1
1
1
1
1
1
1
PROJECT LOCATION
N5km
-
HIGHWAY 1 - MALAHAT
4414 160916
Since 2001 over $33M has been spent on improvements to the Malahat Segment of Highway 1.
In 2007 the “Trans-Canada Highway 1 – Malahat Corridor Study” report was prepared which developed a long-term transportation strategy for the Corridor.
In 2012 a safety review of the corridor was conducted, and the report “Malahat Highway No. 1 Safety Review – Proposed Highway Improvements” was prepared which identified several short term and long term safety improvements for the Corridor.
The findings from the two reports form the basis of the safety improvements works that have been ongoing on the corridor since summer 2012. In 2015, this Malahat Village section was the area of the corridor identified as the next priority in B.C. on the Move. The above reports can be found at: www.gov.bc.ca/malahatsafetyimprovements
HISTORICAL REPORTS
-
HIGHWAY 1 - MALAHAT
4414 160916
The Malahat section of the Trans-Canada Highway is approximately 20 km long, generally beginning near the Leigh Road Interchange in Langford and ending around the Bamberton Overpass near Mill Bay.
It is the main highway corridor on Vancouver Island that connects the communities of southern Vancouver Island with the communities of central and northern Vancouver Island.
The current annual average daily traffic along the corridor is 24,000 vehicles per day making this one of the most important transportation corridors on the island.
The Malahat Village project will enhance the safety of the corridor while also improving corridor reliability and mobility, by providing:• Over 3 km of new median barrier• 5 km of four-laning• Numerous access and intersection improvements
The estimated total project cost is $34M. The Province of BC will be contributing $20M to the project and the Government of Canada will be contributing $14M.
BACKGROUND
-
HIGHWAY 1 - MALAHAT
4414 160916
Phase 1 of the Malahat Safety Improvement Works was completed in 2013, and included the following improvements:
• Installation of seven sections of new concrete median barrier totalling 5.8 km• Upgrades at Finlayson Arm Road, Shawnigan Lake Road, the area near Leigh Road and the south boundary of Goldstream Park, and the Malahat village intersections• Additional RCMP enforcement pullout areas• Installation of an advanced weather advisory system• Improved lighting, signage and roadside delineation
PREVIOUS WORK ON THE MALAHAT CORRIDOR
Phase 2 of the Malahat Safety Improvement Works was completed in 2015 and included the following improvements:
• Installation of an additional 2.3 km of median barrier from Shawnigan Lake Road to the Malahat Summit weather station to address safety concerns in the area known locally as “NASCAR Corner”• A 1 km southbound passing lane extension• Improvements to the Whittaker Road and Holker Place intersections
-
HIGHWAY 1 - MALAHAT
4414 160916
Collision History• The Aspen Road to Shawnigan Lake segment has a collision rate of 0.45 collisions per million vehicle kilometres which is 41% higher than the provincial average of 0.32 collisions per million vehicle kilometres• Three fatalities have occurred along this section of the highway within the last 14 months
EXISTING CONDITIONS
Reliability• The Malahat section of Highway 1 has a history of closures due to collisions and natural hazards. On average, the Malahat highway segment has unplanned closures 10.5 times per year• The closure times range from less than 1 hour to 20 hours with the average closure duration being just over 1 hour• These closures are of great concern as no reasonable alternate detour routes are available south of Shawnigan Lake Road
MobilityThe average travel time through the corridor in the southbound direction is approximately 15% longer on a typical weekday PM Peak and over 30% longer on a typical weekend PM Peak compared to the northbound direction.
Average Travel Time Between Aspen Road and Shawnigan Lake Road
230
220
210
200
190
180
170
160
150Weekday AM Peak Weekday PM Peak Weekend PM Peak Weekend PM Peak
Southbound
Northbound
-
HIGHWAY 1 - MALAHAT
4414 160916
STRATEGIES FOR IMPROVEMENT
Cross Over Collisions
Intersection Collisions
Narrow Paved Shoulders
High access density along corridor
Lack of southbound passing opportunities
Southbound Travel Time Delays
Highway Closures along corridor
Installation of an additional 3.0 km of median barrier which will reduce the severity of collisions.
Converting the Malahat Village and Aspen Road intersections to right-in / right-out and left-in configurations. Converting McCurdy Road intersection to right-in / right out, as well as effectively relocating Okotoks Road intersection and converting it to right-in / right-out only. These improvements to the intersections will reduce the number and severity of collisions.
Increasing the paved shoulder width to 2.0 m will benefit cyclists and provide more refuge area for a stalled vehicle to pull over.
Consolidation of accesses and the construction of backage / frontage roads will reduce the overall number of access points along the corridor and improve safety and mobility.
Construction of 5 km of an additional southbound lane will improve the ability to pass a slow moving vehicle and help reduce the occurrences of aggressive passing maneuvers often seen on shorter passing facilities.
Construction of 5 km of an additional southbound lane will improve travel time and reduce traffic queues behind slow moving vehicles.
Installation of median barriers will reduce the severity of collisions and by extension the duration of any closure caused by a collision. The wider shoulder and the additional southbound lane will provide more width to bypass a collision or stalled vehicle. Also, with the additional southbound lane, crews will be able to implement temporary 2 way traffic to keep people moving around an incident.
IDENTIFIED PROBLEM PROPOSED SOLUTION
-
HIGHWAY 1 - MALAHAT
4414 160916
Making a left turn movement from a side road onto a high volume high speed four-lane highway is difficult
Heavy volumes, high speed and limited visibility along Highway 1 all contribute to the drivers inability to safely judge gaps in traffic for left turning movements onto the highway
As the delays on the side roads increase, drivers begin to get frustrated and are willing to accept shorter and shorter gaps to make their turning movements
This willingness to accept shorter gaps increases the likelihood of angle type collisions which are generally of high severity
Eliminating the left-out movement at an unsignalized T-Intersection reduces the conflict points from 11 to 6 as represented in the adjacent graphics (the 5 eliminated conflict points are shown in red).
Eliminating the left-out movement at high speed and high volume intersections is a widely accepted safety improvement
PROVIDING SAFER ACCESS
LEGENDDirection of travelRemaining con�ict point Eliminated con�ict point
BEFORE
AFTER
LEGENDDirection of travelRemaining con�ict point Eliminated con�ict point
BEFORE
AFTER
-
1
2
5
34
1
LEGENDWindows can be viewed in higher detail on separate story boards
• All new and improved intersections to include improved overhead lighting at night.• Increased paved shoulder width to 2.0m
A new right-in / right-out intersection will be provided north of the Malahat Village to provide access to a new frontage road to service properties west of the highway and north of the Malahat Village
Addition of approximately 3 km of median barrier from the existing U-Turn at Aspen Roadto the existing median barrier near McCurdy Road. Completing an 11km segment of continuous median barrier from Finlayson Arm Road to the Malahat Summit Weather Station.
Conversion of McCurdy Road to a right-in / right-out con�guration with acceleration and deceleration lanes
Improved pavement surface and markingswithin the Malahat Village area
Improvements to the Malahat Village centre access by converting it to a left-in only con�guration to improve safety
A new right-in / right-out intersection will be provided just south of the Malahat Village to provide access to a new backage road and existing businesses on the west side of the highway
A new right-in / right-out and left-in intersection will be located approximately 800m north of Aspen Road. The intersection will provide access to a new northbound to southbound U-turn facility that will replace the current facility. It will also provide access to a new backage road and short frontage road to service the properties south of the Malahat Village and west of the highway.
Improvements to the Aspen Road intersection include increasing the length of the southbound left turn bay into Aspen Road and the addition of a northbound right turn acceleration lane
HIGHWAY 1 - MALAHAT SAFETY IMPROVEMENTS : ASPEN ROAD TO SHAWNIGAN LAKE ROAD
Addition of a second southbound lane starting from Shawnigan Lake Road, connecting into the existing dual southbound lanes located just south of Aspen Road.
-
HT
HT
HT
X
X
X
X
X
X X X XX
XX
X XX
XX
XX
XX
XX
X
X
X
3.27M x 30
0MMØ
CSP
OUTLET=
177.52M
INLET=
177.53M
9.2M
600MMØ
CSP
INLE
T=17
9.89M
OUTLET=
177.23M
31.7M x 600M
MØ
CSPINL
ET=
177.16
M
OUTLE
T=
175.92
M
OUTLE
T=
179.33
M
200MM
Ø
PVC
37.2M x 600M
MØ
CSP
INLET
=
176.09
M
OUTLE
T=
175.11
M
30.5M x 900M
MØ
PVC
INLET
=
180.54
M
OUTLE
T=
179.99
M
INLET
=
193.65
M
200MM
ØC
SP
35.41M x 600M
MØ
OUTLE
T=
191.64M
OUTLET=185.17M
20.23M x 600M
MØ
CSP
INLET=217.14M
OUTLET=216.98M
INLET=217.82M
CRUSHED
& PLUGGED
CSP
8.48M300MMØCSP
INLE
T=22
0.77
M
9.07M300MMØCSPOU
TLET=
218.04M
19.46M x 600M
MØ
CSP
CUL K
INK=
214.09
M
BASE OF ROCK
SOLID
ROCK
SOLID ROCK
SOLID ROCK
SOLID ROCK
SOLID ROCK
BASE O
F ROC
K
BASE
OF RO
CK
TOP O
F ROC
K
TOP O
F ROC
K
TOP OF
ROCK
TOP OF ROCK
BASE OF
ROCK
BASE
OF S
LOPE
BASE
OF
SLO
PE
BASE
OF SL
OPE
BASE
OF SL
OPE
BASE
OF SL
OPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE O
F SLOPE
BASE
OF
SLO
PE
GRAVEL RO
AD
GRAVEL ROAD
CONCRETE ROAD
GRAVEL ROAD
GR
AVEL
RO
AD
GRAVEL ROAD
2T
2T
2P,1
C
3HT,1P,1C
2T
2T
2T
2T
3HT,1
P,1C
1TRAN
S.
3HT,1
P,1C
3HT,1
P,1C
3HT,1
P,1C
2T
3HT,1
P,1C
2T
1TRAN
S
1P
RUSTE
D
BOTTO
M
OF CS
P
2T,2
GU
Y
2T
3T
3T
3T
3T
SOLID ROCK
3T,1GU
Y
HOUSE
WOOD RAILWOOD RAIL GRAVEL ROAD
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3T
3HT,1P,1C
3T
HOUS
E
HOUSE
DECK
3HT,1P,1C
3HT,1P,1C
1GUY,1T
1TRANS
3HT,1P,1C
3HT,1P,1C
3T
3T
3T
3HT,1P,1C
3T
3T
3T
3T
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
SHED
SHED
HOUSE
SUNDECK
ROCK
ROCK
SIDEWALK
3HT,1P,1C
2T
2T
SEPTICTANK
CO
NC
.
SEPTIC FIELDAPPROX. SIZE
TOP OF ROCK
TOP OF ROCKBASE OF ROCK
BASE OF SLOPE
BASE
OF S
LOPE
BASE
OF SL
OPE
TOP OF ROCK
BASE OF ROCK
HOUSE
PROPOSEDFUTURE BUILDING
PROPOSED FUTURE BUILDING
PUMPHOUS
ESHED
SHED
SOLID ROCK
SOLID ROCK
SOLID ROCK
SOLID ROCK
RO
CK W
ALLDIRT
PAD
3HT,1P,1C
3HT,1P,1C
HOUSE
TEL BOX
2T
X
X
55
0.8MØFIR
0.8MØCEDAR
0.8MØFIR
0.1MØ
0.05MØ
0.1MØ
APPLE
0.2MØ
0.8MØFIR
WO
OD
SEPTIC FIELD
WAT
ERFE
ATUR
E
MULTIPLE LIGHTSALONG TRAIL
GARAGEDOOR
CONCRETE
ROCKX
X
X
X
X
X
X
X
XX
XX
5616
56195619
56155615
5619
5616
5619
0.4MØFIR
0.4MØFIR
0.4MØFIR
0.4MØCEDAR0.4MØ
CEDAR0.4MØ
CEDAR0.4MØARBUTUS
0.3MØARBUTUS
0.3MØFIR0.4MØFIR
2x0.4MØCEDAR
0.4MØFIR
GRAV
EL
215
170
220
155
220
130
145
145
185
165
185
225
255
195
240
215
180
205
180
235
215
180
185
240
250
215
145
215
130
180
240
135
190
245
175
95
120
260
145
195
105
200
235
220
235
165
220
220
125
150
200
160
205
235
190
195
225
230
155
175
155
160
115
200
235
240
160
165
250
245
175
205
250
160
165
200
105
145
230
160
230
60
235
150
235
160
170
230
215
150
250
195
100
185
160
60
250
235
130
145
105
100
235
120
180
165
180
140
90
175 150
130
55
150
225
260
135
150
220
70
185
135
135
105
45
190
145
145
225
185
165
110
230
75
115
150
255
185
175
185
180
170
125
130
235
125
200
225
170
185
190
160
180
195
210
115
230
110
150
145
220
90
225
245
165
85
210
240
75
130
120
185
165
115
105
210
160
160
220
140
230
195
220
170
65
175
185
265
75
170
155
125
180
220
190
140
160
80
210
70
90
100
135
80
135
165
195
235
230
95
125
125180
125
170
175
225
215
215
175
115
205
130
100
145
170
85
190
190
215
120
210
85
155
205
165
85
160
220
185
105
155
95
125
115
170
230
130
185
140
110
145
195
230
70
120
105
225
205
105
145
170
190
100
165
115
120
120
110
90
250
120
200
160
140
170
200
140
150
245
220
170
195
140
175
75
160
110
50
220
85
110
180
65
220
160
135
150
185
95
200
100
170
115
240
255
80
175
105
195
250
185
115
200
135
190
165
105
225
160
95
150
245
155
135
185
130
205
145
225
195
105
45
230
180
125
185
245
140
220
135
100
85
155
155
220
200
180
110
125
165
235
170
180
110
205
170
155
85
95125
150
210
175
185
200
185
190
70
150
215
240
160
130
160
165
80
235
145
200
70
125
195
145
85
250
130
210
200
165
190
115
90
140
60
205
185
190
235
190
195
150
165
90
80
135
185
85
185
190
80
195
245
110
180
195
195
180
100
180
225
175
75
95
210
90
170
115
215
175
220
170
210
230
225
180
120
205
195
115
210
205
100
215
200
190
205
110
215
140
215
230
200
150
200
75
205
175
205
210
210
220
155
150
195
170
155
200
55
195
220
175
210
155
155
120
215
55
95
180
130
190
235
120
185
210
65
220
170
130
180
255
155
230
175
205
175
160
195
170
195
150
220
215
225
185
180
115
165
145
185
215
90
205
215
190
225
175
185
100
180
200
190
215
185
220
90
250
155
180
180
180
165
200
210
220
250
195
220
225
150
190
235
220
160
255
170
210
155
200
180
170
255
175
230
165
165
175
255
125
210
210
155
210
170
225
225
205
245
165
190
200
185
145
190
240
205
185
175
160
190
255
230
245
155
265
105
150120
150
225
175
110
220
140
150
140
210
170
230
175
200
220
225
150
205
170
190
240
145
120
240
80
160
110
200
145
185
155
145
220
210
210
165
65
50
145
130
165
140
225
45
160135
220
195
215
215
195
155130
205
225
220
200
165
220
160
220
50
210
145
235
125
185
135
135 175
155
235
180
220
185
205
175
165
180
140
200
175
150
65
165
235
245
210
220
210
155
215
205
215
190
140
215
205
190
245
160
185
160
185
150
175
175
235
130
175
255
245
225
135
170240
95
205
210
205
180
200
180
140
160
180
190
STA
IRS
SA
NS
AN
SAN
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
110
114
32
3334
108
109
107
103
115
104
119
118
117
116
120
121
122
105
106
HIGHWAY 1 - MALAHAT
4414 160916
OUTSET #1 - REVISED ASPEN ROAD INTERSECTION
1
1 : 500
-
HIGHWAY 1 - MALAHAT
4414 160916
OUTSET #2 - NEW INTERSECTION TO ACCESS THE NEW BACKAGE ROADS AND TURNAROUND FACILITY
HT
HT
HT
HT
X
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EWEW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
X
X
X
X
X
X
XX
XX
X
X
X
X
X
X
X
X
X
X X XX
XX
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
INLET
=
193.65
M
200MM
ØC
SP
35.41M x 600M
MØ
CSP
INLET=
192.92M
OUTLE
T=
191.64M
INLET=191.64M
OUTLET=185.17M
57.8M x 1200m
m C
ON
C.
INLET=200.62M
200MM
ØC
SP
INLET=205.83M
200MM
ØC
SP
42.4M x 600MMØ CSP
INLET=209.57M
OUTLET=204.19M
9.0M x
450MMØ
OUTLET=
203.88MINLET=204.40M
CSP
SOLID ROCK
BASE
OF SL
OPE
BASE
OF S
LOPE
BASE
OF S
LOPE
BASE
OF SL
OPE
BASE OF SLOPE
BASE OF SL
OPE
BASE OF
SLOPE
BASE OF SLOPE
BASE
OF
SLO
PE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLO
PE
BASE OF SLOPE
BASE OF SLOPE
GRAVEL ROAD
GR
AVEL
RO
AD
GRAVEL ROAD
GRAVE
L ROA
DGRAVEL ROAD
GR
AVEL RO
AD
GRAVEL RO
AD
GR
AVEL RO
AD
GRAVEL ROAD
GRAV
EL R
OAD
3HT,1
P,1C
2T
1TRAN
S
1T
1T
RUSTE
D
BOTTO
M
OF CS
P
3HT,1P
,1C
3HT,1P,1C
3HT,3P,1C
1T,2
GU
Y
2T,2
GU
Y
1T,1
GU
Y
1T
46.6M x 600MMØ CSP
3HT,1P,1C
3T
2T
3T
3T
3T
3T
3T
3T
SOLID ROCK
3T,1GU
Y
HOUSE
WOOD RAILWOOD RAIL GRAVEL ROAD
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3T
3HT,1P,1C
3T
HOUSE
DECK
3HT,1P,1C
1TRANS
3T
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
SAND
BAGS
SAND
BAGS
SANDBAGS
SHED
SEPTICTANK
CO
NC
.
SEPTIC FIELDAPPROX. SIZE
EW
EW
EW
EW
EW
BASE OF SLO
PE
BASE O
F SLOP
E
EW
X
X
EW
EW
EW
EW
EW
EW
EW
EWEW
EW
EW
EW
HT
HT
HT
BASE OF SLOPE
TOP OF ROCK
BASE OF ROCK
HOUSE
PROPOSEDFUTURE BUILDING
PROPOSED FUTURE BUILDING
PUMPHOUS
ESHED
SHED
PROPOSEDFUTURE BUILDING
SOLID ROCK
SOLID ROCK
SOLID ROCK
SOLID ROCK
PAD
GATE
ROCKWALL
ROCK
WAL
L
ROCK
WAL
L
OUTL
ET=
201.78
M
INLE
T=20
4.08
M
150MM
ØPV
C12.3M
x
RO
CK W
ALLG
RAVEL R
OAD
RO
CK W
ALLSRIPRAP
INLET=
201.57M
1MMINUS
WALL EXTENDSUNDER EARTH
GR
AVEL
OUTLET=
201.17M
12.0M x
1500MMØ
CSP
900MMØ
CSP
OUTLET=
199.95M
TOP OFROCK
CONC.PAD
3HT,1P,1C
3HT,1P,1C
BUILDING
GARAGE
I-BEAMI-BEAM
GR
AVEL
WOODBOARD
1TRANS.
55
1
23
4
5
6
7
8
9
10
215
220
245
245
245
240
220
250
240
260
240
250
210
205
235
215
245
220
245
220
215
215
220
230
250
215
225
230
235
240
250
245
255
250
205
210
230
220
235
230
210
250
235
245
215
245
210
235
180
260
220
190
215
225
200
255
185
225
185
195
225
245
220
200
240
185
220
210
205
230
195
220
265
220
220
205
190
230
215
205
190
210
240
245
210
230
225
215
235
210
245
200
240
230
200
170
195
220
255
180175
210
185
200
225
225
245
200
205
195
220
200
215
240
210
215
250
240
210
200
215
190
225
195
245
180
250
210
220
235
230
225
200
205
220
205
245
215
225
240
225
215
215
255
230
200
205
250
210
230
205
250
210
195
245
250
220
200
215
230
260
180
215
235
235
225
210
195
220
220
195
255
220
260
210
215
265
185
240
180
245
230
215
205
205
225
235
190
185
235
215
250
240
210
220
240
250
220
190
220
220
195
235
255
170
210
200
230
180
255
175
245
175
215
255
240
230
225
255
220
235
250
245
210
210
225
240
225
245
225
190
205
245245
205
215
240
205
205
185
255
245
245
265
205
230
225
215
230
220
200
215
210
230
200
205
210
250
240
235
245
205
235
220
210
225220
200
215
215
225
220
220
240
210
240
235
225
235
220
185
205
220
225
200
245
245 220
210
245
225
210
110
114
28
29
30
31
32
3334
35111
115
112
118
117
116
113
2
1 : 750
-
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XX
X
X
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
XX
X X XX X
XX
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
5.58M
200MMØ
CSP
KINK?
221.49M
OUTLE
T=
220.73
M
37.70M x 900M
MØ
CO
NC
.
INLET=
204.80M
OUTLET=
203.53M
9.3M x
200MM
ØC
SP
INLET=211.87M
KINK205.27M
OUTLE
T=
203.48M
13.5M x
200MM
Ø
CSP3.1M
x
200MM
Ø
CSPINL
ET=
213.03M
KINK
210.
10M
9.1M x200MMØCSP
KIN
K20
4.84
M5.
1M x
200M
MØ
CSP
OU
TLET
=20
3.99
M
PIPE 1PIPE 2
PIPE 3
PIPE 1:
INLET = 201.66M
OUTLET = 201.36M
5.2M X 750M
MØ
CONC.
PIPE 2:
INLET = 201.68M
OUTLET = 201.45M
5.2M X 750M
MØ
CONC.
PIPE 3:
INLET = 201.69M
OUTLET = 201.43M
5.2M X 750M
MØ
CONC.
5.21M x 200MMØCSP
INLET=212.26M
OU
TLET=
209.22M
34.6M x 600MMØCSP
OU
TLET
=21
3.41
M
INLET=214.49M
3.50
M60
0MM
ØCS
P
OUTLET=
212.00M
INLET=213.41M
6.2M x
200MMØ
PVC
OUTLET=
225.56M
226.12M
INLET=
225.56M
200MMØ B
IG-O
450MMØPVC
OUTLET=217.33M
450MM
ØPV
C
INLET
=
226.71
M
LOO
SE R
OCK
SOLID
ROCK
SOLID
ROCK
BASE
OF SL
OPE
BASE
OF S
LOPE
BASE O
F SLOP
E
BASE
OF SL
OPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLO
PE
BASE OF SLO
PE
BASE OF SLOPE
GR
AVEL RO
AD
GRAVEL ROAD
GRAVEL ROAD
3HT,1P
,1C
3T
3T
3HT,1P
,1C
2P,1GUY
1P
3T
1TRAN
S
3HT,1P
,1C
3T
HOUSE
HOUSE
HOUSE
HOUS
E
BUILD
ING
HOUSE
HOUSE
HOUSE
GAR
AGE
HOUS
E
HOUSE
HOUSE
HOUSE
HOTEL
RESTAURANT
HOUSE
HOUSEHOUSE
GAS
HOUSE
HO
USE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUS
E
HO
USE
CABIN
HOUSE
CABIN
#11
CABIN
#12
HO
US
EH
OU
SE
HOUS
E
CABI
N
STATION
3HT,1P
,1C
3HT,1P,1C
LS
1HT,1P,2G
UY
1HT,1P
ELECTRIC
AL
METER
1T,1C1T,1C
1HT
3HT,2P,1C
3HT,1P,1C
3HT,2P,1C
LS
3TRANSLS
3HT,1P,1C
1P
1P
3HT,2P,2C
LS
BOARD
3HT,2P,1C
LS
1HT,1P,2G
UY
1HT,1P
1T
3HT,1P,1C
LS
1T,1GU
Y
3T
3T
1P
3P
1P
3T
INLET=
29.48
M x 6
00MM
Ø
CSP
OUTL
ET=
221.8
3M
500MMØ CSP
500MMØ CSP
500MMØ CSP
500MMØ CSP
HOUSE
POOL
SHED
HO
USEWO
OD
DEC
K
WELL?
HOUSE
HOUSE
SHED
0.6MØ FIR
0.6MØ FIR0.6MØ FIR
0.9MØ FIR
0.7MØ FIR 0.8MØ FIR
1.1MØ FIR
1.2MØ FIR
1.0MØ FIR
3x0.5MØ FIR
1TRA
NS
2x1.0MØ FIR
1.0MØ FIR
BASE
OF SLOPE
1.5MØ FIR
1.0MØ FIR
1.0MØ FIR0.8MØ FIR
0.9MØ FIR
0.8MØ FIR
1.2M
Ø F
IR
1.0M
Ø F
IR1.
1MØ
FIR
1.5MØ FIR
1.2MØ FIR1.0MØ FIR
WO
OD
BOAR
D
WOOD BOARD
WOOD BOARDDILAPITATED
WO
OD
BOAR
D
CONCRETEPAD
2T
MET
AL
BLDG
METAL
BASE OF SLOPE
LIMIT OF SURVEY
LIMIT OF SURVEY
HO
USE
LIMIT OF
SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
EW
EW
EW
EW
EW
EWEW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EWEW
EW
EW
EW
EW
EW
EW
EW
EWEW
EW
EW
EWEW
EW
EW
EW
EWEW
EW
EWEW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EW
EWEW
EW
EW
EW
X
X
X
X
X
XCORR
UGAT
ED
META
L
WOOD BOARD
BLDG CO
NC
.
BLDG
FIELD PERIMETERDRAIN OUTLET=226.37M
0.07MØ
PVC
SEPTIC FIELDAPPROX. SIZE
PER
IMET
ER D
RAI
N
APPR
OX.
LO
CAT
ION
OUTLET=228.11M
INLET=228.18M
4.3Mx
500MMØCSP
0.4MØFRUIT
0.3MØFRUIT
0.3MØFRUIT
0.2MØFRUIT
0.3MØFRUIT
POND
8.0M x
200MMØ
STEEL
OUTLET=
229.30M
INLET=229.61M
ROCK
D.L. BO
UNDARY
APPRO
X. ONLY
D.L. BOUNDARY APPROX. ONLY
26.0
M x
600
MM
ØC
MP
D.L. BOUNDARYAPPROX. ONLY SLOPEBASE OF
PR
OP
OS
ED
FUTU
RE
BU
ILDIN
G
1356
4485
1356
4485
GRAVEL
GR
AVEL
GRAV
EL
GRAVEL
MOBILE T
RAILER
DIR
T
DIRT
DIR
T
250
170
220
155
130
230
210
255
240
145
255
220
215
165
245
185
210
215
240
180
175
205
185
190
190
255
240
235
230
195
195
130
250
235
135
250
120
235
145
225
255
240
105
245
220
235
255
210
125
255
205
235
240
245
115
160
250
230
215
255
175
235
245
180
255
235
225
105
225
160
245
230
225
225
240
175
165
130
245
100
235
130
230
210
250
245
145
225
115
260
160
150
210
225
85
235
120
245
140
170
195
135
165
240
125
215
230
115
100
190
155
170
145
120
105
240
145
110
255
230
260
255
140
160
110
200
95
180
135
125
140
135
210
125
245
210
85
170
185
205
185
130
125
225
205
260
195
165
215
200
195
180
190
175
240
210
170
240
250
220
230
115
215
110
215
250
225
205
220
150
245
230
235
120
220
185
155
150
240
115 90
235100
210
225
235
225
90
155
190
230
230
215
230
235
125
210
230
215
245
215
220
210
235
215
245
200
170
155
200
235
105
150
245
180
185
120
150
250
110
235
175
205
235
150
235
140
240
195
250
150
205
170
240
120
80
200
160
230
235
110
165
205
145
225
250
220
240
155
145
190
215
200
155
175
165
245
180
145
160
220
130
165
210
140
250
170
160135
235
195
155130
180
230
160
230
235
205
145
220
125
240
135
215
245
185
175
230
210
165
180
185
215
140
200
235
150
215
165
190
155
235
190
140
215
235
195
200
185
235
150
175
220
175
215
195
225
255
135
170
95
225
180
140
200
240
160
230
190
52
53
54 59
4142
434544
123
124
125
126
127
128
130
131132
129
HIGHWAY 1 - MALAHAT
4414 160916
OUTSET #3 - MALAHAT VILLAGE AREA AND NEW SOUTHBOUND RIGHT-IN / RIGHT-OUT INTERSECTION
1 : 750
3
-
HT
X
XX
XX
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
EW
EW
EW
EW
EW
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
XX
X
X X
X
X
X
6.2M x200MMØPVC
OUTLET=225.56M
226.12M
INLET=225.56M200MMØ BIG-O
40.5M x
INLET=
225.57M
OUTLET=
224.63M
9.8M x
900MM
ØC
SP
INLET=
226.42M
OU
TLET=
226.25M
12.2M x500MMØCSP
OUTLET=231.37M
INLET=231.66M
7.6M300MM
ØCSP
OUTLET=237.64M
INLET=
237.65M
6.7M x
300MM
Ø
CSP
INLET=
250.02M
OUTLET=
250.07M
22.6M x 600M
MØ
CSP
INLET=
245.45M
OU
TLET=244.29M
OUTLET=252.44M
200MM
Ø
30.1M x 600M
MØ
CS
P
INLET=251.00M
OUTLET=250.14M
OUTLET=255.26M
200MM
Ø
28.4M x 600M
MØ
CS
P
INLET=255.12M
OUTLET=254.48M
35.8M
x 60
0MMØ
CSP
OUTL
ET=
254.8
7M
INLE
T=25
5.89M
36.0M
x 60
0MMØ
CSP
OUTL
ET=
254.8
6M
INLE
T=25
5.92M
25.8M x 600MMØ
CSP
OUTLET=
269.39M
INLET=
270.78M
OUTLET=
289.42M
200MMØ
PVC
36.5M x 600MMØ
CSP
INLET=
288.77M
OUTLET=
288.01M
35.32M x 600MMØ CSP
INLET=
297.93M
OUTLET=
297.41M
41.8M x 600MMØ CSP
INLET=
298.48M
OUTLET=
297.22M
40.3M x 750M
MØ
PVC
OUTLET=
302.01M
INLET=
304.72M
OUTLET=302.99M
200MM
ØC
SP
600MM
ØC
SP
OU
TLET=
301.89M
450MMØPVC
INLET=226.71M
BASE OF ROCK
TOP OF ROCK
TOP OF ROCK
TOP OF ROCK
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF S
LOPE
BASE OF SLOPE
BASE OF SLOPE
BA
SE
OF S
LOP
E
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPEBASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BA
SE
OF S
LOP
E
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
BASE OF SLOPE
GR
AVEL
RO
AD
GRAVEL
ROAD
GR
AVELR
OAD
GRAVEL
ROAD
GRAVEL RO
AD
GR
AVEL RO
AD
GRAVEL ROAD
GRAVEL ROAD
GRAVEL ROAD
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
BUILDING
BUILDING
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUS
E
HOUS
E
CABIN
HOUSE
CABIN#11
CABIN #12
HO
USE
HOUS
E
HOUS
E
CABIN
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
BLDG
HO
USE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
HOUSE
3HT,2P,2C
LS
BOARD
3HT,2P,1C
LS
3HT,2P,1C 1TRANSLS
2P,2G
UY
3HT,2P,1C
LS
1HT,2P,1C750MM
Ø CONCRETE
1000MM
Ø CSP
1TRANS
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C 1TRANS3HT,1P 2P,1C
1C 3HT,1P 3TRANS
3HT,1P,1C 1TRANS3HT,1P,1C1P 3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
3HT,1P,1C
2HT,2P,3C
3HT,1P,3C
3HT,1P,3C
1T
1T
1P
3HT,2P,3C
w/ 2 ELECT.
BOX
w/ CONTROLLER
2T
2T
1HT,
1P
2T
2T
2T2T
2T
2T
1HT,1P
,1T
2T2T
1HT,1P,2G
UY
1HT,1P
1T
3HT,1P,1C
LS
3T
INLET=
29.48M
x 600MM
Ø
CSP
HOUS
E
WOOD DECK
WELL?
HOUSE
HOUSE
SHED
0.6MØ FIR
0.6MØ FIR0.6MØ FIR
0.9MØ FIR
0.7MØ FIR
0.8MØ FIR
1.1MØ FIR
1.2MØ FIR
1.0MØ FIR
3x0.5MØ FIR
1TRA
NS
2x1.0MØ FIR1.0MØ FIR
BASEO
FSLOPE
1.5MØ FIR
1.0MØ FIR
1.0MØ FIR0.8MØ FIR
0.9MØ FIR0.8MØ FIR
1.2MØ
FIR
1.0MØ
FIR
1.1MØ
FIR
1.5MØ FIR1.2MØ FIR
1.0MØ FIR 0.7MØ FIR
0.4MØ FIR0.8MØ FIR
0.9MØ FIR
0.9MØ FIR
0.7MØ FIR0.5MØ FIR
0.6MØ FIR0.5MØ FIR
0.5MØ FIR0.7MØ FIR
0.4MØ FIR
SQUARE
CONC PIPE
WO
OD BO
ARD
WOOD BOARD
WOOD BOARD
DILAPITATED
WO
OD BO
ARD
CONCRETEPAD
RIPRA
P
BOTTO
M FILLED
w/ D
EBRIS
RIPRAP
WOOD BOA
RD
WOOD BOARD
SHED
SHED
RIP RAP
WOOD BOARD
CEDAR HEDGE - 0.2MØ
BASEOF
SLOPE
SHED
0.5MØ CEDARMETALGATE
0.5MØCEDARWOOD P
ANEL
WOOD BOARD
RIP RAP
0.2MØ FRUIT
0.1MØ FRUIT
GARDEN
RIP RAP
RIP R
AP
SMALLRIP RAP
SOLIDROCK
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
2T
GARAGE
HOUS
E
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEYLIMIT OF SURVEY LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT O
F SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT O
F SUR
VEY
LIM
IT O
F S
URVE
Y
LIMIT
OF
SUR
VEY
LIMIT
OF
SUR
VEY
X
EW
EW
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
XX
SEPTIC FIELDAPPROX. SIZE
0.9MØCEDAR
0.2MØFRUIT
0.3MØFRUIT
0.9MØCEDAR 0.5MØ
CEDAR
0.4MØCEDAR0.4MØ
FRUIT
3x0.3MØ
CE
DA
RS
2T
2T
2T
DEBR
IS
LIM
IT O
F S
URVE
Y
SLOPE
BASEOF
GROUNDSEEPAGE
OUTLET=
235.50M500MMØ CSP
234.36MINLE
T=
OUTLET=
234.05M
19.7M x 500
MMØ CSP
13.3M x 1.15M
x 2.0M C
ON
CR
ETE
OU
TLET=261.96M
INLET=
262.79M
6.9M x 900MMØCMP
INLET=222.11MOUTLET=
221.68M
215
290
255
170
220
260
210
255
320
245
260
250
280
305
295
185
185
260
285
215
255
195
255
240
235
215
245
180
265
240
295
255
255
315
230
245
180
220
275
270
250
225
240
230
230
285
310
305
265
230
250
230
300
260
275
230
240
310
310
235
245
250
305
280
295
275
260
265
260
280
260
270
305
280
265
255
240
275
245
280
315
225
310
230
280
230
255
275
270
250
250
240
275
240
305
250
275
280
285
300
280
240
285
305
310
235
265
270
270
305
280
300
235
230
275
245
265
270
270
275
295
290
280
280
230
230
265
215
265
265
295
280
255
210
230
290
270
280
235
245
275
295
225
245
310
305
255
290
275
250
225
290
225
290
285
290
240
295
275
255
235
260
265
240
255
285
280
280
285
230
275
235
260
240
300
275
285
260
295
295
230
265
290
230
290
280
300
270
290
305
280
270
305
245
225
275
275
260
300
260
280
285
280
270
295
270
240
265
315
300
280
235
255
285
300
210
275
300
295
260
295
260
275
215
295
235
295
265
275
290
270
280
265
295
290
260
215
280
305
265
265
285295
210
245
240
215
285
260
230
260
265
245
285
265
235
250
240
250
305
290
265
240
205
300
265
260
195
235
240
250
300
225
205
280
305
250
300
285
265
275
290
305
255
250
255
280
250
240
320
250
290
260
220
275
250
290
250
285
275
285
225
230
285
285
275
240
285
285
200
250
245
235
280
245
275
220
270
235
300
250
295
270
230
230
250
250
250
310
230
300
270
215
230
285
280
230
245
275
240
240
275
280
220
280
270
235
240
270
230
280
260
210
245
290
235
235
270
245
305
280
240
235
285
270
285
295
295225
255
305
255
235
320
300255
215
290
255
250
275
200
250
285
275
270
250
240
290
310
265
270
310
300
255
275
270
235
265
240
265
230
285
285
290
245
285
240
225
265
280
290
235
290
290
245
195
220
300
300
225
270
220
285
250
290
285
255
260
315
275
280
235
270
305
250
245
285
205
280
280
300
245
255
260
235
230
280
220
250
295
325
275
270
305
270
245
285
275
295
280
255
305
255
295
265
280
305
245
255
255
295
225
235
210
235
250
245
275
275280
205
280
300
210
190
245
270
275
300
285
265
245
270
280
310
205
250
210
215
285
250
255
245
275
230
270
255
310
290
295
265
230
250
295
255
290
245
250
240
295
235
260
245
250
225
280
245
305
230
320
275
260
250
245
235
285
305
235
250
235
245
310
275
315
265
260
200
270
300
265
325
235
230
260
310
245
170
245
275
285
235
220
310
190
205
190
240
295
265
275
280
255
245
310
280
230
255
285
285
290
275
295
195
300
245
240
285
280
240
310
255
200
285
230
275
205
245
250
310
250
290
275
245
285
255
240
285
255
275
280
255
290
205
245
240
195
195
265
250
255
200
240
165
310
220
260
280
290
245
315
305
245
210
260
235
180
255
255
290
205
295
280
200
275
175
305
260
230
235
240
260
240
260
210
235
265
280
240
205
190
200
250
215
240
190
160
275
185
265
280
270
235
175
250
220
275
255
250
255
225
250
255
300
280
210
245
200
315
320
240
255
260
295
260
61
62
63
64 65
59
60
148
142
131
132
133
134
135
136 137138
139140
141
143
144
145
146
147
149
HIGHWAY 1 - MALAHAT
4414 160916
OUTSET #4 - REVISED McCURDY ROAD INTERSECTION, AND NEW SOUTHBOUND RIGHT-IN / RIGHT-OUT INTERSECTION
1 : 750
4
-
HIGHWAY 1 - MALAHAT
4414 160916
OUTSET #5 - REVISED SHAWNIGAN LAKE ROAD INTERSECTIONHT
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
X
X
X
X
XX
X
X
25.8M x 600MMØCSP
OUTLET=269.39M INLET=270.78M
OUTLET=289.42M
200MM
ØP
VC
36.5M x 600M
MØ
CSP
INLET=288.77M
OUTLET=288.01M
35.32M x 600M
MØ
CSP
INLET=
297.93M
OU
TLET=297.41M
41.8M x 600M
MØ
CSP
INLET=
298.48M
OU
TLET=297.22M
40.3M x 750MMØ PVC
OUTLET=302.01M
INLET=304.72MOU
TLET=
302.99
M
200MM
ØCSP
600MMØCSP OUTLET=301.89M
BASE OF ROCKTOP OF RO
CKTOP OF ROCK
TOP OF ROCK
BASE OF SL
OPE
BASE OF SLOPE
BASE O
F SLOPE
BASE
OF S
LOPE
BASE OF SLOPE
BASE OF SLOPE
GRAVELROAD
GRAVELROAD
HOUS
E
HOUS
E
HOUS
E
HOUS
E
HOUS
E
HOUS
E
3HT,1P,1C
3HT,1P,1C3HT,1P,1C
3HT,1P,1C
2HT,
2P,3
C
3HT,1P,3C3HT,1P,3C
1T
1T
1P
3HT,2P,3C
w/ 2
ELE
CT.B
OX
w/ C
ONTR
OLLE
R
RIP
RAP
SMALLRIP RAP
SOLID
ROCK
2T2T2T2T
2T2T
2T
LIMIT
OF S
URVE
Y
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY LIMIT OF SURVEY LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SURVEY
LIMIT OF SU
RVEY
LIMIT OF SURVEYLIMIT OF SURVEY
320
305
295
260
295
255
315
275
270
250
285
310
305
275
310
310
280
295
275
260
260
270
305
265275
315
310
275
270
250
275
305
275
285
305
310
305
300
275
270
290
265
295
305
290
285
265
240
295
295
305
280
305
275
275
300
285
270
275
280
245
285
260
265
285
250
280
305
300
290
280
320
275
285
245
270
270
285
275
280
270
270
245
270
305
285
270
285
295
320
300
290
255
250
275
275
270
290
310
265
310
275
265
265
285
240
265
280
290
300
290
315
270
305
250
280
280
260
280
270
285
255
305
255
295
265
305
255
295
235
245
275
280
280
300
270
275
300
285
265
270
310
250
275
270
255
310
290
295
265
295
255
290
245
295
305
320
285
305
245
310
315
270
300
325
260
310
285
310
295
265
275
310
280
255
285
290
275
300
285
280
310
285
275
290
285
255
285
280
310
260
290
305
260
255
290
295
280
275
305
260
260265
280
275
265
280
270
300
295
260
148144145 146 147
149
5
1 : 750
-
HIGHWAY 1 - MALAHAT
4414 160916
Tender the construction contract in December 2016
Start construction in early 2017 through late summer 2018
Ministry of Transportation and Infrastructure staff will be monitoring traffic 24/7 during construction to ensure delays are kept minimal.
A minimum of one lane in each direction will always remain open to traffic, with the exception of brief stoppages for blasting, tree falling, and equipment crossings, all generally occurring outside peak commuter periods.
Regular updates and advance notification will be provided as needed through DriveBC, social media, traffic advisories, changeable message signs, and on the project website.
NEXT STEPS
Public Information Session
November 2016
WE ARE HERE
Design Complete and Project Tendered
December 2016
Construction Start
Early 2017
Project Completion
Summer 2018
Thank You for Coming!
Please remember to provide us with your feedback by:
• Completing a feedback form and leaving it with our team, or
• Sending an email to: [email protected]
Planning, Design and Startup
Summer 2015
Project Announcement
July 2016