HIGHLIGHTS PERFORMANCEnfr.indianrailways.gov.in/uploads/files... · HIGHLIGHTS & PERFORMANCE...
Transcript of HIGHLIGHTS PERFORMANCEnfr.indianrailways.gov.in/uploads/files... · HIGHLIGHTS & PERFORMANCE...
1
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
HIGHLIGHTS&
PERFORMANCE
NORTHEAST FRONTIER RAILWAYIN THE SERVICE OF THE NORTHEAST
DECEMBER 2014
2
NORTHEAST FRONTIER RAILWAY
BRIEF HISTORY OF N.F. RAILWAY
The tea, oil and coal industries were set up in Upper Assam areaaround the 1860s and 70s. Transportation of the produce was by riverroutes down the Brahmaputra. A need was felt for construction of aRailway from the tea and oil producing centres in the hinterland to theriver port at Dibrugarh. The Assam Railways and Trading CompanyLimited which was incorporated in July 1881, took up the task ofconstruction of the first railway line - and the first Metre Gauge train inthe Northeast region chugged from the river ghat in Dibrugarh to Jeyporeroad on 1st May 1882.
By February, 1884 the railway line had reached the coalfields ofMargherita and by May, 1884 another line from Makum to Doomdoomawas constructed. This network formed what was known as the DibruSadiya Railway (DSR).
About this time, an overseas market had been created for tea andjute, the principal products of Assam and Eastern Bengal. The AssamBengal Railway (ABR) was formed in 1892 to connect the port ofChittagong by rail to upper Assam and provide an outlet for theseproducts for the overseas markets. The railway also expected to pickup some of the already existing road traffic between Dhaka andChittagong leading to the steady economic development of the area.The railway line from the port of Chittagong to Tinsukia (Makum) wasconstructed in three phases – from Chittagong to Badarpur with branchlines to Silchar and Laksham, from Badarpur to Lumding through theNorth Cachar Hills and in the third phase from Lumding further Northto connect the DSR at Makum. The line from Lumding to Guwahatiwas constructed as a branch line to this alignment from Makum toChittagong. The Chittagong-Badarpur section opened for traffic up toBadarpur on December 4, 1896 and was extended up to Silchar onNovember 8, 1898. It was for the first time that a part of the Northeastwas rail-linked to the rest of India (with a river crossing betweenChandpur and Goalundo).
3
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Besides the Dibru-Sadiya Railway (DSR) and Assam Bengal Railway(ABR), the Eastern Bengal Railway (EBR) was the third importantconstituent of the present N. F. Railway. These three Railways weremerged during World War-II and came to be known as the BengalAssam (BA) Railway. Thereafter, some of the company-owned railwaysviz, Bengal Dooars Railway, Jorhat Provincial Railway, ChaparmukhSilghat Railway, Katakhal Lalabazar Railway etc. were also mergedwith the Bengal Assam Railway system.
With the partition of India in August 1947, the Bengal Assam Railwaywas bifurcated according to the political boundaries leading to theformation of the Assam Railway with its headquarters at Pandu. In1948, the Darjeeling Himalayan Railway (DHR) was taken over by theGovernment of India and merged with the Assam Railway.
The partition of India severed the links of the Assam Railway withthe rest of the country, connected as the two were, till then, through therailway network in East Pakistan. For restoration of the link to the AssamRailway, the Assam Rail Link Project was taken up on top priority toprovide the connection through the “chicken neck” corridor of NorthBengal. This link was completed in January 1950.
The re-organization of the railway zones in 1951 led to the mergerof the Assam Railway and Avadh Tirhut Railway and these two formedpart of the North Eastern Railway with headquarters at Gorakhpur. Thethen North Eastern Railway thus extended right across northern Indiacovering UP, Bihar, Bengal and Assam, from Bareilly to Tinsukia andBadarpur / Silchar.
The present day Northeast Frontier Railway was carved out of theNorth Eastern Railway and set up with its headquarters at Maligaon on15th of January, 1958.
*******
4
NORTHEAST FRONTIER RAILWAY
AN OVERVIEWSTATUS AS ON 01.01.2015
BG MG NG TotalRoute Length (Km)
3019 896 87 4002Track K.M. 4647 1227 97 5971
No. of Stations 398* 44 10 452* including BG/MG - 1 & BG/NG - 3
State-wise route length (Km) :Assam - 2478Bihar - 327Tripura - 152West Bengal - 1010Others - 35Total - 4002 KM
Coach Holding : 2699 (BG-2432, DEMU - 88, MG-118& NG - 61)
Mail & Exp. Services : BG -96 trains/day, MG-Nil Passenger Services : BG - 101.71 trains/day
MG - NilDEMU - 14.71 trains/dayNG - 16 trains/day
Freight Daily Interchange (in Trains) :Taken Over Made Over
(FY 2013-14) ER 15.4 15.9ECR 11.0 10.5
Passengers carried : *97.62 million (2.68 lakhs/day)(FY 2013--14)
Wagon Holding(FY 2014-15 upto Dec) :BG = 5513 MG = 842
Loco Holding :Diesel (378 BG + 26 MG + 4 NG) + Steam (13 NG)
5
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Diesel Sheds at : Malda, Siliguri,New Guwahati, Lumding
Workshop outturn : (In vehicle units of POH)
Workshop Coaches/month Wagons/monthNew Bongaigaon 53.33 104.3
Dibrugarh 57 —
Originating LoadingFY 2012-13 : 10.54 MTFY 2013-14 : 12.15 MTFY 13-14 (Apr-Dec) : 8.56 MTFY 2014-15 (Apr-Dec) : 8.42 MT
Commodities : Coal, Dolomite, Cement,(Inward/Outward) Food- grain, POL,
Fertilizer.
Level crossing gates : Manned - 1043 (BG+MG): Unmanned- 724 (BG+MG+NG)
PRS Centers : 128 Nos.
UTS Location : 268 Nos.
UTS cum PRS : 95 Nos.
Total Originating EarningsFY 2012-13 : ` 3108.91 Cr.FY 2013-14 : ` 3425.41 Cr.Fy 2013-14 ( Apr-Dec) : ` 2470.75 Cr.FY 2014-15 (Apr-Dec) : ` 2649.38 Cr.
FreightFY 2012-13 : ` 1314.11 Cr.FY 2013-14 : ` 1459.41 Cr.FY 2013-14 (Apr-Dec) : ` 1039.60 Cr.FY 2014-15 (Apr-Dec) : ` 1060.58 Cr.
6
NORTHEAST FRONTIER RAILWAY
PassengerFY 2012-13 : ` 1052.76 Cr.FY 2013-14 : ` 1222.13 Cr.FY 2013-14 (Apr-Dec) : ` 904.63 Cr.FY 2014-15 (Apr-Dec) : ` 1036.14 Cr.
SundryFY 2012-13 : `614.78 Cr.FY 2013-14 : ` 606.13 Cr.FY 2013-14 (Apr-Dec) : ` 419.96 Cr.FY 2014-15 (Apr-Dec) : ` 435.89 Cr.
Other CoachingFY 2012-13 : ` 127.26 Cr.FY 2013-14 : ` 137.74 CrFY 2013-14 (Apr-Dec) : ` 106.56 Cr.FY 2014-15 (Apr-Dec) : ` 116.77 Cr.
Working ExpensesFY 2012-13 : ` 3853.85 Cr.FY 2013-14 : ` 4473.08 Cr.FY 2013-14 (Apr-Dec) : ` 3242.69 Cr.FY 2014-15 (Apr-Dec) : ` 3595.53 Cr.
Employees On Roll : 65131 (Gazetted - 1001): (Non-Gazetted - 64130)
7
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
DIVISIONSKATIHAR –DIVISION
A. InfrastructureBG MG NG Total
Route K.M.760 12 88 860
Single Line 520 12 88 620
Double Line 240 — — 240
Track K.M. 1477 12 109 1598
No. of Railway station: (Comm.Classification, No and Name)
Total : 132 (A1 - 1 (New Jalpaiguri), A - 6 (Katihar,Kishanganj, Siliguri Jn, Jogbani, Raiganj, Purnia) B - 7(Barsoi, Forbesganj, Aluabari, Araria Court, Jalpaiguri Road,Dalkola, Samsi), D - 15, E - 60, F - 43)
Workshop : 1 (Tindharia)
Diesel Sheds : 2 (Malda - 75 Locos,Siliguri Jn 172 Locos)
Major Depots
Coaching maintenance Depot : Katihar & NJP
Wagon maintenance Depot : NJP
ROH Depot : NJP
DEMU Maintenance Depot : Siliguri
Stores Depot : NJP, KIR, MLDT & SGUJ
Ballast Depot : NJP & Harishchandrapur
Printing Press : Kurseong
Crew lobby : 3 (Katihar, NJP, MLDT)
Running Rooms : 5 (NJP, KIR, Jogbani,
Radhikapur & Balurghat )
8
NORTHEAST FRONTIER RAILWAY
Major fuelling points : 2 (Katihar, NJP)
Heritage line : NJP – DJ (DarjeelingHimalayan Railways)
B. Freight & Parcel Business(a) Goods
Goods sheds/Sidings : 13 (NJP, BORA/BPMS, KNE,RNI, PRNA, JPG, KIR, JBN,DLK, MLFC, RNX, JAG,SJKL)
Outward / Inward loading(Rakes per month/Wagons per month)
Divisional Outward Loading2012-13 2012-13
Rake Wagon Rake Wagon96 4337 99 4379 2013-14 Prop. Target 2014-15
(Up to Dec) 2014-15 (Up to Dec)Rake Wagon Rake Wagon Rake Wagon106 4683 -- 4950 117 5304
Divisional Inward Loading2012-13 2013-14
Rake Wagon Rake Wagon157 6652 174 7265 2013-14 Prop. Target 2014-15
(Up to Dec) 2014-15 (Up to Dec)Rake Wagon Rake Wagon Rake Wagon162 6693 -- -- 186 7777
Earnings
Year 2012-13 : ` 666.44 Cr.Year 2013-14 : ` 774.44 Cr.Year 2013-14(up to Dec) : ` 602.26 Cr.Year 2014-15(Prop. Target) : ` 789.24 Cr.Year 2014-15(up to Dec) : ` 696.74 Cr.
9
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
(b) Parcel No. of Parcel Stations : 90 Nos.
LoadingYear 2012-13 : 43065 TonYear 2013-14 : 43113 TonYear 2013-14(up to Dec) : 33315 TonYear 2014-15(Prop. Target) : --Year 2014-15(up to Dec) : 32042 Ton
EarningsYear 2012-13 : ` 8.47 Cr.Year 2013-14 : ` 7.75 Cr.Year 2013-14(up to Dec) : ` 5.65 Cr.Year 2014-15(Prop. Target) : --Year 2014-15(up to Dec) : ` 7.54 Cr.
C. Passenger Business Passengers originating
Year 2012-13 : ` 4.12 Cr.Year 2013-14 : ` 4.04 Cr.Year 2013-14(up to Dec) : ` 3.12 Cr.Year 2014-15(Prop. Target) : ` 2.48 Cr.Year 2014-15(up to Dec) : ` 2.84 Cr.
Passengers Earning originatingYear 2012-13 : ` 313.25 Cr.Year 2013-14 : ` 377.82 Cr.Year 2013-14(up to Dec) : ` 285.99 Cr.Year 2014-15(Prop. Target) : ` 418.14 Cr.Year 2014-15(up to Dec) : ` 308.69 Cr.
D. Sundry Earnings Total
Year 2012-13 : ` 16.67 Cr.Year 2013-14 : ` 19.31 Cr.Year 2013-14(up to Dec) : ` 13.38 Cr.Year 2014-15(Prop. Target) : ` 07.95 Cr.Year 2014-15(up to Dec) : ` 14.88 Cr.
10
NORTHEAST FRONTIER RAILWAY
Commercial PublicityYear 2012-13 : ` 43.08 LakhsYear 2013-14 : ` 45.61 LakhsYear 2013-14(up to Dec) : ` 17.82 LakhsYear 2014-15(Prop. Target) : ` 46.13 LakhsYear 2014-15(up to Dec) : ` 06.86 Lakhs
E. Personnel Staff strength on roll : Gaz 121, Non.Gaz -13741,
Total - 13862 Total No. of Rly. quarters : 10,556 Railway Schools : 3 (NJP, Siliguri, Barsoi) Railway Hospitals : 3 (NJP, Katihar, Tindharia)
Health unit - 09 Subsidiary Dispensary - 01
F Passenger Amenity Adarsh stations : 36 Clean Train Stations : 2 (Katihar & NJP) Watering Stations : 7 (KIR, NJP for all trains)
(SGUJ, HDB, RDP, BLGT &JBN for terminal trains)
24 Coach/ stations : 15 (KIR, NJP, KNE, BOE,SGUJ, AUB, ADQ, TKG,NAK, EKI, DLK, LAV, MFA,RDP & JBN)
Departmental linen Depot : 2 ( Katihar & NJP) Catering - Food plaza : 2 (NJP, Katihar), Jan Ahar 1 (NJP)
Mobile Pantry Services : Nil Total PRS : 34
Total UTS : 82UTS cum PRS - : 31Non - rail Head PRS : 15
JTBS : 07(KIR-3,NJP-1,BOE-1,JBN-1, ARQ-1)RTSA : 05
Retiring Room Stations : 13 (KIR, NJP, SGUJ, KNE,BOE, PRNA, FBG, JBN, DLK,JPG, RGJ, SM, AUB)
*************
11
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
ALIPURDUAR –DIVISIONA. Infrastructure
BG MG TotalRoute Km.
587.98 61.72* 649.70Single Line 494.99 61.72* 556.71Double Line 92.99 — 92.99Track Km. 886.90** 71.04* 957.94
* Under gauge conversion. No. of Railway Stations
Total : 72A1 : NilA : 04 (NCB, APDJ, COB, NOQ)B : 05 (KOJ, HSA, DHH, DQG, NMZ)D : 11E : 47F : 05
Workshop : Nil Diesel Shed : Nil Major Depots
Coaching Maintenence Depot : 01(Alipurduar Jn.) Wagon Maintenence Depot : Nil ROH Depot : Nil Ballast Depot : 01 (JOQ) DEMU Maintenence Depot : Nil Stores Depot : Nil
Printing Press : Nil Crew Lobby : 02 Alipurduar Jn. & New
Coochbehar Running Rooms : 01 (New coochbehar) Major Fuelling Points : Nil Heritage Line : NilB. Freight & Parcel Business
(a) Goods Goods Sheds/Sidings : 14 (BNV, DLO, HSA,
NOQ, GOGH, FKM , KOJ, BSGN, NCB, SXX, FLK, FLK/PCAL,
SLKX/NTPC & DQG
12
NORTHEAST FRONTIER RAILWAY
Outward /Inward loading(Rakes per month/Wagons per month)
Total Divisional Outward Loading (2012-13) (2013-14) (2013-14) (2014-15)
Upto Dec. Upto Dec.Rake Wagon Rake Wagon Rake Wagon Rake Wagon
33 1711 46 2366 42 2153 45 2309
Total Divisional Inward Unloading (2012-13) (2013-14) (2013-14) (2014-15)
Upto Dec. Upto DecRake Wagon Rake Wagon Rake Wagon Rake Wagon
43 1877 38 1661 38 1638 37 1585 Earnings
Year 2012-2013 : ` 123.13 Cr.Year 2013-2014 : ` 160.40 Cr.Year 2013-2014 (up to Dec) : ` 108.16 Cr.Year 2014-2015 (Prop. Target) : ` 210.24 Cr.Year 2014-2015 (up to Dec) : ` 140.06 Cr.
a) Parcel - No. of Parcel stations : 23
LoadingYear 2012-2013 : 26557 TonYear 2013-2014 : 41957 Ton.Year 2013-2014 (up to Dec) : 30422 Ton.Year 2014-2015 (Prop Target) :Year 2014-2015 (up to Dec) : 39735 Ton.
EarningsYear 2012-2013 : ` 5.61 Cr.Year 2013-2014 : ` 8.31 Cr.Year 2013-2014 (up to Dec) : ` 6.27 Cr.Year 2014-2015 (Prop. Target) : Year 2014-2015 (up to Dec) : ` 9.75 Cr.
13
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
C) Passenger Business
Passengers OriginatingYear 2012-2013 : ` 1.40 Cr.Year 2013-2014 : ` 1.24 Cr.Year 2013-2014 (up to Dec) : ` 93 LakhsYear 2014-2015 (Prop. Target) : ` 82.50 LakhsYear 2014-2015 (up to Dec) : ` 91.85 Lakhs
Passenger earnings originatingYear 2012-2013 : ` 134.49 Cr.Year 2013-2014 : ` 158.86 Cr.Year 2013-2014 (up to Dec) : ` 122.82 CrYear 2014-2015 (Prop. Target) : ` 131.89 Cr.Year 2014-2015 (up to Dec) : ` 133.63 Cr.
D) Sundry Earnings -
Year 2012-2013 : ` 8.95 Cr.Year 2013-2014 : ` 9.99 Cr.Year 2013-2014 (up to Dec) : ` 6.95 Cr.Year 2014-2015 (Prop. Target) : ` 6.39 Cr.Year 2014-2015 (up to Dec) : ` 4.35 Cr.
Commercial Publicity -
Year 2012-2013 : NIL.Year 2013-2014 : ` 0.03 Cr.Year 2013-2014 (up to Dec) : NILYear 2014-2015 (Prop. Target) : ` 0.03 Cr.Year 2014-2015 (up to Dec) : NIL
E) Personnel
Staff strength : 47+6(CMP) Non-Gaz. – Sanctioned: 8232Actual: 6909 (including Security & Accounts)Total – Sanctioned::8241 Actual: 6956+ 6 (CMP)(including Security& Accounts)
14
NORTHEAST FRONTIER RAILWAY
Total No. of Railway Quarters : 8251 Railway Hospital : 01 (Alipurduar Jn.) Health
Unit - 07 Railway School : 02 ( RHSS/ Boys & Girls/
Alipurduar Jn.)F) Passenger Amenity
Adarsh stations : 30 stations.
Clean Train Stations : Nil. Watering Stations : 03 (APDJ, NCB & NOQ)
24 Coach/Stations : 14 (NOQ, NCB, FLK, DQG, NMX, JPE , GOGH, FKM, KOJ, APDJ, HSA, DLO, BNV & NMZ)
Departmental Linen Depot : Nil
Catering – Food plaza : Nil. Mobile Pantry Services : 01 (S. Mahananda Exp.) PRS Centres : 13 (Exclusive PRS)
Non-Rail Head PRS : 02UTS-cum-PRS : 10
Total UTS : 62 (Inclusive of UTS-cum-PRS)
JTBS : Nil. RTSA : Nil. Retiring Room Stations : 12 ( APDJ, NOQ, NCB,
FKM, FLK, DQG, KOJ, NMZ, HSA, BNV, NMX & COB)
*************
15
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
RANGIYA –DIVISIONA. Infrastructure
BG MG(Under G.C.) TotalRoute K.M. 676.76 187.92 864.64Single Line 676.76 187.92 864.64Double Line — — —Track K.M. 858.89 187.92 1046.81
Number of Rly Stations:Total-80A1 : NILA3 : 3 (BNGN, BPRD & RNY )B1 : 1 (New Bongaigan)D : 8E : 53F : 14, New stations-DKGN, GMTO, NHLN, NOLB &
MNDP Workshop : New Bongaigaon,
Engineering Workshop/Bongaigaon
Major Depots : P. WAY-TD/Bongaigaon Crew lobby : 2(NBQ & RPAN) Running Rooms : 2 (New Bongaigaon &
Rangiya) Major fueling points : 1 (New Bongaigaon)
B. Freight & Parcel Business(a) Goods -
Goods sheds/Sidings : 23(CGS, BIZ, RNY, GOE, NLV,PTLD, BPRD, SBE, CPQ, NBQ, BPRL,JPZ, PNVT, GLPT,DDNI,BMGN,AZA, DKGN,MNDP, HMY, TNL, Bindukuri, TBH)
Outward /Inward loading(Rakes per month/Wagons per month)Total Divisional Outward Loading
(2012-13) (2013-14) (2013-14) (2014-15) Upto Dec.‘13 Upto Dec.‘14
Rake Wagon Rake Wagon Rake Wagon Rake Wagon109 4836 134 6072 127 5725 88 4045
16
NORTHEAST FRONTIER RAILWAY
Total Divisional Inward Unloading (2012-13) (2013-14) (2013-14) (2014-15)
Upto Dec.‘13 Upto Dec.‘13Rake Wagon Rake Wagon Rake Wagon Rake Wagon
72 2868 72 3114 65 2852 82 3474Goods Earnings
Year 2012-13 : ` 485.12 CrYear 2013-14 : ` 592.89 CrYear 2013-14 (up to Dec) : ` 429.01 CrYear 2014-15 (Prop. Target) : ` 506.52 CrYear 2014-15 (up to Dec) : ` 301.06 Cr
B. Parcel :No. of Parcel Stations : 7 (NBQ, BNGN, BPRD,
NLV, RNY, TNL & RPAN) Loading
Year 2012-13 : 8080 TonYear 2013-14 : 10370 TonYear 2013-14 (up to Dec) : 7530 TonYear 2014-15(Prop. Target) : -Year 2014-15 (up to Dec) : 14276 Ton
EarningsYear 2012-13 : ` 1.19 Cr.Year 2013-14 : ` 2.02 Cr.Year 2013-14 (up to Dec) : ` 1.40 Cr.Year 2014-15(Prop. Target) : Year 2014-15 (upto Dec) : ` 2.34 Cr.
C. Passenger Business: Passenger originating
Year 2012-13 : ` 99.05 LakhsYear 2013-14 : ` 118.03 LakhsYear 2013-14 (up to Dec) : ` 83 LakhsYear 2014-15(Prop. Target) : ` 45 LakhsYear 2014-15 (up to Dec) : ` 99 Lakhs
Passenger earning originatingYear 2012-13 : ` 105.74 Cr.Year 2013-14 : ` 119.73 Cr.
17
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Year 2013-14 (up to Dec) : ` 84.42 Cr.Year 2014-15 (Prop. Target) : ` 69.93 Cr.Year 2014-15 (upt to Dec) : ` 112.63 Cr.
D. Sundry EarningsYear 2012-13 : ` 5.21 CrYear 2013-14 : ` 15.46 CrYear 2013-14 (up to Dec) : ` 9.45 CrYear 2014-15 (Prop. Target) : ` 3.15 CrYear 2014-15 (up to Dec) : ` 6.06 Cr
Commercial PublicityYear 2012-13 : ` 16.15 LakhsYear 2013-14 : ` 9.08 LakhsYear 2014-14 (Prop. Target) : ` 18.72 LakhsYear 2014-15 (up to Dec) : ` 5 Lakhs
E. Personnel Staff strength on roll
: Gaz. - 52, Non.Gaz - 7849,: Total - 7901
Total No. of Railway Quarters : 6299Railway Hospitals : 2 (New Bongaigaon,
Rangapara North): Health unit - 9
F. Passenger Amenity Adarsh stations : 10 Watering Stations : 2 (New Bongaigaon,
Rangapara North) PRS : 22 (RH-9,NRH-13)
UTS : 63UTS cum PRS : 18
JTBS : 01 Retiring Room Stations : 06
*************
18
NORTHEAST FRONTIER RAILWAY
LUMDING –DIVISIONA. Infrastructure
BG MG Total
Route K.M. 438 615 1053
Single Line 415 615 1030
Double Line 23 — 23
Track K.M. 562 748 1310
Number of Rly Stations
Total-147
A1 : 1 (GHY)A : 4 (KYQ, LMG, DMV, SCL)B : 4 (HJI, DPU, HBN, AGTL)D : 14E : 104F : 20
Workshops : Nil
Diesel Sheds : 02 (New Guwahati-(BG)-103,Lumding-(MG)-63)
Fueling points : Lumding,Karimganj, Guwahati, New Guwahati & Kamakhya.
Crew Lobbies : Lumding,Badarpur, Guwahati & NewGuwahati
Running Rooms : 11 (06 at Lumding, New Guwahati, Guwahati,Shilghat, Mairabari, Agartala)
Rest Rooms : 03 at Chaparmukh, Maibong & Karimganj)
B. Freight & Parcel Business Goods Sheds – 21 Nos (BG – 06 Nos + MG – 15 Nos.)
Goods Sheds Siding – 12 Nos (IOC Siding – 05 + FCISiding – 05 + HPC Siding – 02).
19
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
(a) Goods – Outward/Inward loading
(Rakes/Wagons per month)Divisional Outward Loading
(2012-13) (2013-14) (2013-14) (2014-15) Prop Trg Up Upto Dec.‘13 Upto Dec.‘14 to Dec.‘14
RakeWagon Rake Wagon Rake Wagon Rake WagonRake Wagon343 14391 438 18411 278 11690 449 18849 517 21725
Divisional Inward Loading (2012-13) (2013-14) (2013-14) (2014-15) Prop Trg Up
Upto Dec.‘13 Upto Dec.‘14 to Dec.‘14RakeWagon Rake Wagon Rake Wagon Rake WagonRake Wagon2474103909 2623 110161 1908 80148 2086 87627 -- --
EarningsYear 2012-13 : ` 117.21 CrYear 2013-14 : ` 135.38 CrYear 2013-14 (up to Dec) : ` 90.13 CrYear 2014-15 (Prop. Target) : ` 157.77 CrYear 2014-15 (up to Dec) : ` 116.17 Cr(b) Parcel
No. of Parcel Stations : 60 Nos.
LoadingYear 2012-13 : 143636 TonYear 2012-13 : 129213 TonYear 2013-14 (Upto Dec’13) : 97299 TonYear 2014-15 (Prop. Target) : Year 2014-15 (Upto Dec’14) : 95923 Ton
EarningsYear 2012-13 : ` 39.53 CrYear 2013-14 : ` 41.17 CrYear 2013-14 (up to Dec) : ` 30.11 Cr
20
NORTHEAST FRONTIER RAILWAY
Year 2014-15 (Prop. Target) : -Year 2013-14 (up to Dec) : ` 37.91 Cr
C. Passenger Business
Passengers originatingYear 2012-13 : ` 2.67 CrYear 2012-13 : ` 2.75 CrYear 2013-14 (Upto Dec) : ` 2.07 CrYear 2014-15 (Prop. Target) : ` 2.77 CfYear 2013-14 (Upto Dec) : ` 1.83 Cr
Passengers Earning originatingYear 2012-13 : ` 381.34 CrYear 2013-14 : ` 450.90 CrYear 2013-14 (Upto Dec) : ` 337.35 CrYear 2014-15 (Prop. Target) : ` 448.65 CrYear 2014-15 (up to Dec) : ` 368.20 Cr
D. Sundry Earnings
Total2012-13 : ` 17.19 Cr.2013-14 : ` 18.54 Cr.2013-14 (Upto Dec) : ` 16.54 Cr.2014-14 (Prop. Target) : ` 1.80 Cr.2014-15 (Upto Dec) : ` 17.54 Cr.
Commercial PublicityYear 2012-13 : ` 52.08 LakhsYear 2013-14 : ` 71.40 LakhsYear 2013-14 (upto Dec) : ` 42.37 LakhYear 2014-15 (Prop. Target) : ` 50.46 LakhYear 2014-15 (Upto Dec) : ` 53.40 Lakhs
21
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
E. Personnel Staff Strength : Gaz. - 114,
Non-Gaz -16539,Total -16653
Total Number of Qrs. : 9321 Total Rly. Hospitals/Dispensaries : 2 Total No of Health Unit : 13 Total Railway Schools : 3F. Passenger Amenity Adarsh Stations : 06 Nos. Clean Train Station : 01 No. Watering Stations : 04 Nos. Departmental Linen Depot : 01 at KYQ Catering - Jan Ahar : 01(Guwahati) PRS : 17 UTS : 110 Non rail Head PRS : 34 Retiring Room Stations : 13
************
22
NORTHEAST FRONTIER RAILWAY
TINSUKIA-DIVISIONA. Infrastructure
BG MG NG Total
Route K.M. 534 20.58(closed) — 555
Single Line 534 20.58(closed) — 555
Double Line — — — —
Track K.M. 734 104.66(closed) — 734
Number of Rly Stations:Total : 72A1 : NIL
A : 3 (TSK, JTTN, DBRT)B : 3 (MXN, NTSK, DBRG)D : 14E : 27F : 25
Workshop : 1 (Dibrugarh Town)
Diesel Shed : NIL
Major Depots : 3 (DBRG-Coaching,NTSK-Wagon-coaching
& DBWS-Stores)
Crew lobbys : 3 (Mariani, New Tinsukia,Dibrugarh)
Running Rooms : 7 (MXN, NTSK, DBRT,LLO, SLGR, NLR& FKG)
Major fuelling points : 1 (New Tinsukia)
B. Freight & Parcel Business(a) Goods
Goods sheds/Sidings : 15 nos.(G.Shed=9,Sdg=6)
23
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Outward /Inward loading(Rakes per month/Wagons per month)
Total Divisional Outward Loading (2012-13) (2013-14) (2013-14) (2014-15)
Upto Dec.‘13 Upto Dec.‘14Rake Wagon Rake Wagon Target Rake Target Wagon
54 2363 46 2068 - 44 -- 1975
Total Divisional Inward Loading (2012-13) (2013-14) (2013-14) (2014-15)
Upto Dec.‘13 Upto Dec.‘14Rake Wagon Rake Wagon Target Rake Target Wagon
52 2008 49 1330 -- 54 -- 2347Goods Earnings
Year 2012-13 : ` 351.67 Cr.Year 2013-14 : ` 271.96 Cr.Year 2013-14(up to Dec) : ` 170.46 Cr.Year 2014-15(prop target) : ` 186.62 Cr.Year 2014-15 (up to Dec) : ` 184.53 Cr.
(b) Parcel No. of parcel Stations : 31 nos. Loading
Year 2012-13 : 36664 TonYear 2013-14 : 25757.8 TonYear 2013-14 (up to Dec) : 22813 TonYear 2014-15 (prop target) : -Year 2014-15 (up to Dec) : 8986 Ton
EarningsYear 2012-13 : ` 14.04 Cr.Year 2013-14 : ` 11.04 Cr.Year 2013-14 (up to Dec) : ` 9.95 Cr.Year 2014-15 (prop target) : -Year 2014-15 (up to Dec) : ` 3.65 Cr.
24
NORTHEAST FRONTIER RAILWAY
C. Passenger Business Passenger originating
Year 2012-13 : ` 86.26 LakhsYear 2013-14 : ` 84.71 LakhsYear 2013-14 (up to Dec) : ` 62.76 LakhsYear 2014-15 (prop target) : ` -Year 2014-15 (up to Dec) : ` 60.73 Lakhs
Passengers Earning originatingYear 2012-13 : ` 141.76 Cr.Year 2013-14 : ` 154.52 Cr.Year 2013-14 (up to Dec) : ` 111.67 Cr.Year 2014-15 (prop target) : ` 159.48 Cr.Year 2014-15 (up to Dec) : ` 126.66 Cr.
D. Sundry Earnings Total
Year 2012-13 : ` 11.22 Cr.Year 2013-14 : ` 20.39 Cr.Year 2013-14 (up to Dec) : ` 15.35 Cr.Year 2014-15 (prop target) : ` 0.83 Cr.Year 2014-15 (up to Dec) : ` 10.56 Cr.
Commercial PublicityYear 2012-13 : ` 16.27 LakhsYear 2013-14 : ` 17.20 LakhsYear 2013-14 (up to Dec) : ` 7.82 LakhsYear 2014-15 (prop target) : ` 5.75 LakhsYear 2014-15 (up to Dec) : 16.51 Lakhs
E. Personnel Staff strength on roll : Gaz-48, Non.Gaz-6294
Total - 6342 Total No. of Railway Quarters : 7363 Railway Hospitals : 2 (New Tinsukia ,
Dibrugarh Town),Dispensary/H. Unit : 6
Railway Schools :4 (NTSK, MXN & DBRT-2)F. Passenger Amenity Adarsh stations : 01 (Jorhat Town) Watering Stations : 05 24 Coach stations : 07 Catering - Food plaza : 02 NTSK & Jan Ahar(IRCTC) NTSK PRS : 09
UTS : 46UTS cum PRS : 14Non rail Head PRS : 06(Majuli, Dinjan, Sadiya, Tezu,
Along, Roing) Retiring Room Stations : 10
*************
25
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
SAFETYKEY PERFORMANCE PARAMETERS
Category wise analysis of consequential Accidents
Category2012-13 2013-14 2013-14
(Apr-Dec)2014-15
(Apr-Dec)
RB Z T RB Z T RB Z T RB Z T
1. Collision 1 0 1 0 0 0 0 0 0 1 0 1
2.Derail-ment
a)Stat-ion
0 1 1 0 0 0 0 0 0 0 0 0
b)MidSec-tion
2 1 3 2 0 2 2 0 2 2 0 2
3.L.Xing
a)Ma-nned
0 0 0 0 0 0 0 0 0 0 0 0
b)Un--mann-ed
3 1 4 3 0 3 2 0 2 1 0 1
4. Fire in Trains 0 0 0 1 0 1 1 0 1 1 0 1
5. Misc. 0 0 0 0 0 0 0 0 0 0 0 0
Total 6 3 9 6 0 6 5 0 5 5 0 5
* Z-Zonal T-Total
26
NORTHEAST FRONTIER RAILWAY
Summary of All Accidents
Accidents at Level Crossing
0123456789
2012-13 2013-14 2013-14(Apr-Dec)
2014-15(Apr-Dec)
6 65 5
3
0 0 0
9
65 5
RB Zonal Total
00.5
11.5
22.5
33.5
4
2012-13 2013-14 2013-14(Apr.Dec.)
2014-15(Apr.-Dec.)
0 0 0 0
4
3
2
1
Manned Un-manned
27
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Manning Of Level Crossing
Number Of Unauthorised X-ings
0
10
20
30
40
50
60
70
80
Target Progress Target Progress Progress (Upto Sept)
Prop. Target
Progres (Upto Sept)
2012-13 2013-14 2013-14 2014-15
75
3
6065
51
3026
Tinsukia, 263Katihar, 49
Alipurduar, 6
Lumding, 111
Rangiya, 121
28
NORTHEAST FRONTIER RAILWAY
1.5% decrease in current yearr in comparison to same period oflast year.
Target 2014-15 = 12.5(MT)
Freight Loading (MT)
FRIEGHT LOADING & EARNINGS
Loading dropped against target due to ban imposed byNGT for transportation of Coal in MeghalayaLoading is affected due to closure of LMG-BPB-SCL-AGTLmeter gauge section for gauge conversion
Rangiya, 121
0
2
4
6
8
10
12
14
2012-13 2013-14 up to Dec 2013-14
Proportionate target 2014-15
up to Dec 2014-15
10.536
12.149
8.5559.36
8.423
29
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Loading On B.G. (In Wagons/Day)
Loading On M.G. (In Wagons/Day)
3% Improvement in comparison to same period of last year
440
450
460
470
480
490
500
510
520
530
2012-13 2013-14 2013-14 Upto Dec
2014-15 Upto Dec
472
521
499
513
0
10
20
30
40
50
60
70
80
90
201 2-13 2013-14 up to De c 2013-14
up to Dec 2014-15
46
81
58 56
Gauge conversion work for LMG-BPB-SCL section started from1st Oct/2014, thus MG section is closed for traffic
30
NORTHEAST FRONTIER RAILWAY
Transhipment via LMG (Wagons/Day)
Induction of FCI FG via LMG
38
39
40
41
42
43
44
45
46
47
2012-13 2013-14 2013-14 (Up to Sept)
2014-15 (Up to Sept)
42
41
47
41
0
100000
200000
300000
400000
500000
600000
700000
800000
2012-13 2013-14 2013-14 (Up to Sept)
2014-15 (Up to Sept)
672480724680
412056
326592
(in thousand ton)
Gauge conversion work for LMG-BPB-SCL secion started from1st Oct/2014, thus MG section is closed for traffic
31
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
M.G. Throughput (Wagons/Day)
Hill Throughput i.e. wagons run on LMG-BPB MG section per day is affectedon account of drop in transhipment from BG to MG.
Freight earnings (Originating) Rs. in Crs.
0
200
400
600
800
1000
1200
1400
1600
2012-13 2013-14 2013-14 upto Dec'13
2014-15 Prop.
Target upto Dec'14
2014-15 upto Dec'14
1314.111459.41
1039.6
1208.65
1060.58
104
106
108
110
112
114
116
118
120
122
2012-13 2013-14 up to Sept 2013-14
up to Sept 2014-15
113
118
121
110
Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014,thus MG section is closed for traffic
32
NORTHEAST FRONTIER RAILWAY
Comparative Originating Earnings
Comparative Apportioned Earnings
3108
.91
3425
.41
3067
.87
3325
.66
0
500
1000
1500
2000
2500
3000
3500
2012-13 2013-2014 2013-14Upto Dec.'13
2014-15Upto Dec.'14
Passenger Other Coaching Goods Sundry Total
1052
.76
127.
2613
14.1
1 3108
.91
614.
78
1222
.13
137.
7414
59.4
160
6.13
3425
.41
904.
6310
6.56
1039
.60
419.
96 2470
.75
1036
.14
116.
7710
60.5
843
5.89
2649
.38
0
500
1000
1500
2000
2500
3000
3500
Actual 2012-13 Actual 2013-2014 2013-14 ActualUpto Dec.'13
2014-15 Actual Upto Dec.'14
Passenger Other Coaching Goods Sundry Total
782.
8912
8.73
1541
.47 30
67.8
761
4.78 90
4.96
142.
1516
72.4
260
6.13
3325
.66
676.
6710
9.74
1164
.07
419.
96 795.
7011
6.41
1308
.51
435.
8926
38.2
0
2370
44
33
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Punctuality Performance(%) Of Mail/Exp. Trains (BG)
Remarks :- Punctuality performance of Mail/Exp trains has deteriorated forthe period from April/14 to Dec14 as compared to corresponding period ofprevious year mainly due to• Trains T/O excessively late from other Railways became out of path &Re-scheduling of link rake thereof,• Imposition of 50 Kmph speed restriction in APDJ-SGUJ section forElephant corridor and as per order of Hon’ble Supre Court freight trainsare running at a restricted speed of 25 Kmph round the clock in the abovesection for strength of 18 Kms in 4 locations,• Frequent Rail Roko/Agitation/Bundh called by different organizations,• Piloting and running of trains in convoy in entire Assam area, part ofNorth Bengal upto NJP & from KIR to KNE for security reason inconnection with Independence Day, 2014.• Speed restriction imposed in flood affected KYQ-GLPT-NBQ section ofRNY Div & Sinkage of bank between AJRE-SNBR stations of LMG Div. dueto heavy rain.• Non Interlocking work for patch doubling between ABFC-BLK section ofKIR Div.• Excessive failure of S&T gears/Locomotives,• Want of line clear/keeping outside signal by Eastern Railway,• Excessive engineering loss for PQRS work in TSK Div. & exceeding blockperiod in BOE-SUD section of KIR Div,• Fog mostly in KIR & APDJ Divisions.
Figure in %
8 1
8 2
8 3
8 4
8 5
8 6
8 7
8 8
8 9
9 0
2 01 2-13 2 01 3-14 2 01 3-14 (U p to D e c)
2 01 4 -1 5 (U p to D ec )
20 14 -15 (Ta rge t)
8 7
8 6
8 8
8 4
9 0
34
NORTHEAST FRONTIER RAILWAY
Punctuality Performance(%) Of Passenger Trains (BG)
87
88
89
90
91
92
93
94
95
2012-13 2013-14 2013-14 (Up to Dec)
2014-15 (Up to Dec)
2014-15 (Target)
95 95 95
93
90
Figure in %
35
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Punctuality Performance % Of Mail/Express Trains (MG)
Punctuality Performance % Passenger Trains (MG)
0
10
20
30
40
50
60
70
80
90
2012-13 (2013-14 2013-14 (Up to Sept)
2014-15 (Up to Sept)
2014-15 (Target)
58
8884 86 90
Figure in %
All MG passenger carrying trains have been cancelled due to Gauge Conversion work inLMG-BPB-SCL MG section of LMG Division w.e.f. 01.10.2014.
76
78
80
82
84
86
88
90
92
94
96
2012-13 2013-14r 2013-14 (up to Dec)
2014-15 (up to Dec)
2014-15 (Target)
83
96 96 95
90
All MG passenger carrying trains have been cancelled due to Gauge Conversionwork in LMG-BPB-SCL MG section of LMG Division w.e.f. 01.10.2014. One pair MGpassenger Spl 05264/05263 is introduced between KXJ-AGTL as a Skeleton servicew.e.f. 01.10.2014.
Figure in %
36
NORTHEAST FRONTIER RAILWAY
87.5
88
88.5
89
89.5
90
90.5
91
91.5
92
2012-13 2013-14 2013-14 (up to Dec)
2014-15 (up to Dec)
2014-15 (Target)
91 91
92
89
90
Overall Punctuality Performance % both M/Exp &Passenger Trains (BG)
0
10
20
30
40
50
60
70
80
90
100
2012-13 2013-14 2013-14 (up to Dec)
2014-15 (up to Dec)
2014-15 (Target)
79
95 93 93 90
Overall Punctuality Performance % both M/Exp &Passenger Trains (MG)
37
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Induction of FCI via LMG
0
100000
200000
300000
400000
500000
600000
700000
800000
2012-13 2013-14 2013-14 (up to Sept)
2014-15 (up to Sept)
672480724680
412056
326592
Induction of FG for NE States
0
500000
1000000
1500000
2000000
2500000
3000000
3500000
2013-14 2013-14 (up to Dec)
2014-15 (up to Dec)
3118290
2329278
1
2699046
15.9% Improvement in current year
38
NORTHEAST FRONTIER RAILWAY
Nature of complaints:-
Type of complaints % (Nos.)i) Passengers booking/Reservation - 22.22% 44
/Enquiryii) Malfunctioning of Electric equipments- 10.10% 20
iii) Theft and pilferage, Bribery, Corruption 4.55% 9
PASSENGER COMPLAINTS
SN Month 2012-13 2013-14 2014-15 % of(up to Dec) Variation
1 April 26 19 19 - 26.922 May 41 34 16 - 17.073 June 45 28 21 - 37.784 July 33 27 24 - 18.18
5 August 19 22 32 + 15.79
6 September 23 25 25 + 8.707 October 21 24 19 + 14.298 November 21 23 26 + 9.529 December 18 27 16 + 50
10 January 15 20 - + 33.311 February 17 15 - - 11.7612 March 19 17 - - 10.52
39
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
FINANCIAL REVIEWEARNINGS 2013-14
Originating Earnings (upto Sept ‘14)
Originating Earnings (upto Dec‘14)
Earnings
(1)
Passenger
OtherCoaching
Goods
Sundries
TOTAL
Actual2013-14
(3)
1222.23
137.74
1459.41
606.13
3425.41
2013-14Actualup to
Dec’13
(4)
904.63
106.56
1039.60
419.96
2470.75
2014-15Prop.Targetup to
Dec’14
(5)
1121.57
115.78
1208.65
420.44
2866.4
Variationwith
Target
(7=6-5)
-85.43
0.99
-148.07
15.45
-217.06
Variationwith last
year
(8=6-4)
131.51
10.21
20.98
15.93
178.63
Actual2012-13
(2)
1052.76
127.26
1314.11
614.78
3108.91
2014-15Actualup to
Dec’14
(6)
1036.14
116.77
1060.58
435.89
2649.38
3108
.91
3425
.41
0
500
1000
1500
2000
2500
3000
3500
2012-13 2013-2014 2013-14Upto Dec.'13
2014-15Upto Dec.'14
Passenger Other Coaching Goods Sundry Total
1052
.76
127.
2613
14.1
1 3108
.91
614.
78
1222
.13
137.
7414
59.4
160
6.13
3425
.41
904.
6310
6.56
1039
.60
419.
96 2470
.75
1036
.14
116.
7710
60.5
843
5.89
2649
.38
40
NORTHEAST FRONTIER RAILWAY
Apportioned Earnings(Figs in Crs of `)
Earnings
(1)
Passenger
OtherCoaching
Goods
Sundries
TOTAL
Actual2013-14
(3)
904.96
142.15
1672.42
606.13
3325.66
2013-14Actualup to
Dec’13
(4)
676.67
109.74
1164.07
419.96
2370.44
2014-15Prop.Targetup to
Dec’14
(5)
795.70
116.41
1295.91
420.44
2628.46
Variationwith
Target
(7=6-5)
-20.17
1.86
12.60
15.45
9.74
Variationwith last
year
(8=6-4)
98.86
8.53
144.44
15.93
267.76
Actual2012-13
(2)
782.89
128.73
1541.47
614.78
3067.87
2014-15Actualup to
Dec’14
(6)
775.53
118.27
1308.51
435.89
2638.20
3067
.87
3325
.66
0
500
1000
1500
2000
2500
3000
3500
Actual 2012-13 Actual 2013-2014 2013-14 ActualUpto Dec.'13
2014-15 Actual Upto Dec.'14
Passenger Other Coaching Goods Sundry Total
Apportioned Earnings (Upto Dec’14)
782.
8912
8.73
1541
.47 30
67.8
761
4.78 90
4.96
142.
1516
72.4
260
6.13
3325
.66
676.
6710
9.74
1164
.07
419.
96 795.
7011
6.41
1308
.51
435.
8926
38.2
0
2370
44
41
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
(Fig in ` Cr)ANALYSIS OF REVENUE EXPENDITURE
WKG. EXPENSES
(1)
Dem-3(Genl.Sup.&Services)
Dem-4(Repairs &Main.P/Way & works)
Dem-5(Repairs &Main.motive Power)
Dem-6(Repairs &Main.Carriage &
Wagon)
Dem-7(Repairs &Main.plant& Equipment)
Dem-8(Operat.Exp.Rolling stk.& Equip-
ment)
Dem9(Operat.Exp.Traffic)
Dem10(Operat.Exp.Fuel)
Dem-11(Staff welfare &Amenities)
Dem-12(Misc.working.Exp)
Dem-13(PF,Pen& Otherretirement benifits)
TOTAL
Actual2013-
14
(3)
316.30
617.30
165.25
480.62
224.83
286.91
413.59
1345.10
326.87
183.15
43.28
4473.08
Actual2012-
13
(2)
294.04
617.79
136.57
446.05
215.36
260.10
443.90
857.13
307.28
245.44
30.19
3853.85
2013-14Actualup to
Dec’13
(4)
234.80
438.84
123.34
347.12
158.45
218.38
339.99
934.16
230.27
183.15
34.19
3242.69
2014-15 BP
ONACCupto
Dec’14(5)
257.00
500.00
125.00
378.00
180.00
239.00
428.00
1010.00
250.00
192.56
39.00
3598.00
2014-15Actualup to
Dec’14
(6)
256.45
498.61
122.85
379.36
179.07
243.13
427.00
1005.57
249.33
193.56
40.00
3595.53
Varia-tionwithLastyear
(8=6-4)
21.65
59.77
-0.49
32.24
20.62
24.75
87.61
71.41
19.06
10.41
5.81
352.84
Varia-tionwithBP
(7=6-5)
-0.55
-1.39
-2.15
1.36
-0.93
4.13
-0.4
-4.43
-0.67
1.56
1.00
-2.47
42
NORTHEAST FRONTIER RAILWAY
CAPITAL EXPENDITURE PLANHEAD WISE(Fig in ` Cr)
PLAN HEAD Actual Actual 2013-14 ON ACCT 2014-15 Utiliza 2012-13 2013-14 Actual 2014-15 Actual tion
up to up to (in %)Dec’13 Dec’14
1100 New Lines 1651.32 1804.58 1084.36 36.20.00 1794.52 49.57
1400 Gauge Conversion 1075.33 1614.59 1129.50 1002.75 1212.78 120.95
1500 Doubling 12.69 103.25 81.63 404.10 120.33 29.78
1600 Traffic Facilities 18.07 23.25 15.55 23.95 9.83 41.04
1700 Computerisation 2.10 2.35 1.22 8.16 1.46 17.89
2100 Rolling Stock 289.58 59.18 6.58 27.11 1.40 5.16
2200 Leased Assets 114.58 144.01 144.01 175.35 174.97 99.78
2900 Safety Works LC 56.50 22.76 15.21 26.75 9.49 35.48
3000 Safety WorksRUB/ROB 7.77 21.94 12.24 27.01 16.75 62.01
3100 Track Renewals 208.48 125.48 123.17 119.00 97.44 81.88
3200 Bridge Works 15.91 10.25 -2.59 13.31 5.96 44.78
3300 S & T Works 39.09 35.34 22.79 34.75 12.88 37.06
3600 Other Elec. Works 6.95 8.29 4.34 5.65 2.98 52.74
4100 Plant & Machinery 11.70 16.26 11.39 10.67 9.45 88.57
4200 Workshops 20.19 19.73 14.75 25.65 14.91 58.13
5100 Staff Quarters 18.76 28.12 23.47 20.10 13.57 67.51
5200 Amenities for Staff 20.96 23.87 17.77 15.41 10.00 64.89
5300 Pass. Amenities 64.82 41.89 29.68 42.91 24.35 56.75
6400 Other SpecifiedWorks 28.58 28.03 13.73 26.87 13.46 50.09Gross(Exclu. Susp) 3663.38 4133.17 2748.80 5629.50 3546.53 63.00
43
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
OPERATING RATIO (%)Actual Actual 2013-14 Target 2014-15
2012-13 2013-14 Actual up to 2014-15 Actual uptoDec’13 up to Dec’14 Dec’14
178.39% 193.08% 192.61% 196.92% 196.10%
COMMODITIES WISE LOADING
0
500
1000
1500
2000
2500
3000
3500
4000
2013-14 2013-14 Upto
Sept'13
Bud. Prop. Upto Dec'14
Actual upto Dec'14
2014-15 upto Dec'14
Coal Pol Food Grains Dolomite Others
2054
3476
1346
1038
2622
1970
3623
1493
1264
3799
1227
2769
1298
880
2381
1550
2570
1180
3380
887
2708
1108
2445
680
1275
165
170
175
180
185
190
195
200
2012-13 2013-14 Actual upto Dec'13
Target up to Dec'14
Actual up to Dec'14
178.39
193.08 192.61
196.92 196.1
44
NORTHEAST FRONTIER RAILWAY
NUMBER OF ORIGINATING PASSENGER (FIGS. IN MILLION)
Number of Originating passengers up to Dec’14 have decreased by5.36 Million over the tarrget and decreased by 4.36 Million over the corre-sponding period of last year.
Originating Passenger earnings upto Dec’14 is lower by Rs.85.43 Crsover the target and higher by Rs.131.51 Crs over the corresponding period oflast year.
0
20
40
60
80
100
120
2012-13 2013-14 2013-14 upto Sept'13
2014-15 Prop. Target upto
Sept'14
2014-15 upto Sept'14
100.5697.62
74 75 69.64
0
200
400
600
800
1000
1200
1400
2012-13 2013-14 2013-14 upto Dec'13
2014-15 Prop.Target upto Dec'14
2014-15 upto Dec'14
1052 .76
1222.13
904.63
1121.571036.14
45
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
PERFORMANCE REVIEW
OPERATING DEPARTMENT
BG Loaded Receipt (in wagons/day)
14.9*% improvement in comparison to same period of last year
750
800
850
900
950
1000
1050
2012-13 2013-14 up to Dec 2013-14
up to Dec 2014-15
845
900
874
1004
46
NORTHEAST FRONTIER RAILWAY
BG Release (No. Of Wagons/Day)
MG Release (No. Of Wagons/Day) LMG Division
10.1% improvement in comparison to same period of last year
1.6% improvement in comparison to same period of last year
700
720
740
760
780
800
820
840
2012-13 2013-14 up to Dec 2013-14
up to Dec 2014-15
755
803
760
837
110
115
120
125
130
135
2012-13 2013-14 up to Sept 2013-14
up to Sept 2014-15
118
134
129131
47
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Interchange with ER (No. Of Trains/Day)
Interchange With ECR (No. Of Trains)
9.0% improvement in comparison to same period of last year
4.4% improvement in comparison to same period of last year
0
5
10
15
20
25
30
35
2012-13 2013-14 2013-14 (up to Dec)
2014-15 (up to Dec)
25.4
29.2 28.831.4
Figure in %
19
19.5
20
20.5
21
21.5
22
22.5
23
23.5
2012-13 2013-14 2013-14 (up to Dec )
2014-15 (up to Dec )
23.5
20.6 20.5
21.4
Figure in %
48
NORTHEAST FRONTIER RAILWAY
BG Diesel KM/Day
MG Diesel KM/Day(LMG Div)
460
480
500
520
540
560
580
600
2012-13 2013-14 2013-14 (upto Dec)
2014-15 (upto Dec)
589 586594
506
Major cause of fall in DKM was due to huge induction of foodgrain in view of mega blockleading to stabling of rake. Moreover large number of locos were utilized for unloading ofBallast rakes both in North & South bank.
198
200
202
204
206
208
210
212
214
216
218
2012-13 2013-14 2013-14 (upto Sept)
2014-15 (upto Sept)
205
215
217
215
49
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
(Orig
inat
ing)
(Fig
ure
in `
lakh
s)
Com
mer
cial
Ear
ning
sCOMMERCIAL DEPARTMENT
Ear
ning
Par
ticul
ars
Achi
vem
ent
2012
-13
2013
-14
Targ
et 2
014-
2015
Upt
o S
ept’1
4
Act
ual 2
013-
2014
Upt
o S
ept’1
4
Act
ual
2014
-201
5U
pto
Sep
t’1
4
Ove
rTa
rget
Ove
r las
tye
ar
Par
cel &
6961
.75
7040
.17
3994
.00
3406
.63
3899
.60
(-) 2
.36
(+) 1
4.49
Lugg
age
Tick
et19
33.1
522
52.6
411
85.5
614
63.5
4(+
) 23.
44C
heck
ing
Com
mer
cial
127.
5814
6.72
100.
0049
.98
44.0
0(-)
56.
00(-)
11.
96Pu
blic
ity
4361
.02
3541
.01
2128
.16
5773
.87
Ope
ning
Bal
ance
as o
n 01
.04.
2014
Acc
rual
Apr
-S
ept’1
4
Cle
aran
ceA
pr-
Sep
t’14
Clo
sing
Bal
ance
as o
n 01
.10.
2014
Stat
ion
Out
stan
ding
(Goo
ds &
Coa
chin
g)(F
igur
e in
` la
khs)
50
NORTHEAST FRONTIER RAILWAY
MECHANICAL DEPARTMENT
Diesel Loco availibility (BG&MG)
Ineffective % (Loco/Coach/Wagon)
0
1
2
3
4
5
6
7
8
9
10
2012-13 2013-14 2013-14 (upto Dec)
Prop Trg 2014-15 (upto Dec)
2014-15 (upto Dec)
4.4 4 4.1
8.5
3.6
2
3.5 3.3
2
3.7
7.748.3
8.67
10
9.08
BG Coach BG Wagon BG Loco
0
20
40
60
80
100
120
140
160
180
2012-13 2013-142013-14
(upto Sept)Prop Trg 2014-15
(upto Dec)
2014-15 (upto Dec)
132.05
155.6 152.77 158.61 162.25
BG
Num
ber/M
onth
Num
ber/M
onth
51
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Workshop Out Turn (Coaching/Wagon)
Diesel Loco Reliabilty
0
500
1000
1500
2000
2500
3000
3500
4000
4500
2012-13 2013-14 2013-14 (upto Dec)
prop. Trg 2014-15 (upto
Dec)
2014-15 (upto Dec)
12071427
985 1071 100011841250
9301080
940
4340 4417
3306 33303170
Coach Wagon ROH
Num
bers
/Mon
th
0
1
2
3
4
5
6
7
8
9
2012-13 2013-14 2013-14 (upto Dec)
2014-15 (upto Dec)
8.22
7.137.57
6.3
BG
Failu
re/1
00 lo
co/m
onth
52
NORTHEAST FRONTIER RAILWAY
Specific Fuel Consumption
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
2012-13 2013-14 2013-14 (upto Dec)
Prop Tar 2014-15 (upto
Dec)
2014-15 (upto Dec)
4.17 4.06 4.08 4.04 4.02
1.94 1.98 1.97 1.9 1.88
Passenger Goods
Ltrs
./100
0 G
TKM
53
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
ELECTRICAL DEPARTMENT
4 Modification of FuseDistribution Board in GS& SCN Coaches 450 402 254 338 125
B. Electrical Power1 Electric energy
consumption in nontraction area in MU 137.65 139.33 107.51 102.66 110.80
2 Electrification ofRailway Quarters ( Nos) 190 250 171 23 32
3 Provision of energyefficient 60 W ceiling fanin place of 90W ceilingfans ( Nos) 1975 1740 1551 1193 1367
4 Rewiring of Staffquarters( Nos) 1613 1388 908 443 682
5 Replacement ofConventional KWHmeters by electronicKWH meters ( Nos. ) 3102 1998 1593 1125 1351
6 HSD OIL consumptionin DG sets in KL 795.19 574.48 458.19 453.00 501.38
7 Provision of electronicfan regulators in placeof conventional fanregulators in ceiling fan( nos) 2131 2111 1631 1688 1728
8 Use of solar streetlights for
(a) Remote places & colonies.
(b) Training Institute. (c) Retiring room (d) Officers rest house 30 16 10 57 63
A. Train lighting & Air conditioning
S Item /Activity Actual Actual Actual Proportionate ActualN 2012-13 2013-14 2013-14 Target 2014-15
(April- 2014-15 (April-Dec) (April- Sept)
Dec)
1 Certified Non-AC cases(Nos) 0 0 0 4 1
2 Punctuality loss(AC & Non-AC) (Nos.) 30 29 24 34 41
3 Provision of EmergencyLight (Nos.) 163 135 98 113 55
54
NORTHEAST FRONTIER RAILWAY
Punctuality Loss Cases of Train Lighting & AC
0
5
1 0
1 5
2 0
2 5
3 0
3 5
4 0
4 5
2 0 1 2 - 1 3 2 0 1 3 - 1 4 A c t u a l A p r i l -D e c 2 0 1 3 - 1 4
P r o pTa r g e t
A p r - D e c 2 0 1 4 - 1 5
A p r i l - D e c 2 0 1 4 - 1 5
3 0 2 9
2 4
3 4
4 1
0
2 0
4 0
6 0
8 0
1 0 0
1 2 0
1 4 0
1 6 0
1 8 0
2 0 1 2 - 1 3 2 0 1 3 - 1 4 A c t u a l A p r i l -D e c 2 0 1 3 -1 4
P r o p o r t o n a t eTa r g e t
A p r i l - D e c 2 0 1 4 - 1 5
A c t u a lA p r i l -D e c 2 0 1 4 -1 5
1 6 3
1 3 5
9 81 1 3
5 5
E m e r g e n c y L ig h t
0
5 0
1 0 0
1 5 0
2 0 0
2 5 0
3 0 0
3 5 0
4 0 0
4 5 0
2 0 1 2 - 1 3 2 0 1 3 - 1 4 A c t u a l A p r i l -D e c 2 0 1 3 - 1 4
P r o p .T a r g e t A p r i l - D e c
2 0 1 4 - 1 5
A c t u a lA p r i l - D e c 2 0 1 4 - 1 5
4 5 0
4 0 2
2 5 4
3 3 8
1 2 5
M o d i f i c a t i o n o f F B D c o v e r s
55
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Electric energy consumption in non traction area in MU
0
2 0
4 0
6 0
8 0
1 0 0
1 2 0
1 4 0
2 0 1 2 - 1 3 2 0 1 3 - 1 4 A c t u a l A p r i l -D e c
2 0 1 3 - 1 4
P r o p .T a r g A p r i l - D e c2 0 1 4 - 1 5
A c t u a l A p r i l -D e c
2 0 1 4 - 1 5
1 3 7 . 6 5 1 3 9 . 3 3
1 0 7 . 5 1 1 0 2 . 6 61 1 0 . 8
E l e c t r i c E n e r g y C o n s u m p t i o n i n M U
0
2 0 0
4 0 0
6 0 0
8 0 0
1 0 0 0
1 2 0 0
1 4 0 0
1 6 0 0
1 8 0 0
2 0 1 2 - 1 3 2 0 1 3 -1 4 A c t u a l A p r i l -S e p t 2 0 1 3 - 1 4
P r o p .T a r g e t A p r i l - S e p t
2 0 1 4 -1 5
A c t u a l A p r i l -S e p t 2 0 1 4 - 1 5
1 6 1 3
1 3 8 8
9 0 8
4 4 3
6 8 2
R e w i r i n g o f s t a f f q u a r t e r
0
5 0 0
1 0 0 0
1 5 0 0
2 0 0 0
2 5 0 0
3 0 0 0
3 5 0 0
2 0 1 2 -1 3 2 0 1 3 -1 4 A c t u a l A p r il-D e c 2 0 1 3 -1 4
P r o p . Ta r g e t
A p r i l-D e c 2 0 1 4 -1 5
A c t u a l A p r i l-D e c 2 0 1 4 -1 5
3 1 0 2
1 9 9 8
1 5 9 3
1 1 2 51 3 5 1
R e p la c e m e n t o f C o n v e n t io n a l K W H m e te r b y E le c t r o n ic K W H m e te r s
56
NORTHEAST FRONTIER RAILWAY
ENGINEERING DEPARTMENT
Prog
ress
1 Track Renewal CTR 75.97 75.55 62.03 18 27.782 Ballast ‘000 387.88 400.084 291.36 257 260.293
Supply Cum3 Rail/Weld Nos. 61 34 26 <42 31
failure4 Insertion of Eq. 65 94.50 28.75 62.25 45
PSC Turn out setsleepers
5 Scrap MT 14082 10055.25 5937.75 6200 2490.87offered
6 Removal of Nos. 1 19 10 3 56PSR
7 Manning of MT 3 65 51 30 26UMLCs
8 Closure of Nos. 25 23 12 30 9LCs
9 Sundry Nos. 28.80 29.39 25.01 22.50 23.74Earnings
10 USFD Nos. 12359 12936.36 9134.21 8775 10043.03Testing
11 Rehabilitation Crs. 32 28 14 18 44of Br. Rs.
12 CSM (incl. TEX KM 2796 4017.08 2890.76 2630 2351.73& DUO)
13 ISD KM 79.029 93.30 48.54 42.00 46.84
2014-15(Upto Dec)
Prog
ress
SN ITEM UNIT
2011-12 2013-14
Prog
ress
(Upt
o D
ec)
Targ
et
Prog
ress
57
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
ASSET RELIABILITY
Introduction of 30 Kmph Loopline
Rail
Weld
Total
0
10
20
30
40
50
60
70
2012-13 2013-14 2013-14 (up to Dec)
2014-15 up to Dec
2418 16
11
37
1610
20
61
3426
31
Reducing Trend of Rail/Weld Failures
0
20
40
60
80
100
120
140
160
180
2012-13 2013-14 2014-15 up to Dec'14
Total
7 0 5
173
58
NORTHEAST FRONTIER RAILWAY
SIGNAL & TELECOM DEPARTMENTSN
ITEM
1 2 3 4 5 6 7
RRI/P
I/EI
Tota
l Tra
ck C
ircui
ting
(No.
of L
ocat
ins)
Blo
ck P
rovi
ng b
y Ax
leC
ount
er (B
PAC
)
LED
Lit
Sign
al(N
os. o
f Sta
tions
)
Dat
a Lo
gger
s
Leve
l Cro
ssin
gIn
terlo
ckin
g
Fina
ncia
l Exp
endi
ture
Cro
res
` (PH
33)
14 20 16 - 5 5
34.6
8
30 120
33 29 53 31 35.6
7
2013
-14
Targ
etAc
hive
-m
ent
Targ
et
12 17 12 2 2 2 37.3
3 20 14 4 2 14 39.2
4
2012
-13
Achi
ve-
men
t
16 68 14 16 25 4
23.4
6
8 22 30 - 12 6
35.0
0
Targ
et
2013
-14
Achi
ve-
men
t(u
p to
Dec
’13)
2013
-14
6 16 22 - 9 4
26.0
0
6 20 3 - - 3
16.4
9
Prop
or-
tiona
teTa
rget
(up
toD
ec’1
4)
Achi
ve-
men
t(u
p to
Dec
14)
59
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
5070 4725 3631 3449 3391 6.61%
0
1000
2000
3000
4000
5000
6000
2012-13 2013-14 1013-14 (Upto Dec)
2014-15 (Prop. Target)
14-15 (upto Dec)
5070 4725
3631 3449 3391
2014-15 (Prop. Target)
Total Signal Failure
Asset Reliability : (S&T)
Actual Actual Actual Prop. Actual %Total 2012-13 2013-14 2013-14 Target 2014-15 ImproveSignal upto 14-15 upto mentFailures Dec’13 Dec’14 Dec’14
60
NORTHEAST FRONTIER RAILWAY
61
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
I N C I D E N C E O F A G I T A T I O N S : S t a t e - w i s e
F i n a n c ia lY e a r S t a t e B u n d h R a i l - R o -
k o
O b s t r u c -t io n /D h -
a r n aT o ta l
A p r . ' 1 2 t oM a r , ' 1 3
A s s a m 6 5 1 8 3 8 1 2 1
B e n g a l 7 1 1 6 2 4
B ih a r 4 0 6 1 0
M a n ip u r 1 0 0 1
T r i p u r a 1 0 0 1
T o t a l 7 8 1 9 6 0 1 5 7
A p r . ' 1 3 t oM a r , ' 1 4
A s s a m 1 3 0 4 2 3 1 2 0 3
B e n g a l 7 4 6 1 7
B ih a r 8 3 1 1 2
T r i p u r a 1 0 0 1
N a g a la n d 2 0 0 2
M a n ip u r 1 0 0 1
T o t a l 1 4 9 4 9 3 8 2 3 6
A p r . ' 1 3 toD e c 1 3
A s s a m 9 9 2 6 4 7 1 7 2
B e n g a l 1 0 0 1 0 7 1 8
B ih a r 0 5 1 0 3 0 9
T r i p u r a 1 0 0 1
N a g a la n d 2 0 0 2
M a n ip u r 1 0 0 1
T o t a l 1 1 8 2 8 5 7 2 0 3
A p r . ' 1 4 toD e c ' 1 4
A s s a m 5 2 4 3 2 0 1 1 5
B e n g a l 0 5 1 1 0 3 1 9
B ih a r 0 7 . 0 3 0 5 1 5
M iz o r a m 0 1 0 4 0 1 0 6
T r i p u r a 0 1 0 0 0 0 0 1
T o t a l 6 6 6 1 2 9 1 5 6
62
NORTHEAST FRONTIER RAILWAY
STORE DEPARTMENT
To m
eet B
oard
’s ta
rget
, Eng
g. S
crap
aris
ing
shou
ld b
e ap
prox
350
00 M
T. H
owev
er E
ngg.
Dire
ctor
ate,
Rai
lway
Boa
rd h
ave
fixed
targ
et fo
r P
-way
for
FY 2
014-
15 a
s 80
00 M
T (N
. F.
Rai
lway
) & 4
000
MT
(N. F
. Rai
lway
Con
stru
cttio
n O
rgan
izat
ion)
onl
y
Actu
alAc
tual
Actu
alYe
arly
Prop
ortio
nate
Actu
alVa
riatio
n20
12-1
3 2
013-
1420
13-1
4Ta
rget
Targ
et u
pto
Perf
orm
-Ap
ril to
2014
-15
Dec
201
4-15
man
ce
D
ec)
upto
Dec
2014
-15
ASc
rap
disp
osal
` 84
Cr.
` 58.
80` 2
5.35
-57%
(In `
Cr.
)
BAr
isin
g of
` 103
.58
` 82.
57` 4
4.25
Engg
.12
,800
9,60
010
,046
+5%
Scra
p (M
T)C
Scra
p in
App
rox.
200
0 M
T w
orth
` 4.
5 C
r.ha
nd
Financial Year 2014-15
63
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
28.1
8%
18.5
8%
0
20
40
60
80
100
120
2012-13 2013-14 2013-14 (Upto Dec)
2014-15 Prop. Target)
2014-15 (Upto Dec)
103.58
82.27
44.25
58.8
25.35
Earning from Scrap Disposal(Figure in Cr. Rs.)
26%19%
27%
7%
13%
66%
18.82% 17.28%
28.18%
18.58% 17%
26%
0%
10%
20%
30%
40%
50%
60%
70%
Without Fuel With Fuel Without Fuel With Fuel Without Fuel With Fuel
2012-13 2013-14 2014-15 (upto Oct'14)
Turn over Ration (Position of Fuel and without Fuel)
64
NORTHEAST FRONTIER RAILWAY
MAN POWER PLANNING
MANPOWER - SALIENT FEATURES
Gazetted Cadre ('A' & 'B') Sanctioned - 1172
On-roll - 1001 (including NFR Con. Org.)
Non-Gazetted Cadre
Sanctioned - 73112 On-Roll - 64130Total Vacancies - 8982
Safety Category Vacancies - 4219 (13.45%) [Cadre of 31,371].
A panel of 2549 was received from RRC and offer letters are beingissued.
Man Power Planning
Surrenders- 468(in redundant & diminishing categories)
Creations - Nil (In Safety and operational categories for New Assets/Activities)
Indents for Recruitment (Placed/Under Process):
With RRBs - 3829 With RRCs - 1230 posts
Men-on-roll have reduced from 69907 (in April’2006) to 64130(upto Dec’2014) i.e by 8.26%
416 Court cases pending (as on 31.12.2014). Winning percentageof Court case is 59% (17 cases won during Oct’14 to Dec’14).
Single unified wage period successfully implemented.
99.24% disbursement of salary through banks.
65
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
ACHIEVEMENTS/SYSTEM/IMPROVEMENTMajor Initiatives
During the 2014-15 (April-Dec) Operating :A) 1 Instroduction of new trains :-
i) 13063/13064 Exp. between Howrah-Balughat (Bi-weekly)w.e.f. 13.10.14.
ii) 55820/55819 Passenger between Guwahati andMendipathar w.e.f. 29.11.14.
2 Extension of trains :-i) 15605/15606 (KYQ-JTTN-MXN) I/C Exp to DBRG viaMRHT w.e.f. 01.11.14.
3. Speeding Up :-i) By speeding up of 15611 LTT-KYQ Exp. to 65 mts the pairing
train 15612/15611 has been upgraded to Superfast Exp by re- numberingas22512/22511.
B) Clearance of extra rush for tourists and other passengers.
No of Spl Trains No of Trips Total Seat/Berth
29 1317 1619372
C) Coaches Augmented:-i) 2920 coaches augmented temporarily with provision of
2,39,200 seat/berths.ii) 6 coaches augmented permanently with provision of 384 berths.
D) Parcel Cargo Exp. :- 58 rakes of Parcel Cargo Exp. trains were run duringApr/14 to Dec/14 between NGC-PTNR-NGC via CP with earnings of Rs.11,17,04,123.
66
NORTHEAST FRONTIER RAILWAY
E) Premium Special :- 58 trips Premium special trains were run duringApr/14 to Dec/14 between KYQ-NDLS, KYQ-BNC, KYQ-PUNE, KYQ-MAS & NJP-MAS respectively with earnings of Rs.8.7 crore. (approx).
F) Piecemeal Demand VPs:- 1600 VPs were loaded during Apr/14 to Dec/14 with earnings of Rs. 15,30,15,983.
G) Millennium Parcel :- 60 rakes loaded during Apr/14 to Dec/114 withearnings of Rs. 11,65,17,911.
1. Rangapahar, Diphu, Langcholie, Laopani, Barpathar, Bokajan, Naojanand Daldali. The following stations have been commissioned withProvision of universal simultaneous facilities to enhance Line Capacity assefety oof Guwahati-Lumding-Farkating Section
2. NFR has captured additional traffic of Cement, Paper, Fertilizer &Dolomite and as a result there has been increase of 158.8%, 48.4% ,27.2&25.9% loading in Cement, Paper, Fertilizer & Dolomite traffic respectively.3. Interchange has increased by 10.5%. Loaded Inward has increased by14.9 % & Release has increased by 10.1%.
4.Terminal Management System (TMS) has been commissioned atDekargaon (DKGN), Bindukuri (BKTB) , Harmuti (HMY) newly Gaugeconverted section of RNY-RPAN-MZS Section and Jalalgarh (JAG),Ranipatra (RNX) at KIR Division, in addition to existing locations. OnNFR 69 (Sixty nine) location have TMS and 23 number are likely to beprovided shortly.
5.NFR has marketed the newly launched automatic freight rebate scheme.Total additional revenue generated was Rs.5,15,83,746/-
System Improvement in Coaching OperationDecongestion of GHY yard by integration of rakes viz.
15644/15643 KYQ-PURI Exp & 15640/15639 GHY-PURI Exp lie overutilized to run special trains.15651/15652 Lohit Exp &15653/15654 Amarnath Exp integrated lie overused to run special train.Using of rake of 15645 LT(T)-GHY to run 12501 GHY-NDLS SamparkKranti Exp for late running of link rake.
67
QUARTERLY PERFORMANCE REPORT - UP TO DEC’ 2014
Medical Department1. Observed “World no Tobacco Day/2014” at LMG hospital in a befittingmanner on 31st May/2014 and organised Seminar Cum Awareness meeting, Posters were displayed and leaflets were also distributed2. 479 no. of Registration & 98 no. of Food licenses under Food Safety &Standard Act/2006 have been issued. More over 70 no. of Food samplesunder Food Safety & Standard Act/2006 have been collected & sent toFood Analysist/GHY & Kolkata where 15 no. of Food Samples have beendeclared unsafe, substandard & Misbranded. Which have been put underAdjudication & Prosecution in the Court of Law
MECHANICAL:1. Steam condensate recovery system for saving boiler operation cost ofKamakhya laundry was adjudged as 2nd best innovation at Railway Board’slevel and an award of Rs. 2 lakhs has given by Board.2. Trial for 12 coach DEMU formation has been successfully conducted inKIR division. It will mitigate the woes of commuters due to rampantovercrowding of trains in that area.3. NFR has achieved 2nd best Goods SFC figure(1.78 litre/1000 GTKM)amongst 16 Zonal Railways. This has been possible by strict enforcing oftrip ration and focused maintenance of Diesel Locomotives in NFR Sheds.4. Restoration of train services has been done in sections affected bylandslide in DHR. Now NG trains are running from Siliguri to Darjeeling ontrial basis wef 25.12.2014
ENGINEERING
EQUIPMENT RELIABILITY: Continuous reduction in rail/weld failurefrom 247 (2006-07) to 34 (2013-14) and 31 during 2014-15.
1. Hon’ble Prime Minister Shri Narendra Modi inaugurated introduction ofPassenger train on New line from Dudhnoi – Mendipathar (19.62 Km) inRangiya Division on 29-11-2014 and thereby connected Meghalaya statewith rest of Indian Railway network.
2. Speed on Simaluguri – New Tinsukia Jn. (101.25 Km) of TinsukiaDivision increased from 75 Kmph to 100 Kmph for WDG3A, WDP4B &WDP4D locos.
68
NORTHEAST FRONTIER RAILWAY
3. Speed increased from 15 Kmph to 30 Kmph on looplines in Katihar – Mukuriasection (5 stations) of Katihar Division.
4. Removal of Encroachment:- Despite resistance of public 1392 Nos. ofencroachments have been removed and consequently 12.174 hectares ofRailway Land could be realised upto the Dec’14 during the year 2014-15.