High Speed Rail Studies Hyderabad - Chennai - Thiruvananthapuram High-Speed Railway Corridor Location: Hyderabad - Chennai - Thiruvananthapuram, India As a JV member, OC Global conducted the pre-feasibility study on the proposed route No.5 and No.6 for running high speed trains with maximum design speed of 350 km/h. The new high speed rail service between Hyderabad-Vijayawada-Chennai (No.5) and Chennai - Bengaluru - Coimbatore - Ernakulam - Thiruvananthapuram (No.6) will cover a distance of 676 km and 1,060 km, respectively. The projects are part of the six high-speed corridors identified for implementation in India. Mumbai-Ahmedabad High Speed Railway Corridor Location: Mumbai - Ahmedabad, India The proposed 534 km Mumbai-Ahmedabad high-speed link is part of the 650 km Pune- Mumbai-Ahmedabad line, one of the six high-speed corridors identified for implementation in India. Co-financed by Government of India and the Japan International Cooperation Agency (JICA) a detailed joint feasibility study is being carried out since September 2013. As the JV member, OC Global is providing technical, institutional and financial consultancy services. Hanoi - Ho Chi Minh High-Speed Railway Location: Hanoi - Ho Chi Minh, Vietnam Over 1,500 km-long route will begin at Ngoc Hoi Station in Hanoi and end at Thu Thiem in HCMC. Trains on the new line will travel at speeds up to 350 km per hour.A section of the route between Ngoc Hoi and Vinh, a town in the central province of Nghe An, as well as a section between Thu Thiem and NhaTrang in the south-central province of KhanhHoa, are selected to be priority. As JV member, OC Global formulated a general development plan and detailed development programs for north priority sections. Feasibility Study and Detailed Design of High Speed Train (Bangkok - Rayong) Location: Bangkok - Rayong, Thailand Appointed by the State Railway of Thailand (SRT), OC Global conducted a feasibility study and detailed designs for the country’s first high speed rail project from Bangkok to the eastern seaboard province of Rayong. When in operation the new rail service will take only an hour and 15 minutes at a speed of 250 km per hour. The route corridor will pass Chachoengsao, Chonburi, Pattaya and Rayong, after which it may extend to Trat if feasible. Feasibility Study for High-Speed Rail link in Indonesia Location: Jakarta - Bandung - Surabaya, Indonesia Appointed by the Japan International Cooperation Agency, OC Global conducted feasibility study for the high-speed railway system in Java Island as a part of the Master Plan of Acceleration and Expansion of Indonesia Economic Development. The study on the High Speed Railway route between the capital city of Jakarta and Surabaya via Bandung, approximately 730 km in length, consists of an examination of specifications by utilization of Shinkansen system. As a JV member, OC Global provided consultancy services on the project cost estimation.

Transcript of High Speed Rail Studies - 株式会社オリエンタルコン … Hanoi - Ho Chi Minh, Vietnam Over...

High Speed Rail Studies 

Hyderabad - Chennai - Thiruvananthapuram High-Speed Railway Corridor Location: Hyderabad - Chennai - Thiruvananthapuram, India

As a JV member, OC Global conducted the pre-feasibility study on the proposed route No.5and No.6 for running high speed trains with maximum design speed of 350 km/h. The new highspeed rail service between Hyderabad-Vijayawada-Chennai (No.5) and Chennai - Bengaluru -Coimbatore - Ernakulam - Thiruvananthapuram (No.6) will cover a distance of 676 km and1,060 km, respectively. The projects are part of the six high-speed corridors identified forimplementation in India.

Mumbai-Ahmedabad High Speed Railway Corridor Location: Mumbai - Ahmedabad, India

The proposed 534 km Mumbai-Ahmedabad high-speed link is part of the 650 km Pune-Mumbai-Ahmedabad line, one of the six high-speed corridors identified for implementation inIndia. Co-financed by Government of India and the Japan International Cooperation Agency(JICA) a detailed joint feasibility study is being carried out since September 2013. As the JV member, OC Global is providing technical, institutional and financial consultancy services.

Hanoi - Ho Chi Minh High-Speed Railway Location: Hanoi - Ho Chi Minh, Vietnam

Over 1,500 km-long route will begin at Ngoc Hoi Station in Hanoi and end at Thu Thiem inHCMC. Trains on the new line will travel at speeds up to 350 km per hour.A section of theroute between Ngoc Hoi and Vinh, a town in the central province of Nghe An, as well as asection between Thu Thiem and NhaTrang in the south-central province of KhanhHoa, areselected to be priority. As JV member, OC Global formulated a general development plan anddetailed development programs for north priority sections.

Feasibility Study and Detailed Design of High Speed Train (Bangkok - Rayong) Location: Bangkok - Rayong, Thailand

Appointed by the State Railway of Thailand (SRT), OC Global conducted a feasibility study anddetailed designs for the country’s first high speed rail project from Bangkok to the easternseaboard province of Rayong. When in operation the new rail service will take only an hour and15 minutes at a speed of 250 km per hour. The route corridor will pass Chachoengsao,Chonburi, Pattaya and Rayong, after which it may extend to Trat if feasible.

Feasibility Study for High-Speed Rail link in Indonesia Location: Jakarta - Bandung - Surabaya, Indonesia

Appointed by the Japan International Cooperation Agency, OC Global conducted feasibility study for the high-speed railway system in Java Island as a part of the Master Plan of Acceleration and Expansion of Indonesia Economic Development. The study on the HighSpeed Railway route between the capital city of Jakarta and Surabaya via Bandung,approximately 730 km in length, consists of an examination of specifications by utilization of Shinkansen system. As a JV member, OC Global provided consultancy services on the projectcost estimation.