![Page 1: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/1.jpg)
High-Speed Monitoring of
Multiple Grid-Tied PV Array
Configurations
![Page 2: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/2.jpg)
Motivation
2
1) Test engineers who can maintain a
calibrated test facility
2) I-V curve tracers, IR cameras, etc. to
intermittently evaluate performance
3) Large scale test facilities monitored
over many years in a variable
climate
4) Long-term system performance,
durability, and reliability data over the
actual lifetime, or at least five
years
5) Monthly sampling of DC IV curves at
array, string, and module level
6) Detailed collection of operation and
maintenance data and analysis
7) Statistical sampling of modules/cells
and outdoor characterization
8) Continuous string level monitoring
9) Validation of degradation rates and
documentation of failure modes
10) High accuracy instrumentation,
including meteorological, and given
uncertainties
11) Spectral measurements
12) High-speed sampling (1 s)
13) Sky imaging
14) Obstruction data
a) Shading
b) Snow/ice
c) Soiling
15) PVsyst validation
Modeling and Validation Needs
Will meet this year — rest met/commenced next year
![Page 3: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/3.jpg)
Motivation (cont.)
3
1) Ability to examine:
a) Inverter MPPT speed,
accuracy, modes of
operation
b) Anti-islanding test
perturbations
c) Effects of fast moving
clouds
d) Causes of module and
BOS component failures
e) Dynamic electrical
effects from irradiance
enhancement and
transitions
2) More accurate mean
power and energy yield
values
3) Identify fluctuating DC
offsets from aliasing errors
4) Validation of
a) Short-term irradiance
forecasting
b) Inverter/grid interaction
models
High-Speed Sampling (1 Hz)
![Page 4: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/4.jpg)
Locations
4
(271 kW, 20° tilt)
(243 kW, ±5° W/E)
(73 kW, 10° tilt)
![Page 5: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/5.jpg)
Locations
5
Canopy Array • Commissioned June 2012
• 1032 Mono-Si Modules
• 243 kW (DC rated)
• 5° East/West
Ground Array • Commissioned July 2012
• 1152 Mono-Si Modules
• 271 kW (DC rated)
• 20° due south
Tilted Roof Array • Commissioned June 2012
• 312 Mono-Si Modules
• 73 kW (DC rated)
• 10° due south
Horizontal Roof Array • Commissioned September 2001
• 234 Mono-Si Modules
• 35 kW (DC rated)
Weather Station • Commissioned August 2014
• Shortwave, Longwave, UV,
Spectral
• DNI, DHI on Solar Tracker
• Wind, snow depth, rain
• I-V Traced Modules
• Sky Camera
![Page 6: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/6.jpg)
Location
6
![Page 7: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/7.jpg)
7
Positions per IEC 60891
Instrumentation (Arrays)
8-10 module temperature
measurements per array
31-52 data streams from each inverter
21 data streams from each AC meter
GHI, POA x 2, wind, ambient air
temperature
![Page 8: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/8.jpg)
Dual Communications
8
![Page 9: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/9.jpg)
Data Loggers
9
![Page 10: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/10.jpg)
1 sec. vs. 1 min.
10
• Details lost at slower sampling rates
and longer averaging intervals
• Example:
o Irradiance
o Inverter Power
o Inverter Operating State
at:
o 1 sec. sampling rate (no averaging)
o 10 sec. sampling rate (no averaging)
o 60 sec. sampling rate (no averaging)
o 1 sec. sampling rate, 60 sec.
averaging
17 Sep 2014
![Page 11: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/11.jpg)
Instrumentation (Weather Station)
11
Domed Diffused Si Pyranometer
Thermopile Pyranometers
900 – 1700 nm
Spectroradiometer
UV-B Radiometer
Flat-plate Si Irradiance Sensor
UV (Total) Radiometer
350 – 1000 nm Spectroradiometer
UV-A Radiometer
![Page 12: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/12.jpg)
Reference Modules
12
1
, , lnref
c c ref oc oc ref therm s
ET T V V V N
E
, ,1sc sc ref Isc c c refS I I T T
14 Sep 2015, 10:49 EDT
![Page 13: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/13.jpg)
Array Images
13
26 Sep 2014
22 Feb 2015
Output Circuit Power and Efficiency
Output Circuit Power and Efficiency
![Page 14: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/14.jpg)
All-Sky Images
14
![Page 15: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/15.jpg)
Bonus: Inverter Arcing Event
15
25 Aug. 2015
![Page 16: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/16.jpg)
Contact (to obtain data):
16
Boyd, M., “High-Speed Monitoring of Multiple Grid-Connected Photovoltaic Array Configurations”, NIST Technical Note 1896, http://dx.doi.org/10.6028/NIST.TN.1896 .
![Page 17: High-Speed Monitoring of Multiple Grid-Tied PV Array ......Locations 5 Canopy Array • Commissioned June 2012 • 1032 Mono-Si Modules • 243 kW (DC rated) • 5° East/West Ground](https://reader034.fdocuments.net/reader034/viewer/2022052018/6031dfa40c7b50346b444ba9/html5/thumbnails/17.jpg)
17