100% Design /Construction Kick Off Community Meeting
Please sign in on your mobile device: https://communitymeeting.ocps.net/
August 19, 2019
High School Site 113-H-W-4
1
High School Site 113-H-W-4100% Design /Construction Kick off Meeting AgendaAugust 19, 2019 6:00 PM
• Welcome – School Board Member: Pam Gould• Introductions – Jessma Lambert: Facilities Director,
Construction Planning• Project Update – Lynn Lefebvre, AIA
– Patrick Rauch, AIA– Tom Widener- Wharton- Smith
• Questions and Answers• Adjournment
Site Location 113-H-W-4
2
DISNEY WORLD
HickorynutLake
Reedy Lake
Lake Tibet
north
ORANGE COUNTY
NATIONAL GOLF COURSE
DR. PHILLIPS HS
NEW HS SITE 80
SITE 113NEW HIGH
SCHOOL
WIN
TER
GAR
DEN
VIN
ELAN
D RO
AD
FICQ
UET
TE R
D.
WINDERMERE HS
Huckleberry Lake
Lake Hancock
Lake MabelLake Sheen
Lake Butler
INTE
RSTA
TE 4
S.R.
429
LAKE
CO
UN
TYO
RAN
GE
COU
NTY
Site Aerial 113- H-W-4
3
H.S. Site113-H-W-4
(+/-68 Acres)
north
SEIDEL ROAD
HickorynutLake
Reedy Lake
Tub Lake
Lakeshore
Site Plan 113-H-W 4
4
SEIDEL ROAD
Staff Parking
(200 Spaces)
Parking(480 Spaces)
Parking(170
Spaces)
Bus Parking
(75 buses & 75 cars)
Stadium Track &
Field (lighted)
Baseball(lighted)
Softball(lighted)
Practice
Tennis & Basketball
CourtsFut. Exp.
FRO
NTA
GE
ROAD
Wetland
FRONT DOOR
Retention
north
0’ 200’
3-Story HS Campus
Access Easement for Reedy Creek
Improvement District
Student Stations = 2,776
Parking = 810 spacesCar Stacking = up to 300 carsBus Driver parking= 75 spaces
On-site Bus Stacking = 40+ buses
Service
Retention
Practice
Parent Drop
Future Bus Fueling and Driver Lounge
Location
Retention
Project Basis – OCPS Prototype High School 113-H-W-4
5
OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School
Oak Ridge High School
Project Basis – OCPS Prototype High School 113-H-W-4
6
UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs
Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout
Energy Efficiency• LED lighting campus wide (interior, exterior,
site and athletic fields)• High efficiency chillers and variable
pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and
power metering
Security• Full security access control and cameras for
the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting
Windermere High School
Renderings 113-W-H-4
7
north
Renderings 113-H-W-4
8
north
Renderings 113-H-W-4
9
north
Renderings 113-H-W-4
10
north
Building Program
15
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 344,000 Square Feet
CAFETERIA
MEDIA CENTER
Building Program
16
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 340,000 Square Feet
SCIENCE LAB
COMPUTER LAB
Building Program
17
GYMNASIUM
AUDITORIUM
Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings
• Classrooms• Science Labs• Computer Labs• CTE Labs
Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab
Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling
113-H-W-4Student Capacity: 2,776Buildings: 340,000 Square Feet
Site Program
18
Cars and BusesStudent and Faculty parking
(+/-850 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)Bus parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
STADIUM/TRACK & FIELD
GREENHOUSE
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Site Program
19
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-810 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)Bus Parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
SOFTBALL
BASEBALL
Site Program
20
Site AmenitiesGreenhouse and Shade houseAthletics
• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions
• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts
Cars and BusesStudent and Faculty parking
(+/-850 Spaces)Parent Drop off / pick upBus Loop (up to 50 buses)Bus Driver parking = 75 spacesBus Parking (up to 75 buses)
113-H-W-4Site: +/-68 Acres
OUTDOOR BASKETBALL
TENNIS
Additional Features 113-H-W-4
21
Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls
Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity
CLASSROOM TECHNOLOGY
SECURE ENTRY POINT
Audio Enhancement
System
70” Touchscreen
Wireless Access Point
Sustainability 113-H-W-4
22
Building• 10% more energy efficient than ASHRAE
90.1 standard• High Efficiency Chillers (15% energy
reduction)• Light colored roof to reduce heat gain and
improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing
Site• Native/low water plants – reduce water
consumption• Low Impact Design (LID) stormwater design
Sustainable Design Criteria
What to Expect 113-H-W-4
Work Hours*Monday – Friday 6:00am – 6:00pm* Early morning concrete pours will be necessary and will be in strict accordance with the Orange County noise ordinance
DeliveriesMonday – Friday 6:00am – 6:00pmAll construction deliveries to enter the jobsite from Frontage Rd.
Road Closures
Frontage Rd. will be closed except to construction related traffic and for access to the adjacent solar field.
Limited single lane closure will be required along Seidel Rd. at times throughout the project to complete work located immediately adjacent to traffic lanes.
23
Site Logistic Plan113-H-W-4
24
Planned Schedule 113-H-W-4
Main Campus Construction
May 2021
April2019
November2019
Move-In
August2021
Design, Permitting,and Bidding
EarlySitePackage
January2020
25
26
Questions & Answers