    1. ABOUT ARCOP

    2. INTRODUCTION3. SITE LOCATION

    4. IMPORTANCE OF LOCATION

    5. DESIGN PHILOSPHY

    6. FEATURES

    7. DESIGN DEVELOPMENT

    8. FLOOR PLANS9. ELEVATIONS

    10. FLOOR PLANS OF MULTIPLEX

    11. ELEVATIONS

    12. AREA STATEMENT

    13. INTERIORS

    14. LANDSCAPE15. STRUCTURE

    16. CONSTRUCTION

    17. SERVICES

    CONTENTS

  • 8/13/2019 High rise housing

    4/50

    The Arcop Group is an architectural practice with offices located in Montreal, Toronto,

    Boston, New Delhi and Muscat.

    It has evolved from the merging in 1992 of two separate offices of complementary

    skills and resources, Arcop Associates and Ct Glouberman Architects.

    Arcop is an acronym for "Architects in co-partnership".

    Arcop has presence in India since early 1970s .

    With over 50 years of Experience ARCOP has been delivering:

    Homes to Cities

    Retail Stores to Special Economic Zones

    Kindergartens to Universities

    Pedestrian Plazas to Airports

    Conservation to Hi- Tech State of Art Structures

    ARCOP is globally designing and executing :

    Over 22.5 Million Sq.Mt. of Real Estate

    Over 100,000 Homes

    Over 1500 Hectares of Master Planning

    ABOUT ARCOP

  • 8/13/2019 High rise housing

    5/50

    INTRODUCTION

    Jaypee Group is well-diversified infrastructural and industrial group with turnover of

    over Rs. 5500 Crores

    The Jaypee Group is synonymous with creating premium lifestyle experiences through

    exclusive golf-centric real estate.

    The existing 452-acre development at Jaypee Greens, Greater Noida integrates homes

    with landscaped greens, resort living and commercial developments amidst an 18 hole

    Greg Norman golf course & 9 hole Graham Cooke designed chip & putt Golf Course .

    It is a complete lifestyle destination offering individual homes and luxury apartments.

    .

  • 8/13/2019 High rise housing

    6/50

  • 8/13/2019 High rise housing

    7/50

    Greater Noida is one of the fastest developing cities in India & falls withinthe

    National Capital Region of Indias capital -New Delhi.

    Greater Noida offers world class infrastructural facilities. Key features are: Connectivity:

    50 min. from New Delhi Railway Station and 60 min. from I.G.I. Airport

    Proposed international airport at Greater Noida - Jewar

    Infrastructure:

    Scientifically planned sector layout 60-105-metre wide road network

    Indias first Formula One racing track constructed by Jaypee Group.

    A Night Safari is also scheduled to be constructed in Greater Noida.

    IMPORTANCE OF LOCATION

  • 8/13/2019 High rise housing

    8/50

    Roads

    The city is strategically located at a distance of 25 kms from New Delhi to which it is

    connected by a DND Flyover and a newly developed 6-lane Expressway. The city is also linked to Kolkata by GT Road.

    Internal Roads Netwo rk

    130 m ROW road as the backbone connecting the northern end to southern end

    Peripheral 24m loop and 12m access roads to individual plots.

    Industrial roads - minimum 24m wide Slow moving traffic restricted to service lane of arterial roads.

    Railways

    Plans are underway to connect to Delhi by fast EMU for passenger traffic and by

    separate link with Tughlakabad for Goods Traffic.

    The Howrah - Delhi railway line is passing through Greater Noida area. Plans are on the anvil to link Greater Noida with Delhi metro.

    IMPORTANCE OF LOCATION

  • 8/13/2019 High rise housing

    9/50

    MASTERPLAN

    9 HOLE GOLF

    COURSE

    18 HOLE GREG NORMANGOLF COURSE

    BOOMERANG

    CLUB HOUSE

    60 ACRE NATURE

    RESERVE PARK

    WAY TO JAYPEE

    GREENS

    WAY TO

    JAYPEE GREENS

    N

  • 8/13/2019 High rise housing

    10/50

    KEY FEATURES

    Spread over 452 acres.

    With over 85% open & greens areas.

    18-hole Greg Norman ,spread over 197 acres.

    167-room Golf and Spa Resort.

    `Boomerang-the club with distinct architectural appeal and delightful views.

    Atlantis-The Club at Jaypee Integrated Sports Complex, with multiple indoor

    and outdoor sports facilities.

    60-acre Nature Reserve Park enveloped by 7.5 acre man-made lake full off flora

    and fauna.

    Variety of residential options ranging from low rise luxury apartments to high rise

    ones.

    MASTERPLAN

  • 8/13/2019 High rise housing

    11/50

    SITE PLAN

    PARKING

    DROP OFF POINTS

    GOLF COURSE

    GOLF COURSE

    6m WIDE ROAD

    THE SUN COURT APARTMENTS

  • 8/13/2019 High rise housing

    12/50

    The circle is a symbol of infinity which

    encompasses all possibilities. The powerful

    centre of the circle is you on an eternalquest for perfection at every point.

    on a journey to touch the precincts of

    fulfillment

    on the unwinding path in the circle of life.

    Ushering in a revolutionary new concept in

    urban living as a tribute to your quest.

    THE SUN COURT APARTMENTS

    DESIGN PHILOSPHY

  • 8/13/2019 High rise housing

    13/50

    Recipient of the Best Apartment award at CNBC Asia-Pacific property awards.

    SUN COURT is a complete glass cylindrical masterpiece that offers uninterrupted

    breathtaking view of the golf course.

    The 30 storey towers provide elite private space with just 2 apartments

    on each floor & 2 luxurious penthouses.

    Total Area Tower A, B, C & D = 78000 Sq.Mt.

    Total Basement area = 16500 Sq.Mt. Total nos. of Cars in Basement = 375 nos.

    Total nos.of cars in open area= 200 nos.

    TOTAL APARTMENTS in the project = 212 nos.

    Breakup :

    Total no .of Apartments in Tower A = 54 Total no. of Apartment in Tower B = 52

    Total No. of Apartment in Tower C = 52

    Total no. of Apartment in Tower D = 54

    Total no. of Penthouses = 8 , 2 in each Tower.

    FEATURES

  • 8/13/2019 High rise housing

    14/50

    LIFT SCHEDULE:

    Total Passenger Lifts = 3 nos. in each Towers

    Capacity = 13 passenger each. Speed of Passenfer Lifts = 3.5 m/s

    Service Lift = 1 nos. in each Tower ,Speed of Service Lift = 2.5 m/s

    Total Passenger Lifts = 3x2 + 2x2 Towers = 10nos.

    Total Service Lifts = 1x4 Towers = 4nos

    OTHER FACILITIES

    Ground Floor of Each Tower

    Circulation/ Lobbies

    Waiting Lounge with Washrooms

    Area for Public Utilities in Tower A &D

    Conference Room

    Baby Sitting & Day Care

    Indoor games

    Area for Public Utilities in Tower B & C

    Health Club-Fitness Center

    Business Center Party Hall

    FEATURES

  • 8/13/2019 High rise housing

    15/50

    DESIGN DEVELOPMENT

  • 8/13/2019 High rise housing

    16/50

    GROUND FLOOR PLAN-3BHKTOWER-C&D

  • 8/13/2019 High rise housing

    17/50

    FIRST FLOOR PLAN-3BHKTOWER-C&D

  • 8/13/2019 High rise housing

    18/50

    TYPICAL FLOOR PLAN-4BHKTOWER-A&B

  • 8/13/2019 High rise housing

    19/50

    UNIT PLAN-4BHK

  • 8/13/2019 High rise housing

    20/50

    UNIT PLAN-4BHK

  • 8/13/2019 High rise housing

    21/50

    PENT HOUSE-29thFLOOR

  • 8/13/2019 High rise housing

    22/50

    PENT HOUSE-30thFLOOR

  • 8/13/2019 High rise housing

    23/50

    TERRACE FLOOR PLAN

  • 8/13/2019 High rise housing

    24/50

    ELEVATION

    TOTALHT.OFBU

    ILDING111.020m

    3100

    VIEWMETAL AND GLASS

    BALCONY

    TEXTURE PAINT FINISHVENETIAN BLINDS

    IN TOILETS SPANDREL PANEL

    MULLION

    DGU GLASS

  • 8/13/2019 High rise housing

    25/50

    SECTION

  • 8/13/2019 High rise housing

    26/50

    DETAILSCURTAIN GLAZING

    A

  • 8/13/2019 High rise housing

    27/50

    DETAILSCURTAIN GLAZING

    DEATAIL AT A

  • 8/13/2019 High rise housing

    28/50

    DETAILSMETAL PORCH

    PLAN

    SECTION 1

  • 8/13/2019 High rise housing

    29/50

    DETAILSMETAL PORCH

    3D VIEW VIEW

    DETAIL AT C DETAIL AT A

  • 8/13/2019 High rise housing

    30/50

    LANDSCAPE

  • 8/13/2019 High rise housing

    31/50

    SERVICESFIRE SAFETY

    1.GENERAL CLASSIFICATION ( as per NBC) :

    Character of Occupancy : Group A : Residential(Ref: Annexure 1 Clause 3.1.1)

    Sub Division A-4 Apartment Houses (flats)

    (Ref: Annexure 1 Clause 3.1.2)

    Fire Zone No. 1

    (Ref: Annexure 1 Clause 3.2.2.2)

    Height of the Building : 97.4 mts. ( High Rise building) according to NBC.

    2. FIRE PREVENTION

    Measures taken for Transformers and DG Sets in the Basement :

    As /NBC Dry type transformers provided in Upper extended Basement (Basementnot connected to Apartment building Ref: Annexure 2) cut off from the other portion

    of premises by fire doors and walls having 4 hr fire resistance (Ref : Annexure 1

    Clause C-1.16).

    As/NBC The substation(only Transformers & Lt panels) structure is located at the

    periphery of Extended Basement line having separate access to fire exits.

  • 8/13/2019 High rise housing

    32/50

    3. FIRE DETECTION:

    As/NBC the following automatic fire detection and alarm systems provided in the

    building (Ref:Annexure 1 Table 23 for minimum fire fighting systemsinstallations).

    Apartment Building has been equipped with Smoke and heat type detectors.

    Basement have provision of Smoke and heat type detectors.

    4. FIRE FIGHTING

    Systems confirming to relevant IS Codes provided in the building.(Ref annexure1 table 23 for details):

    Fire extinguisher:

    1. One unit 4.5 kg, CO2type ( as per I.S: 2878 ) fire extinguisher, One unit 9 lit.water expelling type (as per I.S:940- 1989 ) & One unit Dry Chemical powder(Biocarbonate I.S. 4308) B & C type of Fire of 5 Kg. Capacity type fire

    extinguisher on each floor of Tower.

    2. Four unit 4.5 kg, CO2type ( as per I.S: 2878 ) fire extinguisher, Four unit 9 lit.water expelling type (as per I.S:940- 1989 ) & Four unit Dry Chemical powder(Biocarbonate I.S. 4308).

    SERVICESFIRE FIGHTING

  • 8/13/2019 High rise housing

    33/50

    Internal Hydrants:

    1. Apartment - Total 29 nos. of hydrants. (1 nos. each floor of Tower).2. BasementTotal 8 nos. of hydrants. (4 nos. each floor of Basement phase-1)

    First Aid Hose Reels : 20 mm dia 36.5 m long connected directly to riser.

    Fire Hose: Two nos. R.R.L. hose pipe with 63 mm dia and 15 m length provided

    near each hydrant.

    Wet Riser: 2 Nos. 150mm dia.

    Automatic Sprinkler System : Installed in the Basement

    and Tower .

    Terrace Tank: capacity 25000 litres (of each tower ).

    Underground Water Tank: 100000 litres capacity Has

    been provided as a centralized tank near the building.

    SERVICESFIRE FIGHTING

  • 8/13/2019 High rise housing

    34/50

    5. FIRE EXITSAs/NBC following are the provisions taken for fire exits.

    Every unit in the building has access to two separate exits, which are remote fromeach other and are reached by traveling in different directions.

    (Ref: Annexure 1 Clause 6.1.3.4)

    No. of exits in basements ( Ref: Annexure 1 Clause 6.1.3.6 for guidelines).

    Lower Basement: 2 staircases & 6 Ramps

    Upper Basement: 7 Ramps and 3 staircases

    Doorways :

    Width of exit doorways1500mm & 1000 mm (For guidelines Ref : Annexure 1Clause 4.7.2)

    Corridors and Passageways :

    Width of corridor -1000 m

    Staircases :(For guidelines Ref : Annexure 1 Clause 4.9.7)

    Total 5 nos. of staircases provided in Basement.

    3 nos. of Staircases from Upper Basement to Ground Level.

    2 Staircases from Lower Basement to Ground Level

    Fire staircase Tread : 300

    Width: 1350mm & 1200 mmRiser : 150 mm to 165mm

    FIRE FIGHTING SERVICES

  • 8/13/2019 High rise housing

    35/50

    HVAC

    The CENTRAL AIR CONDITIONING plants or the systems are used when large

    buildings, hotels, theaters, airports, shopping malls etc are to be air conditioned

    completely. These are basically of two types:

    Direct expansion or DX central air conditioning plant.

    Chilled type central air conditioning plant.

    In Suncourt, chilled type central air conditioning plant is being used. It has the

    plant room where all the important units like the compressor, condenser,throttling valve and the evaporator are housed.

    AHU are present in each floor which comprise of cooling coil and the blower.

    The cool air is supplied to the space through ducts. The blower sucks hot return

    air from the room via ducts and blows it over the cooling coil.

    SERVICES

  • 8/13/2019 High rise housing

    36/50

    SERVICES

    PLANT ROOM AT

    SECOND LEVEL

    PUMP ROOM ATSECOND LEVEL

    ELECTRICAL

    PANEL ROOM

    DG ROOM

    UPPER BASEMENT

  • 8/13/2019 High rise housing

    37/50

    ELECTRICAL PANEL ROOM

    An electrical room is a room or space in a building dedicated to electrical

    equipment.

    The main electrical distribution room can be of considerable size with many

    more smaller electrical rooms throughout the rest of the building.

    Electrical rooms typically house the following equipment:

    Electric Switch boards, Distribution board, Circuit breakers and disconnects,

    Electricity meters, Transformers, Bus bars, Back up batteries, Fire alarmcontrol panels, Distribution Frames etc.

    SERVICES

  • 8/13/2019 High rise housing

    38/50

    DIESEL GENERATOR ROOM

    The DG set room or diesel generator room in Suncourt comprise of 2 generators

    which have 1600 KVA capacity.

    These generators run when electrical supply fails and total

    load transfer takes place on DG set.

    PLC panels act as an intermediate and run the generators

    when there is power failure.

    PUMP ROOM

    It comprises of Ground Water Tank, Irrigation Water Pump, Fire Hydrant Pump,

    Hydrant Pump and Sprinkler Pump.

    The supplied water is first filtered with the help of dual media filter and then softened

    twice so as to remove all impurities and mineral salts. The Irrigation water pump takes water from STP and supplies it to cooling towers ,

    flushing cisterns and for maintenance of landscaped area.

    The Fire Hydrant Pump carries water that is used in case of fire hazards. If electrical

    supply fails during fire hazard then Diesel Engine pumps work.

    Sprinkler Pump is used when there is minor fire and fountain of water comes out.

    SERVICES

  • 8/13/2019 High rise housing

    39/50

    Mivan is basically an aluminium formwork system developed by one of theconstruction company from Europe. In 1990, the Mivan Company Ltd from Malaysia

    started the manufacturing of such formwork systems.

    An engineered system of building construction, namely 3-S system wasdeveloped for achieving, speed, strength, safety and economy in constructionpractices.

    Achieving the 3-S system in the MIVAN formwork is quite easy.

    The MIVAN formwork proves to cost efficient as it can be used efficiently for 250times.

    Rapid construction of multiple units of repetitive type using semi skilled labours.

    On leaving the MIVAN factory all panels are clearly labeled to ensure that they areeasily identifiable on site.

    The cut out in slabs ,walls are left in factory according to the drawings.

    Fitting and erecting the portion of shuttering.

    Carrying out concreting of the walls and slabs together.

    CONSTRUCTIONMIVAN- A Versatile Formwork

  • 8/13/2019 High rise housing

    40/50

    MIVAN FORMWORK

    Aluminium alloy panels. Excellent stiffness-to- weight ratio.

    4mm thick plates.

    Pin and wedge arrangement system- simple pin and

    wedge system that passes through holes in the outside rib

    of each panel.

    Requires no bracing.

    Small panelsno heavy equipments.

    Once the panels have been numbered, measuring is not necessary. As the erection

    process is manually, tower cranes are not required.

    CONSTRUCTIONMIVAN- A Versatile Formwork

    PIN AND WEDGE SYSTEM

  • 8/13/2019 High rise housing

    41/50

    BEAM COMPONENTS

    CONSTRUCTIONMIVAN- A Versatile Formwork

    OTHER COMPONENTS

    WALL COMPONENTSBEAM ASSEMBLY DETAILS

  • 8/13/2019 High rise housing

    42/50

    WORK CYCLE

    De shuttering of the panels12-15 hrs.

    Positioning brackets & platforms on the level- 10-15 hrs.

    De shuttered panels lifted & fixed on floor- 7-10 hrs.

    Kicker & external shutters fixed in 7 hrs.

    Shutters are erected in 6-8 hrs.

    Reinforcement & electrical conduits are fixed- 20-22 hrs.

    Pouring of concrete.

    Remove vertical formwork panels after 24 hrs,

    props in 7 days and floor slab formwork after 3 days.

    CONSTRUCTIONMIVAN- A Versatile Formwork

  • 8/13/2019 High rise housing

    43/50

  • 8/13/2019 High rise housing

    44/50

    CONSTRUCTIONAAC

  • 8/13/2019 High rise housing

    45/50

    CONSTRUCTIONAAC

  • 8/13/2019 High rise housing

    46/50

    TOWERS

    Pile Foundation

    A Deep foundationis a type of foundationdistinguished from shallow foundationsby

    the depth they are embedded into the ground and is called Pile Foundation.

    Total no. of RCC piles used in one tower are 22.

    STRUCTURE

    PILE CAP

    PEDESTAL

    1m dia RCC PILE

    30m long.

    PLAN

    http://en.wikipedia.org/wiki/Foundation_(architecture)http://en.wikipedia.org/wiki/Shallow_foundationshttp://en.wikipedia.org/wiki/Shallow_foundationshttp://en.wikipedia.org/wiki/Foundation_(architecture)
  • 8/13/2019 High rise housing

    47/50

    Living, Dining, Foyer

    Imported Italian marble flooring.

    Bedrooms, Family Lounge Solid wood plank flooring in Cumaru, Teak, steam beech.

    7 high laminated wooden wardrobes in bedrooms.

    Bathrooms, Powder Room

    Imported Beige Marble/ Spanish vitrified tiles in flooring.

    Glass Mosaic/ Bisazza Mosaic/ Imported tiles in walls till 7ftheight in Bathrooms.

    Balance painted in acrylic emulsion paint.

    Jacuzzi in master bathroom.

    Frameless glass shower enclosure.

    Imported fittings of TOTO, Kohler. Imported fixtures of Grohe .

    His-and-her vanity with heated mirrors for defogging.

    SPECIFICATIONS

    DRAWING ROOM

  • 8/13/2019 High rise housing

    48/50

    Kitchen/Utility

    Imported anti-skid ceramic tile flooring.

    2 ft high dado above counter in decorative ceramic tiles. 25 mm Granite counter top and back splash

    Modular kitchen in stainless steel and laminate with appliance package:

    Wall Treatments

    Acrylic emulsion/ Texture paint on walls with POP cornice in ceiling

    Special elements in architectural glass.Doors and Windows

    External:

    Curtain wall glazing

    Provision for installation of manual/ remote controlled tracks for blinds

    Internal:

    Main Entrance door - 50mm teak wood

    Others - Veneered flush doors

    Balconies

    Terracotta tiles with red Sandstone skirting.

    Worker Room - Tile flooring .