HIGH-CAPACITY TRANSIT SYSTEM JANUARY 2020...-()ˆˇ˘˝ ˙ Bel RdIneBdiaRiScehS GlGen Gdan JANUARY /...
Transcript of HIGH-CAPACITY TRANSIT SYSTEM JANUARY 2020...-()ˆˇ˘˝ ˙ Bel RdIneBdiaRiScehS GlGen Gdan JANUARY /...
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
HIGH-CAPACITY TRANSIT SYSTEM JANUARY 2020SISTEMA DE TRANSPORTE DE ALTA CAPACIDAD ENERO 2020
202
51
143
101
101
101
10
10
17
17202
202
Bell Rd
Indian School Rd
McDowell Rd
Broadway Rd
Buckeye Rd
Thunderbird Rd
Peoria Ave
Bethany Home Rd
Northern Ave
Baseline Rd
83
rd A
ve
67t
h A
ve
51s
t A
ve
35
th A
ve
19th
Ave
Cen
tral
Ave
24
th S
t
40
th S
t
56
th S
t
Rur
al R
d
Pri
ce R
d
Alm
a S
choo
l Rd
Mes
a D
r
Gilb
ert
Rd
Glendale
Peoria
Phoenix
Tempe
Mesa
Phoenix
Tolleson
20212021
20242024
2024202420302030
20242024
20212021
LEGENDValley Metro RailTren de Valley Metro
Northwest Phase II Light Rail ExtensionFase II de la Extensión Noroeste
Tempe StreetcarTren moderno de Tempe
Capitol/I-10 West Light Rail Extension Phase I & IIExtensión Capitol/I-10 West Fase I y II
South Central Light Rail Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
Future CorridorsFuturos corredores
Operations and Maintenance Center ExpansionAmpliación del Centro de Operaciones y Mantenimiento
1 Mile 2 Miles
Dates shown are based on Regional Transportation Plan (RTP).Las fechas que se muestran se basan en el Plan de Transporte Regional (RTP).
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
CAPITOL/I-10 WEST EXTENSIONEXTENSIÓN CAPITOL/I-10 WEST
■ Addresses traffic congestionExamina el congestionamiento de tráfico
● Provides a shared solution (transit, highway improvements, HOV lanes) in the West Valley in order to address peak period congestionProvee una solución compartida (transporte, mejoramientos a las autopistas, carriles de alta ocupación vehicular “HOV”) en el Oeste del Valle para resolver el congestionamiento durante las horas pico
● Enhances transit options for West Valley commutersMejora las opciones de transporte para los viajeros del Oeste del Valle
■ Connects to notable destinationsSe conecta con destinos notables
● State CapitolCapitolio del Estado
● City of Phoenix and Maricopa County government center Centro del gobierno de la Ciudad de Phoenix y del Condado Maricopa
● Downtown entertainment centersCentros de entretenimiento en el Centro de la Ciudad
● Ak-Chin Pavilion amphitheaterAnfiteatro Ak-Chin Pavilion
■ Provides opportunities for community enhancement and growthProporcionar oportunidades para el mejoramiento y crecimiento de la comunidad
■ Meets Valley Metro's and City of Phoenix's goal for a sustainable futureCumple con la meta de Valley Metro y de la Ciudad de Phoenix para lograr un futuro sostenible
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
2012 APPROVED LIGHT RAIL ROUTERUTA APROBADA DEL TREN LIGERO EN 2012
101
TOLLESON
PHOENIX
1010
17
202
DOWNTOWN SECTIONSECCIÓN DEL CENTRO DE LA CIUDAD
MAINLINE SECTIONSECCIÓN DE LA LÍNEA PRINCIPAL
StateCapitol
Maricopa County Admin.
City Hall
StateFairgrounds
Downtown Phoenix
ConcertPavilion
Algodón Center
Desert Sky Mall
79th AvePark-and-Ride
7th
Ave
19th
Ave
83
rd A
ve
75th
Ave
67t
h A
ve
59
th A
ve
51s
t Ave
43
rd A
ve
Van Buren St
Thomas Rd
Buckeye Rd
McDowell Rd
35
th A
ve
27t
h A
ve
UPRR
7th
St
BNSF
Cen
tral
Ave
Valley Metro Rail / StationTren de Valley Metro / Estacion
Approved RouteRuta Aprobada
19th Avenue Design OptionOpción de Diseño de 19th Avenue
Park-and-Ride
Activity CenterCentro de Actividades
City of TollesonCiudad de Tolleson
Unincorporated Maricopa CountyÁreas No Incorporadas del Condado Maricopa
Station Target AreaÁrea Deseada para la Estación
Median Station SiteSitio de la Estación en el Camellón
North Side Station SiteSitio de la Estación en el Lado Norte
LEGEND1/2 Mile 1 Mile
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
2012 ROUTE OPTIONS EVALUATEDOPCIONES DE LA RUTA DE 2012 EVALUADAS
202
Van Buren St
79th
Ave
67t
h A
ve
75th
Ave
59
th A
ve
51s
t Ave
43
rd A
ve
35
th A
ve
10
Buckeye Rd
Washington StAdams St
Jefferson StMadison St
Jackson St
27t
h A
ve
19th
Ave
17th
Ave
15th
Ave
10th
Ave
7th
Ave
7th
St
5th
St
5th
Ave
3rd
Ave
Cen
tral
Ave
3rd
St
McDowell Rd
Thomas Rd
10
17
Grand Ave
BNSF
79th Ave/I-10 Park-and-Ride
Desert Sky Mall
StateCapitol
ChaseFieldTalking Stick
Resort Arena
City Hall
Theater
PhoenixArtMuseum
State Fairgrounds
Considered RoutesRutas Consideradas
Approved RouteRuta Aprobada
Transit CenterCentro de Transporte
19th Avenue Design OptionOpción de Diseño de 19th Avenue
Valley Metro Rail Tren de Valley Metro
LEGEND
DOWNTOWN SECTIONSECCIÓN DEL CENTRO DE LA CIUDAD
MAINLINE SECTIONSECCIÓN DE LA LÍNEA PRINCIPAL
1/2 Mile 1 Mile
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
DOWNTOWN REEVALUATIONREEVALUACIÓN DEL CENTRO DE LA CIUDAD
South Central Extension/ Downtown Hub provided opportunity to reevaluate Washington Street as a routeLa Extensión Sur Central/Centro de Conexiones brindó la oportunidad de reevaluar a Washington Street como una ruta
CityHall
Municipal Court
Police Dept.
Industrial Commission
Corporation Commission
Supreme Court Clerk
Central Arizona Shelter
Services
Corporation Commission/
Education Board
AZ AttorneyGeneral
Administrative O�ce
ADEQ/Housing/Gaming
Crime Lab
Sandra Day O’Connor
Federal Courthouse
Municipal Court
Social Security Administration
O�ce
Human ServicesCampus
AZ Supreme Court
Administrative O�ce
Carnegie Library
and Park
Wesley BolinMemorial Plaza
StateCapitol
Dept. ofEconomicSecurity
Dept. ofCorrections
Dept. ofEducation
Dept. ofTransportation
Dept. ofTransportation
Dept. ofAdministration
Dept. ofTransportation
One Az Credit Union
Dept. of HealthServices Power
Authority
Dept. of Agriculture
Dept. of Insurance
Board ofPharmacy
Dept. ofAgriculture
Board of Cosmetologyand Nursing
Dept. ofRevenue
StateHealth
Lab
ShrineAuditorium
Oakland Historic District
Woodland Historic District
CapitolElementary
School
University Park
Van Buren St
Adams St
Washington St
Jefferson St
Madison St
Jackson St
3rd
Ave
4th
Ave
5th
Ave
19th
Ave
18th
Ave
17th
Ave
15th
Ave
16th
Ave
Grand Ave 7th
Ave
2012 Approved RouteRuta Aprobada
Considered RouteRuta Considerada
19th Avenue Design OptionOpción de Diseño de 19th Avenue
SchoolEscuela
ParkParque
Government OfficeOficina gubernamental
LEGEND500FT 1000FT
Valley Metro Rail Tren de Valley Metro
Existing StationEstación existente
South Central Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
South Central StationsEstación de la Extensión Sur Central
■ Prominent gateway between Downtown and the CapitolAcceso prominente entre el Centro de la Ciudad y el Capitolio
■ Greater access to neighborhoods and employment centersMayor acceso a vecindarios y centros de empleo
■ Easier connection between the Downtown and Mainline sections of the projectConexión más fácil entre las secciones del Centro de la Ciudad y la Línea Principal del proyecto
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
State Capitol Wesley Bolin Memorial Plaza
SupremeCourt
ShrineAuditorium
EvansHouse
City HallTheater
US DistrictCourt
County Court Complex
County ForensicScience Center
Pioneer &Military
Memorial Park
SmurthwaiteHouse
MunicipalCourt
OaklandHistoricDistrict
Woodland Historic District
Library Park
Van Buren St
Adams St
Washington St
Je�erson St
Madison St
1st A
ve
2nd
Ave
3rd
Ave
4th
Ave
5th
Ave
19th
Ave
BNSF
18th
Ave
17th
Ave
15th
Ave
7th
Ave
8th
Ave
Cent
ral A
ve
South Central Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
South Central StationsEstación de la Extensión Sur Central
Potential StationEstación potencial
Valley Metro Rail Tren de Valley Metro / Estación
Existing StationEstación existente
Capitol/I-10 West Phase ICapitol/I-10 West Fase I
Capitol/I-10 West Phase IICapitol/I-10 West Fase II
LEGEND
500FT 1000FT
2012 APPROVED ROUTERUTA APROBADA EN 2012
Right of WayDerecho de Paso
Potential impacts to properties between 7th and 8th avenuesImpactos potenciales a las propiedades entre 7th Avenue y 8th Avenue
19th Avenue constrained by BNSF Railway on west side of the road19th Avenue está limitada por el ferrocarril BNSF Railway en el lado oeste de la calle
Cultural/Community ResourcesRecursos Culturales/Comunitarios
Adjacent to Library Park, Smurthwaite House, Pioneer and Military Memorial Park and Wesley Bolin Memorial Plaza Adyacente al parque Library Park, a Smurthwaite House, al parque Pioneer & Military Memorial Park y a la plaza Wesley Bolin Memorial Plaza
Other ConsiderationsOtras Consideraciones
Requires challenging bridge design at Van Buren Street and 19th AvenueRequiere el desafiante diseño de un puente en Van Buren Street y 19th Avenue
Jefferson Street between 12th and 13th avenues looking eastJefferson Street, entre 12th Avenue y 13th Avenue viendo hacia el este
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
WASHINGTON CONCEPT AWASHINGTON CONCEPTO A
State Capitol Wesley Bolin Memorial Plaza
SupremeCourt
ShrineAuditorium
EvansHouse
City HallTheater
US DistrictCourt
County Court Complex
County ForensicScience Center
Pioneer &Military
Memorial Park
SmurthwaiteHouse
MunicipalCourt
OaklandHistoricDistrict
Woodland Historic District
Library Park
Van Buren St
Adams St
Washington St
Je�erson St
Madison St
1st A
ve
2nd
Ave
3rd
Ave
4th
Ave
5th
Ave
19th
Ave
BNSF
18th
Ave
17th
Ave
15th
Ave
7th
Ave
8th
Ave
Cent
ral A
ve
500FT 1000FT
South Central Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
South Central StationsEstación de la Extensión Sur Central
Station AreaÁrea de estación
Valley Metro Rail Tren de Valley Metro / Estación
Existing StationEstación existente
Capitol/I-10 West Phase ICapitol/I-10 West Fase I
Capitol/I-10 West Phase IICapitol/I-10 West Fase II
LEGEND
Washington Street between 12th and 13th avenues looking westWashington Street, entre 12th Avenue y 13th Avenue viendo hacia al oeste
Right of WayDerecho de Paso
Potential impacts to properties between 7th and 8th avenuesImpactos potenciales a las propiedades entre 7th Avenue y 8th Avenue
Limited space along Washington Street curve to Adams Street, decreasing design flexibility Espacio limitado a lo largo de la curva de Washington Street a Adams Street, disminuyendo la flexibilidad del diseño
Cultural/Community ResourcesRecursos Culturales/Comunitarios
Potential impacts to existing streetscape (palm trees, landscaping, viewshed to Capitol) along Washington StreetImpactos potenciales al paisaje urbano existente (palmas, jardinería ornamental, cuenca al Capitolio) a lo largo de Washington Street
Adjacent to Shrine Auditorium, Evans House and Library Park Adyacente al auditorio Shrine Auditorium, Evans House y el parque Library Park
Other ConsiderationsOtras Consideraciones
Provides closer access for Woodland and Oakland NeighborhoodsProvee acceso más cercano a los vecindarios Woodland y Oakland
Provides easier connection to Phase IIProporciona una conexión más fácil a la Fase II
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
WASHINGTON CONCEPT BWASHINGTON CONCEPTO B
State Capitol Wesley Bolin Memorial Plaza
SupremeCourt
ShrineAuditorium
EvansHouse
City HallTheater
US DistrictCourt
County Court Complex
County ForensicScience Center
Pioneer &Military
Memorial Park
SmurthwaiteHouse
MunicipalCourt
OaklandHistoricDistrict
Woodland Historic District
Library Park
Van Buren St
Adams St
Washington St
Je�erson St
Madison St
1st A
ve
2nd
Ave
3rd
Ave
4th
Ave
5th
Ave
19th
Ave
BNSF
18th
Ave
17th
Ave
15th
Ave
7th
Ave
8th
Ave
Cent
ral A
ve
500FT 1000FT
South Central Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
South Central StationsEstación de la Extensión Sur Central
Station AreaÁrea de estación
Valley Metro Rail Tren de Valley Metro / Estación
Existing StationEstación existente
Capitol/I-10 West Phase ICapitol/I-10 West Fase I
Capitol/I-10 West Phase IICapitol/I-10 West Fase II
LEGEND
Right of WayDerecho de Paso
Fewer potential property impacts between 7th and 8th avenuesMenos mpactos potenciales a la propiedad entre 7th Avenue y 8th Avenue
Limited space along Washington Street curve to Adams Street, decreasing design flexibility Espacio limitado a lo largo de la curva de Washington Street a Adams Street, disminuyendo la flexibilidad del diseño
Cultural/Community ResourcesRecursos Culturales/Comunitarios
Fewer potential impacts to existing streetscape (palm trees, landscaping, viewshed to Capitol) along Washington StreetMenos impactos potenciales al paisaje urbano existente (palmas, jardinería ornamental, cuenca al Capitolio) a lo largo de Washington Street
Adjacent to Shrine Auditorium, Smurthwaite House, Wesley Bolin Memorial Plaza, Evans House, Library Park and Pioneer Park Adyacente al auditorio Shrine Auditorium, Smurthwaite House, Wesley Bolin Memorial Plaza, Evans House, el parque Library Park y el parque Pioneer Park
Other ConsiderationsOtras Consideraciones
Provides closer access for Woodland and Oakland NeighborhoodsProvee acceso más cercano a los vecindarios Woodland y Oakland
Provides easier connection to Phase IIProporciona una conexión más fácil a la Fase II
Washington Street between 12th and 13th avenues looking westWashington Street, entre 12th Avenue y 13th Avenue viendo hacia al oeste
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
WASHINGTON CONCEPT CWASHINGTON CONCEPTO C
State Capitol Wesley Bolin Memorial Plaza
SupremeCourt
ShrineAuditorium
EvansHouse
City HallTheater
US DistrictCourt
County Court Complex
County ForensicScience Center
Pioneer &Military
Memorial Park
SmurthwaiteHouse
MunicipalCourt
OaklandHistoricDistrict
Woodland Historic District
Library Park
Van Buren St
Adams St
Washington St
Je�erson St
Madison St
1st A
ve
2nd
Ave
3rd
Ave
4th
Ave
5th
Ave
19th
Ave
BNSF
18th
Ave
17th
Ave
15th
Ave
7th
Ave
8th
Ave
Cent
ral A
ve
500FT 1000FT
South Central Extension/Downtown HubExtensión Sur Central/Centro de Conexiones
South Central StationsEstación de la Extensión Sur Central
Station AreaÁrea de estación
Valley Metro Rail Tren de Valley Metro / Estación
Existing StationEstación existente
Capitol/I-10 West Phase ICapitol/I-10 West Fase I
Capitol/I-10 West Phase IICapitol/I-10 West Fase II
LEGEND
Washington Street between 12th and 13th avenues looking westWashington Street, entre 12th Avenue y 13th Avenue viendo hacia al oeste
Right of WayDerecho de Paso
Potential impact to State properties in Capitol areaImpacto potencial a las propiedades del estado en el área del Capitolio
Requires less space to accommodate light railRequiere menos espacio para dar cabida al tren ligero
Cultural/Community ResourcesRecursos Culturales/Comunitarios
Potential impacts to existing streetscape (palm trees, landscaping, viewshed to Capitol) along Washington StreetImpactos potenciales al paisaje urbano existente (palmas, jardinería ornamental, cuenca al Capitolio) a lo largo de Washington Street
Adjacent to Library Park, Smurthwaite House, Pioneer & Military Memorial Park, Shrine Auditorium, Evans House and Wesley Bolin Memorial Plaza Adyacente al parque Library Park, a Smurthwaite House, al parque Pioneer & Military Memorial Park, al auditorio Shrine Auditorium, a Evans House y a la plaza Wesley Bolin Memorial Plaza
Other ConsiderationsOtras Consideraciones
Fewer overall design challenges Menos desafíos de diseño
Provides closer access for Woodland and Oakland Neighborhoods (for westbound light rail travel)Provee acceso más cercano a los vecindarios Woodland y Oakland (para los viajes hacia el oeste del tren ligero)
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
POTENTIAL EXTENSION TO DESERT SKY MALLPOSIBLE EXTENSIÓN AL CENTRO COMERCIAL DESERT SKY MALL
■ Consistent with future development goalsConsistente con las metas del desarrollo futuro
■ Connects to key activity centers, increasing project ridershipSe conecta con centros clave de actividad, aumentando el número de pasajeros del proyecto
■ Increases project costAumenta el costo del proyecto
79th AvePark-and-Ride
Desert Sky Mall
CastroMiddleSchool
PeraltaElementary
School
AmberleaElementary
School
Desert HorizonElementary
School
BrowneHigh School
Starlight ParkElementary School
DesertSage
Library
Concert Pavilion
Desert SkyTransit Center Thomas Rd
Osborn Rd
83
rd A
ve
75th
Ave
79th
Ave
Encanto Rd
McDowell Rd
10
2012 Approved RouteRuta aprobada en 2012
Potential Route/StationRuta/estación potencial
SchoolEscuela
Activity CenterCentro de Actividades 1/4 Mile 1/2 Mile
LEGEND
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
CAN THE PROJECT BE COMPLETED SOONER?¿EL PROYECTO SE PUEDE COMPLETAR ANTES?
CAPITOL/I-10 WEST PHASING SCENARIOSESCENARIOS DE FASES DE CAPITOL/I-10 WEST
PHASE I PHASE II
SCENARIO A
LIGHT RAIL
3rd Ave & Washington/
Jefferson State Capitol79th Ave
Park-and-Ride59th Ave
Park-and-RideDesert Sky MallTransit Center
SCENARIO B(Current Project)
LIGHT RAIL
PHASE ISCENARIO C
LIGHT RAIL
SCENARIO D
LIGHT RAIL
EXCLUSIVEBUSWAY
PHASE IIIPHASE II
OPTIONAL
OPTIONAL
OPTIONAL
PHASE I
PHASE II OPTIONAL
■ Four scenarios, including the current project (light rail constructed in two phases) are being evaluatedSe están evaluando cuatro escenarios, incluyendo al proyecto actual (tren ligero construido en dos fases)
■ Evaluation considerations include:Las consideraciones de evaluación incluyen:
● Phasing (timing for completing all or portions of the project)Por fases (tiempo para completar todo o partes del proyecto)
● Type of transit (light rail or exclusive busway)Tipo de transporte (tren ligero o autobús con carril exclusivo)
● CostCosto
● Rider convenience (is a transfer needed?)Conveniencia para los pasajeros (¿se necesita transbordo?)
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
WHAT IS EXCLUSIVE BUSWAY? ¿QUÉ ES EL AUTOBÚS CON CARRIL EXCLUSIVO?
■ A type of transit being considered for the mainline section of the project (to potentially complete the project sooner)Un tipo de transporte que se está considerando para la sección principal del proyecto (para potencialmente completar el proyecto más pronto)
■ A high-quality, bus-based transit system that delivers fast and efficient service (Federal Transit Administration)Un sistema de transporte de alta calidad basado en autobuses que provee servicio rápido y eficiente (Administración Federal de Transporte)
■ Exclusive busway may include some/all of the elements shown belowEl autobús con carril exclusivo puede incluir algunos/todos los elementos que se muestran a continuación
Provo, Utah Istanbul, Turkey Los Angeles, California
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
TRANSIT TYPE COMPARISONCOMPARACIÓN DEL TIPO DE TRANSPORTE
LIGHT RAILTRANVÍA LIGERO
EXCLUSIVE BUSWAYTRANSPORTE RAPIDO DE AUTOBUS
SpeedVelocidad
SimilarSimilar
SimilarSimilar
GuidewayCarril
DedicatedDedicado
Mostly DedicatedPrincipalmente Dedicado
Cost to BuildCosto para construirlo $$$ $
CapacityCapacidad
175 persons per vehicle175 personas por vehículo
80 persons per bus80 personas por autobús
Cost to Operate*Costo para operar* $ $$
RidershipPasajeros
Higher PotentialPotencial Más Alto
Lower PotentialPotencial Más Bajo
Economic DevelopmentDesarrollo Económico
Greater PotentialMayor Potencial
Less PotentialMenor Potencial
*Average operating cost per rider*Costo promedio de operación por pasajero
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
MAINLINE PHOTO SIMULATION (67TH AVENUE)SIMULACIONES FOTOGRÁFICAS LÍNEA PRINCIPAL (67TH AVENUE)
Light Rail / Tranvía Ligero
Exclusive Busway / Transporte Rapido de Autobus
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
TYPICAL PROJECT FUNDINGFINANCIACIÓN TÍPICA DE PROYECTOS
40-50%of project costdel costo del proyecto
20-25%of project costdel costo del proyecto
20-25%of project costdel costo del proyecto
Regional Public Transportation Fund
approved by voters in 2004Fondo Regional de Transporte Público
aprobado por los votantes en 2004
Dedicated to transitprogram; cannot be usedfor non-transit projects
Dedicado al programa de transporte; no se puede usar para proyectos que no sean de
transporte
Federal GrantsSubvenciones Federales
For fixed guideway/railprojects
Para proyectos de vías/carril guía fijos
City of Phoenix T2050 funds approved by voters in 2015
Fondos de T2050 de la Ciudad de Phoenix aprobados por los votantes en 2015
CAPITOL/I-10 WEST
LIGHT RAIL EXTENSION
T I TLE
TYPEJANUARY / ENERO 2020
NEXT STEPSPRÓXIMOS PASOS
■ Continue technical analysis and incorporate community inputContinuar con el análisis técnico e incorporar los comentarios de la comunidad
■ Continue community outreachContinuar con los esfuerzos de alcance hacia la comunidad
■ Present refined options and results of analysis/input (spring 2020 public meetings)Presentar opciones refinadas y resultados del análisis/los comentarios (reuniones públicas en la primavera de 2020)
■ Present results/recommendations to Phoenix City Council (summer 2020)Presentar los resultados/las recomendaciones al Concilio de la Ciudad de Phoenix (verano de 2020)