Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

18
NBI © 2014 NBI © 2014 Cathy Higgins NBI Research Director Getting to Zero: The 2014 Net Zero Energy Status Report Findings for Commercial Buildings Amy Cortese, Cathy Higgins and Mark Lyles

Transcript of Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

Page 1: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014 NBI © 2014

Cathy Higgins NBI Research Director

Getting to Zero: The 2014 Net Zero Energy Status Report

Findings for Commercial Buildings

Amy Cortese, Cathy Higgins and Mark Lyles

Page 2: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014 NBI © 2014

Transform the World

Page 3: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Number of ZNE Projects

2012 to 2014

160 ZNE ZNE Registry

+ 40 more Pending

Page 4: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Locations of 160 ZNE Buildings

California ZNE Count in the Status Report: 10 Verified + 37 Emerging = 47 Total

Page 5: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014 NBI © 2014

Sizes of ZNE Buildings

63% of buildings are < 25,000 square feet (sf)

and 18% are > 100,000 sf

Page 6: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

ZNE Building Types

• 36% Education • 24% Renovations • 18 Districts • 12 Multi-family • Increase in Private Sector

Page 7: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Walgreens

IBEW 595

Solterra

Sokol Blosser Winery

PNC Bank

Morphosis Architects

Melink Corp.

McCormick Spices & Co.

Hines

Domus Development

Kaiser Permanente

Hanover Page Mill Associates

Green Leaf Inn

Georgia Peanut Commission

Frito-Lay TD Bank

DPR Construction

States & Cities: CA, CO, DC, MA, MN, NY, NM, VT, WA, Seattle, Austin

The European Union British Columbia, Canada

Adobe

Honda

KB Homes

JC Johnson Co.

3C Company

Hewlett Packard

TNT Express

Bubbly Dynamics

Walt Disney

Bayer

Who is going to Zero?

Page 8: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Packard Building Energy Model

CA Title 24 EUI = 50

Courtesy: EHDD

kBtu

/sf/

yr

kWh

s/sf

/yr

Actual Performance

Page 9: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Bullitt Center HVAC Overview Courtesy: PAE Consulting Engineers

Passive Solutions First

Decoupling Space Conditioning from Ventilation Moving away from forced air

Page 10: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Plug Load Strategies

Courtesy T. Hootman RNL Design, S. Pleiss NREL

Page 11: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

© N

ew B

uild

ings

In

stit

ute

Walgreens Evanston Store 14,000 sf - Opened April ‘14

Efficiency Measures:

• Building massing (geometry and

orientation)

• Excellent insulation and windows

• Exterior shading, automated interior

shades & operable windows

• Dedicated outside air ventilation system

• Demand ventilation controls

• All LED lighting

• Daylight harvesting controls

• Refrigerated case doors

• Heat recovery from refrigeration

systems

• Ground source (geothermal) heat pump

heating and cooling

• Natural (CO2) refrigerant

• Solar PV & Wind turbine

Page 12: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

8,116 stores

120,000,000 sf

28W to 25W just one modest lamp change

$765/year/store energy savings

$765 x 8,116 = $6,208,740!

Scale Matters

Page 13: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

HVAC on Display through Clear Wall

Page 14: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Redding School for the Arts, CA Courtesy : Trilogy Architecture Steve Whittaker Photography

Teaching more than students

Page 15: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Performance Range - Education

Average for all verified Education buildings = 70% below the national average

Energy Use Intensity (EUI) kBtus/sf/yr

Page 16: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014 NBI © 2014

Transformation

Page 17: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

ZNE Take Aways

• Emerging movement

• Achievable with readily available and emerging

technology in all US climates

• High performance first – lower energy use lowers

PV cost

• District, community, campus level offer cost and

scaling efficiencies

• The energy use downstream of design is critical with

operations and tenants

Nothing beats Zero

Page 18: Higgins_ACE3_SS_2014_G2Z_pres_paper_1224[1]

NBI © 2014

To

pic

1

To

pic

3

NBI © 2014

Questions - Discussion

Your thoughts on Pathways to Zero:

Proof – Program - Policy