HFT development

9
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope

description

HFT development. MimoStar2 based telescope. Outline. Our goals Setup Current status Problems to solve What next …. Our goals:. test functionality of a prototype MIMOSTAR2 detector in the environment at STAR: Charged particle environment near the interaction region in STAR. - PowerPoint PPT Presentation

Transcript of HFT development

Page 1: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

HFT development

MimoStar2 based telescope

Page 2: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Outline

• Our goals

• Setup

• Current status

• Problems to solve

• What next …

Page 3: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Our goals:

test functionality of a prototype MIMOSTAR2 detector in the environment at STAR:

Charged particle environment near the interaction region in STAR.

Performance of our cluster finding algorithm. Performance of the MIMOSTAR2 sensors. Functionality of our tested interfaces to the other STAR

subsystems. Performance of our hardware / firmware as a system. The noise environment in the area in which we expect to

put the final HFT.

Page 4: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

MIMOSTAR

2

MIMOSTAR

2

MIMOSTAR

2

Motherboard

Analog signalsClock & controlJTAGLU prot. Power

Analog signalsClock & controlCluster FIFOHot Pixel MapMemory Access(for full frame)Trigger infoPower

Stratix

Daughtercard

Trigger, Clockfrom MWPC

Powerfrom MWPC

JTAGx3 for MIMOSTARx1 for daughtercard

Latch upmonitor and reset

powerDDL to Linux PC

serial / ip connection

JTAG

Trigger, ClockCluster FIFOBusy to trigger

PC(WIN)

control conectionto PC in DAQ room

STRATIX

DAUGHTER CARD

RORC SIU

MimoStar2 chips on kapton cables

MOTHERBOARD

Acquisition Server (Linux)

Telescope setup - components

Control PC (Win)

Page 5: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Power, clk, sync, jtag

analog

mxfirst

Control, readout

TELESCOPE HEAD

3 MimoStar2 chips as TELESCOPE

Telescope setup

Page 6: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

East Pole Tip installation

H. Wieman

Page 7: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Current Status

• Electronics Hardware / Hardware – All required PCBs, cables, computers, etc are in hand. We are currently working on some problems involving noise in our electronics setup. We hope to resolve this shortly and assemble and test the telescope setup in a beam run at the ALS at LBL before moving the system to BNL for the beam test.

• Firmware – The required functionality required for the test has been implemented and tested in the ways possible before a working set of detectors is used.

• Integration – The insertion tube and electronics box are in place at BNL as is the cooling system, DAQ and control PCs. Final assembly and testing of the telescope is required before we can do further testing.

Page 8: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Problems to solve - distortions

In the configuration with a fully loaded kapton cable we see some distortions which appear in the middle of the frame

Page 9: HFT development

IPHC-LBL-BNL video conference 19 Jan 2007

Problems to solve - noise

• The noise doesn’t come from the DAQ system (~1 ADC)

setup sub array Peak [ADC]

Noise [ADC]

ENC [e-]

IPHC

(40°C)

Std - - 17.8

Rad - - 25.3

Mezz. full Std 260 5.2 32.8

Rad 222 5.4 40.0

Mezz. part Std 286 5.1 29.2

Rad 247 5.2 34.8

Flex 1 Std 268 4.2 25.7

Rad 227 4.8 34.7

Flex 2a Std 304 5.6 32.0

Rad 266 5.8 35.7

Flex 2b Std 183 3.9 34.9

Rad 162 4.0 40.5

IPHC – results from Strasbourg

Mezz. Full – chip bonded on a mezzanine card

Mezz. Part – chip bonded on a mezzanine card with part of the bonds (like for a flex cable)

Flex1 – only on flex cable in the hft system

Flex2 – two chips in parallel in the hft system