IPHC-LBL-BNL video conference 19 Jan 2007
HFT development
MimoStar2 based telescope
IPHC-LBL-BNL video conference 19 Jan 2007
Outline
• Our goals
• Setup
• Current status
• Problems to solve
• What next …
IPHC-LBL-BNL video conference 19 Jan 2007
Our goals:
test functionality of a prototype MIMOSTAR2 detector in the environment at STAR:
Charged particle environment near the interaction region in STAR.
Performance of our cluster finding algorithm. Performance of the MIMOSTAR2 sensors. Functionality of our tested interfaces to the other STAR
subsystems. Performance of our hardware / firmware as a system. The noise environment in the area in which we expect to
put the final HFT.
IPHC-LBL-BNL video conference 19 Jan 2007
MIMOSTAR
2
MIMOSTAR
2
MIMOSTAR
2
Motherboard
Analog signalsClock & controlJTAGLU prot. Power
Analog signalsClock & controlCluster FIFOHot Pixel MapMemory Access(for full frame)Trigger infoPower
Stratix
Daughtercard
Trigger, Clockfrom MWPC
Powerfrom MWPC
JTAGx3 for MIMOSTARx1 for daughtercard
Latch upmonitor and reset
powerDDL to Linux PC
serial / ip connection
JTAG
Trigger, ClockCluster FIFOBusy to trigger
PC(WIN)
control conectionto PC in DAQ room
STRATIX
DAUGHTER CARD
RORC SIU
MimoStar2 chips on kapton cables
MOTHERBOARD
Acquisition Server (Linux)
Telescope setup - components
Control PC (Win)
IPHC-LBL-BNL video conference 19 Jan 2007
Power, clk, sync, jtag
analog
mxfirst
Control, readout
TELESCOPE HEAD
3 MimoStar2 chips as TELESCOPE
Telescope setup
IPHC-LBL-BNL video conference 19 Jan 2007
East Pole Tip installation
H. Wieman
IPHC-LBL-BNL video conference 19 Jan 2007
Current Status
• Electronics Hardware / Hardware – All required PCBs, cables, computers, etc are in hand. We are currently working on some problems involving noise in our electronics setup. We hope to resolve this shortly and assemble and test the telescope setup in a beam run at the ALS at LBL before moving the system to BNL for the beam test.
• Firmware – The required functionality required for the test has been implemented and tested in the ways possible before a working set of detectors is used.
• Integration – The insertion tube and electronics box are in place at BNL as is the cooling system, DAQ and control PCs. Final assembly and testing of the telescope is required before we can do further testing.
IPHC-LBL-BNL video conference 19 Jan 2007
Problems to solve - distortions
In the configuration with a fully loaded kapton cable we see some distortions which appear in the middle of the frame
IPHC-LBL-BNL video conference 19 Jan 2007
Problems to solve - noise
• The noise doesn’t come from the DAQ system (~1 ADC)
setup sub array Peak [ADC]
Noise [ADC]
ENC [e-]
IPHC
(40°C)
Std - - 17.8
Rad - - 25.3
Mezz. full Std 260 5.2 32.8
Rad 222 5.4 40.0
Mezz. part Std 286 5.1 29.2
Rad 247 5.2 34.8
Flex 1 Std 268 4.2 25.7
Rad 227 4.8 34.7
Flex 2a Std 304 5.6 32.0
Rad 266 5.8 35.7
Flex 2b Std 183 3.9 34.9
Rad 162 4.0 40.5
IPHC – results from Strasbourg
Mezz. Full – chip bonded on a mezzanine card
Mezz. Part – chip bonded on a mezzanine card with part of the bonds (like for a flex cable)
Flex1 – only on flex cable in the hft system
Flex2 – two chips in parallel in the hft system