Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway...

42
Affiliated of Hesayar Holding Multiple Co.

Transcript of Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway...

Page 1: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Affiliated of

Hesayar Holding Multiple Co.

Page 2: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Wagon Pars Company (WPC) which is the leading manufacturer

of Rolling Stocks in whole Middle East and North Africa, owned by

Hesayar Cooperative Multiple Company.

Founded on 1974, Wagon Pars Co. located its 33-hectar- factory

in Industrial Town of Arak which is the major industrial pole of

Iran.

Through transfer of technologies from Wagon Union (now

Bombardier Transportation Co.) as well as SGP (now Siemense

Transportation Co. Austria), WPC started manufacturing different types of passenger coaches and freight wagons on UIC basis.

History:

Page 3: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Main Targets :

New Technologies in design and production

Wide Range of Products

High Quality

Developing Exports

After-Sales Services

Competitive Price

On Time Delivery

Wagon Pars Strategic Direction

Page 4: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Wagon Pars Products:

Freight Wagons

Passenger Coaches

Locomotives (Main Line & Shunting)

Train Sets (DMU)

Metro Cars

Airport Passenger Boarding Bridges

Components

Elevator

Page 5: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

TAW Co.

Ehya Sanaat

Engineering Co.

Supplying Parts and Components for

Wagons and Bogies

Repairing and Maintenance Services for

Wagons, Locomotives and Bogies

Affiliate Company:

Page 6: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Production Capacity

Annual Capacity Product Row

1500 units Freight wagon 1

150 units passenger coach 2

100 units Metro car 3

40 units Train set (DMU) 4

40 units Locomotive 5

Page 7: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Wagon Pars Products

Quantity Type of Product

Total Export Local Market

8804 1694 8150 Freight Wagon

307 67 240 Passenger Coach

30 - 30 High Speed Car Transportation

70 - 70 Metro Car

52 - 52 Train Set

88 - 80 + 8 Locomotive (Shunting & Main Line)

12145 1948 10197 Freight Bogie

888 350 538 Passenger Bogie (MD36, MD52M,

MD523)

160 - 160 Locomotive Bogie (CO-CO)

14 - 14 Airport Passenger Boarding Bridge

8 - 8 Generator Wagon Structure

Page 8: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Customers Date of contract Quantity Subject Row

SYRIA 1994 360 Cereal wagon 1

SYRIA 1995 559 Tank wagon 2

SYRIA 1995 45 Cement wagon 3

Bangladesh 1995 67 Passenger wagon 4

SUDAN 2001 180 Covered wagon 5

CHINA 2005 100 Bogie MD52M 6

CHINA 2005 60 Bogie MD52M 7

CUBA 2005 100 Cement wagon 8

CUBA 2006 200 Tank wagon 9

CUBA 2005 150 Container flat wagon 10

CUBA 2005 100 Covered wagon 11

Delivered EXPORT Contracts

Page 9: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Customer Date of

Contract No. Delivered Qty Subject Row

CUBA 2007 1 Prototype 164 Passenger coaches 1

CUBA 2007 1 Prototype 18 Restaurant coaches 2

CUBA 2007 1 Prototype 18 Generator wagon 3

SYRIA 2000 2 Prototype 99 Refurbishment of

passenger coach 4

SYRIA 2003 1 Prototype 80 Phosphate wagon 5

Current Export Contracts

Page 10: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Iranian

Customer

Tehran Urban &

Suburban Railway

Co.

Islamic Republic

of Iran Railways

RAJA Passenger Trains Co. Mobarakeh steel complex

Imam Khomeini International

Airport

Khoozestan

Steel Foundry

Page 11: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Export

Marketing

Bangladesh Railway Syrian Railways

China CMC / CRC Sudan Railways

CUBA Railways Vietnam Railways

Page 12: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Locomotive

Bogie

Metro Car

Train Set (DMU)

Passenger Boarding Bridge

Main cooperator company in development of Technology

Page 13: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Product

Freight Products Passenger Products

Locomotive Bogie

Other Products

Page 14: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Freight Products

Flat Wagon

Hopper Wagon

Ballast Wagon

Cement Wagon

Fuel Tank

Covered wagon

6-Axle Wagon Open Top Wagon

Car Transporterer Wagon

Phosphate wagon

Return

Page 16: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Locomotives

Main Line

Locomotive Shunting

Locomotive

Return

Page 19: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

HOPPER WAGON

³ m 80 – Hopper Wagon

³ m 50 – Hopper Wagon

Return

Page 25: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Airport Passenger Boarding Bridge

Return

Page 26: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

• Connection to the RAI’s Railway Network

• 33 km Railway Lines in the Factory and Depot

• 20 Units of Power Substation and Dispatching Control Room

• Gas Production Units (CO2, O2, N2 & Compressed Air)

• Central Air Ventilation System for The Workshop and office Rooms

• Mechanized Stores for Raw Materials, Equipments and Sub Assemblies

• Modern Network Lines to Energy Transfer

• Advanced Painting Room

• 10 km Fiber-Optic Network

•.

•.

Manufacturing and Workshop Facilities

Page 27: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Technical and Engineering Capabilities

•Product:

Design of all type of freight wagons, Passenger coaches

and bogies by modern computer software: AutoCAD, CATIA, ANSYS , …… .

•Tools:

•Designing and production of all jigs & fixtures

Page 28: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Test facilities

• Static and Strength Test of Carbodies

• Product Balancing Test

• Bogie Balancing Test

• Weight Test

• Electrical Test

• Prototype Dynamic Tests

• Brake Tests

• Painting Tests

• Destructive Test & Non-Destructive Test

Page 29: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Locomotive Final Assembly Workshop

Page 30: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Locomotive Final Assembly Workshop

Page 31: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

DMU Final Assembly Workshop

Page 32: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

DMU Final Assembly Workshop

Page 33: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Carbody Manufacturing Workshop

Page 34: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Carbody Manufacturing Workshop

Page 35: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Carbody Manufacturing Workshop

Page 36: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Metro Car Final Assembly Workshop

Page 37: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Metro Carbody Manufacturing Workshop

Page 38: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Steel structure Repair Workshop

Page 39: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Steel Structure Repair Workshop

Page 40: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

ISO Quality Certificate

Page 41: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Sri Lanka

Syria

Pakistan

Bangladesh

Iraq

Our Agents

Page 42: Hesayar Holding Multiple Co. · • Connection to the RAI’s Railway Network • 33 km Railway Lines in the Factory and Depot • 20 Units of Power Substation and Dispatching Control

Web Address : www.wagonpars.com

Email Address: [email protected]

Contact Us: Head office:

No. 520 West Taleghani Ave.

Tehran 14168

Iran

P.O.Box 14155-5814

Tehran

Iran

Tel: +98 21 664 051 05

Fax: +98 21 664 002 63

Factory:

km 4 Tehran Rd.

Arak

Iran

Tel: +98 861 3133 048 – 50

Fax: +98 861 3133 999