HES-HKS & KaoS meeting Toshi Gogami 5/June/2012 May/2009 @ Hall-C.
HES HKS meeting
-
Upload
martina-oriole -
Category
Documents
-
view
22 -
download
0
description
Transcript of HES HKS meeting
![Page 1: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/1.jpg)
HES HKS meeting8Nov 2010T.Gogami
E05-115 experimental setup in JLab Hall C (2009)
![Page 2: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/2.jpg)
Content
• HKS GEANT– Committed• NMRPort , Chmaber extension2 , flange• MaterialList
• Moller scattering differential cross section in Lab system
![Page 3: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/3.jpg)
Committed (svn)• src/– ChamberExtension2.cc– CEF.cc– NMRPort.cc– HKSDetectorConstruction.cc
• include/– ChamberExtension2.hh– CEF.hh– NMRPort.hh– HKSDetectorConstruction.hh
![Page 4: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/4.jpg)
Committed (svn)
• /src– MaterialList.cc
• /include– MaterialList.hh
1. Harver2. SUS3043. Concrete
![Page 5: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/5.jpg)
Concrete
Concrete
![Page 6: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/6.jpg)
Moller scattering CM==> Lab
http://lambda.phys.tohoku.ac.jp/~gogami/HES-HKS/Moller_lab_cm/moller_lab_cm.pdf
![Page 7: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/7.jpg)
Moller cross sectiontheta and momentum dependence
in Lab system
GEANTuniform gen. Collimator (-3cm , 12C)
HES acceptance >3 [deg]
thetamomentum
HES
2000 ×2000
collimator OFF
![Page 8: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/8.jpg)
Summary and to do• Summary– HKS GEANT
• Committed (subversion)– NMRPort , Chmaber extension2 , flange– MaterialList
– Moller scattering • HES cannot accept Moller electrons
• to do– Analysis
• ee+ background– reconstruct real xx’ distribution with simulation– rejection code– Time difference between ee+ and particles on optics.
• Residual of chambers for each arm.• HES tracking
– Strangeness 2010 in KEK• registration has been done !
![Page 9: HES HKS meeting](https://reader036.fdocuments.net/reader036/viewer/2022070400/56813513550346895d9c673b/html5/thumbnails/9.jpg)
End
11/6 時点