Henry Begg, TWI Ltd
Solutions to Materials Challenges in Geothermal
![Page 3: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/3.jpg)
• Underused compared with other renewables, despite global abundance
• Need high enthalpy reservoir
• Geologically active parts of the world
• Deep drilling
Geothermal – free power beneath our feet?
Why isn’t it everywhere?
![Page 4: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/4.jpg)
• Projects require large capital outlay
• Drilling
• Plant
What’s holding us back from building plant?
Cost
The projects have received funding from the European Union’s Horizon 2020 program under grant agreement numbers 815319 and 764086
![Page 5: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/5.jpg)
• Significant materials challenges
• Wear/fracture of drill components in breaking rock
• Associated down-time with removing the drill string
• Wear of components in transport of cuttings
Why is drilling so expensive?
Damaged drill bit – Dexcel (Wikipedia)
![Page 6: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/6.jpg)
• Significant materials challenges
• Wear/fracture of drill components in breaking rock
• Associated down-time with removing the drill string
• Wear of components in transport of cuttings
Why is drilling so expensive?
Worn drill component - Image courtesy of the GeoDrill consortium
![Page 7: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/7.jpg)
This project received funding from the European Union’s Horizon 2020 program under grant agreement number 815319.
![Page 8: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/8.jpg)
• New materials & coatings
• GO-WC
• Hardfacing HVOF and High Entropy Alloys
• Novel diffusion bonding techniques
• New hammer design
• Fewer moving parts – bi-stable fluidic oscillator
• Intelligent monitoring system
• 3D printed sensors directly on drill string components
HVOF coating – copyright TWI Ltd
![Page 9: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/9.jpg)
• Significant materials challenges
• Corrosion – aggressive geochemistry (temperature, pH, chloride, H2S)
• Erosion – suspended, precipitated solids cause wear
• Scaling – precipitation of dissolved minerals
Why is plant so expensive?
Corroded component –Image courtesy of the GeoCoat consortium
![Page 10: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/10.jpg)
• Significant materials challenges
• Corrosion – aggressive geochemistry (temperature, pH, chloride, H2S)
• Erosion – suspended, precipitated solids cause wear
• Scaling – precipitation of dissolved minerals
Why is plant so expensive?
Eroded component - Image courtesy of the GeoCoat consortium
![Page 11: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/11.jpg)
• Significant materials challenges
• Corrosion – aggressive geochemistry (temperature, pH, chloride, H2S)
• Erosion – suspended, precipitated solids cause wear
• Scaling – precipitation of dissolved minerals
Why is plant so expensive?
Boch, Ronny & Szanyi, János & Leis, Albrecht & Mindszenty, A & Deák, József & Kluge, Tobias & Hippler, Dorothee & Demény, Attila & Dietzel, Martin. (2016). Geothermal Carbonate Scaling: Forensic Studies
Applying High-Resolution Geochemical Methods. Proceedings of the European Geothermal Congress. ISBN: 978-2-9601946-0-9. S-GC.
![Page 12: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/12.jpg)
This project received funding from the European Union’s Horizon 2020 program under grant agreement number 764086.
![Page 13: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/13.jpg)
• New coatings
• New compositions (high entropy alloys, Ni-PTFE composites)
• Range of deposition techniques (HVOF, laser cladding, electroless plating, esd)
• New materials
• Novel metal matrix composites Laser cladding – copyright TWI Ltd
![Page 14: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/14.jpg)
Contact Details
Henry Begg
Section Manager
Surface Engineering
TWI Ltd
tel: +44 1223 899 565
email: [email protected]
web: www.twi-global.com
![Page 15: Henry Begg, TWI Ltd - EU Sustainable Energy Week · 2019-06-28 · Projects require large capital outlay • Drilling • Plant What’s holding us back from building plant? Cost](https://reader033.fdocuments.net/reader033/viewer/2022042116/5e9375f2ca2f8b02cd4e85fe/html5/thumbnails/15.jpg)