Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The...

5
Fairfield Area Library 1401 N. Laburnum Ave. Henrico, VA 23223 County of Henrico, Virginia PO Box 90775 4301 E. Parham Road Henrico, VA 23273-0775 Henrico, VA 23228 ATTACHMENT E

Transcript of Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The...

Page 1: Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The Architect shall review requests by the Owner, Owner's consultants or Contractor for

Fairfield Area Library1401 N. Laburnum Ave.Henrico, VA 23223

County of Henrico, VirginiaPO Box 90775 4301 E. Parham RoadHenrico, VA 23273-0775 Henrico, VA 23228

ATTACHMENT E

Page 2: Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The Architect shall review requests by the Owner, Owner's consultants or Contractor for

ATTACHMENT D - AIA DOCUMENT B214

2009

The Architect shall provide an energy model and appropriate revisions in support of the LEED Certification.The energy model assumptions, basis and performance anticipated shall be provided to the Owner for reviewand concurrence during Design Development and prior to submission to GBCI. The final energy model datafiles shall be provided for the owner's records and future use.

F.

Page 3: Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The Architect shall review requests by the Owner, Owner's consultants or Contractor for

ATTACHMENT D - AIA DOCUMENT B214

, certification,clarification, and appeals processes.

for those

in a timely manner.

Page 4: Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The Architect shall review requests by the Owner, Owner's consultants or Contractor for

ATTACHMENT D - AIA DOCUMENT B214

The Architect shall review requests by the Owner, Owner's consultants or Contractor for changes in Workrelated to LEED certification.

The Architect shall review all proposed changes in the Work to determine if the implementation of therequested change will impact LEED certification requirements. The Architect shall notify the Owner of theirfindings and provide recommendations to the Owner.

Page 5: Henrico Fire House 19 - Attachment B - AIA B214 LEED ... · ATTACHMENT D - AIA DOCUMENT B214 The Architect shall review requests by the Owner, Owner's consultants or Contractor for

ATTACHMENT D - AIA DOCUMENT B214

the LEED target credits, or the revised credits as mutually modified by the Architect and Owner. The Architect shall identify, in thebid documents, those construction credits from which the Contractor shall select to pursue and shall identify the minimum numberof credits that the Contractor must obtain. The Architect, with the Owners approval, shall establish contractual responsibilities andpenalties should the contractor not achieve the credits under its responsibility. The Architect shall include the target credits in the biddocuments and shall establish values for each credit in the schedule of values under the Contractor's responsibility.

The Architect shall notify the Owner when Additional Services beyond the LEED Certification Services stated herein are anticipated. The Architect shall not provide Additional LEED Services beyond those identified in this agreement until the Architect receives the Owner's written authorization.

The Architect shall pursue sufficient credits to assure that the target LEED Certification Level is obtained based upon

C,

C,