Heller Flexible Machining SystemPrivately Negotiated Sale Conducted by Gibbs Machinery Company
Pre-Fracture MachiningOperations 5 - 70
OPERATION 5/10-1
HELLER MCH 400 PC
Qualification Crank Bore/Pan
OPERATION 5/10-2
HELLER MCH 400 PC
Qualification Crank Bore/Pan
OPERATION 20/1A-1B
HELLER MCH 400 PC
Rough Cylinder Bores and Top Deck
OPERATION 20/2A-2B
HELLER MCH 400 PC
Rough Cylinder Bores and Top Deck
OPERATION 40/1A-1B
GROB BZ 800
Finish Pan Rail, Main Cap Bolt Holes
OPERATION 40/2A-2B
CINCINNATI HPC 800
Finish Pan Rail, Main Cap Bolt Holes
OPERATION 50/1A-1B
HELLER MCH 350 PC
Drill & Tap Mounting Holes Front, Rear, Sides
OPERATION 50/2A-2B
HELLER MCH 350 PC
Drill & Tap Mounting Holes Front, Rear, Sides
OPERATION 60
DURR ECOCLEAN WASHER
Pre-Cracker Wash
OPERATION 70
ALFING FRACTURE SYSTEM
Fracture Main Bearing Caps
Finish MachiningOperations 80 - 180
OPERATION 80.1
HELLER MCD 450 D
Piston Cooling
OPERATION 90.1
HELLER MCD 450 D
Cylinder Bore Roughing / Left Right Mounting Holes
OPERATION 90.2
HELLER MCD 450 D
Cylinder Bore Roughing / Left Right Mounting Holes
OPERATION 100
Durr EcoClean
Pre-Assembly Wash
OPERATION 110
Assembly System
Bearing Cap Install
OPERATION 120
HELLER TRS 4000
Crank Bore, Idler Bore FR/RR Dowels
OPERATION 130
MARPOSS
In-Line Gage
OPERATION 140
HELLER TRS 4000VS
Cylinder Bore/Head Deck Finish
OPERATION 150.1
HELLER MCH 400 D
Fuel Pump/Air Compressor Pad, Mount Holes
OPERATION 150.2
HELLER MCH 400 D
Fuel Pump/Air Compressor Pad, Mount Holes
OPERATION 160
DURR EcoCLEAN
Pre Wash
OPERATION 170
DURR EcoFLEX
Robot Deburr & Final Wash
OPERATION 180
Reinhart Industrial
Leak Test