Introduction

Plant is a major cause of workplace death or injury in Australia.

The Work Health and Safety Act 2012 and Work Health and Safety Regulations 2012 have significant plant and structure safety requirements.

Page 3: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICESHEALTH AND SAFETY SERVICES

Definition of Plant

Any machinery, equipment, appliance, container, implement and tool, and includes any component or anything fitted or connected to any of those things.

Certain kinds of plant, such as forklifts, cranes and some pressure equipment, require a licence from the WHS regulator to operate and some high-risk plant must also be registered with the WHS regulator.

Page 4: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICESHEALTH AND SAFETY SERVICES

Definition of Structure

Is anything that is constructed, whether fixed or moveable, temporary or permanent and includes buildings, masts, towers, framework, pipelines, transport infrastructure and underground works, any component of a structure and part of a structure.

Page 5: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Registration and Licencing of Plant and Structures

Some plant must be registered with SafeWork SA before it can be supplied (at design) or before it can be used (management or control).

Some plant require the operator to hold a high risk work licence before it can be operated.

Page 6: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

The Principles of Safe Plant Management

All hazards and risks to health and safety as a result of using plant are managed in accordance with risk management principles covering the full life cycle of plant.

Design Manufacture Import / Supply Pre purchase Install Use Dispose

Page 7: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duties

PCBU

Primary duty to ensure, so far as is reasonably practicable, that workers and other persons are not exposed to health and safety risks arising from the business or undertaking. This includes:• The provision and maintenance of safe plant; and• The safe use, handling, storage and transport of plant.

PCBU with management or control of plant

Officers

Workers

Also have a duty to:• Manage the health and safety risks associated with plant.• Prevent unauthorised alterations to or interference with plant.• Use plant only for the purpose for which it was designed unless the proposed use does not

increase the risk to health and safety.

Duty to exercise due diligence to ensure that the PCBU complies with the WHS Act and Regulations. This includes taking reasonable steps to ensure that the PCBU has and uses appropriate resources and processes to eliminate or minimise risks that arise from plant used in the workplace.

Duty to take reasonable care for their own health and safety and must not adversely affect the health and safety of other persons. Workers must comply with any reasonable instruction and cooperate with any reasonable policy or procedure relating to health and safety at the workplace.

Page 8: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

Page 9: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

• Eliminate or minimise risks at design stage where practicable

• Comply with specified requirements eg. guarding

• Provide information about the plant such as hazards and risks associated with the use, testing, inspections and emergency response requirements.

Page 10: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

• Inform the designer of any hazards identified during manufacture.

• If this is not possible, the manufacturer is required to eliminate or control the risk.

• Provide information about the plant eg. information about the hazards, to the person who is supplied the plant.

Page 11: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(includes Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

• Obtain information about the plant from the manufacturer eg. hazards, risk assessments , control measures, operator /user manuals and instructions, construction, installation, erection, commissioning plans, records from previous owners.

• Provide this information to the person who is supplied the plant eg. safety records, inspection reports, maintenance, repair and any modifications to the plant.

Page 12: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

Through sale, loan, trade-in, transfer or donation must:• Identify any faults in the plant.• Provide information in writing to the

person who is supplied the plant about:- The condition of the plant.- Any identified faults.- Notice that the plant should not be

used until faults have been fixed.

Page 13: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

A competent or licensed person installs, constructs or commissions plant and structures in accordance with information provided by the designer, manufacturer, importer or supplier of the plant or structure.

Page 14: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty Holders

PCBU

MANUFACTURERS

DESIGNERS

IMPORTERS AND SUPPLIERS(Hirers and Leasers)

SUPPLIERS OF SECOND HAND PLANT(Internal transfers within workplaces)

INSTALL, CONSTRUCT OR COMMISSION PLANT OR STRUCTURES

MANAGEMENT OR CONTROL OF PLANT AT A WORKPLACE

• Risks are manages in accordance with risk management requirements.

• Control measurers are implemented before installation or commissioned into use eg. guarding, e-stops.

• Unauthorised interference with or alteration to plant is prevented.

• Plant is only used for its intended purpose

• Risks associated with proposed use is assessed by a competent person.

• Guards, e-stops and warning devices are in place and operational.

• Safety features and warning devices are used.

• Plant does not create a risk to health and safety when not in use.

• Maintenance, inspection, repair and testing is only carried out by a competent person.

Page 15: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Duty to Consult

Design, manufacture and use of plant may involve several PCBUs. Where several PCBUs have duties on same matter, they must consult, co-operate

and co-ordinate activities with each other on the matter. Duty to consult workers who may be affected.

Page 16: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Alterations to or Interference with Existing Plant

Risk assessments must be undertaken to determine potential impacts on existing operations and the health and safety of workers: Prior to any alteration or modification to existing plant. A change in the way plant is used or a system of work associated with the plant. A change in the location of the plant.

Alterations or modifications, including the removal of guarding or interference with emergency stop controls or warning devices must not be undertaken without the site manager’s approval.

Page 17: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Decommissioning, Dismantling and Disposing of Plant

Plant can be identified as suitable for disposal because: It is no longer required due to change in workplace, procedure, function or

activity. It no longer complies with WHS legislation, Australian Standards or DECD

specifications. It is beyond economical repair and is suitable for scrap or spare parts only.

Page 18: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Decommissioning, Dismantling and Disposing of Plant

The process occurs in accordance with manufacturer’s instructions and is managed by a competent person.

It complies with the requirements of Regulation 204 of the WHS Regulations 2012 to ensure that any hazards inherent in the process of decommissioning, dismantling or disposal have been identified and controlled.

If the plant contains materials which are likely to present a risk to the health and safety of individuals or to the environment (eg. asbestos or a hazardous chemical), the material is disposed of in accordance with relevant regulatory requirements.

Page 19: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Hazard Identification and Risk Assessment

Detailed information on the identification of hazards, risk assessment process and control measures are provided in: DECD Guidelines for the Safe Use of Machinery. Managing the Risks of Plant in the Workplace Code of Practice.

Where a hazard has been identified a risk assessment must be undertaken using the Plant Risk Assessment Form in consultation with affected workers.

Page 20: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Control Measures

Elimination

Substitution

Isolation

Engineering

Administration

PPE

Page 21: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Approved Codes of Practice relating to Plant

SafeWork Australia has drafted a number of Approved Codes of Practices relevant to plant safety:

How to manage work health and safety risks Managing risks of plant in the workplace

Draft Codes of Practice pending: Safe design, manufacture, import a d supply of plant Managing risks of plant in rural workplaces

Page 22: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Role of Approved Codes of Practice

National Codes must be approved by the Minister to become ACOP.

Admissible in court as evidence whether duty under the Act has been complied with.

Court may have regard to ACOP: On what is known about a hazard or risk or risk control. To determine what is reasonably practicable in the circumstances.

Evidence may be provided as compliance in a manner that is different from what is outlined in an ACOP – but the standard must be equal or better .

Page 23: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Reasonably Practicable

REASONABLY PRACTICABLELikelihood of

hazard or risk occurring

Seriousness of harm

(Death or disability)

Availability or suitability of ways

to eliminate or minimise risks

Cost

Knowledge about the risks

(What you know or should know)

Page 24: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Use

Plant must used only for the purpose it was designed and is operated in accordance with manufacturer’s instructions.

Safe work zones are established.

Guards and e-stops must not be removed or tampered with.

Safety Operating Procedures (SOPS) are placed in close proximity to the plant.

Personal Protective Equipment suitable to the task is used where required.

When plant is not in use for 3 months or more, an OUT OF SERVICE tag must be attached and plant is locked out where possible.

Page 25: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Maintenance and Inspection

Site Maintenance Schedules are to be maintained for all plant.

Isolation or lock out systems to be used when inspecting, testing or performing maintenance or repairs to high risk plant in accordance with DECD specifications.

Testing and tagging of electrical plant is to be undertaken in accordance with DECD Electrical Testing Procedure.

Activities are undertaken by a competent person.

Page 26: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.

HEALTH AND SAFETY SERVICES

Record Keeping

WHS Regulations has prescriptive record keeping requirements for: Maintenance, testing records of plant subject to design or item registration with

SafeWork SA - life of plant. Presence sensing safeguarding systems – 5 years.

DECD requires site managers to keep records for plant in their management or control For the life of the plant. Or until control is relinquished.

Page 27: HEALTH AND SAFETY SERVICES Introduction to Safe Management of Plant.