Head Lines:

1. About Gulf Technology Co…………………………………….

a. History…………………………………………………...

b. Profile……………………………………………………

c. Organizational structure…………………………………

d. Employees, Equipments & Vehicles…………………….

2. One of the major projects accomplished for kharafi national co.

3. Clients &projects………………………………………………..

4. References………………………………………………………

a. Commercial Registration No……………………………..

b. Chamber Of Commerce No………………………………

c. Sample snap shot of Kharafi National Co. Project……….

d. Sample snap shots of deferent projects, equipment & tools with brief

explanation………….

About Gulf Technology:a. History:

Gulf Tech Co. started contracting in medium volt projects on 1999 with different contracts in main-tains of 11/0.415 KV transformers for commercial buildings, and HV testing of 11KV cables. Soon we started handling installation projects for 11KV switchgear panels and transformers with testing and commissioning. We could gain the confidence of our clients by our professionalism and experience, in which we have the most experienced engineers and foremen in that field who have work experience for more than 25 years with MEW Kuwait.

b. Gulf Technology’s Profile:

Company’s Name: Gulf Technology General Trading & Contracting Company

Year Of Establishment: 31/07/1999

Head Office Address: Hawally – Qutaiba St. Shikha Complex Third Fl.

Postal Address: P.O.Box 1071 Salmiya 22011 – Kuwait

TEL: 22630512 FAX: 22630514

Email: [email protected]

Commercial registration No 993/1999 (copy Attached)

Chamber of Commerce. No. (copy Attached)

Paid Capital: KD 150000.00

c. Organizational Structure:

Eng. Fadi Al-Daour General Manager [email protected] mob.: +965 9 7444 131

Mr. Eyas AL Daour Deputy [email protected] mob.: +965 9 765 4654

Mr. Yousef Al Daour Finance anf [email protected] mob.: +965 9 951 7267

Mr. Anas Al Daour Sales & [email protected] mob.: +965 9 933 6209

Eng. Ershad Mohamd Electrical Engineer (execution)[email protected] mob.: +965 9 772 7514

Eng. Suha Electrical Engineer (Marketing)[email protected] mob.: +965 9 775 7516

Eng. Rem Site [email protected]

mob.: +965 9 775 7814

Mr.Ahmad Abd [email protected] mob.: +965 9 77 63215

d. Employees, Equipments & VehiclesMan Power: (pay roll)

• Management Staff 5 nos.

• Tech. Staff 27 nos.

• Engineers 4 nos.

• Foreman 4 nos.

• Cable Jointers 3 nos.

• Electricians 8 nos.

• Drivers 4nos.

• Assistants 8 nos.

MEW approved staff• Senior engineer• Senior foreman for testing• Senior foreman for erection• Cable jointers• Electricians for testing and erection

Vehicles:

• Saloon 3 nos.

• Jeep 4 nos.

• Van 2 nos.

• Half lorry 2 nos.

Tools and Equipment• Diesel Generator• Boring machine for earthing pits• Cable trailer• Megger 1 KV• Megger 5 KV• Earth tester• Avo meter• Secondary injection test set• Primary injection test set• HV DC cable testing set 40kV• Welding set• Oil pump• Crimping tools

One of the major projects accomplished for kharafi national co.

Included some pictures utilizing the scope of work of one of the best projects made, It was for Kharafi National Co. as one of our major clients in MV projects.

Client: Kharafi National Co.

Project: Sulaibiya Waste Water Treatment and Reclamation Plant, KUWAIT.

Type Of Work: Installation, testing & commissioning of 11KV SwitchgearBattery chargersOil and dry transformers,MV cablesPilot and control cableLV cablesEarthing system and all related works for 13 substations with switching sta-tion.

Job included the following:

• Installation, testing & commissioning of 101nos. MV pales• Installation, testing & commissioning of 33nos 1600KVA Transformers• Installation, testing & commissioning of 13nos. Battery Chargers• Installation, termination, testing & commissioning of 11KV 3C 185mm cables• Installation, termination, testing & commissioning of 1C 800mm cables• Installation, testing & commissioning of 27 cells 11KV switching station• Earth system for all the above.

Work was Done according to MEW standards. And handed over in three month.

We Confirm:

• Our engineers, foremen, jointers and electricians are MEW approved and worked in several MEW MV projects.

• Our works comply with MEW latest specifications and regulations.• Our equipments and materials comply with I.E.C or B.S.S.

Clients & Projects:

Mushreff Co.Replacement of 2nos. Oil type 11/3.3kv transformers with 2nos. 11/3.3kv dry type 2500kva with all related cable works with testing & commissioning

Al-Ghanim Int.Delivery, installation and commissioning of 1250kva 11kv transformer to com-mercial bld.

Al-Ghanim car showroom

Supply & installation of 11kv switch board, battery charger, 2nos. 1250kva transformers and L.T Panel with all related works, with testing and commis-sioning.

Al Ghanim Interna-tional

Testing and commissioning of MV equipments and work for Shwaikh power station upgrade

KGLComplete warehouse electrical supply & installation. electrical panels, cable laying cable tray, power & light points, etc.

Kirby

Design, supply, installation, testing and commissioning of a complete 650KW distribution system for the new machinery in Kirby factory and gain MEW approval and energizing. Consists of Electrical Panels, Bus duct, trunking system. Cable, etc...

C&S BUS DUCT SYSTEM

Supply, installation, testing and commissioning of Bus bar trunking system for different projects in Kuwait, KOC, KNPC, Al Nassar Tower, Holliday Inn & a lot more

The National Co. Ardiya Pumping Station all MV Installation, testing & commissioning

The National Co. Khiran station, All cable, cable tray, panel installation and earthing works

The National Co. Suibiya sewage treatment plant, all MV installation, testing & commissioning

The National Co. Sulaybia Camp, All MV installation, testing & commissioning

The National Co.Sheikh Jabber Al Ahmed Stadium. power cable, cable tray and panels Installa-tion

The National Co. Mina Abdulla Kharafi Factory. All electrical Works.

Al Ghanim Int. Shwaikh Power Station, New Gas Turbine Testing Of All 11KV system

Doniya Int.KOC, Supply, Install, Testing & Commissioning of Package substations and connect to existing 11KV network with modification on existing panels for protection.

Kirby Factory All electrical works from MV to LV ( 4 substations with 8 transformers)

Al Ghanim Group. Modification of Ahlia Switchgear from 100/1 to 400/1 in Arifjan Camp. 2 units.

Al Nassar TowerSupply & Install C&S Bus Duct System 1000, 1250 & 1600A with all related termination, testing & commissioning.

Holiday Inn Supply of 2000A C&S Bus Duct system with testing

Crown PlazaSupply and Installation of 2nos ABB dry type 2500kVA 11/3.3kV Transformer with ABB 8 Panel 3.3kV switchgear for upgrading the chillers system.

Kharafi National 11kV Panels, Transformers, VFD’s and MLTP’s installation at AlZour station

Al Ghanim Interna-tional

Testing of 11kV system (gas turbine, Panels, Transformers, controls, cable….) at al Al Zour Generation plant

Kharafi National Upgrade of Al Sulabiya treatment plant earthing system

Toltest Inc.Supply, Installation and upgrade of existing 11kV ring with new UDS’s and RMU with all required cable laying and installation at Camp ARIFJAN

ECC. Electrical Installation at Satellite farm – Camp ARIFJAN

ECC 11kV Installations at Kuwait Navy Base

Discovery Mall Cable installation and termination works

Tpltest Inc.Supply and installation of 150kVA DG sets with ATS’s and synchronizing for K-Crossing camp boarder

Gravity Tower Supply of C&S Bus Duct System – BIG

Salmiya New Hotel Supply of C&S Bus Duct System – Gulf Engineering

Al Najat School Supply of C&S Bus Duct System – Amal United

Mubarak Hospital Replacement of all old MLTB’s (10 no.) with new without interrupting hospital operations.

MOJ Supply and install new MLTP & ATS to replace the existing at Hawally court house

Kharafi NationalAll power installation, 11kV SWG, Transformers, MLTB’s, PFCP, ATS’s and cabling at AL Hamra Tower (tallest Tower in Kuwait)

MODSupply and install two 11/0.415 kV Package substations (3 way 11kV RMU, Transformer, MLTB & ATS for Generator – special design made by us)

American embassy IBB - KTS

Installation of 11kV switchgear ABB make with all related substation work at International broadcasting bureau

IEPC Installation of IEPC 11kV SWG & Transformers at New Khiran City

KOC Supply of two package substations 11kV / 440V (1600 & 1000 kVA) with RMU and MLTB

Kharafi National Design Supply & install of 11/0.415 1600kVA transformer package for Ardiya sewage plant

Al Jahra HospitalDesign, Supply and install of Generator power plant consists of 4nor 2000kVA Generators, totalizing and synchronizing panels, 6nos. 1600kVA transformers, ATS’s, MLTB’s, PFCP and cabling

For projects updates visit www.gulftechco.com

References:

Installation of Ahlia 11kV SWGR @ Sulaibia sewage plant

Termination of 11kV multi core cables

Installation of ABB dry type transformers

11kV cable termination

Replacement of low tension boards @ Mubarak Al Kabeer Hospital

Installation of Diesel Generators with ATS @ remote locations

Assembly of 11Kv Switchgear

27 cell Switching station

High pressure test for 11kV bus Bar

Ring Main Unit with 1000kVA Oil Transformer

Instalation of Oil Transformers

Transformer 11kV cable ermination

Replacment of 4 nos. MLTB’s @ Kirpy

Installation of BusDuct

MLTB installation

Earth teting

Megger testing

40kV Hi Pot

1.8 tom cable puller

Cable cutting and termination hydraulic equipment