Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking...

16
Hazard 7: Lead Housing Health and Safety Rating System 2012 1

Transcript of Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking...

Page 1: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Hazard 7: Lead

Housing Health and Safety Rating

System

2012 1

Page 2: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Potential for Harm

• The most vulnerable age group is children

under six years old.

– This is because of potential effects on neurological

development, and because young children’s

bodies more readily take up lead.

• Other risk groups include pregnant women

and fetuses.

2012 2

Page 3: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Relevant Matters Affecting Likelihood and Harm Outcome

1. Date of construction – Dwellings constructed before 1978 may contain lead based paint (LBP).

– 24% of houses built from 1960-1978 contain LBP.

– 69% of houses built from 1940-1960 contain LBP

– 87% of houses built before 1940 contain LBP.

2. Disrepair to Lead Based Paint– Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-

containing paint chips.

– Lack of heat can cause increased deterioration

– Lack of water can cause inability to wet clean lead contaminated dust

– Roof and pipe leaks can cause increased deterioration.

– Evidence of remodeling may indicate more dust and debris

----------------------------------------------------------------------------------------------------------------------------

3. Lead pipework– The presence of lead pipework for domestic water increases likelihood of lead exposure

and more severe harm outcomes.,

4. Plumbo-solvent water– Plumbo-solvent water, or water of high acidity likely to dissolve lead in pipes, affects

likelihood of exposure.

2012 3

Page 4: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

2012 4

Lead

Average likelihood and health outcomes for all persons aged under 3 years, 1997-19991

Dwelling type and age Average

likelihood

(1 in...)

Spread of health outcomes Average

HHSRS scores

Class I Class II Class III Class IV

Non HMOs Pre 1920 39,060 0.0 1.0 9.0 90.0 0 (J)

1920-45 40,710 0.0 1.0 9.0 90.0 0 (J)

1946-79 99,580 0.0 1.0 9.0 90.0 0 (J)

Post 1979 179,600 0.0 1.0 9.0 90.0 0 (J)

HMOs Pre 1920 38,680 0.0 1.0 9.0 90.0 0 (J)

1920-45 33,730 0.0 1.0 9.0 90.0 0 (J)

1946-79 63,930 0.0 1.0 9.0 90.0 0 (J)

Post 1979 59,740 0.0 1.0 9.0 90.0 0 (J)

All Dwellings 58,400 0.0 1.0 9.0 90.0 0 (J)

Potential for Harm (UK Standards) – N/A for any U.S. urban or rural setting.

1Table from HUD Guidance Manual on HHSRS. Data should be generalizable to the United States, as “mainly US studies or high exposure area studies were used to

generalize current background rates of lead exposure for children in the UK” (p. 78).

Page 5: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Adjusting averages to fit local circumstances

Detroit Data:

In 2011, there were 64,302 children under the age of 6 in Detroit; 28,674 (44.6%) were tested

for lead.

2,317 (8.08%) had blood lead levels from 5 to 9 µg/dL.

310 (1.08%) had a confirmed EBLL between 10-14 µg/dL.

105 (0.37%) had a confirmed EBLL between 15-19 µg/dL.

120 (0.42%) had a confirmed EBLL between 20-44 µg/dL.

10 (0.0003%) had a confirmed EBLL ≥ 45 µg/dL.

There were another 66 children with elevated capillary tests (50 between 10-

14 µg/dL, 7 between 15-19 µg/dL, & 9 between 20-44 µg/dL) that were not

confirmed by a venous test.

• 9.95% of Detroit children have a level over 5 µg/dL,

• Based on this data, we have adjusted our Average

Detroit Likelihood to 1 in 10

Page 6: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

7. Lead Likelihood Outcome Class I Outcome Class II Outcome Class III Notes

Detroit Local Outcomes 0 0.5 10

Average

A. With lead grant 1 in 180 or 320

B. New windows but no lead grant 1 in 32

C. Old win., little chipping paint 1 in 10 or 1 in 18

D. bad front porch, some chipping paint. 1 in 6

E. poor condition ext. paint 1 in 6 increase

moderate chipping paint and all old windows1 in 3 increase

Adjusting averages to fit local circumstances

How do we determine outcomes:

Class I: Death- very unlikely (statistically zero)

Class II: Hospitalization because of chelation

Class III: Repeated poisonings; lead level does not go down; higher blood

lead level

The highlighted portion represents the average house in Detroit. Rating

guide based on data and informed professional judgment.

Page 7: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

What would influence likelihood and outcome?

Windows and window components…

Severe cases- Increase both likelihood and outcome

Page 8: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Doors, door components, and interior trim

Page 9: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Exterior surfaces, porches, and components

Page 10: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Metal Objects

Page 11: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

What may not be a lead hazard?

Ceilings and walls

Look for “alligatoring”

Page 12: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

As we all know, the best way to measure is

through a Lead Inspection/ Risk Assessment.

•But without this, assume lead based paint

(based on age of house and components) and

use your informed professional judgment

2012 12

Page 13: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Determining Your Likelihoods and Outcomes:

Hazard Prevalence in HHRS Study Sites

• Poor housing quality is a major risk factor elevated blood lead levels. Older housing (pre-1978) is more likely to have lead products, such as paint or piping.– In Detroit, 62.2% of housing was built before 1950, a substantially

higher percentage than any other county in Michigan.

– In Alameda County, CA, 29.8% of housing was built before 1950, and another 48.7% was built between 1950 and 1979.

• Chipping, peeling paint can lead to higher lead levels in the home. – According to the 2003 American Housing Survey, 72,100 (3.8%) of

units in metro Detroit (Wayne, Macomb, Oakland, St. Clair, Monroe, Livingston, & Lapeer counties) had this problem.

– In the AHS’s 1998 survey of metropolitan Oakland (Alameda & Contra Costa counties), 42,100 housing units (4.7%) had broken plaster or peeling paint in their interiors.

2012 13

Page 14: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Outcome Data: National

• Nationally, in 2010 there were 24,258,220 children under 6 years old – 3,937,631 of those children were tested for an elevated blood lead level (EBLL).

– Of those children that were tested, 24,043 (0.61%) had an EBLL ≥ 10 µg/dL (the previous CDC action level).

– Another 238,260 children tested (6.05%) had a blood lead level between 5-9 µg/dL, above the new CDC action level of 5 µg/dL.

2012 14

Page 15: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

Outcome Data: Oakland (CA)

• In 2009, 17,892 children ages 0-5 were tested

for lead.

– 97 (0.5%) had an EBLL of 9.5+ µg/dL

– 524 (2.9%) had a blood lead level of 4.5 to < 9.5

µg/dL.

• Statewide, there were 2,426 cases of an EBLL 9.5+

µg/dL, meaning Alameda accounted for nearly 4%

of all such cases in California.

2012 15

Page 16: Hazard 7: Lead - Wayne State University...2. Disrepair to Lead Based Paint – Damage and/or flaking of old paintwork leads to possible ingestion of lead dust and lead-containing paint

16

Healthy Home Rating System Project Leadership

2012

Lyke Thompson

Director

CUS/WSU

(313) 577-5209

[email protected]

Allyson Lindsey

Research Assistant

CUS/WSU

(313) 577-9382

[email protected]

Angie Sarb

Research Assistant

CUS/WSU

(313) 577-8911

[email protected]

David Ormandy

Professorial Fellow

University of Warwick

+44 (0) 76524 936

[email protected]