Date: 27.10.2013 d-_,;.II CLs ,. ~ .•..... I"-E-I"-u:. d.! I ,.j 119 CUiL.b.U AL GHUBRAH POWER & DESALINATION COMPANY SAOC TO WHOM SOEVER iT MAY CONCERN This is to certify that MIS Power links International Co LLC., Sultanate of Oman have successfully completed the below mentioned Emergency work pertaining to Removing, Replacement & Testing of 11kV, 300sq.mm Cu, XLPE cable along with end terminations at Ghubrah Power & Desalination Plant within the shortest period. The brief scope of work is as follows. Project Name Ghubrah Power & Desalination Plant, Sultanate of Oman GPDCO PO Ref PO No. 53470 dated 09.10.2013 Total Order Value OMR 4805.000 PL!- scope of work Turnkey scope of Remove & Replace 2Cx300mm 2 Cu, XlPE Cable including HVDC Test at GT 7 Date of HVDC Test K commission: 25.10.2013 Performance Compieted the works successfully within the scheduled duration. II (+q1A) ((q(qq •• :ulJlIill ule,c ii.Lbl.w - <4.!i.stIl.ll". :\S~WI.klJ.JI. 1110 :l,J.I.)Q IVlrl"rr :,,~iJL:;W1J.:;I.w.II ro-DJ I (~I) rn ••V(v (oJI·~~I) rnQAOEA :~LD P.O. Box: 1665, PC: 130, AI-Atheiba, Sultanate of Oman I Tel: (+968) 24949900 Fax: 24698548 (Admin) , 24600747 (Plant) Ie. R. No: [email protected]

Transcript of IIpowerlinksintl.com/images/pdf/Job-Completion-certificates.pdf · have completed the Testing scope...

Date: 27.10.2013

d-_,;.II CLs ,.~ .•.....I"-E-I"-u:. d.! I ,.j 119 CUiL.b.U

AL GHUBRAH POWER& DESALINATION

COMPANY SAOC

TO WHOM SOEVER iT MAY CONCERN

This is to certify that MIS Power links International Co LLC., Sultanate of Omanhave successfully completed the below mentioned Emergency work pertaining to

Removing, Replacement & Testing of 11kV, 300sq.mm Cu, XLPE cable along with

end terminations at Ghubrah Power & Desalination Plant within the shortest

period.

The brief scope of work is as follows.

Project Name Ghubrah Power & Desalination Plant,Sultanate of Oman

GPDCO PO Ref PO No. 53470 dated 09.10.2013

Total Order Value OMR 4805.000

PL!- scope of work Turnkey scope of Remove & Replace

2Cx300mm2 Cu, XlPE Cable including HVDC

Test at GT 7

Date of HVDC Test K commission: 25.10.2013

Performance Compieted the works successfullywithin thescheduled duration.

II (+q1A) ((q(qq •• :ulJlIill ule,c ii.Lbl.w - <4.!i.stIl.ll". :\S~WI.klJ.JI.1110 :l,J.I.)Q

IVlrl"rr :,,~iJL:;W1J.:;I.w.II ro-DJ I (~I) rn ••V(v (oJI·~~I) rnQAOEA :~LD

P.O. Box: 1665, PC: 130, AI-Atheiba, Sultanate of Oman I Tel: (+968) 24949900Fax: 24698548 (Admin) , 24600747 (Plant) Ie. R. No: [email protected]

p.~ •••.••..~;~·j..;...! .•.•..~.:.!: e- ~i

~'ii;.!m.~n~-:linPJ-l:",!U1:"';: JOB COMPLETION CERTIFICATE

EMERGENCY WORK

I Project: Requisition No 21740

Contractor POWER LINKS INTL CO LLC Client OMAN ELECTRICITYTRANSMISSIONCOMPANY S.A.O.C

OETCRef. OETC/CEO/2013/949 dated s'" August 2013 & Instruction to carry out work onEmergency basis vids Ltr # OETC / STM / 2013 / &9 dated zs" August, 2013

Start Date 03-09-2013 End Date 115-09-2013

Job TItle Installation of OOSEtermination, Supply & Installation of Straight through joint of132kV, Ie x 2000 Sqmm cable at Kabourah Grid station

Location Kabourah Gird Station

Feeder MIS-2, R Phase

Description of work:

• Cutting and removing of existing 132kV OOSEo Cutting and removing of existing 132kV cable about 25 mtrslit Installation of 132kV 1C x 2000 Sqmm cable Terminatione Supply and installation of 132kV lex 2000 Sqmm Cable straight through joint

(Pfisterer, Germany)• Provision of 132kV Pfisterer certified jointer with Jointing/Termination tools(9 Transportation of Pfisterer termination kit and 132kV cable drum from OETC store to Site

and returning old materials• Laying of 132kV cable in the trench• Cable sheath test after laying the cable• Provision of scaffolding for ODSE termination

I hereby certify the work has been completed satisfactory and system is safe for operation.

On Behalf of Pli OMAN

HYUNDAIHEAVY INDUSTRIES CO••lTD.

Electro Electric Systems1, Jeonha-donq, Dong-gu,Ulsan 682-792, Korea

TEL: +82 52 202-8268FAX: +82 52 202-8379

TO WHOM SOEVER IT MAY CONCERN

This is to certify that MIS Power Links International Co LLC., Sultanate of Oman havesuccessfully completed the below mentioned Testing work pertaining to 132kV Gas InsulationSwitchgear(GIS) at Awqad Grid Station, Salalah.

The brief scope of work is as follows

Project Nam~ . : DPC Project-Awqad Grid :S~b.stati01J.Salalah _Sultanate of Oman

HHI Service Contract # : W640-KBJ-2013-01SDated 08.07.2013

Total order valve : USD 40,OOO(US$Forty thousand only)

PLI scope of work : Performing High voltage Test on 132kV GIS(8 Bays) at site

Date ofHVAC Test completion: 18.07.2013

Performance : Completed the work successfully within the scheduledduration

; Kim / General ManagerProduct Assurance Dep'tElectro Electric Systems, Hyundai Heavy Industries1, Jeonha-dong, Dong-gu, Ulsan, Korea 682-792, koreaT) +82-52-202-8443, F) +82-52-250-9912e-mail: [email protected]

Sales Office140-2, Gye-dong, Jongno-gu,

Seoul 110-793, KoreaPage 1 of 1

Head Office & Factory1, Jeonha-dong, Dong-gu,Ulsan 6B2-792, Korea

r'., ........,. r:

II t ,-tW-8-1689- 300:' 1-~1.\[I.: "'l10NG'(~);:';I J{ I'lGCOD)\\1 WI' I'ROJJ Cl I1f1!CI - l' ens. 1'.130:\ 12.!t\RK.\. ~UJ.[Ai\:\ n 01 UM \'\1ltL\D 01-1IU - 901-3. IAi-.JlON-DONC. CHY,\t\G-ClI. !'\lUHUN. KOiH....\ { nL+g:~-J:-~))-"'~III1.\X+8)-:r:-)j,:--{j}~t

Date: 17.10.2012

TO WHOM SOEVER IT MAY CONCERN

This is to certify that MIs Power Links International Co LLC., Sultanate of Oman

have successfully completed the below mentioned work pertaining to Installation

of 220kV, 1000sq.mm Cu, XLPE cable along with bonding cable, Earth Cable,

Concentric cable & Installation of Link Boxes at Barka Power Plant.

The brief scope of work is as follows.

Project Name Construction of Barka IPP 3 Power Plant,Sultanate of Oman

Sejong PO Ref SJ/Bar3-019 dated 31.07.2011 & SJ/Bar3

dated 17.10.2011 & SJ/BAR3-11/01

Total Order Value OMR 100356.000

PLI- scope of work Scope Installation of 220kV 1Cx1000mm2

Cu XLPE Cable, cable cleat, Link Boxes,

Concentric cable, Bonding cable, 11kV

3Cx150mm2 Cable & Installation of LVCabie

Date of completion 02.02.2012

Performance Completed the works successfully within the

scheduled duration.

,~\..",. ,, .

:t' ..••~.

P.O Box 1665PC 130, AI AtheibaSultanate of OmanTel: +96824584900

+968 24584907+968 24584903

Fax: +96824490421C.R. No. 1171232/2

\ '\ '\ 0 :'7'.,-,,",~.:u.J1 \ r· :(S..u."....,J1 .:,...)1

-0~~+~'\A HOA~~" :J:iLA+~\A HOA~~'V+~\A noA[~·r+~\A 'l'u~·tn :~L.;

\/V\HT/T :0.<..>"

d·· ••llds :.~ Fp.c.p.ut d !I.,; n 9diiLbJI

Al GHUBRAH POWER8&DESALINATION

COMPANY SAOC

Date: 27.06.2012

TO WHOM SOEVER IT MAY CONCERN

This is to certify that MIS Power links International Co LLC., Sultanate of Omanhave successfully completed the below mentioned Emergency work pertaining toSupply, Installation & Testing of 132kV, 630sq.mm CUI XLPE cable along with endterminations at Ghubrah Power & Desalination Plant within the shortest period.The brief scope of work is as follows:

Project Name Ghubrah Power & Desalination Plant,Sultanate of Oman

GPDCO PO nos EMS/082012 dated 25.01.2012 & 51998dated 18.02.2012.

PLI- scope of work Turnkey scope of Supply, Installation &Testing of 132kV, 630sq.mm Cu, XLPEcable(LS Cables), GIS end Terminations(NKT,Germany), Outdoor sealing Endterminations (CCC, Germany), Ring TypeCurrent Transformers (Kappa electrical), LVTests & HVAC Test with complete accessoriesbetween GIS (F6) & Transformer (TA 4).

Date of HVAC Test & completion: 13.05.2012.

Performance Completed the works successfully within thescheduled duration.

A RaiisiDeputy General Manager

(A Member of ALiREZA Group of Companies)

CR. No.: 1090244Post Box 1413, P.C. 130Azaibha, Sultanate of OmanTel. : +96824499586, Fax: +968 24494146E-mail: [email protected]

:.U At\ I!J~ \lJll.JJ AA ... t\ ~ .. :..t\~.~.~ .. ~ J ..,y-- ~(L.......;"...> ~ ~~ wLS.~ t.S.l.-:o..I)

'.~.Ht: w.t.>"\\,'. :1..5.l:!yll.;.-...;J1 ,\t 'I" :'-:-'.U'"

- u~t.l...hl....,~:wl+~iA ~ttH' t'\ : ~lL+~iA Ht~~oAi : <...l.U

[email protected] J)5J~1 .y.r.J1

SAUDI NATIONAL CONTRACTING CO. L.L.C

.(8CQ~1.J;.ll..,l1 u'lJ~\ »:/

~..J.,........:.lI.J J...i.'l\ ~Transmission & Distribution Division

SNCC/OMAN/329-2009/001/2012 09.01.2012

To Whomsoever It May concernContractor Power Links International Co LLC

Project Electricity Transmission Company- Tender no: 329/2009 -Replacing of 220KV and 132kV Over Head lines inMuscat with cable Phase 2, Part 3

Work Order # : NCC/OMAN/OETC/329 /2009 /WO/24 dt. 1st February,2011 for 132 kV, 2500sq.mm Cable works betweenAirport Height SS& Mawellah SS

NCC/OMAN/OETC/329/2009/WO/95 dated 17thAugust,2011 for 132kV, 2500sq.mm cable works between RusylPS& Mawellah SS

Total Value of Order: RO.325,205/- (Omani Rial Three twenty five thousandand Two hundred five only)

This is to certify that the above referred project of OErC has been sublet toMIs. Power Links International Co LLC and further certify that they have so farcompleted works amounting to RO.2250001- representing about 70%of the totalworks.

Thisis issued for the purpose of Tender Board registration.

lor Saudi Notional co~J.~~~:'j~-~~'-<"••...• £••, 1 ti.. ;: ~

. ,(J) _. . <i ;\i:: o ~:it~. ~'A:> ~ t f\.~~lt.oS'v~lVo:1o<?J'\)~~~~~f

',-~<\I.q IlQte o~0 coy~ (CONTRAC1\\I(; ~

~~~

A Member of the Alireza Group of CompaniesT&D Office: Tel: +96638683120, Fox: +96638683130

Head Office: Tel: -+-96638828008/8825700, Fax: -+-96638826678, P.O. Box: 90, AI-Khobar 31952, Kingdom of Saudi ArabiaASSOCIATED COMPANY: REZAYAT EUROPE LTD. 52, MOUNT STREET, LONDON, WIK 2Sf

OMAN ELECTRICITY TRANSMISSION COMPANY S.A.O.C

JOB COMPLETION CERTIFICATE

Name of Contractor: Mis POWER LINKS INTL. CO L.L.C

Job Description Testing of Ghubrah- MSQ Feeder 1&2

OETCP.ONo. 52357 dated on 26.10.2011

Date of Completion: a) As per Order : 30/10/20 11

b) By Contractor 30/10/2011

Cost of Scheme : a) As per Contract : R.O 4,470.000Rial Omani (Four Thousand Four Hundred and Seventy Only).

: b) On Completion : R.O 4,470.000Rial Omani (Four Thousand Four Hundred and Seventy Only).

Note:

Scope testing the cables of 132kV Ghubrah- MSQ Feeder 1&2 by LV Test Consist of the Following:

Phasing Check, Insulation, Resistance Test, Cable outer sheath, Conductor resistance, Capacitance test,

Link Box contact resistance test & SVL Characteristic.

We Mis OETC, certified that the above testing works have been completed satisfactorily in accordance

with the standard specifications issued by Oman Electricity Transmission Company.

For OETC:

\o\,~MANAGER

, /vnrf / '\ : ~'..J'" (T'\'A) HovrH" :..,...s~(+'\'A) 'l'tovry·· :.....:u~-.;.,~ ~ - ,,-=~I ,n : -?P.O Box 1224 Postal Code: 131 Hamriya, Sultanate od Oman - Tel.: +968 24573200, Fax: +968 24573242, C.R. 1/71234/9, W

. .I· •• f • ,

CoR. No. ; 1140304/4

f'~'~ (IJ~) oL.S)=d~9~g...i9 ~NJ'IIJt·r·tJt : ,:,,0"

LARSEN & TOUBRO (OMAN) LlC

LTO/IWPP/OlJuly 12, 2011

TO WHOM SOEVER IT MAY CONCERN

This is to certify that MIS Power links International Co LLC.,Sultanate of Omanhave completed the Testing scope of works of 132kV cables & GIS at 132/33kV SFZ andIWPP Grid Station.

The brief scope of work is as follows.

Contract reference noProject Name

132/33kV SFZ and IWPP Grid stationEstablishing new 132/33kV Substationsat SFZ and IWPP Grid projects inSalallah, Sultanate of Oman

L&TOman LLC. LPO no LTO/PTD/IWPP/L0090010/WO/65dated 28th December, 2010.

PU - scope of work Perform LV Electrical Tests, HVACresonant frequency test, Sheath faultlocation work for 132 kVr 2500 mm2cable at Outdoor sealing ends. Circuit- AI Qarm S/S - IWPP (Total Circuits -2 Nos) Perform HVAC test on 2 baysof 132kV GIS

Completion date Jan 2011 (GIS) & May 2011 (Cables)

This certificate is issued on specific request from Power Links International Co LLC for theirrecord and reference,

With best regards,

P.O. Box: 598, RuwiPostal Code: 112SUltanate of OmanTeL: {96B} 24797445. 24797466. 24762200Fax: (96B) 24797024E-mail: Inlom01 @omanlel.netom/

: ltogen@omanleLnetom

\,i.3J 0\"': v-IJ'I

\\T:~.L1~I';'YIu'---'-s-~

(n,,)YlV~ n·· .T!V~V!'" T!V\VHo: u#("") T!V\V.Y!: u-Su

Inlom01@omanteLnetom/:';' ~.;sJ"j1~.r,-I'[email protected] : -

SSIXXIU6 WBililll SEPCOIII CONSTRUCTION L.L.C

Ref no: SALIOMAN-SEPCOII I-P-CO-0261 Date: 2011-8-20

This is to certify that MIS Power Links International Co LLC., Sultanate

of Oman have successfully completed the below mentioned Emergency

work pertaining to 132kV, 1C x 630sq.mm cable jointing works at

Sembcorp Salalah IWPP Project within the shortest period.

The brief scope of work is as follows.

Project Name : Sembcorp Salalah IWPP in Salallah,

Sultanate of Oman

Sepco III Construction LPO no: SAL/OMAN-SEPCOIII-P/CO-0261

dated 15.08.2011.

PLI- scope of work Supply of 1 No Jointing kit suitable

for 132kV, 630sq.mm XLPE, Cu cable

(Make: Elastimold, USA), Installation of

132kV, 630sq.mm cable [ointinq work &

LV Tests

Duration of work 17.08.2011 to 19.08.2011