Date: 27.10.2013
d-_,;.II CLs ,.~ .•.....I"-E-I"-u:. d.! I ,.j 119 CUiL.b.U
AL GHUBRAH POWER& DESALINATION
COMPANY SAOC
TO WHOM SOEVER iT MAY CONCERN
This is to certify that MIS Power links International Co LLC., Sultanate of Omanhave successfully completed the below mentioned Emergency work pertaining to
Removing, Replacement & Testing of 11kV, 300sq.mm Cu, XLPE cable along with
end terminations at Ghubrah Power & Desalination Plant within the shortest
period.
The brief scope of work is as follows.
Project Name Ghubrah Power & Desalination Plant,Sultanate of Oman
GPDCO PO Ref PO No. 53470 dated 09.10.2013
Total Order Value OMR 4805.000
PL!- scope of work Turnkey scope of Remove & Replace
2Cx300mm2 Cu, XlPE Cable including HVDC
Test at GT 7
Date of HVDC Test K commission: 25.10.2013
Performance Compieted the works successfullywithin thescheduled duration.
II (+q1A) ((q(qq •• :ulJlIill ule,c ii.Lbl.w - <4.!i.stIl.ll". :\S~WI.klJ.JI.1110 :l,J.I.)Q
IVlrl"rr :,,~iJL:;W1J.:;I.w.II ro-DJ I (~I) rn ••V(v (oJI·~~I) rnQAOEA :~LD
P.O. Box: 1665, PC: 130, AI-Atheiba, Sultanate of Oman I Tel: (+968) 24949900Fax: 24698548 (Admin) , 24600747 (Plant) Ie. R. No: [email protected]
p.~ •••.••..~;~·j..;...! .•.•..~.:.!: e- ~i
~'ii;.!m.~n~-:linPJ-l:",!U1:"';: JOB COMPLETION CERTIFICATE
EMERGENCY WORK
I Project: Requisition No 21740
Contractor POWER LINKS INTL CO LLC Client OMAN ELECTRICITYTRANSMISSIONCOMPANY S.A.O.C
OETCRef. OETC/CEO/2013/949 dated s'" August 2013 & Instruction to carry out work onEmergency basis vids Ltr # OETC / STM / 2013 / &9 dated zs" August, 2013
Start Date 03-09-2013 End Date 115-09-2013
Job TItle Installation of OOSEtermination, Supply & Installation of Straight through joint of132kV, Ie x 2000 Sqmm cable at Kabourah Grid station
Location Kabourah Gird Station
Feeder MIS-2, R Phase
Description of work:
• Cutting and removing of existing 132kV OOSEo Cutting and removing of existing 132kV cable about 25 mtrslit Installation of 132kV 1C x 2000 Sqmm cable Terminatione Supply and installation of 132kV lex 2000 Sqmm Cable straight through joint
(Pfisterer, Germany)• Provision of 132kV Pfisterer certified jointer with Jointing/Termination tools(9 Transportation of Pfisterer termination kit and 132kV cable drum from OETC store to Site
and returning old materials• Laying of 132kV cable in the trench• Cable sheath test after laying the cable• Provision of scaffolding for ODSE termination
I hereby certify the work has been completed satisfactory and system is safe for operation.
On Behalf of Pli OMAN
HYUNDAIHEAVY INDUSTRIES CO••lTD.
Electro Electric Systems1, Jeonha-donq, Dong-gu,Ulsan 682-792, Korea
TEL: +82 52 202-8268FAX: +82 52 202-8379
TO WHOM SOEVER IT MAY CONCERN
This is to certify that MIS Power Links International Co LLC., Sultanate of Oman havesuccessfully completed the below mentioned Testing work pertaining to 132kV Gas InsulationSwitchgear(GIS) at Awqad Grid Station, Salalah.
The brief scope of work is as follows
Project Nam~ . : DPC Project-Awqad Grid :S~b.stati01J.Salalah _Sultanate of Oman
HHI Service Contract # : W640-KBJ-2013-01SDated 08.07.2013
Total order valve : USD 40,OOO(US$Forty thousand only)
PLI scope of work : Performing High voltage Test on 132kV GIS(8 Bays) at site
Date ofHVAC Test completion: 18.07.2013
Performance : Completed the work successfully within the scheduledduration
; Kim / General ManagerProduct Assurance Dep'tElectro Electric Systems, Hyundai Heavy Industries1, Jeonha-dong, Dong-gu, Ulsan, Korea 682-792, koreaT) +82-52-202-8443, F) +82-52-250-9912e-mail: [email protected]
Sales Office140-2, Gye-dong, Jongno-gu,
Seoul 110-793, KoreaPage 1 of 1
Head Office & Factory1, Jeonha-dong, Dong-gu,Ulsan 6B2-792, Korea
r'., ........,. r:
II t ,-tW-8-1689- 300:' 1-~1.\[I.: "'l10NG'(~);:';I J{ I'lGCOD)\\1 WI' I'ROJJ Cl I1f1!CI - l' ens. 1'.130:\ 12.!t\RK.\. ~UJ.[Ai\:\ n 01 UM \'\1ltL\D 01-1IU - 901-3. IAi-.JlON-DONC. CHY,\t\G-ClI. !'\lUHUN. KOiH....\ { nL+g:~-J:-~))-"'~III1.\X+8)-:r:-)j,:--{j}~t
Date: 17.10.2012
TO WHOM SOEVER IT MAY CONCERN
This is to certify that MIs Power Links International Co LLC., Sultanate of Oman
have successfully completed the below mentioned work pertaining to Installation
of 220kV, 1000sq.mm Cu, XLPE cable along with bonding cable, Earth Cable,
Concentric cable & Installation of Link Boxes at Barka Power Plant.
The brief scope of work is as follows.
Project Name Construction of Barka IPP 3 Power Plant,Sultanate of Oman
Sejong PO Ref SJ/Bar3-019 dated 31.07.2011 & SJ/Bar3
dated 17.10.2011 & SJ/BAR3-11/01
Total Order Value OMR 100356.000
PLI- scope of work Scope Installation of 220kV 1Cx1000mm2
Cu XLPE Cable, cable cleat, Link Boxes,
Concentric cable, Bonding cable, 11kV
3Cx150mm2 Cable & Installation of LVCabie
Date of completion 02.02.2012
Performance Completed the works successfully within the
scheduled duration.
,~\..",. ,, .
:t' ..••~.
P.O Box 1665PC 130, AI AtheibaSultanate of OmanTel: +96824584900
+968 24584907+968 24584903
Fax: +96824490421C.R. No. 1171232/2
\ '\ '\ 0 :'7'.,-,,",~.:u.J1 \ r· :(S..u."....,J1 .:,...)1
-0~~+~'\A HOA~~" :J:iLA+~\A HOA~~'V+~\A noA[~·r+~\A 'l'u~·tn :~L.;
\/V\HT/T :0.<..>"
d·· ••llds :.~ Fp.c.p.ut d !I.,; n 9diiLbJI
Al GHUBRAH POWER8&DESALINATION
COMPANY SAOC
Date: 27.06.2012
TO WHOM SOEVER IT MAY CONCERN
This is to certify that MIS Power links International Co LLC., Sultanate of Omanhave successfully completed the below mentioned Emergency work pertaining toSupply, Installation & Testing of 132kV, 630sq.mm CUI XLPE cable along with endterminations at Ghubrah Power & Desalination Plant within the shortest period.The brief scope of work is as follows:
Project Name Ghubrah Power & Desalination Plant,Sultanate of Oman
GPDCO PO nos EMS/082012 dated 25.01.2012 & 51998dated 18.02.2012.
PLI- scope of work Turnkey scope of Supply, Installation &Testing of 132kV, 630sq.mm Cu, XLPEcable(LS Cables), GIS end Terminations(NKT,Germany), Outdoor sealing Endterminations (CCC, Germany), Ring TypeCurrent Transformers (Kappa electrical), LVTests & HVAC Test with complete accessoriesbetween GIS (F6) & Transformer (TA 4).
Date of HVAC Test & completion: 13.05.2012.
Performance Completed the works successfully within thescheduled duration.
A RaiisiDeputy General Manager
(A Member of ALiREZA Group of Companies)
CR. No.: 1090244Post Box 1413, P.C. 130Azaibha, Sultanate of OmanTel. : +96824499586, Fax: +968 24494146E-mail: [email protected]
:.U At\ I!J~ \lJll.JJ AA ... t\ ~ .. :..t\~.~.~ .. ~ J ..,y-- ~(L.......;"...> ~ ~~ wLS.~ t.S.l.-:o..I)
'.~.Ht: w.t.>"\\,'. :1..5.l:!yll.;.-...;J1 ,\t 'I" :'-:-'.U'"
- u~t.l...hl....,~:wl+~iA ~ttH' t'\ : ~lL+~iA Ht~~oAi : <...l.U
[email protected] J)5J~1 .y.r.J1
SAUDI NATIONAL CONTRACTING CO. L.L.C
.(8CQ~1.J;.ll..,l1 u'lJ~\ »:/
~..J.,........:.lI.J J...i.'l\ ~Transmission & Distribution Division
SNCC/OMAN/329-2009/001/2012 09.01.2012
To Whomsoever It May concernContractor Power Links International Co LLC
Project Electricity Transmission Company- Tender no: 329/2009 -Replacing of 220KV and 132kV Over Head lines inMuscat with cable Phase 2, Part 3
Work Order # : NCC/OMAN/OETC/329 /2009 /WO/24 dt. 1st February,2011 for 132 kV, 2500sq.mm Cable works betweenAirport Height SS& Mawellah SS
NCC/OMAN/OETC/329/2009/WO/95 dated 17thAugust,2011 for 132kV, 2500sq.mm cable works between RusylPS& Mawellah SS
Total Value of Order: RO.325,205/- (Omani Rial Three twenty five thousandand Two hundred five only)
This is to certify that the above referred project of OErC has been sublet toMIs. Power Links International Co LLC and further certify that they have so farcompleted works amounting to RO.2250001- representing about 70%of the totalworks.
Thisis issued for the purpose of Tender Board registration.
lor Saudi Notional co~J.~~~:'j~-~~'-<"••...• £••, 1 ti.. ;: ~
. ,(J) _. . <i ;\i:: o ~:it~. ~'A:> ~ t f\.~~lt.oS'v~lVo:1o<?J'\)~~~~~f
',-~<\I.q IlQte o~0 coy~ (CONTRAC1\\I(; ~
~~~
A Member of the Alireza Group of CompaniesT&D Office: Tel: +96638683120, Fox: +96638683130
Head Office: Tel: -+-96638828008/8825700, Fax: -+-96638826678, P.O. Box: 90, AI-Khobar 31952, Kingdom of Saudi ArabiaASSOCIATED COMPANY: REZAYAT EUROPE LTD. 52, MOUNT STREET, LONDON, WIK 2Sf
OMAN ELECTRICITY TRANSMISSION COMPANY S.A.O.C
JOB COMPLETION CERTIFICATE
Name of Contractor: Mis POWER LINKS INTL. CO L.L.C
Job Description Testing of Ghubrah- MSQ Feeder 1&2
OETCP.ONo. 52357 dated on 26.10.2011
Date of Completion: a) As per Order : 30/10/20 11
b) By Contractor 30/10/2011
Cost of Scheme : a) As per Contract : R.O 4,470.000Rial Omani (Four Thousand Four Hundred and Seventy Only).
: b) On Completion : R.O 4,470.000Rial Omani (Four Thousand Four Hundred and Seventy Only).
Note:
Scope testing the cables of 132kV Ghubrah- MSQ Feeder 1&2 by LV Test Consist of the Following:
Phasing Check, Insulation, Resistance Test, Cable outer sheath, Conductor resistance, Capacitance test,
Link Box contact resistance test & SVL Characteristic.
We Mis OETC, certified that the above testing works have been completed satisfactorily in accordance
with the standard specifications issued by Oman Electricity Transmission Company.
For OETC:
\o\,~MANAGER
, /vnrf / '\ : ~'..J'" (T'\'A) HovrH" :..,...s~(+'\'A) 'l'tovry·· :.....:u~-.;.,~ ~ - ,,-=~I ,n : -?P.O Box 1224 Postal Code: 131 Hamriya, Sultanate od Oman - Tel.: +968 24573200, Fax: +968 24573242, C.R. 1/71234/9, W
. .I· •• f • ,
CoR. No. ; 1140304/4
f'~'~ (IJ~) oL.S)=d~9~g...i9 ~NJ'IIJt·r·tJt : ,:,,0"
LARSEN & TOUBRO (OMAN) LlC
LTO/IWPP/OlJuly 12, 2011
TO WHOM SOEVER IT MAY CONCERN
This is to certify that MIS Power links International Co LLC.,Sultanate of Omanhave completed the Testing scope of works of 132kV cables & GIS at 132/33kV SFZ andIWPP Grid Station.
The brief scope of work is as follows.
Contract reference noProject Name
132/33kV SFZ and IWPP Grid stationEstablishing new 132/33kV Substationsat SFZ and IWPP Grid projects inSalallah, Sultanate of Oman
L&TOman LLC. LPO no LTO/PTD/IWPP/L0090010/WO/65dated 28th December, 2010.
PU - scope of work Perform LV Electrical Tests, HVACresonant frequency test, Sheath faultlocation work for 132 kVr 2500 mm2cable at Outdoor sealing ends. Circuit- AI Qarm S/S - IWPP (Total Circuits -2 Nos) Perform HVAC test on 2 baysof 132kV GIS
Completion date Jan 2011 (GIS) & May 2011 (Cables)
This certificate is issued on specific request from Power Links International Co LLC for theirrecord and reference,
With best regards,
P.O. Box: 598, RuwiPostal Code: 112SUltanate of OmanTeL: {96B} 24797445. 24797466. 24762200Fax: (96B) 24797024E-mail: Inlom01 @omanlel.netom/
: ltogen@omanleLnetom
\,i.3J 0\"': v-IJ'I
\\T:~.L1~I';'YIu'---'-s-~
(n,,)YlV~ n·· .T!V~V!'" T!V\VHo: u#("") T!V\V.Y!: u-Su
Inlom01@omanteLnetom/:';' ~.;sJ"j1~.r,-I'[email protected] : -
SSIXXIU6 WBililll SEPCOIII CONSTRUCTION L.L.C
Ref no: SALIOMAN-SEPCOII I-P-CO-0261 Date: 2011-8-20
This is to certify that MIS Power Links International Co LLC., Sultanate
of Oman have successfully completed the below mentioned Emergency
work pertaining to 132kV, 1C x 630sq.mm cable jointing works at
Sembcorp Salalah IWPP Project within the shortest period.
The brief scope of work is as follows.
Project Name : Sembcorp Salalah IWPP in Salallah,
Sultanate of Oman
Sepco III Construction LPO no: SAL/OMAN-SEPCOIII-P/CO-0261
dated 15.08.2011.
PLI- scope of work Supply of 1 No Jointing kit suitable
for 132kV, 630sq.mm XLPE, Cu cable
(Make: Elastimold, USA), Installation of
132kV, 630sq.mm cable [ointinq work &
LV Tests
Duration of work 17.08.2011 to 19.08.2011
P.o.Box: 133, Salalah-Taqa" P.C.218, Sultanate of OmanTel: 00968-23258005 Fax: 00968-23284505 Mail: [email protected]