HASLE REFRACTORIES A/SHASLE-ISOMEMBRANE®
The ISOMEMBRANE® TECHNOLOGY
www.hasle-isomembrane.com
HASLE® Timeline
5HASLE® High Temperature Technology
Coa
l min
e
bric
k pl
ant
bric
k, a
nd C
eram
ic p
ipes
Bric
k, p
ipes
and
Cas
tabl
es
1843
F.L.
Sm
idth
buy
ing
HA
SLE
. Sta
rt up
Dev
elop
ing
of S
peci
al L
CC
Cas
tabl
es
and
pre
cast
sol
utio
ns
New
ow
ner o
f HA
SLE
. Sta
rt up
deve
lopi
ng o
f Ref
ract
ory
solu
tions
for P
ower
, Ste
el a
nd o
ther
Hig
h
Tem
pera
ture
App
licat
ions
New
ow
ner o
f HA
SLE
and
new
pro
duct
ion
faci
litie
s
New
pre
cast
pro
duct
ion
faci
lity
impl
emen
ted
F.L.
Sm
idth
Sta
rt up
Den
sit t
o de
velo
p
new
Wea
r Pro
tect
ion
Sol
utio
ns
1875 1925 1948 1981 1988 2002 20061983
HASLE®in brief
o App. 50 employeeso Own production facilities in
Denmarko 7.500 tons (low-)cement
castables produced yearly
o 350 tons precast products for all High Temperature applications
o Clients worldwide
HASLE®ISOMEMBRANE®
o HASLE-ISOMEMBRANE – air in-leakage control.o A specially developed ceramic fiber membrane
solution – PROVEN TECHNOLOGYo Applied to 100’s of Power Plants worldwide
ISOMEMBRANE® & Gases
o Why use ISOMEMBRANE® in a Gas Fired Power Plant?o A simple solution to a critical
safety problem:o Vibrations in pipes cause
cracks in the boiler wallo Differential Pressure causes
emission of un-combusted gasses from the boiler house to adjacent dead spaces
o Leaks in the boiler floor area allows for gases to emit to the atmosphere.
o Picture courtesy of Tasei Corporation
ISOMEMBRANE® & Gases
• The ISOMEMBRANE® can prevent this…
o Natural gas (CH4+C2H6+C3H8 and other HC’s) cannot penetrate the ISOMEMBRANE® seal.
o ISOMEMBRANE® provides an economic, flexible and durable solution with a long life time
A Tight Seal
o The advanced ISOMEMBRANE® structure forms an impermeable seal o Installed on 5 gas-fired plants in the US – Latest on the ComED Power
Plant in Illinois
Lates
A Simple Installation Process
1. Shutdown of boiler & vacuum cleaning of boiler house2. ”Ceramic paper” is fixed to pipes and taped3. Brackets are mounted on pipes for improved structural
stability4. The sandwich-type ISOMEMBRANE® construction is
constructed around all pipes5. The ceramic fiber is held in place with a layer of HASLE®
castable (CS1300)6. The boiler is re-commissioned7. Duration: 2½ weeks, 20 men, 2 shifts (500MV boiler)
ISOMEMBRANE in a Power Plant
Fluegas & Fly-ash
o The coal fired power plant:o Leaks in expansion
joints and around pipe- and wall structures constitute ideal conditions for ingress of fluegas carrying fly-ash to dead spaces throughout the boiler house environment.
Hazelwood Power Plant, prior to installation of HASLE-ISOMEMBRANE
Why install ISOMEMBRANE®
o Avoid lenghty and expensive shutdowns
o Avoid cleaning out several feet of dust from dead spaces
o Improve work environmento Increase life-time of steel
structureso Fly-ash insulates
o Avoid long cool down times of boiler
o Increase boiler efficiencyo Prevents LOIo Decreases opacityo Decreases stress of ID Fan
Chisene Experience
Flyash - 3 metres deep
Fly ash can weigh several hundred tons, if water enters the boiler house environment and settles in the ash.
Severe risk of boiler roof collaps.
Leaks in a Polish Plant
Severe consequenses
o Risk of boiler roof collapso Significantly reduced
lifetime of steel structures
o Loss of combustion efficiency in boiler
o Cold air ingress into boiler results in increased power consumption
Installation & Results
Installation & Results
Before and After
Complete Installation
Before & After
Before & After
From Thought to Realisation
o Preparationo Customer realises and fights Air In-Leakage problemso Drawings and description of installation site is sent to HASLE®o Proposal and installation drawings are sent to cliento Preparation meeting at siteo Contract signature
o Project realisationo Plant is shut downo Client prepares plant and cleans up all dust in boiler voids o HASLE® arrives to site and installs the ISOMEMBRANE®
Project Timeline
1st week
2nd week
3rd week 4th week
5th week
Cool down
Penthouse vacuuming
Surface prepare
Re-vacuum
Installation
Release for operation
The Technology
o HASLE® has installed ISOMEMBRANE® in power plants from 9 to 2.200 MW.
o References China, USA, Australia, Denmark, Sweden, Norway, UK
o Short installation timeo Expected lifetime of app.
10 years.
The Technology
o A flexible membrane seal, developed especially for sealing up to 700 C degree.
o Sandwich construction with layers of high density ceramic fiber, a special metal mesh, finished with a sealing of HASLE®castable to the surface
o Fixes to any clean surface with HASLE® ISOFIX high temperature resistant glue
o Can be installed in many shapes according to actually need.
A unique product
o What makes the HASLE®ISOMEMBRANE® unique?o Specially designed ceramic
fiber materialso The HASLE® ISOFIX high
temperature resistant glue o The correct installation and
membrane construction by certified workers
o The long lifetime
HASLE Refractories A/S
Almindingsvej 76 DK- 3700 Roenne Tel: +4556951800 Fax: +4556953181 Mail: [email protected] Web: www.hasle-refractories.com
• Contact: Jacob B. Turman• Mail: [email protected] • Tel. +45 5694 2617• www.hasle-isomembrane.com
• THANK YOU FOR YOUR ATTENTION