    Description of item No. L B D/H Rate Amount

    1 Earth work in excavation for

    structures in ordinary soil up

    to 3m depth as per MORD

    specifications 300

    1 1.00 1.14 0.91 1.04 cum 170.76 177.14

    2 Providing P.C.C. grade M 10

    (Nominal mix 1:3:6) in open

    foundations as per MORD

    specifications 800&1200

    1 1.00 1.14 0.30 0.34 cum 4308.10 1473.37

    3 Brick masonary work in

    cement mortar 1:4 in

    foundation complete as per

    MORD specifications

    600&1200

    1 1.00 0.800 0.23 0.18

    1 1.00 0.685 0.23 0.16

    1 1.00 0.460 0.15 0.07

    0.41 cum 4,327.15 1776.51

    3 Brick masonary work in

    cement mortar 1:4 in

    substructure complete as per

    MORD specifications

    600&1200

    1 1.00 0.460 0.61 0.28

    1 1.00 0.345 0.61 0.21

    Taper portion 0.5 1.00 0.115 1.37 0.080.57 cum 4,543.51 2589.01

    4 Providing and laying

    plaincement concrete M 20

    grade (Nominal mix 1:2:4) in

    substructure as per MORD

    specifications 800

    Coping 1 1.00 0.345 0.050 0.02 cum 4960.53 85.57

    6 Pointing with cement mortar

    1:3 on brickwork as per

    MORD specifications 600

    Outside 1 1.00 1.37 1.37 sqm45.76

    62.70

    Total 6164.30

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    ANALYSIS OF RATE FOR CONSTRUCTION OF1.37 mtr HIGH RETAINING WALL

    Unit: Per mtr

    Qty

  • 8/13/2019 Harana CD Work

    2/114

  • 8/13/2019 Harana CD Work

    3/114

    Sr.

    No.

    Description of item No. L B D/H Rate AmountQty

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

  • 8/13/2019 Harana CD Work

    4/114

  • 8/13/2019 Harana CD Work

    5/114

    9th STEP 4 1.875 0.920 0.150 1.035 CUM

    10th STEP 4 1.875 0.805 0.150 0.906 CUM

    11th STEP 4 1.875 0.690 0.150 0.776 CUM

    12th STEP 4 1.875 0.575 0.150 0.647 CUM

    13th STEP 4 1.875 0.460 0.150 0.518 CUM

    14th STEP 4 1.875 0.345 0.150 0.388 CUM

    15th STEP 4 2.105 0.345 0.410 1.191 CUM

    16th STEP Avg.0.230/2=0.115 ,

    (1.380x0.345)/2=0.238

    4 0.115 0.238 1.500 0.164 CUM

    Curtain walls

    2 1.155 0.460 0.150 0.159 CUM

    2 1.270 0.345 0.150 0.131 CUM

    2 1.385 0.230 0.150 0.096 CUM

    2 1.500 0.230 0.075 0.052 CUM

    Parapet

    4 2.480 0.345 0.450 1.540 CUM

    76.81 4327.15 332365

    per cum

    4 Plain/reinforced cement concrete

    (RCC Grade M-25) in sub

    structure complete as per

    drawings and technical

    specification clauses

    802,804,805,806,807,1202 and

    1204.

    FOR DECK SLAB 1 9.200 1.900 0.210 3.67 CUM

    For Bed Plates 2 9.200 0.575 0.200 2.12 CUM

    Sides of Slab 2 9.200 0.355 0.210 1.37 CUM

    Parapet walls 2 1.900 0.115 0.450 0.20 CUM

    For Wearing Slab 1 2.650 8.500 0.080 1.80 CUM

    9.16 CUM 5454.07 49944

    5 Supplying, fitting and placing TMT

    bar reinforcement (Fe 500) in

    substructure complete as per

    drawings and technicalspecification clauses 1002,

    1005,1010 and 1202

    Factorwt. Kg

    per mtr

    12 mm dia bar (main steel) 93 1.850 0.89 153.12 KG

    10 mm dia bar (Dist. Steel) 11 9.160 0.62 62.47 KG

    10 mm dia bar ( Temp. steel) 47 1.850 0.62 53.91 KG

    10 mm dia bar ( Temp. steel) 11 9.160 0.62 62.47 KG

    8 mm dia bar (for bed plate)

    2x8=16

    16 9.160 0.39 57.16 KG

    8mm dia bar (for parapet)

    2x2x11=44

    44 1.000 0.39 17.16 KG

    8mm dia bar (for parapet)

    2x2x3 =12

    12 1.850 0.39 8.66 KG

    8mm Ring(2x35)=70 70 1.87 0.39 51.05 KG

    466.00 KG

    Add 10% for Gradual Overlap 46.60 KG

    Add 5% for Chairs 23.30 KG

    535.90 KG

    0.536 MT 54737.8 29334

    6 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

  • 8/13/2019 Harana CD Work

    6/114

    Abutment 2 9.200 1.500 27.60 SQM

    Abutment sides and wing walls 4 2.680 1.500 16.08 SQM

    Parapet sides 4 2.105 0.450 3.79 SQM

    Parapet Top 4 2.480 0.345 47.47 SQM

    Parapet end sides 4 0.345 0.450 67.34 SQM

    162.28 SQM 45.76 7426

    per sqm

    7 Providing and fixing in position 20

    mm thick pre-molded joint fil ler inexpansion joint for fixed ends of

    simply supported spans, covered

    with sealant complete as per

    drawing and technical

    specif ication as per clause 1200

    (Rate 210mm deep,Rate is per

    mtr per cm depth, hence for 21 cm

    depth the qnty will be

    2x6.7= 13.4x21x1=281 2 9.2 18.40

    For 210 mm deep 1 18.40 21 386 RMT 18.38 7103

    8 Providing PCC M-20 Architectural

    coping on the top of wing wall

    return wall etc. comp. as per

    drawing and technical

    specification clause 615 75mm

    thick

    Parapets 4 2.480 9.92 RMT 312.76 3103

    9 Painting two coats including

    primer coat after filling the surface

    with synthetic enamel paint in all

    shades on new, plastered /

    concrete surfaces as per drawing

    and Technical Specification

    Clause 1701

    2x2=4 4 6.86 0.450 12.348 SQM 91.50 1130

    per sqm

    10 Providing weepholes in brickmasonry/stone masonry,

    plain/reinforced concrete

    abutment, wing wall, return wall

    with 100 mm dia AC pipe

    extending through the full width of

    the structures with slope of

    1(V):20(H) towards drawing face

    complete as per drawing and

    technical specification Clauses

    614, 709, 1204.3.7 16 0.69 12.00 RMT 226.41 2717

    11 Providing and laying c.c. flooring

    1:2:4 for bed protection as per

    MORD specifications 1303

    Inside of culvert 1 9.20 1.50 0.075 1.04

    1.04 cum 4792.85 4961

    12 Earth filling for diversion to

    continue the traffic

    For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518

    13 Back filling of abettments with

    Sandy material

    29.200 0.100 1.350 2.484

    Cum

    2 9.200 0.115 1.910 4.042 Cum

    2 0.172 0.238 1.500 0.123 Cum

  • 8/13/2019 Harana CD Work

    7/114

    2 9.200 0.520 1.500 14.352 Cum

    2 9.200 1.645 3.260 98.674 Cum

    119.674 Cum

    less qnty as per brick work of wing

    walls

    -27.271 Cum

    less Road crust 2 6.7 2.105 0.48 -13.539 Cum

    78.864 Cum 1,752.44 138204

    14 Wrought iron & Mild steel ladders,

    framed grills, gratings etc. withends of bars rivetted of molded

    forged framed window guards,

    barred iron doors stair case iron

    railing etc. including cost of bolts

    and nuts, screws, welding rod

    complete fixing in position

    ISA 50 mm X 50 mm X 6 mm

    2X5 10 1.38 - - 13.800 m

    [email protected] Kg/ m 61.134 Kg

    Pipe 33.7mm O/D

    2X2 4 32.400 [email protected] Kg/ m 95.256 Kg

    Total 156.390 Kg

    Rate As per CSR 18.4 =

    6894.90+16%

    or 1.564 Qtl 7,998.08 12508

    15 Providing and applying two coats

    of ready mix paint including primer

    coat of approved brand on steel

    surface after through cleaning of

    surface to give an even shade as

    per drawing and Technical

    Specification Clause 1701

    Angles

    2X5

    10 0.45 0.846 Sqm

    Angles

    2X2

    4 8.10 0.376 Sqm

    Total 1.222 Sqm 80.90 99

    689889

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi BoardPatiala-1 Patiala

    (6.90+0.60+0.60)

    ((50+50+44+44)/

    1000)

    3.14X33.7)/100

    mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m
  • 8/13/2019 Harana CD Work

    8/114

    Sr. No. Description of item No. L B D/H Rate Amount

    1 Earth work in excavation for

    structures in ordinary soil up to 3m

    depth as per MORD specifications

    300Abutment 2 9.40 0.90 0.60 10.15

    Head Wall 4 0.23 0.90 0.60 0.50

    Curtain Wall 2 0.53 0.39 0.55 0.23

    For bed 1 8.74 0.39 0.175 0.60

    11.47 cum 170.76 1959

    2 Providing P.C.C. grade M 10

    (Nominal mix 1:3:6) in open

    foundations as per MORD

    specifications 800&1200

    Abutment 2 9.40 0.90 0.15 2.54

    Head Wall 4 0.23 0.90 0.15 0.12

    Curtain Wall 2 0.53 0.39 0.10 0.04

    For bed 1 8.74 0.39 0.10 0.34

    3.04 cum 4308.10 13116

    3 Brick masonary work in cement

    mortar 1:4 in foundation complete

    as per MORD specifications

    600&1200

    Abutment 2 9.200 0.690 0.150 1.90

    2 9.200 0.570 0.150 1.57

    2 9.200 0.460 0.300 2.54

    2 9.200 0.345 0.450 2.86

    Head walls 4 0.230 0.690 0.150 0.10

    4 0.340 0.575 0.150 0.12

    4 0.460 0.460 0.300 0.25

    4 0.460 0.345 0.650 0.41

    Curtain Wall 2 0.460 0.60 0.150 0.082 0.345 0.600 0.150 0.06

    9.90 cum 4,327.15 42827

    4 Brick masonry work in cement

    mortar 1:3 in parapet excluding

    pointing and plastering as per

    drawing and technical

    specifications Clauses 600, 900

    and 1208.4

    Parapet walls 2 2.44 0.345 0.40 0.67

    0.67 cum 4,529.22 3050

    5 Providing and laying reinforced

    cement concrete M 20 grade

    (Nominal mix 1:2:4) insuperstructure as per MORD

    specifications 800

    For bed 1 9.20 0.600 0.075 0.41 cum

    0.41 cum 4960.53 2054

    6 Providing and laying reinforced

    cement concrete M 25 grade

    (Nominal mix 1:1:3) in

    superstructure as per MORD

    specifications 800

    Slab 1 9.20 1.29 0.20 2.37 cum

    DETAIL ANALYSIS FOR CONST. OF0.60 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M

    Unit: Each

    Qty

  • 8/13/2019 Harana CD Work

    9/114

    2.37 cum 5454.07 12946

    7 Supplying, fitting and placing TMT

    bar (Fe 500) reinforcement in

    superstructure as per MORD

    specifications 1000

    Slab Length Factor Kg

    10mm main 2 47 1.23 0.62 71.68

    10mm DS 2 8 9.16 0.62 90.87

    Chairs 1 12.00 0.45 0.62 3.35Overlap 1 10 0.50 0.62 3.10

    169.00 kg

    or 0.169 MT 54737.77 9251

    8 Providing PCC M-20 Architectural

    coping on the top of wing wall

    return wall etc. comp. as per

    drawing and technical

    specification clause 615 75mm

    thick

    Parapets and wing walls 2 2.44 4.88 mtr 312.76 1526

    9 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

    Abutment insides 2 9.2 0.60 11.04

    Abutment sides 4 0.91 0.90 3.28

    4 0.575 0.200 0.46

    Parapet side 4 2.44 0.40 3.90

    End sides 4 0.40 0.345 0.55

    19.23 sqm 45.76 880

    10 Painting of parapet walls of CD

    work with cement paint as per

    MORD specifications 1701

    Parapet top 2 2.44 0.45 2.20

    Parapet inside 2 2.44 0.45 2.20End sides 4 0.45 0.345 0.62

    5.01 sqm 91.50 458.71

    13 Back filling of abettments with

    Sandy material

    2 5.800 0.175 0.100 0.203 Cum

    2 6.700

    0.203 Cum 1,752.44 356

    Total 88423

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    No.

  • 8/13/2019 Harana CD Work

    10/114

    Sr. No Description of Items

    No. Length Breadt

    h

    Height/

    Depth

    Qty. Rate

    (Rs.)

    Amount

    (Rs.)

    1 Earth work in excavation for

    structures as per drawing andtech. specifications clause 305.1

    including setting out, const. of

    shouring and bracing, removal of

    stumps and other deleterious

    material and disposal up to a lead

    of 50 mar dressing of sides a and

    b

    Abutment 2 9.400 2.960 1.550 86.254

    Wing walls 4 1.760 2.000 1.550 21.824

    Curtain walls 2 4.750 0.530 0.775 3.902

    Under flooring 1 8.140 3.320 0.175 4.729

    116.710 CUM 170.76 19929

    2 Plain Cement Concrete M 10

    (1:3:6 nominal mix) in leveling

    course below open foundation of

    Head walls as per drawing and

    Technical Specification Clause

    1109.

    Abutment 2 9.400 2.960 0.200 11.130

    Wing walls 4 1.760 2.000 0.200 2.816

    Curtain walls 2 5.300 0.530 0.150 0.843

    For Bed 1 8.140 6.000 0.100 4.884

    19.67 CUM 4308.10 84750

    3 Brick Masonry work in cement

    mortar 1:4 in foundations

    complete except pointing and

    plastering as per drawing andtechnical specification Clauses

    600,1202 and 1203

    ABUTMENTS

    1st STEP 2 9.200 2.760 0.150 7.618 CUM

    2nd STEP 2 9.200 2.645 0.150 7.300 CUM

    3rd STEP 2 9.200 2.530 0.150 6.983 CUM

    4th STEP 2 9.200 2.415 0.150 6.665 CUM

    5th STEP 2 9.200 2.300 0.150 6.348 CUM

    6th STEP 2 9.200 2.185 0.150 6.031 CUM

    7th STEP 2 9.200 2.070 0.150 5.713 CUM

    8th STEP 2 9.200 1.955 0.150 5.396 CUM

    9th STEP 2 9.200 1.840 0.150 5.078 CUM

    10th STEP Avg(1.61+0.690)/2=1.15

    2 9.200 1.150 2.970 62.845 CUM

    Wing walls

    1st STEP 4 1.760 1.840 0.450 5.829 CUM

    2nd STEP 4 1.760 1.725 0.450 5.465 CUM

    3rd STEP 4 1.760 1.610 0.225 2.550 CUM

    4th STEP 4 1.760 1.495 0.150 1.579 CUM

    5th STEP 4 1.875 1.380 0.150 1.553 CUM

    6th STEP 4 1.875 1.265 0.150 1.423 CUM

    7th STEP 4 1.875 1.150 0.150 1.294 CUM

    8th STEP 4 1.875 1.035 0.150 1.164 CUM

    DETAIL ANALYSIS FOR CONST. OF6.00 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M

    Detail of Qty

  • 8/13/2019 Harana CD Work

    11/114

  • 8/13/2019 Harana CD Work

    12/114

    6 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

    Abutment 2 9.200 2.970 54.65 SQM

    Abutment sides and wing walls 4 2.680 2.970 31.84 SQM

    Parapet sides 4 2.105 0.450 3.79 SQM

    Parapet Top 4 2.480 0.345 90.28 SQM

    Parapet end sides 4 0.345 0.450 125.90 SQM306.45 SQM 45.76 14025

    per sqm

    7 Providing and fixing in position 20

    mm thick pre-molded joint fil ler in

    expansion joint for fixed ends of

    simply supported spans, covered

    with sealant complete as per

    drawing and technical

    specif ication as per clause 1200

    (Rate 210mm deep,Rate is per

    mtr per cm depth,10mm wide

    hence for 21 cm depth the qnty

    will be 2x6.7=

    13.4x21x2=563 2 9.2 18.40

    For 210 mm deep 2 18.40 21 773 RMT 18.38 14205

    8 Providing PCC M-20 Architectural

    coping on the top of wing wall

    return wall etc. comp. as per

    drawing and technical

    specification clause 615 75mm

    thick

    Parapets 4 2.480 9.92 RMT 312.76 3103

    9 Painting two coats including

    primer coat after filling the surface

    with synthetic enamel paint in all

    shades on new, plastered /

    concrete surfaces as per drawingand Technical Specification

    Clause 1701

    2x2=4 4 6.90 0.450 12.42 SQM 91.50 1136

    per sqm

    10 Providing weepholes in brick

    masonry/stone masonry,

    plain/reinforced concrete

    abutment, wing wall, return wall

    with 100 mm dia AC pipe

    extending through the full width of

    the structures with slope of

    1(V):20(H) towards drawing face

    complete as per drawing andtechnical specification Clauses

    614, 709, 1204.3.7 20 0.69 13.80 RMT 226.41 3124

    11 Providing and laying c.c. flooring

    1:2:4 for bed protection as per

    MORD specifications 1303

    Inside of culvert 1 9.20 6.00 0.075 4.14

    4.14 cum 4689.96 19416

    12 Earth filling for diversion to

    continue the traffic

  • 8/13/2019 Harana CD Work

    13/114

    For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518

    13 Back filling of abettments with

    Sandy material

    26.700 0.100 1.350

    1.809 Cum

    2 6.700 0.115 1.910 2.943 Cum

    2 0.172 0.238 1.500 0.123 CUM

    2 8.990 0.520 1.500 14.024 Cum

    2 6.700 1.645 3.260 71.860 Cum

    90.760 Cum

    less qnty as per brick work of wingwalls

    -26.374 Cum

    less Road crust 2 6.7 2.105 0.48 -13.539 Cum

    50.847 Cum 1,752.44 89105

    14 Wrought iron & Mild steel ladders,

    framed grills, gratings etc. with

    ends of bars rivetted of molded

    forged framed window guards,

    barred iron doors stair case iron

    railing etc. including cost of bolts

    and nuts, screws, welding rod

    complete fixing in position

    ISA 50 mm X 50 mm X 6 mm

    2X10 20 1.38 - - 27.600 m

    [email protected] Kg/ m 122.268 KgPipe 33.7mm O/D

    2X2 4 31.920 m

    [email protected] Kg/ m 93.845 Kg

    Total 216.113 Kg

    Rate As per CSR 18.4 =

    6894.90+16%

    or 2.161 Qtl 7,998.08 17285

    15 Providing and applying two coats

    of ready mix paint including primer

    coat of approved brand on steel

    surface after through cleaning of

    surface to give an even shade as

    per drawing and Technical

    Specification Clause 1701

    Angles

    2X10

    20 0.45 1.692 Sqm

    Pipes

    2X2

    4 8.10 0.376 Sqm

    Total 2.068 Sqm 80.90 167

    1284701

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    (7.38+0.30+0.30)

    ((50+50+44+4

    4)/1000)

    ((3.14X33.7)/

    1000)

    mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m
  • 8/13/2019 Harana CD Work

    14/114

    Sr. No Description of Items

    No. Length Breadt

    h

    Height/

    Depth

    Qty. Rate

    (Rs.)

    Amount

    (Rs.)

    1 Earth work in excavation for

    structures as per drawing and

    tech. specifications clause 305.1

    including setting out, const. of shouring and bracing, removal of

    stumps and other deleterious

    material and disposal up to a lead

    of 50 mar dressing of sides a and

    b

    Abutment 2 9.400 2.960 1.550 86.254

    Wing walls 4 1.760 2.000 1.550 21.824

    Curtain walls 2 4.750 0.530 0.775 3.902

    Under flooring 1 8.140 0.960 0.175 1.368

    113.348 CUM 170.76 19355

    2 Plain Cement Concrete M 10

    (1:3:6 nominal mix) in leveling

    course below open foundation of

    Head walls as per drawing and

    Technical Specification Clause

    1109.

    Abutment 2 9.400 2.040 0.200 7.670

    Wing walls 4 1.760 2.000 0.200 2.816

    Curtain walls 2 5.300 0.530 0.150 0.843

    For Bed 1 8.140 3.000 0.100 2.442

    13.77 CUM 4308.10 59327

    3 Brick Masonry work in cement

    mortar 1:4 in foundations

    complete except pointing and

    plastering as per drawing and

    technical specification Clauses

    600,1202 and 1203ABUTMENTS

    1st STEP 2 9.200 1.840 0.150 5.078 CUM

    2nd STEP 2 9.200 1.725 0.150 4.761 CUM

    3rd STEP 2 9.200 1.610 0.150 4.444 CUM

    4th STEP 2 9.200 1.495 0.150 4.126 CUM

    5th STEP 2 9.200 1.380 0.150 3.809 CUM

    6th STEP 2 9.200 1.265 0.150 3.491 CUM

    7th STEP 2 9.200 1.150 0.150 3.174 CUM

    8th STEP 2 9.200 1.035 0.150 2.857 CUM

    9th STEP 2 9.200 0.920 0.150 2.539 CUM

    10th STEP Avg

    (1.61+0.690)/2=1.15

    2 9.200 1.150 2.000 42.320 CUM

    Wing walls1st STEP 4 1.760 1.840 0.450 5.829 CUM

    2nd STEP 4 1.760 1.725 0.450 5.465 CUM

    3rd STEP 4 1.760 1.610 0.225 2.550 CUM

    4th STEP 4 1.760 1.495 0.150 1.579 CUM

    5th STEP 4 1.875 1.380 0.150 1.553 CUM

    6th STEP 4 1.875 1.265 0.150 1.423 CUM

    7th STEP 4 1.875 1.150 0.150 1.294 CUM

    8th STEP 4 1.875 1.035 0.150 1.164 CUM

    9th STEP 4 1.875 0.920 0.150 1.035 CUM

    10th STEP 4 1.875 0.805 0.150 0.906 CUM

    DETAIL ANALYSIS FOR CONST. OF3.00 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M

    Detail of Qty

  • 8/13/2019 Harana CD Work

    15/114

    11th STEP 4 1.875 0.690 0.150 0.776 CUM

    12th STEP 4 1.875 0.575 0.150 0.647 CUM

    13th STEP 4 1.875 0.460 0.150 0.518 CUM

    14th STEP 4 1.875 0.345 0.150 0.388 CUM

    15th STEP 4 2.105 0.345 0.345 1.002 CUM

    16th STEP

    Avg.(0.230x1.50)/2=0.172 ,

    (1.380x0.345)/2=0.238

    4 0.172 0.238 1.500 0.246 CUM

    Curtain walls2 2.310 0.460 0.230 0.489 CUM

    2 2.540 0.345 0.230 0.403 CUM

    2 2.770 0.230 0.450 0.573 CUM

    2 3.000 0.230 0.100 0.138 CUM

    Parapet

    4 2.480 0.345 0.450 1.540 CUM

    106.12 4327.15 459182

    per cum

    4 Plain/reinforced cement concrete

    (RCC Grade M-25) in sub

    structure complete as per

    drawings and technical

    specification clauses

    802,804,805,806,807,1202 and

    1204.

    FOR DECK SLAB 1 9.200 3.600 0.300 9.94 CUM

    For Bed Plates 2 9.200 0.575 0.200 2.12 CUM

    Sides of Slab 2 9.200 0.275 0.300 1.52 CUM

    Parapet walls 2 3.600 0.115 0.450 0.37 CUM

    For Wearing Slab 1 8.970 4.150 0.075 2.79 CUM

    16.73 CUM 5454.07 91271

    5 Supplying, fitting and placing TMT

    bar reinforcement (Fe 500) in

    substructure complete as per

    drawings and technical

    specification clauses 1002,1005,1010 and 1202

    Factor

    wt. Kgper mtr

    16 mm dia bar (main steel) 63 3.560 1.58 354.42 KG

    10 mm dia bar (Dist. Steel) 19 9.160 0.62 107.90 KG

    10 mm dia bar ( Temp. steel) 19 9.160 0.62 107.90 KG

    10 mm dia bar ( Temp. steel) 47 3.560 0.62 103.74 KG

    8 mm dia bar (for bed plate)

    2x8=16

    16 9.160 0.39 57.16 KG

    8mm dia bar (for parapet)

    2x2x11=44

    72 1.000 0.39 28.08 KG

    8mm dia bar (for parapet)

    2x2x3 =12

    12 7.660 0.39 35.85 KG

    8mm Ring

    (2x35)=70

    70 1.87 0.39 51.05 KG

    Add 10% for Gradual Overlap 846.10 KG

    Add 5% for Chairs 84.61 KG

    42.31 KG973.02 KG

    0.973 MT 54737.8 53261

    6 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

    Abutment 2 9.200 2.000 36.80 SQM

  • 8/13/2019 Harana CD Work

    16/114

  • 8/13/2019 Harana CD Work

    17/114

    2 0.172 0.238 1.500 0.123 CUM

    2 8.990 0.520 1.500 14.024 Cum

    2 6.700 1.645 3.260 71.860 Cum

    90.760 Cum

    less qnty as per brick work of wing

    walls

    -26.374 Cum

    less Road crust 2 6.7 2.105 0.48 -13.539 Cum

    50.847 Cum 1,752.44 89105

    14 Wrought iron & Mild steel ladders,

    framed grills, gratings etc. with

    ends of bars rivetted of molded

    forged framed window guards,

    barred iron doors stair case iron

    railing etc. including cost of bolts

    and nuts, screws, welding rod

    complete fixing in position

    ISA 50 mm X 50 mm X 6 mm

    2X8 16 1.38 - - 22.080 m

    [email protected] Kg/ m 97.814 Kg

    Pipe 33.7mm O/D2X2 4 31.920 m

    [email protected] Kg/ m 93.845 Kg

    Total 191.659 Kg

    Rate As per CSR 18.4 =

    6894.90+16%

    or 1.917 Qtl 7,998.08 15329

    15 Providing and applying two coats

    of ready mix paint including primer

    coat of approved brand on steel

    surface after through cleaning of

    surface to give an even shade as

    per drawing and Technical

    Specification Clause 1701

    Angles

    2X8

    16 0.45 3.008 Sqm

    Pipes

    2X2 (3600+300) =3900

    4 3.90 1.650 Sqm

    Total 4.658 Sqm 80.90 377

    879293

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    (7.38+0.30+0.30)

    ((50+50+44+4

    4)/1000)

    ((3.14X33.7)/

    1000

    mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m
  • 8/13/2019 Harana CD Work

    18/114

    Sr. No Description of Items

    No. Length Breadt

    h

    Height/

    Depth

    Qty. Rate

    (Rs.)

    Amount

    (Rs.)

    1 Earth work in excavation for

    structures as per drawing and

    tech. specifications clause 305.1

    including setting out, const. of shouring and bracing, removal of

    stumps and other deleterious

    material and disposal up to a lead

    of 50 mar dressing of sides a and

    b

    Abutment 2 11.300 2.960 1.550 103.689

    Wing walls 4 1.760 2.000 1.550 21.824

    Curtain walls 2 4.750 0.530 0.775 3.902

    Under flooring 1 8.140 0.960 0.175 1.368

    130.782 CUM 170.76 22332

    2 Plain Cement Concrete M 10

    (1:3:6 nominal mix) in leveling

    course below open foundation of

    Head walls as per drawing and

    Technical Specification Clause

    1109.

    Abutment 2 11.300 2.040 0.200 9.221

    Wing walls 4 1.760 2.000 0.200 2.816

    Curtain walls 2 5.300 0.530 0.150 0.843

    For Bed 1 8.140 3.000 0.100 2.442

    15.32 CUM 4308.10 66007

    3 Brick Masonry work in cement

    mortar 1:4 in foundations

    complete except pointing and

    plastering as per drawing and

    technical specification Clauses

    600,1202 and 1203ABUTMENTS

    1st STEP 2 11.100 1.840 0.150 6.127 CUM

    2nd STEP 2 11.100 1.725 0.150 5.744 CUM

    3rd STEP 2 11.100 1.610 0.150 5.361 CUM

    4th STEP 2 11.100 1.495 0.150 4.978 CUM

    5th STEP 2 11.100 1.380 0.150 4.595 CUM

    6th STEP 2 11.100 1.265 0.150 4.212 CUM

    7th STEP 2 11.100 1.150 0.150 3.830 CUM

    8th STEP 2 11.100 1.035 0.150 3.447 CUM

    9th STEP 2 11.100 0.920 0.150 3.064 CUM

    10th STEP Avg

    (1.61+0.690)/2=1.15

    2 11.100 1.150 2.000 51.060 CUM

    Wing walls1st STEP 4 1.760 1.840 0.450 5.829 CUM

    2nd STEP 4 1.760 1.725 0.450 5.465 CUM

    3rd STEP 4 1.760 1.610 0.225 2.550 CUM

    4th STEP 4 1.760 1.495 0.150 1.579 CUM

    5th STEP 4 1.875 1.380 0.150 1.553 CUM

    6th STEP 4 1.875 1.265 0.150 1.423 CUM

    7th STEP 4 1.875 1.150 0.150 1.294 CUM

    8th STEP 4 1.875 1.035 0.150 1.164 CUM

    9th STEP 4 1.875 0.920 0.150 1.035 CUM

    10th STEP 4 1.875 0.805 0.150 0.906 CUM

    DETAIL ANALYSIS FOR CONST. OF3.00 M SPAN SLAB SQEW TYPE CULVERT WITH CARRIAGE WAY 8.50 M

    Detail of Qty

  • 8/13/2019 Harana CD Work

    19/114

    11th STEP 4 1.875 0.690 0.150 0.776 CUM

    12th STEP 4 1.875 0.575 0.150 0.647 CUM

    13th STEP 4 1.875 0.460 0.150 0.518 CUM

    14th STEP 4 1.875 0.345 0.150 0.388 CUM

    15th STEP 4 2.105 0.345 0.345 1.002 CUM

    16th STEP

    Avg.(0.230x1.50)/2=0.172 ,

    (1.380x0.345)/2=0.238

    4 0.172 0.238 1.500 0.246 CUM

    Curtain walls2 2.450 0.460 0.230 0.518 CUM

    2 2.680 0.345 0.230 0.425 CUM

    2 2.910 0.230 0.450 0.602 CUM

    2 3.140 0.230 0.100 0.144 CUM

    Parapet

    4 2.480 0.345 0.450 1.540 CUM

    122.02 4327.15 528012

    per cum

    4 Plain/reinforced cement concrete

    (RCC Grade M-25) in sub

    structure complete as per

    drawings and technical

    specification clauses

    802,804,805,806,807,1202 and

    1204.

    FOR DECK SLAB 1 11.100 3.600 0.300 11.99 CUM

    For Bed Plates 2 11.100 0.575 0.200 2.55 CUM

    Sides of Slab 2 11.100 0.275 0.300 1.83 CUM

    Parapet walls 2 3.720 0.115 0.450 0.39 CUM

    For Wearing Slab 1 10.870 4.150 0.075 3.38 CUM

    20.14 CUM 5454.07 109849

    5 Supplying, fitting and placing TMT

    bar reinforcement (Fe 500) in

    substructure complete as per

    drawings and technical

    specification clauses 1002,1005,1010 and 1202

    Factor

    wt. Kgper mtr

    16 mm dia bar (main steel) 75 3.680 1.58 436.15 KG

    10 mm dia bar (Dist. Steel) 19 11.060 0.62 130.29 KG

    10 mm dia bar ( Temp. steel) 19 11.060 0.62 130.29 KG

    10 mm dia bar ( Temp. steel) 57 3.560 0.62 125.81 KG

    8 mm dia bar (for bed plate)

    2x8=16

    16 11.060 0.39 69.01 KG

    8mm dia bar (for parapet)

    2x2x11=44

    72 1.000 0.39 28.08 KG

    8mm dia bar (for parapet)

    2x2x3 =12

    12 7.660 0.39 35.85 KG

    8mm Ring

    (2x35)=70

    70 1.87 0.39 51.05 KG

    Add 10% for Gradual Overlap 1006.53 KG

    Add 5% for Chairs 100.65 KG

    50.33 KG1157.51 KG

    1.158 MT 54737.8 63359

    6 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

    Abutment 2 11.100 2.000 44.40 SQM

  • 8/13/2019 Harana CD Work

    20/114

    Abutment sides and wing walls 4 2.680 2.000 21.44 SQM

    Parapet sides 4 2.105 0.450 3.79 SQM

    Parapet Top 4 2.480 0.345 69.63 SQM

    Parapet end sides 4 0.345 0.450 94.86 SQM

    234.12 SQM 312.76 73223

    per sqm

    7 Providing and fixing in position 20

    mm thick pre-molded joint fil ler in

    expansion joint for fixed ends of simply supported spans, covered

    with sealant complete as per

    drawing and technical

    specif ication as per clause 1200

    (Rate 300mm deep,Rate is per

    mtr per cm depth,10mm wide

    hence for 30 cm depth the qnty

    will be 2x11.10=

    22.20x30x2=1332 2 11.1 22.20

    For300 mm deep 2 22.20 30 1332 RMT 18.38 24484

    8 Providing PCC M-20 Architectural

    coping on the top of wing wall

    return wall etc. comp. as per

    drawing and technical

    specification clause 615 75mm

    thick

    Parapets 4 2.480 9.92 RMT 312.76 3103

    9 Painting two coats including

    primer coat after filling the surface

    with synthetic enamel paint in all

    shades on new, plastered /

    concrete surfaces as per drawing

    and Technical Specification

    Clause 1701

    2x2=4 4 3.600 0.450 6.48

    2 3.600 0.115 0.828

    7.308 SQM 91.50 66910 Providing weepholes in brick

    masonry/stone masonry,

    plain/reinforced concrete

    abutment, wing wall, return wall

    with 100 mm dia AC pipe

    extending through the full width of

    the structures with slope of

    1(V):20(H) towards drawing face

    complete as per drawing and

    technical specification Clauses

    614, 709, 1204.3.7 20 0.69 13.80 RMT 226.41 3124

    11 Providing and laying c.c. flooring

    1:2:4 for bed protection as perMORD specifications 1303

    Inside of culvert 1 11.20 3.00 0.075 2.52

    2.52 cum 4689.96 11819

    12 Earth filling for diversion to

    continue the traffic

    For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518

    13 Back filling of abettments with

    Sandy material

    26.700 0.100 1.350

    1.809 Cum

    2 6.700 0.115 1.910 2.943 Cum

  • 8/13/2019 Harana CD Work

    21/114

    2 0.172 0.238 1.500 0.123 CUM

    2 8.990 0.520 1.500 14.024 Cum

    2 6.700 1.645 3.260 71.860 Cum

    90.760 Cum

    less qnty as per brick work of wing

    walls

    -26.374 Cum

    less Road crust 2 6.7 2.105 0.48 -13.539 Cum

    50.847 Cum 1,752.44 89105

    14 Wrought iron & Mild steel ladders,

    framed grills, gratings etc. with

    ends of bars rivetted of molded

    forged framed window guards,

    barred iron doors stair case iron

    railing etc. including cost of bolts

    and nuts, screws, welding rod

    complete fixing in position

    ISA 50 mm X 50 mm X 6 mm

    2X8 16 1.38 - - 22.080 m

    [email protected] Kg/ m 97.814 Kg

    Pipe 33.7mm O/D2X2 4 18.000 m

    [email protected] Kg/ m 52.920 Kg

    Total 150.734 Kg

    Rate As per CSR 18.4 =

    6894.90+16%

    or 1.507 Qtl 7,998.08 12056

    15 Providing and applying two coats

    of ready mix paint including primer

    coat of approved brand on steel

    surface after through cleaning of

    surface to give an even shade as

    per drawing and Technical

    Specification Clause 1701

    Angles

    2X8

    16 0.45 3.008 Sqm

    Pipes

    2X2 (3600+300) =3900

    4 3.90 1.650 Sqm

    Total 4.658 Sqm 80.90 377

    1053037

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    (3.90+0.30+0.30)

    ((50+50+44+4

    4)/1000)

    ((3.14X33.7)/

    1000

    mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m
  • 8/13/2019 Harana CD Work

    22/114

    Sr. No Description of Items

    No. Length Breadt

    h

    Height/

    Depth

    Qty. Rate

    (Rs.)

    Amount

    (Rs.)

    1 Earth work in excavation for

    structures as per drawing and

    tech. specifications clause 305.1including setting out, const. of

    shouring and bracing, removal of

    stumps and other deleterious

    material and disposal up to a lead

    of 50 mar dressing of sides a and

    b

    Abutment 2 9.400 2.960 1.550 86.254

    Pier 1 9.400 2.960 1.550 43.13

    Wing walls 4 1.760 2.000 1.550 21.824

    Curtain walls 2 4.750 0.530 0.775 3.902

    Under flooring 1 8.140 0.960 0.175 1.368

    156.475 CUM 170.76 26719

    2 Plain Cement Concrete M 10

    (1:3:6 nominal mix) in leveling

    course below open foundation of

    Head walls as per drawing and

    Technical Specification Clause

    1109.

    Abutment 2 9.400 2.040 0.200 7.670

    Pier 1 9.400 2.960 1.550 43.13

    Wing walls 4 1.760 2.000 0.200 2.816

    Curtain walls 2 5.300 0.530 0.150 0.843

    For Bed 1 8.140 3.000 0.100 2.442

    56.90 CUM 4308.10 245124

    3 Brick Masonry work in cement

    mortar 1:4 in foundations

    complete except pointing andplastering as per drawing and

    technical specification Clauses

    600,1202 and 1203

    ABUTMENTS

    1st STEP 2 9.200 1.840 0.150 5.078 CUM

    2nd STEP 2 9.200 1.725 0.150 4.761 CUM

    3rd STEP 2 9.200 1.610 0.150 4.444 CUM

    4th STEP 2 9.200 1.495 0.150 4.126 CUM

    5th STEP 2 9.200 1.380 0.150 3.809 CUM

    6th STEP 2 9.200 1.265 0.150 3.491 CUM

    7th STEP 2 9.200 1.150 0.150 3.174 CUM

    8th STEP 2 9.200 1.035 0.150 2.857 CUM

    9th STEP 2 9.200 0.920 0.150 2.539 CUM10th STEP Avg

    (1.61+0.690)/2=1.15

    2 9.200 1.150 2.000 42.320 CUM

    PIER

    1st STEP 1 9.200 1.840 0.200 3.39 CUM

    2nd STEP 1 9.200 1.725 0.200 3.17 CUM

    3rd STEP 1 9.200 1.610 0.200 2.96 CUM

    4th STEP 1 9.200 1.495 0.200 2.75 CUM

    5th STEP 1 9.200 1.380 0.200 2.54 CUM

    6th STEP 1 9.200 1.265 0.200 2.33 CUM

    7th STEP 1 9.200 1.150 0.150 1.59 CUM

    Detail of Qty

    DETAIL ANALYSIS FOR CONST. OF3.00 M (DOUBLE SPAN)SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY

  • 8/13/2019 Harana CD Work

    23/114

    8th STEP 1 9.200 1.035 2.000 19.04 CUM

    Wing walls

    1st STEP 4 1.760 1.840 0.450 5.829 CUM

    2nd STEP 4 1.760 1.725 0.450 5.465 CUM

    3rd STEP 4 1.760 1.610 0.225 2.550 CUM

    4th STEP 4 1.760 1.495 0.150 1.579 CUM

    5th STEP 4 1.875 1.380 0.150 1.553 CUM

    6th STEP 4 1.875 1.265 0.150 1.423 CUM

    7th STEP 4 1.875 1.150 0.150 1.294 CUM8th STEP 4 1.875 1.035 0.150 1.164 CUM

    9th STEP 4 1.875 0.920 0.150 1.035 CUM

    10th STEP 4 1.875 0.805 0.150 0.906 CUM

    11th STEP 4 1.875 0.690 0.150 0.776 CUM

    12th STEP 4 1.875 0.575 0.150 0.647 CUM

    13th STEP 4 1.875 0.460 0.150 0.518 CUM

    14th STEP 4 1.875 0.345 0.150 0.388 CUM

    15th STEP 4 2.105 0.345 0.345 1.002 CUM

    16th STEP

    Avg.(0.230x1.50)/2=0.172 ,

    (1.380x0.345)/2=0.238

    4 0.172 0.238 1.500 0.246 CUM

    Curtain walls

    2 2.310 0.460 0.230 0.489 CUM

    2 2.540 0.345 0.230 0.403 CUM

    2 2.770 0.230 0.450 0.573 CUM

    2 3.000 0.230 0.100 0.138 CUM

    Parapet

    4 2.480 0.345 0.450 1.540 CUM

    143.89 = #VALUE!

    per cum

    4 Plain/reinforced cement concrete

    (RCC Grade M-25) in sub

    structure complete as per

    drawings and technical

    specification clauses

    802,804,805,806,807,1202 and

    1204.FOR DECK SLAB 2 9.200 3.800 0.300 20.98 CUM

    For Bed Plates 2 9.200 0.575 0.200 2.12 CUM

    For Bed Plate( PIER) 1 9.200 1.035 0.200 1.90 CUM

    Sides of Slab 2 9.200 0.275 0.300 1.52 CUM

    Parapet walls 4 3.800 0.115 0.450 0.79 CUM

    For Wearing Slab 2 8.970 4.075 0.075 5.48 CUM

    32.78 CUM 0.00 0

    5 Supplying, fitting and placing TMT

    bar reinforcement (Fe 500) in

    substructure complete as per

    drawings and technical

    specification clauses 1002,1005,1010 and 1202

    Factor

    wt. Kgper mtr

    16 mm dia bar (main steel) 2X63 126 3.740 1.58 744.68 KG

    10 mm dia bar (Dist. Steel) 2X20 40 9.160 0.62 227.17 KG

    10 mm dia bar ( Temp. steel) 40 9.160 0.62 227.17 KG

    10 mm dia bar ( Temp. steel)

    2X47

    94 3.740 0.62 217.97 KG

    8 mm dia bar (for bed plate)

    2x8=16

    16 9.160 0.39 57.16 KG

    9 mm dia bar (for PIER bed plate) 6 9.160 0.39 21.43 KG

  • 8/13/2019 Harana CD Work

    24/114

    8mm dia bar (for parapet)

    2x4x11=88

    88 1.000 0.39 34.32 KG

    8mm dia bar (for parapet)

    2x4x3 =24

    24 7.660 0.39 71.70 KG

    8mm Ring

    (2x35)=70

    70 1.87 0.39 51.05 KG

    8mm Ring

    35

    35 2.5 0.39 34.13 KG

    Add 10% for Gradual Overlap 1652.64 KGAdd 5% for Chairs 165.26 KG

    82.63 KG1900.54 KG

    1.901 MT 0.0 0

    6 Pointing with Cement Mortar (1:3),

    on brickwork as per technical

    specification Clause 613.3

    Abutment 2 9.200 2.000 36.80 SQM

    Pier 2 9.200 2.000 36.80 SQM

    Pier 2 1.035 2.000 4.14 SQM

    Abutment sides and wing walls 4 2.680 2.000 21.44 SQM

    Parapet sides 4 2.105 0.450 3.79 SQM

    Parapet Top 4 2.480 0.345 102.97 SQM

    Parapet end sides 4 0.345 0.450 128.20 SQM

    334.14 SQM 0.00 0

    per sqm

    7 Providing and fixing in position 20

    mm thick pre-molded joint fil ler in

    expansion joint for fixed ends of

    simply supported spans, covered

    with sealant complete as per

    drawing and technical

    specif ication as per clause 1200

    (Rate 300mm deep,Rate is per

    mtr per cm depth,10mm wide

    hence for 30 cm depth the qntywill be 3x9.20=

    27.60x30x2=1656 3 9.2 27.60

    For300 mm deep 2 27.60 30 1656 RMT 18.38 30440

    8 Providing PCC M-20 Architectural

    coping on the top of wing wall

    return wall etc. comp. as per

    drawing and technical

    specification clause 615 75mm

    thick

    Parapets 4 2.480 9.92 RMT 0.00 0

    9 Painting two coats including

    primer coat after filling the surface

    with synthetic enamel paint in allshades on new, plastered /

    concrete surfaces as per drawing

    and Technical Specification

    Clause 1701

    2x2X2=8 8 3.600 0.450 12.96

    2x2 =4 4 3.800 0.115 1.748

    14.708 SQM 91.50 1346

  • 8/13/2019 Harana CD Work

    25/114

    10 Providing weepholes in brick

    masonry/stone masonry,

    plain/reinforced concrete

    abutment, wing wall, return wall

    with 100 mm dia AC pipe

    extending through the full width of

    the structures with slope of

    1(V):20(H) towards drawing face

    complete as per drawing andtechnical specification Clauses

    614, 709, 1204.3.7 20 0.69 13.80 RMT 0.00 0

    11 Providing and laying c.c. flooring

    1:2:4 for bed protection as per

    MORD specifications 1303

    Inside of culvert 1 9.20 3.00 0.075 2.07

    2.07 cum 0.00 0

    12 Earth filling for diversion to

    continue the traffic

    For approaches 1 60 6.7 0.60 241.20 CUM 0.00 0

    13 Back filling of abettments with

    Sandy material

    26.700 0.100 1.350

    1.809 Cum

    2 6.700 0.115 1.910 2.943 Cum

    2 0.172 0.238 1.500 0.123 CUM

    2 8.990 0.520 1.500 14.024 Cum

    2 6.700 1.645 3.260 71.860 Cum

    90.760 Cum

    less qnty as per brick work of wing

    walls

    -26.374 Cum

    less Road crust 2 6.7 2.105 0.48 -13.539 Cum

    50.847 Cum 0.00 0

    14 Wrought iron & Mild steel ladders,

    framed grills, gratings etc. with

    ends of bars rivetted of molded

    forged framed window guards,barred iron doors stair case iron

    railing etc. including cost of bolts

    and nuts, screws, welding rod

    complete fixing in position

    ISA 50 mm X 50 mm X 6 mm

    2X2X8 32 1.38 - - 44.160 m

    [email protected] Kg/ m 195.629 KgPipe 33.7mm O/D

    2X2X2 8 18.000 m

    [email protected] Kg/ m 52.920 Kg

    Total 248.549 Kg

    Rate As per CSR 18.4 =6894.90+16%

    or 2.485 Qtl 7,998.08 19879

    (3.90+0.30+0.30)

    mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m
  • 8/13/2019 Harana CD Work

    26/114

    15 Providing and applying two coats

    of ready mix paint including primer

    coat of approved brand on steel

    surface after through cleaning of

    surface to give an even shade as

    per drawing and Technical

    Specification Clause 1701

    Angles2X8

    16 0.45 3.008 Sqm

    Pipes

    2X2 (3600+300) =3900

    4 3.90 1.650 Sqm

    Total 4.658 Sqm 80.90 377

    #VALUE!

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    Sr. No Description of Items

    No. Length Breadth Height/D

    epth

    Qty. Rate

    (Rs.)

    Amount

    (Rs.)

    1 Earth work in excavation for structures as

    per drawing and tech. specifications clause

    305.1 including setting out, const. of

    shouring and bracing, removal of stumps

    and other deleterious material and disposal

    up to a lead of 50 mar dressing of sides a

    and b

    Abutment 2 10.350 2.300 3.00 142.83

    Pier 1 10.350 2.000 3.00 62.10

    Wing walls 4 2.100 2.260 3.00 56.95

    Toe walls d/s and u/s 4 3.400 0.750 1.00 10.20

    For bed 1 2.400 8.750 0.30 6.30278.38 CUM 0.00 0

    2 Plain Cement Concrete M 10 (1:3:6

    nominal mix) in leveling course below open

    foundation of Head wal ls as per drawing

    and Technical Specification Clause 1109.

    Abutment 2 10.350 2.300 0.20 9.52

    Pier 1 10.350 2.000 0.20 4.14

    ((50+50+44+44)/1000)

    ((3.14X33.7)/

    1000)

    DETAIL ANALYSIS FOR CONST. OF3.0 M DOUBLESPAN SLAB TYPE CULVERT WITH CARRIAGFE

    Detail of Qty

  • 8/13/2019 Harana CD Work

    27/114

    Wing walls 4 2.100 2.257 0.20 3.79

    Toe walls d/s and u/s 4 3.400 0.750 0.20 2.04

    For Bed 2 3.000 8.750 0.20 10.50

    29.99 CUM 0.00

    3 Brick Masonry work in cement mortar 1:4 in

    foundations complete except pointing and

    plastering as per drawing and technical

    specification Clauses 600,1202 and 1203

    ABUTMENTS

    1st STEP 2 10.150 2.270 0.200 9.22 CUM

    2nd STEP 2 9.950 2.170 0.200 8.64 CUM

    3rd STEP 2 9.750 2.070 0.200 8.07 CUM

    4th STEP 2 9.550 1.970 0.200 7.53 CUM

    5th STEP 2 9.350 1.870 0.200 6.99 CUM

    6th STEP 2 9.150 1.770 0.200 6.48 CUM

    7th STEP 2 8.950 1.670 0.200 5.98 CUM

    8th STEP (Av. 1.470+0.70)/2 2 8.750 1.085 1.800 34.18 CUM

    1st STEP 1 10.150 1.800 0.200 3.65 CUM

    2nd STEP 1 10.050 1.600 0.200 3.22 CUM

    3rd STEP 1 9.950 1.400 0.200 2.79 CUM

    4th STEP 1 9.850 1.200 0.200 2.36 CUM

    5th STEP 1 9.750 1.000 0.200 1.95 CUM

    6th STEP 1 9.650 0.900 0.200 1.74 CUM

    7th STEP 1 9.550 0.800 0.200 1.53 CUM

    8th STEP 1 9.450 0.700 2.500 16.54 CUM

    RETURN WALLS

    1st STEP 4 2.100 2.057 0.200 3.46 CUM

    2nd STEP 4 2.100 1.957 0.200 3.29 CUM

    3rd STEP 4 2.100 1.857 0.200 3.12 CUM

    Sr. No Description of Items

    4th STEP 4 2.100 1.757 0.200 2.95 CUM

    5th STEP 4 2.100 1.657 0.200 2.78 CUM

    6th STEP 4 2.100 1.557 0.200 2.62 CUM

    7th STEP 4 2.100 1.457 0.200 2.45 CUM

    8th STEP (Av.4x(2.20+2.80)/2

    (1.26+.52)/2

    4 2.500 0.890 1.800 16.02 CUM

    (4x2.8) , (0.59+.40)/2 4 2.800 0.890 0.500 4.98 CUM

    9th Step I Toe walls D/S , U/S

    ( 0.65+0.45)/2=0.550

    4 3.300 0.550 0.800 5.81 CUM

    Parapet 2 13.000 0.345 0.450 4.04 CUM

    172.36 0.00

    per cum

    Sr. No Description of Items

    No. Length Breadth Height/D

    epth

    Qty. Rate

    (Rs.)

    Am

    4 Plain/reinforced cement concrete (RCC

    Grade M-25) in sub structure complete as

    per drawings and technical specif ication

    clauses 802,804,805,806,807,1202 and

    1204.

    For main Slab 2 3.800 8.750 0.300 19.95 CUM

    For Bed Plates 2 8.750 0.700 0.200 2.45 CUM

    1 8.750 0.600 0.200 1.05 CUM

    Front of slab 2 8.750 0.300 0.300 1.58 CUM

    25.03 CUM 534.99 1

    Detail of Qty

    Detail of Qty

  • 8/13/2019 Harana CD Work

    28/114

    5 Supplying, fitting and placing TMT bar

    reinforcement (Fe 415) in substructure

    complete as per drawings and technical

    specification clauses 1002, 1005,1010 and

    1202 Factor

    20 mm dia bar for Main Slab (Main Bar) 136 3.800 2.470 1276.50 KG

    12 mm die bar for Main slab (Distribution

    Bar)

    42 8.750 0.890 327.08 KG

    10 mm dia bar for Main Slab (Surface Slab) 68 2.000 0.620 84.32 KG

    24 8.750 0.620 130.20 KG

    8mm Ring (2x45)= 90 2.120 0.390 74.41 KG

    45 1.455 0.390 25.54 KG

    8mm bars (2x9)+(1x8)=26 26 8.750 0.390 88.73 KG

    2006.76 KG

    For parpet and pillers L.S 350.00 KG

    Add 10% for Gradual Overlap 200.68 KG

    Add 5% for Chairs 100.34 KG

    2657.78 KG

    2.66 MT 0.00

    6 Plain/reinforced cement concrete (RCCGrade M-25) in sub structure comlete as

    per drawings and technical specif ication

    clauses 802,804,805,806, 807,1202 and

    1204

    For Wearing Slab 2 7.850 4.400 0.075 5.18

    Total 5.18 Cum 534.99

    7 Pointing with Cement Mortar (1:3), on

    brickwork as per technical specif ication

    Clause 613.3

    ABUTMENT 2 8.750 1.8 31.50 SQM

    Pier 2 9.450 2.5 47.25 SQM

    2 0.700 2.5 3.50 SQMFOR Wing Wall 4 3.500 2.1 29.40 SQM

    111.65 SQM 0.00

    per sqm

    8 Providing and fillling joint sealing

    compound as per drawings and technical

    specifications with coarse sand and 6 per

    cent bitumen by weight.

    For 300 mm deep 3 8.750 30 787.5 RMT 0.00

    per m/cm

    9 Providing PCC M-20 Architectural coping

    on the top of wing wall return wall etc.

    comp. as per drawing and technical

    specification clause 615 75mm thick

    Parapets 2 13.000 26 mtr 0.00

    10 Plastering with Cement Mortar (1:4), 15 mm

    thick on brick work in sub structure as per

    technical specification Clause 613.3

    Out and side of parapet wall

    2x2=

    4 13.000 0.450 23.400 SQM

    Front side 4 0.345 0.450 0.62124.021 0.00

    S N D i ti f It D t il f Qt

  • 8/13/2019 Harana CD Work

    29/114

  • 8/13/2019 Harana CD Work

    30/114

    Ite

    m

    N

    o

    Description Quantity Total Qty. Cost as

    per

    MORD

    Data

    Book

    Nos. L B H/D Rate Amount1 2 3 4 5 6 7 8 9

    1

    Earth work in excavation for foundation of

    structures upto 3 m depth as per drawing

    and technical specification Clause 1 1 04

    including setting out, construction of

    shoring and bracing, removal of stumps

    and other deleterious matter, dressing of

    sides and Bottom and back filling with

    approved material.

    Head Walls (Av. Depth) 2 2.750 0.900 2.000 9.900

    Under Pipes 1 5.900 1.070 1.000 6.313

    Under Sump SIZE 900X900 mm inside 2 1.229 1.558 0.600 2.29818.51 170.76 3161

    cum

    2 Plain Cement Concrete M 10 (1:3:6

    nominal^nfx) in levelling course below

    open foundation of Head walls as per

    drawing and Technical Specification

    Clause 1109.

    Under Pipes 1 6.586 1.07 0.15 1.057

    Head Walls 2 2.75 0.9 0.15 0.743

    Under Sump 2 1.229 1.558 0.1 0.383

    2.183 4,308.10 9402

    cum Per cum

    3 Providing and laying reinforced cementconcrete pipe NP 3 for culverts on first

    class bedding of granular material in

    single row including fixing collar with

    cement mortar 1:2 but excluding

    excavation, protection works, backfilling,

    concrete and masonry works in head walls

    and parapets Clause 1106.

    NP-3 Concrete Pipes 1 7.5 7.500 2,703.82 20279

    Metre

    4 Brick Masonary work in cement mortar 1

    :4 in foundation of Head Walls complete

    excluding pointing and plastering as per

    drawing and technical specification

    Clause 1 109

    Net Qty. 7.370 4,543.51 33486

    Standard Sub Estimate for Const of 600 mm dia Hume Pipe Culvert..

  • 8/13/2019 Harana CD Work

    31/114

    cum

    5 Pointing with Cement Mortar (1:3) on

    brickwork as per technical specfication

    Clause 613.3

    Head Walls outer Side 2 2.45 2.190 10.731

    Top & In side 2 2.45 0.690 3.381

    Face wall 4 0.345 1.000 1.380

    6 Plastring with cement Morter (1:4),15 mmthick on brick work in sub stucture as per

    technical specification Clause 613.3

    15.492 45.76 709

    Bed 2 0.900 0.9 1.620

    Top of Walls 4 0.900 0.229 0.824

    2 1.358 0.229 0.622

    Sides 2 1.587 1.145 3.634

    Inside 4 0.900 1.145 4.122

    Deduction 2 0.600 1.145 1.374

    12.197 135.47 1652

    sqm

    8 Providing PCC m 20 Architectural Coping

    388mm x 75 mm on the top of wing wall,

    return wall etc, complete as per drawing

    and technical specification clause 612.5.

    Top of Parapets 2 2.450 _ _ 4.900 312.76 1533

    metre

    9 Painting two coats with prime coat after

    filling the surface synthetc enamel paint in

    all sheds on new plastred concreate

    surface. as pec Tech. specification of

    MORD 1700.

    For Parapet Inside & Outside 4 2.45 0.345 3.381

    Top 2 2.45 0.345 1.691For Front Portion 4 0.345 0.345 0.476

    5.548 86.80 482

    Sqm

    Total Rupees 70703

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi BoardPatiala-1 Patiala

  • 8/13/2019 Harana CD Work

    32/114

    S

    r.

    No.

    Description of item No. L B D/H Rate Amount

    1 Earth work in excavation for

    structures in ordinary soil up to

    3m depth as per MORD

    specifications 300

    Head Wall 2 2.575 0.750 1.650 6.373

    For pipe laying 1 8.060 1.350 1.150 12.513

    18.89 cum 169.07 3193

    2 Providing P.C.C. grade M 10

    (Nominal mix 1:3:6) in open

    foundations as per MORD

    specifications 800&1200

    Head Wall 2 2.575 0.750 0.150 0.579

    Under R.C.C. Pipe 1 8.060 1.350 0.100 1.088

    For Traingular portion with pipe 1 8.060 1.050 0.375 3.174

    (1.35+0.75)/2 13151

    Deduct pipe

    1/2x1/4x22/7x.750x.750x8.06=1.7

    81

    1 -1.781

    3.06 cum 4297.68

    3 Providing and Laying 600 mm

    Hume pipes including joining

    them

    3.5

    2.500

    8.75 m 2703.82 23658

    3 Brick masonary work in cement

    mortar 1:4 in foundation complete

    as per MORD specifications

    600&1200Head Walls 1st step 2 2.45 0.8 0.150 0.588

    2nd step 2 2.45 0.686 0.150 0.504

    3rd step 2 2.45 0.57 0.150 0.419

    4th'step 2 2.45 0.457 1.845 4.132

    5th step 2 2.45 0.345 0.345 0.583

    Deduct Pipe ( - ) 2 3.14 0.144 0.457 0.413

    Pye r2

    For Sump Bed 2 0.9 0.9 0.075 0.122

    DETAIL ANALYSIS FOR CONST. OF 600 mm pipeTYPE CULVERT WITH CARRIAGE WAY 8.75 M

    Unit: Each

    Qty

  • 8/13/2019 Harana CD Work

    33/114

    Sides 4 0.9 0.229 1.220 1.006

    Deduction 2 0.6 0.229 1.220 0.335

    8.10 3,636.60 29463

    5 Providing PCC M-20

    Architectural coping on the top of

    wing wall return wall etc. comp.

    as per drawing and technical

    specification clause 615 75mm

    thick

    2 2.4 0.345 1.66 mtr 312.76 518

    5 Pointing with Cement Mortar (1:3) on

    brickwork as per technical specfication

    Clause 613.3

    Sqm

    Head Walls outer Side 2 2.45 2.190 10.731 Sqm

    Top & In side 2 2.45 0.690 3.381 Sqm

    Face wall 4 0.345 1.000 1.380 Sqm

    15.49 Sqm 45.78 709

    Painting two coats with prime coat after

    filling the surface synthetc enamel paint in

    all sheds on new plastred concreate

    surface. as pec Tech. specification of

    MORD 1700.

    sqm

    For Parapet Inside & Outside 4 2.45 0.345 3.381 sqmTop 2 2.45 0.345 1.691 sqmFor Front Portion 4 0.345 0.345 0.476 sqm

    5.55 sqm 86.80 481.54

    1 7.250 1.350 1.150 11.256 Cum

    8 Back filling of abettments with

    Sand

    2 2.575 0.087 0.150 0.067

    2 2.575 0.202 0.150 0.156

    2 2.575 0.318 0.050 0.082

    -1.088

    Deduct concrete as per item no 2 -3.560

    Deduct pipe

    1/4x22/7x.750x.750x8.06=3.56

    6.913 Cum 1,128.54 7801.31

    Total 78975.46

    Executive Engineer ( C )

    Sub Division Officer ( C ) Punjab Mandi BoardPb.Mandi Board, Patiala

    Samana

  • 8/13/2019 Harana CD Work

    34/114

    Sr. No Description of Items

    No. Length Breadth Height/Dept

    h

    Qty. Rate

    (Rs.)

    Amount (Rs.)

    1

    Earth work in excavation for foundation of

    structures upto 3 m depth as per

    drawing and tech. specifications clause1104 including setting out, const. of

    shouring and bracing, removal of stumps

    and other deleterious matter,dressing of

    sides andbottom and backfilling with

    approved material

    1 1.000 1.100 0.650 0.715 Cum 170.76 122

    2

    Brick Masonry work in cement mortar 1:4

    in foundations complete except pointing

    and plastering as per drawing and

    technical specification Clauses 600,1202

    and 1203

    Base 1 1.000 1.100 0.075 0.083 Cum

    Reimbursments 2 1.000 0.225 0.525 0.236 Cum0.319 4,327.15 1379

    3

    Providing concrete for plain/reinforced

    concrete 1:2:4 in open foundations

    complete as per drawings and technical

    specifications Clause 802, 803, 1202 &

    1203

    Inside drain 1 1.000 0.450 0.075 0.034for coping 2 1.000 0.225 0.050 0.023

    0.056 4,792.85 270

    4

    Plastering with Cement Mortar (1:4), 15

    mm thick on brick work in sub structure

    as per technical specification Clause

    613.3

    Reimbursments in side 2 1.000 0.500 1 Sqm 135.47 135

    5 R.C.C. slab for drain 1 1.000 0.900 0.900 Sqm #REF! #REF!Rate of RCC slab is as per sub

    estimate #REF!

    Cost per metre #REF!

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    DETAIL ANALYSIS FOR

    Construction of U-Shaped coveredSide Drain Size (450mmx450mm)

    Detail of Qty

  • 8/13/2019 Harana CD Work

    35/114

  • 8/13/2019 Harana CD Work

    36/114

    Sr. No Description of Items

    No. Length Breadth Height/Dept

    h

    Qty. Rate

    (Rs.)

    Amount (Rs.)

    1

    Earth work in excavation for foundation of

    structures upto 3 m depth as per drawing and tech. specifications clause

    1104 including setting out, const. of

    shouring and bracing, removal of stumps

    and other deleterious matter,dressing of

    sides andbottom and backfilling with

    approved material

    1 1.000 1.250 0.800 1.000 Cum 170.76 171

    2

    Brick Masonry work in cement mortar 1:4

    in foundations complete except pointing

    and plastering as per drawing and

    technical specification Clauses 600,1202

    and 1203

    Base 1 1.000 1.250 0.075 0.094 CumReimbursments

    2 1.000 0.225 0.675 0.304 Cum

    0.398 Cum 4,327.15 1720

    3

    Providing concrete for plain/reinforced

    concrete 1:2:4 in open foundations

    complete as per drawings and technical

    specifications Clause 802, 803, 1202 &

    1203

    Inside drain

    1 1.000 0.600 0.075 0.045 Cumfor coping

    2 1.000 0.225 0.050 0.023 Cum

    0.068 Cum 4,792.85 324

    4

    Plastering with Cement Mortar (1:4), 15

    mm thick on brick work in sub structure

    as per technical specif ication Clause

    613.3

    Reimbursments in side 2 1.000 0.650 1.300 Sqm 135.47 176

    2390

    Cost per metre 2390

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    DETAIL ANALYSIS FOR

    Construction of U-Shaped Side Drain Size (600mmx600mm)

    Detail of Qty

  • 8/13/2019 Harana CD Work

    37/114

    Sr. No Description of Items

    No. Length Breadth Height/Dept

    h

    Qty. Rate

    (Rs.)

    Amount (Rs.)

    1

    Earth work in excavation for foundation of

    structures upto 3 m depth as per

    drawing and tech. specifications clause1104 including setting out, const. of

    shouring and bracing, removal of stumps

    and other deleterious matter,dressing of

    sides andbottom and backfilling with

    approved material

    1 1.000 1.100 0.650 0.715 Cum 170.76 122

    2

    Brick Masonry work in cement mortar 1:4

    in foundations complete except pointing

    and plastering as per drawing and

    technical specification Clauses 600,1202

    and 1203

    Base 1 1.000 1.100 0.075 0.083 CumReimbursments 2 1.000 0.225 0.525 0.236 Cum

    0.319 4,327.15 1379

    3

    Providing concrete for plain/reinforced

    concrete 1:2:4 in open foundations

    complete as per drawings and technical

    specifications Clause 802, 803, 1202 &

    1203

    Inside drain 1 1.000 0.450 0.075 0.034for coping 2 1.000 0.225 0.050 0.023

    0.056 4,792.85 270

    4

    Plastering with Cement Mortar (1:4), 15

    mm thick on brick work in sub structure

    as per technical specification Clause

    613.3

    Reimbursments in side 2 1.000 0.500 1 Sqm 135.47 135

    1906

    Cost per metre 1906

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    DETAIL ANALYSIS FOR

    Construction of U-Shaped Side Drain Size (450mmx450mm)

    Detail of Qty

  • 8/13/2019 Harana CD Work

    38/114

    Sr. No Description of Items

    No. Length Breadth Height/Dept

    h

    Qty. Rate

    (Rs.)

    Amount (Rs.)

    1

    Earth work in excavation for foundation of

    structures upto 3 m depth as per

    drawing and tech. specifications clause1104 including setting out, const. of

    shouring and bracing, removal of stumps

    and other deleterious matter,dressing of

    sides andbottom and backfilling with

    approved material

    1 1.000 0.95 0.500 0.475 Cum 170.76 81

    3

    Brick Masonry work in cement mortar 1:4

    in foundations complete except pointing

    and plastering as per drawing and

    technical specification Clauses 600,1202

    and 1203

    Base 1 1.000 0.950 0.075 0.071 CumReimbursments 2 1.000 0.225 0.375 0.169 Cum

    0.240 Cum 4,327.15 1039

    4

    Providing concrete for plain/reinforced

    concrete 1:2:4 in open foundations

    complete as per drawings and technical

    specifications Clause 802, 803, 1202 &

    1203

    Inside drain 1 1.000 0.300 0.10 0.030 Cumfor coping 2 1.000 0.225 0.05 0.023 Cum

    0.053 Cum 4,792.85 252

    5

    Plastering with Cement Mortar (1:4), 15

    mm thick on brick work in sub structure

    as per technical specif ication Clause

    613.3

    Reimbursments in side 2 1.000 0.350 0.70 Sqm 135.47 951466

    Cost per metre 1466.08

    Sub Divisional Officer Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    DETAIL ANALYSIS FOR

    Construction of U-Shaped Side Drain Size (300mmx300mm)

    Detail of Qty

  • 8/13/2019 Harana CD Work

    39/114

  • 8/13/2019 Harana CD Work

    40/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)Amount (Rs.)

    12.3 1100

    ( B ) 1000 mm die

    Unit : m

    Taking output = 7.50 m

    ( 3 Pipes of 2.5 m length each)

    a) Labour

    Mate day 0.09 194.81 17.53

    Mason 1st Class day0.25 266.73 66.68

    Mazdoor (Unskilled) day2.00 180.06 360.12

    b) Material

    Sand at site cum 0.04 1,121.47 44.86

    Cement at sitet 0.03 5700.00 171.00

    R.C.C. pipe NP 3 pipes including collar at

    site

    m7.50 3800 28,500.00

    29,160.19

    c) Overheads and Contractor's profit @

    12.5% on (a+b) 3,645.02

    d) Add Labour cess @ 1% on (a+b+c)328.05

    Cost for 7.5 m=( a+b+c)33,133.27

    Rate per m = (a+b+c)/7.5 4,417.77

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Analysis of rate for

    Providing and laying reinforced cement concrete pipe NP3 as per design in ( 1000 mm dia ) single row

    Description

    Providing and laying reinforced cement concrete

    pipe NP3 for culverts on first class bedding of

    granular material in single row including fixing

    collar with cement morter 1:2 but excluding

    excavation, protection works,backfilling,concrete

    and masanory works in the head walls and

    parapets Clause 1106

  • 8/13/2019 Harana CD Work

    41/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)Amount (Rs.)

    12.3 1100

    ( C ) 600 mm dia

    Unit : m

    Taking output = 7.50 m

    ( 3 Pipes of 2.5 m length each)

    a) Labour

    Mate day 0.05 194.81 9.74

    Mason 1st Class day 0.15 266.73 40.01

    Mazdoor (Unskilled) day 1.20 180.06 216.07

    265.82

    Less 20% Labour for 600 mm die pipes

    iinstead of 750 mm die(-) -53.16

    Nett labour for 600 mm dia pipes 212.66

    b) Material

    Sand at site cum 0.02 1,128.54 27.08

    Cement at site t 0.02 5959.00 107.26

    R.C.C. pipe NP 3 pipes including collar at

    site

    m8.75 2000 17,500.00

    17,847.00

    c) Overheads and Contractor's profit @

    12.5% on (a+b)2,230.88

    d) Add Labour cess @ 1% on (a+b+c)200.78

    Cost for 7.5 m=( a+b+c) 20,278.66

    Rate per m = (a+b+c)/7.5 2,703.82

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Samana Patiala

    Providing and laying reinforced cement concrete pipe NP3 as per design in ( 600 mm dia ) single row

    Description

    Providing and laying reinforced cement concrete

    Analysis of rate for

  • 8/13/2019 Harana CD Work

    42/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)Amount (Rs.)

    12.3 1100

    ( C ) 450 mm dia

    Unit : m

    Taking output = 7.50 m

    ( 3 Pipes of 2.5 m length each)

    a) Labour

    Mate day 0.04 194.81 7.79

    Mason 1st Class day 0.11 266.73 29.34

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    b) Material

    Sand at site cum 0.024 1,121.47 26.92

    Cement at site t 0.018 5700.00 102.60

    R.C.C. pipe NP 3 pipes including collar at

    site

    m7.50 1200 9,000.00

    9,328.70

    c) Overheads and Contractor's profit @

    12.5% on (a+b)1,166.09

    d) Add Labour cess @ 1% on (a+b+c)104.95

    Cost for 7.5 m=( a+b+c) 10,599.74

    Rate per m = (a+b+c)/7.5 1,413.30

    Sub Division Officer ( C ) Executive Engineer ( C )Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Providing and laying reinforced cement concrete

    Analysis of rate for

    Providing and laying reinforced cement concrete pipe NP3 (burried conduits) as per design in (

    450 mm dia ) single row

    Description

  • 8/13/2019 Harana CD Work

    43/114

    Sr. No Description of Items Quantity Unit Rate

    (Rs.)

    Amount

    (Rs.)

    1 Dismentling of 1.50 Mtr.

    Span Slab Culvert

    No. -6576.58 0

    2 Dismentling of 3.00 Mtr.

    Span Slab Culvert

    1 No. 10890.27 10890

    3 Dismentling of

    300/450/600mm dia Pipe

    Culvert

    8 No. -113.25 -906

    4 Dismentling of Retaining

    Wall Brick Work

    Cum 198.09 0

    5 Dismentling of RCC

    Causeway

    Mtr 0.00 0

    9984

    Sub Divisional Officer( c ) Executive Engineer(C)

    Punjab Mandi Board Punjab Mandi Board

    Patiala-1 Patiala

    Sub Estimate for Dismentling of Existing Structure

  • 8/13/2019 Harana CD Work

    44/114

  • 8/13/2019 Harana CD Work

    45/114

    Sr.

    No.

    Referenc

    e to

    MORD

    Specifica

    tions

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.9 600

    Unit = Nos

    Taking output = 30 Nos

    a) Material

    AC pipe 100 mm dia including wastage

    @ 5 per cent. Average length of weep

    hole is taken as one metre for thepurpose of estimating

    m 31.50 120.00 3,780.00

    MS clamps Nos. 30.00 60.00 1,800.00

    Cement mortar 1:3 (For rate refer to item

    11.5 I)

    cum 0.05 4,271.76 213.59

    b) Labour

    Mate day 0.03 194.81 5.84

    Mason 1st Class day 0.50 266.73 133.37

    Mazdoor (Unskilled) day 0.25 180.06 45.02

    c) Overheads and Contractor's profit @

    12.5% on (a+b)

    747.23

    d) Add Labour cess @ 1% on (

    a+b+c )

    67.25

    Cost for 30 Nos = (a+b+c+d) 6,792.29Rate per No = (a+b+c+d )/30 226.41

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Analysis of rate for

    Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment,

    Description

    Providing weepholes in brick masonry/stone

    masonry, plain/reinforced concrete abutment, wing

    wall, return wall with 100 mm dia AC pipe extending

    through the full width of the structures with slope of

    1(V):20(H) towards drawing face complete as per

    drawing and technical specification Clauses 614,

    709, 1204.3.7

  • 8/13/2019 Harana CD Work

    46/114

    Sr.

    No.

    Referenc

    e to

    MORD

    Specifica

    tions

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    13.16 1200 Filler Joint

    IV) Providing and fillling joint sealing

    compound as per drawings and

    technical specifications with coarse

    sand and 6 per cent bitumen by

    weight.

    Unit = Running m

    Taking output = 7.5 m

    7.5 m long x 100 mm deep x 10 mm

    wide recess

    a) Material

    Sand cum 0.008 1,121.47 8.97

    Volume = 7.5 x 0.1 x 0.01 = 0.008 cum

    Weight = 0.008 x 1400 = 11.2 kg

    Bitumen-11.2 x 0.06 = 0.672 kg t 0.0007 51,932.21 36.35

    b) Labour

    Mate day 0.02 194.81 3.90

    Mazdoor (Skilled) day 0.50 208.06 104.03

    Mazdoor (Unskilled) day 0.10 180.06 18.01

    c) Overheads and Contractor's profit @

    12.5% on (a+b)

    21.41

    Cost for 7.5 m with 10 cm depth =a+b+c 192.66

    Rate per m with 1 cm depth =

    (a+b+c)/75

    2.57

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Analysis of rate for

    Providing and fillling joint sealing compound as per drawings and technical specifications

  • 8/13/2019 Harana CD Work

    47/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    13.1 (III) 800 & 1200

    1 R.C.C. grade M 30

    Unit = cum

    a) Material

    Cement t 0.43 5,700.00 2,451.00

    Coarse sand cum 0.45 1,121.47 504.66

    20 mm aggregate cum 0.54 1,160.74 626.80

    10 mm aggregate cum 0.36 1,136.08 408.99

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.12 266.73 32.01

    Mazdoor (Unskilled) day 1.73 180.06 311.50

    Bhisti day 0.27 3.50 0.95

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 10% on (a+b+c) 445.42

    e) Overheads and Contractor's profit

    @ 12.5% on (a+b+c+d)

    612.45

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    55.12

    Rate per cum = a+b+c+d+e 5,567.21

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Providing concrete for plain/reinforced concrete

    in openSub Structures complete as per

    drawings and technical specifications Clause802, 803, 1202 & 1203

  • 8/13/2019 Harana CD Work

    48/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.4 (v) 800 & 1200

    1 R.C.C. grade M 25

    Unit = cum

    a) Material

    Cement t 0.404 5,700.00 2,302.80

    Coarse sand cum 0.45 1,121.47 504.66

    20 mm aggregate cum 0.54 1,160.74 626.80

    10 mm aggregate cum 0.36 1,136.08 408.99

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.12 266.73 32.01

    Mazdoor (Unskilled) day 1.73 180.06 311.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 3.75% on (a+b+c) 163.64

    e) Overheads and Contractor's profit@ 12.5% on (a+b+c+d)

    565.92

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    50.93

    Rate per cum = a+b+c+d+e+f 5,144.18

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Providing concrete for plain/reinforced concrete

    in openfoundations complete as per drawingsand technical specifications Clause 802, 803,

    1202 & 1203

    Analysis of rate for

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and

    Description

  • 8/13/2019 Harana CD Work

    49/114

  • 8/13/2019 Harana CD Work

    50/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.4 (I) 800 & 1200

    I. P.C.C grade M 10

    (i) Nominal mix 1:3:6

    Unit = cum

    a) Material

    Cement t 0.250 5,700.00 1,425.00

    Coarse sand cum 0.48 1,121.47 538.30

    40 mm aggregate cum 0.576 1,288.06 741.92

    20 mm aggregate cum 0.288 1,160.74 334.29

    10 mm aggregate cum 0.096 1,136.08 109.06

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.10 266.73 26.67

    Mazdoor (Unskilled) day 1.63 180.06 293.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Mechnical concrete mixer 0.4/0.28

    cum capacity fitted with water

    measuring device and preferably also

    with load cell.

    hour 0.40 256.80 102.72

    d) Add cost of formwork @ 4% on

    above

    145.83

    e) Overheads and Contractor's profit

    @ 12.5%

    473.94

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    42.65

    Rate per cum 4,308.10

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and

    Description

    Providing concrete for plain/reinforced concretein open foundations complete as per drawings

    and technical specifications Clause 802, 803,

    1202 & 1203

    Analysis of rate for

  • 8/13/2019 Harana CD Work

    51/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.4(II) 800 & 1200

    P.C.C grade M 15

    (i) Nominal mix 1:2.5:5

    Unit = cum

    a) Material

    Cement t 0.275 5,700.00 1,567.50

    Coarse sand cum 0.48 1,121.47 538.30

    40 mm aggregate cum 0.480 1,288.06 618.27

    20 mm aggregate cum 0.240 1,160.74 278.58

    10 mm aggregate cum 0.080 1,136.08 90.89b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.10 266.73 26.67

    Mazdoor (Unskilled) day 1.63 180.06 293.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Mechnical concrete mixer 0.4/0.28

    cum capacity fitted with water

    measuring device and preferably also

    with load cell.

    hour 0.40 256.80 102.72

    d) Add cost of formwork @ 4% on (

    a+b+c )

    143.63

    e) Overheads and Contractor's profit

    @ 12.5%

    466.78

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    42.01

    Rate per cum a+b+c+d+e+f 4,243.06

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Providing concrete for plain/reinforced concretein open foundations complete as per drawings

    and technical specifications Clause 802, 803,

    1202 & 1203

    Analysis of rate for

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and

  • 8/13/2019 Harana CD Work

    52/114

  • 8/13/2019 Harana CD Work

    53/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.4 (iv) 800 & 1200

    R.C.C. grade M 20

    Unit = cum

    a) Material

    Cement t 0.35 5,700.00 1,995.00

    Sand cum 0.45 1,121.47 504.66

    20 mm aggregate cum 0.54 1,160.74 626.80

    10 mm aggregate cum 0.36 1,136.08 408.99

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.12 266.73 32.01

    Mazdoor (Unskilled) day 1.73 180.06 311.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 4 % on (a+b+c) 162.24

    e) Overheads and Contractor's profit

    @ 12.5% on (a+b+c+d)

    527.27

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    47.45

    Rate per cum = a+b+c+d+e+f 4,792.85

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Providing concrete for plain/reinforced concrete

    in openfoundationscomplete as per drawings

    and technical specifications Clause 802, 803,1202 & 1203

    Analysis of rate for

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and

    Description

  • 8/13/2019 Harana CD Work

    54/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.5(v) 800 & 1200

    R.C.C. grade M 20

    Unit = cum

    a) Material

    Cement t 0.35 5,700.00 1,995.00

    Sand cum 0.45 1,121.47 504.66

    20 mm aggregate cum 0.54 1,160.74 626.80

    10 mm aggregate cum 0.36 1,136.08 408.99

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.12 266.73 32.01

    Mazdoor (Unskilled) day 1.73 180.06 311.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 10 % on (a+b+c) 405.59

    e) Overheads and Contractor's profit

    @ 12.5% on (a+b+c+d)

    557.68

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    50.19

    Rate per cum = a+b+c+d+e+f 5,069.36

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Providing concrete for plain/reinforced concrete

    in openSub Structure complete as per

    drawings and technical specifications Clause

    802, 803, 1202 & 1203

  • 8/13/2019 Harana CD Work

    55/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.4(iii) 800 & 1200

    III. P.C.C. grade M 20

    (i) Nominal mix (1:2:4)

    Unit = cum

    a) Material

    Cement t 0.33 5,700.00 1,881.00

    Sand cum 0.45 1,121.47 504.66

    40 mm aggregate cum 0.36 1,288.06 463.70

    20 mm aggregate cum 0.36 1,160.74 417.87

    10 mm aggregate cum 0.18 1,136.08 204.49

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.10 266.73 26.67

    Mazdoor (Unskilled) day 1.63 180.06 293.50

    Bhisti day 0.27 217.13 58.63

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 4 % on (a+b+c) 158.75

    e) Overheads and Contractor's profit

    @ 12.5% on (a+b+c+d)

    515.95

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    46.44

    Rate per cum = a+b+c+d+e+f 4,689.96

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Providing concrete for plain/reinforced concrete

    in open foundationscomplete as per drawings

    and technical specifications Clause 802, 803,1202 & 1203

    Analysis of rate for

    Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and

  • 8/13/2019 Harana CD Work

    56/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.5(iii) 800 & 1200

    III. P.C.C. grade M 20

    (i) Nominal mix (1:2:4)

    Unit = cum

    a) Material

    Cement t 0.33 5,700.00 1,881.00

    Sand cum 0.45 1,121.47 504.66

    40 mm aggregate cum 0.36 1,288.06 463.70

    20 mm aggregate cum 0.36 1,160.74 417.87

    10 mm aggregate cum 0.18 1,136.08 204.49

    b) Labour

    Mate day 0.08 194.81 15.58

    Mason (1st Class) day 0.10 266.73 26.67

    Mazdoor (Unskilled) day 1.63 180.06 293.50Bhisti day 0.27 217.13 58.63

    c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72

    d) Formwork @ 10 % on (a+b+c) 396.88

    e) Overheads and Contractor's profit

    @ 12.5% on (a+b+c+d)

    545.71

    f) Add Labour cess @ 1% on (

    a+b+c+d+e )

    49.11

    Rate per cum = a+b+c+d+e+f 4,960.53

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Providing concrete for plain/reinforced concrete

    in openSub Structurecomplete as per

    drawings and technical specifications Clause

    802, 803, 1202 & 1203

  • 8/13/2019 Harana CD Work

    57/114

  • 8/13/2019 Harana CD Work

    58/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.5 600

    II. In 1:5 Cement mortar

    Unit = cum

    a) Material

    Bricks Nos. 500.00 4.797 2,398.45

    Cement mortar cum 0.24 3,131.76 751.62

    b) Labour

    Mate day 0.09 194.81 17.53

    Mason 1st Class day 0.80 266.73 213.38

    Mazdoor (Unskilled) day 1.60 180.06 288.10

    Bhisti day 0.20 217.13 43.43

    c) Overheads and Contractor's profit

    @ 12.5% on (a+b)

    464.06

    d) Add Labour cess @ 1% on (

    a+b+c+d )

    41.77

    Rate per cum = a+b+c+d 4,218.34

    Sub-analysis

    Cement mortar 1:5 (1 cement :

    5 sand)Unit = cum

    a) Material

    Cement t 0.31 5,700.00 1,767.00

    Sand cum 1.05 1,121.47 1,177.54b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 3,131.76

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Analysis of rate for

    Description

    Brick masonry work in cement mortar in

    foundationcomplete excepting pointing andplastering, as per drawing and technical

    specification Clauses 602, 603, 604, 1202 & 1204

    Brick masonry work in cement mortar 1:5 in substructure complete excepting pointing and plastering,

  • 8/13/2019 Harana CD Work

    59/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.1 600

    II. In 1:4 Cement mortar

    Unit = cum

    a) Material

    Bricks Nos. 500.00 4.797 2,398.45

    Cement mortar

    (Rate as in item 11.5 II) cum 0.24 3,530.76 847.38

    b) Labour

    Mate day 0.09 194.81 17.53

    Mason 1st Class day 0.80 266.73 213.38

    Mazdoor (Unskilled) day 1.60 180.06 288.10

    Bhisti day 0.20 217.13 43.43

    Add for scaffolding @ 5 per cent of

    cost of materials and labour (a+b)

    190.41

    c) Overheads and Contractor's profit

    @ 12.5% on (a+b)

    499.84

    d) Add Labour cess @ 1% on (

    a+b+c+d )

    44.99

    Rate per cum = a+b+c+d 4,543.51

    Sub-analysis

    Cement mortar 1:4 (1 cement :

    4 sand)Unit = cum

    a) Material

    Cement t 0.38 5,700.00 2,166.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 3,530.76

    Sub Division Officer ( C ) Executive Engineer ( C )Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Description

    Brick masonry work in cement mortar in

    substructurecomplete excepting pointing and

    plastering, as per drawing and technical

    specification Clauses 602, 603, 604, 1202 & 1204

    Analysis of rate for

    Brick masonry work in cement mortar 1:4 in substructure complete excepting pointing and plastering,

    as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204

  • 8/13/2019 Harana CD Work

    60/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.1(i) 600

    II. In 1:3 Cement mortar

    Unit = cum

    a) Material

    Bricks Nos. 500.00 4.797 2,398.45

    Cement mortar

    (Rate as in item 11.5 II) cum 0.24 4,271.76 1,025.22

    b) Labour

    Mate day 0.09 194.81 17.53

    Mason 1st Class day 0.80 266.73 213.38

    Mazdoor (Unskilled) day 1.60 180.06 288.10

    Bhisti day 0.20 217.13 43.43

    Add for scaffolding @ 5 per cent of

    cost of materials and labour (a+b)

    199.31

    c) Overheads and Contractor's profit

    @ 12.5% on (a+b)

    523.18

    d) Add Labour cess @ 1% on (

    a+b+c+d )

    47.09

    Rate per cum = a+b+c+d 4,755.68

    Sub-analysis

    Cement mortar 1:3 (1 cement :

    3 sand)Unit = cum

    a) Material

    Cement t 0.51 5,700.00 2,907.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 4,271.76

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Analysis of rate for

    Brick masonry work in cement mortar 1:3 in substructure complete excepting pointing and plastering,

    Description

    Brick masonry work in cement mortar in

    substructure complete excepting pointing andplastering, as per drawing and technical

    specification Clauses 602, 603, 604, 1202 & 1204

  • 8/13/2019 Harana CD Work

    61/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.13 600

    Unit = Running m

    Taking output = 1 m

    Assume wall thickness = 345 mm

    Quantity = 1 x 0.395 x 0.150 = 0.059

    PCC M-20 Grade (1:2:4) Nominal

    Mix

    As per item No. 12.5 (II)(i) cum 0.059 4,819.15 284.33

    Add 10 per cent extra of cost of (a)being architectural coping

    28.43

    Cost of 1 m = a 312.76

    Rate per m = a 312.76

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Samana Patiala

    Providing PCC M-20 architectural coping on the

    top of wing wall, return wall etc. complete as per

    drawing and technical specification Clauses 615,

    710 and 1204.3.11

    Analysis of rate for

    Projection of the coping will be 25 mm wide on both

    side of the wall = 345 + 50 = 395 mm

    Description

  • 8/13/2019 Harana CD Work

    62/114

  • 8/13/2019 Harana CD Work

    63/114

    CEMENT MORTAR

    1:4

    Sub-analysis

    Cement mortar 1:4 (1 cement : 4sand)

    Unit = cum

    a) Material

    Cement t 0.38 5,700.00 2,166.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 3,530.76

    1:3

    Sub-analysis

    Cement mortar 1:3 (1 cement : 3

    sand)

    Unit = cum

    a) Material

    Cement t 0.51 5,700.00 2,907.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 4,271.76

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

  • 8/13/2019 Harana CD Work

    64/114

  • 8/13/2019 Harana CD Work

    65/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    12.3 600

    Unit = 10 sqm

    Taking output = 10 sqm

    a) Material

    Cement mortar 1:3 (Rate as in sub

    estimate )

    cum 0.24 4,271.76 1,025.22

    b) Labour

    Mate day 0.06 194.81 11.69

    Mason 1st Class day 0.60 266.73 160.04

    Mazdoor (Unskilled) day 0.60 180.06 108.04

    Bhisti day 0.30 217.13 65.14

    c) Overheads and Contractor's profit@ 12.5% on (a+b)

    171.27

    d) Add Labour cess @ 1% on (

    a+b+c )

    15.41

    Rate per 10 sqm = a+b+c 1,556.80

    Rate per sqm 155.68

    Sub-analysis

    Cement mortar 1:3 (1 cement :

    3 sand)Unit = cum

    a) Material

    Cement t 0.51 5,700.00 2,907.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 4,271.76

    Sub Division Officer ( C ) Executive Engineer ( C )

    Pb.Mandi Board, Punjab Mandi Board

    Patiala -1 Patiala

    Analysis of rate for

    Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification

    Description

    Plastering with cement mortar (1:3), 15 mm thick

    on brickwork in substructureas per technicalspecification Clauses 613.4 & 1204

  • 8/13/2019 Harana CD Work

    66/114

  • 8/13/2019 Harana CD Work

    67/114

    Sr.

    No.

    Reference to

    MORD

    Specifications

    Unit QuantityRate

    (Rs.)

    Amount

    (Rs.)

    11.5(ii) 600 & 1200

    Unit = cum

    II. Brick masonry in 1:4 cement

    mortarUnit = cum

    a) Material

    Brick Nos. 500.00 4.797 2,398.45

    Cement mortar 1:4 cum 0.24 3,530.76 847.38

    Rates as per sub-analysis

    b) Labour

    Mate day 0.09 194.81 17.53

    Mason (1st Class) day 0.80 266.73 213.38Mazdoor (Unskilled) day 1.60 180.06 288.10

    Bhisti day 0.20 217.13 43.43

    c) Overheads and Contractor's profit

    @ 12.5% on (a+b)

    476.03

    d) Add Labour cess @ 1%n on (

    a+b+c)

    42.84

    Rate per cum = a+b+c 4,327.15

    Sub-analysis

    Cement mortar 1:4 (1 cement : 4

    sand)

    Unit = cum

    a) Material

    Cement t 0.38 5,700.00 2,166.00

    Sand cum 1.05 1,121.47 1,177.54

    b) Labour

    Mate day 0.04 194.81 7.79

    Mazdoor (Unskilled) day 0.90 180.06 162.05

    Bhisti day 0.08 217.13 17.37

    Total material and labour = (a+b) 3,530.76