Sr.
No.
Description of item No. L B D/H Rate Amount
1 Earth work in excavation for
structures in ordinary soil up
to 3m depth as per MORD
specifications 300
1 1.00 1.14 0.91 1.04 cum 170.76 177.14
2 Providing P.C.C. grade M 10
(Nominal mix 1:3:6) in open
foundations as per MORD
specifications 800&1200
1 1.00 1.14 0.30 0.34 cum 4308.10 1473.37
3 Brick masonary work in
cement mortar 1:4 in
foundation complete as per
MORD specifications
600&1200
1 1.00 0.800 0.23 0.18
1 1.00 0.685 0.23 0.16
1 1.00 0.460 0.15 0.07
0.41 cum 4,327.15 1776.51
3 Brick masonary work in
cement mortar 1:4 in
substructure complete as per
MORD specifications
600&1200
1 1.00 0.460 0.61 0.28
1 1.00 0.345 0.61 0.21
Taper portion 0.5 1.00 0.115 1.37 0.080.57 cum 4,543.51 2589.01
4 Providing and laying
plaincement concrete M 20
grade (Nominal mix 1:2:4) in
substructure as per MORD
specifications 800
Coping 1 1.00 0.345 0.050 0.02 cum 4960.53 85.57
6 Pointing with cement mortar
1:3 on brickwork as per
MORD specifications 600
Outside 1 1.00 1.37 1.37 sqm45.76
62.70
Total 6164.30
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
ANALYSIS OF RATE FOR CONSTRUCTION OF1.37 mtr HIGH RETAINING WALL
Unit: Per mtr
Qty
-
8/13/2019 Harana CD Work
2/114
-
8/13/2019 Harana CD Work
3/114
Sr.
No.
Description of item No. L B D/H Rate AmountQty
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
-
8/13/2019 Harana CD Work
4/114
-
8/13/2019 Harana CD Work
5/114
9th STEP 4 1.875 0.920 0.150 1.035 CUM
10th STEP 4 1.875 0.805 0.150 0.906 CUM
11th STEP 4 1.875 0.690 0.150 0.776 CUM
12th STEP 4 1.875 0.575 0.150 0.647 CUM
13th STEP 4 1.875 0.460 0.150 0.518 CUM
14th STEP 4 1.875 0.345 0.150 0.388 CUM
15th STEP 4 2.105 0.345 0.410 1.191 CUM
16th STEP Avg.0.230/2=0.115 ,
(1.380x0.345)/2=0.238
4 0.115 0.238 1.500 0.164 CUM
Curtain walls
2 1.155 0.460 0.150 0.159 CUM
2 1.270 0.345 0.150 0.131 CUM
2 1.385 0.230 0.150 0.096 CUM
2 1.500 0.230 0.075 0.052 CUM
Parapet
4 2.480 0.345 0.450 1.540 CUM
76.81 4327.15 332365
per cum
4 Plain/reinforced cement concrete
(RCC Grade M-25) in sub
structure complete as per
drawings and technical
specification clauses
802,804,805,806,807,1202 and
1204.
FOR DECK SLAB 1 9.200 1.900 0.210 3.67 CUM
For Bed Plates 2 9.200 0.575 0.200 2.12 CUM
Sides of Slab 2 9.200 0.355 0.210 1.37 CUM
Parapet walls 2 1.900 0.115 0.450 0.20 CUM
For Wearing Slab 1 2.650 8.500 0.080 1.80 CUM
9.16 CUM 5454.07 49944
5 Supplying, fitting and placing TMT
bar reinforcement (Fe 500) in
substructure complete as per
drawings and technicalspecification clauses 1002,
1005,1010 and 1202
Factorwt. Kg
per mtr
12 mm dia bar (main steel) 93 1.850 0.89 153.12 KG
10 mm dia bar (Dist. Steel) 11 9.160 0.62 62.47 KG
10 mm dia bar ( Temp. steel) 47 1.850 0.62 53.91 KG
10 mm dia bar ( Temp. steel) 11 9.160 0.62 62.47 KG
8 mm dia bar (for bed plate)
2x8=16
16 9.160 0.39 57.16 KG
8mm dia bar (for parapet)
2x2x11=44
44 1.000 0.39 17.16 KG
8mm dia bar (for parapet)
2x2x3 =12
12 1.850 0.39 8.66 KG
8mm Ring(2x35)=70 70 1.87 0.39 51.05 KG
466.00 KG
Add 10% for Gradual Overlap 46.60 KG
Add 5% for Chairs 23.30 KG
535.90 KG
0.536 MT 54737.8 29334
6 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
-
8/13/2019 Harana CD Work
6/114
Abutment 2 9.200 1.500 27.60 SQM
Abutment sides and wing walls 4 2.680 1.500 16.08 SQM
Parapet sides 4 2.105 0.450 3.79 SQM
Parapet Top 4 2.480 0.345 47.47 SQM
Parapet end sides 4 0.345 0.450 67.34 SQM
162.28 SQM 45.76 7426
per sqm
7 Providing and fixing in position 20
mm thick pre-molded joint fil ler inexpansion joint for fixed ends of
simply supported spans, covered
with sealant complete as per
drawing and technical
specif ication as per clause 1200
(Rate 210mm deep,Rate is per
mtr per cm depth, hence for 21 cm
depth the qnty will be
2x6.7= 13.4x21x1=281 2 9.2 18.40
For 210 mm deep 1 18.40 21 386 RMT 18.38 7103
8 Providing PCC M-20 Architectural
coping on the top of wing wall
return wall etc. comp. as per
drawing and technical
specification clause 615 75mm
thick
Parapets 4 2.480 9.92 RMT 312.76 3103
9 Painting two coats including
primer coat after filling the surface
with synthetic enamel paint in all
shades on new, plastered /
concrete surfaces as per drawing
and Technical Specification
Clause 1701
2x2=4 4 6.86 0.450 12.348 SQM 91.50 1130
per sqm
10 Providing weepholes in brickmasonry/stone masonry,
plain/reinforced concrete
abutment, wing wall, return wall
with 100 mm dia AC pipe
extending through the full width of
the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing and
technical specification Clauses
614, 709, 1204.3.7 16 0.69 12.00 RMT 226.41 2717
11 Providing and laying c.c. flooring
1:2:4 for bed protection as per
MORD specifications 1303
Inside of culvert 1 9.20 1.50 0.075 1.04
1.04 cum 4792.85 4961
12 Earth filling for diversion to
continue the traffic
For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518
13 Back filling of abettments with
Sandy material
29.200 0.100 1.350 2.484
Cum
2 9.200 0.115 1.910 4.042 Cum
2 0.172 0.238 1.500 0.123 Cum
-
8/13/2019 Harana CD Work
7/114
2 9.200 0.520 1.500 14.352 Cum
2 9.200 1.645 3.260 98.674 Cum
119.674 Cum
less qnty as per brick work of wing
walls
-27.271 Cum
less Road crust 2 6.7 2.105 0.48 -13.539 Cum
78.864 Cum 1,752.44 138204
14 Wrought iron & Mild steel ladders,
framed grills, gratings etc. withends of bars rivetted of molded
forged framed window guards,
barred iron doors stair case iron
railing etc. including cost of bolts
and nuts, screws, welding rod
complete fixing in position
ISA 50 mm X 50 mm X 6 mm
2X5 10 1.38 - - 13.800 m
[email protected] Kg/ m 61.134 Kg
Pipe 33.7mm O/D
2X2 4 32.400 [email protected] Kg/ m 95.256 Kg
Total 156.390 Kg
Rate As per CSR 18.4 =
6894.90+16%
or 1.564 Qtl 7,998.08 12508
15 Providing and applying two coats
of ready mix paint including primer
coat of approved brand on steel
surface after through cleaning of
surface to give an even shade as
per drawing and Technical
Specification Clause 1701
Angles
2X5
10 0.45 0.846 Sqm
Angles
2X2
4 8.10 0.376 Sqm
Total 1.222 Sqm 80.90 99
689889
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi BoardPatiala-1 Patiala
(6.90+0.60+0.60)
((50+50+44+44)/
1000)
3.14X33.7)/100
mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m -
8/13/2019 Harana CD Work
8/114
Sr. No. Description of item No. L B D/H Rate Amount
1 Earth work in excavation for
structures in ordinary soil up to 3m
depth as per MORD specifications
300Abutment 2 9.40 0.90 0.60 10.15
Head Wall 4 0.23 0.90 0.60 0.50
Curtain Wall 2 0.53 0.39 0.55 0.23
For bed 1 8.74 0.39 0.175 0.60
11.47 cum 170.76 1959
2 Providing P.C.C. grade M 10
(Nominal mix 1:3:6) in open
foundations as per MORD
specifications 800&1200
Abutment 2 9.40 0.90 0.15 2.54
Head Wall 4 0.23 0.90 0.15 0.12
Curtain Wall 2 0.53 0.39 0.10 0.04
For bed 1 8.74 0.39 0.10 0.34
3.04 cum 4308.10 13116
3 Brick masonary work in cement
mortar 1:4 in foundation complete
as per MORD specifications
600&1200
Abutment 2 9.200 0.690 0.150 1.90
2 9.200 0.570 0.150 1.57
2 9.200 0.460 0.300 2.54
2 9.200 0.345 0.450 2.86
Head walls 4 0.230 0.690 0.150 0.10
4 0.340 0.575 0.150 0.12
4 0.460 0.460 0.300 0.25
4 0.460 0.345 0.650 0.41
Curtain Wall 2 0.460 0.60 0.150 0.082 0.345 0.600 0.150 0.06
9.90 cum 4,327.15 42827
4 Brick masonry work in cement
mortar 1:3 in parapet excluding
pointing and plastering as per
drawing and technical
specifications Clauses 600, 900
and 1208.4
Parapet walls 2 2.44 0.345 0.40 0.67
0.67 cum 4,529.22 3050
5 Providing and laying reinforced
cement concrete M 20 grade
(Nominal mix 1:2:4) insuperstructure as per MORD
specifications 800
For bed 1 9.20 0.600 0.075 0.41 cum
0.41 cum 4960.53 2054
6 Providing and laying reinforced
cement concrete M 25 grade
(Nominal mix 1:1:3) in
superstructure as per MORD
specifications 800
Slab 1 9.20 1.29 0.20 2.37 cum
DETAIL ANALYSIS FOR CONST. OF0.60 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M
Unit: Each
Qty
-
8/13/2019 Harana CD Work
9/114
2.37 cum 5454.07 12946
7 Supplying, fitting and placing TMT
bar (Fe 500) reinforcement in
superstructure as per MORD
specifications 1000
Slab Length Factor Kg
10mm main 2 47 1.23 0.62 71.68
10mm DS 2 8 9.16 0.62 90.87
Chairs 1 12.00 0.45 0.62 3.35Overlap 1 10 0.50 0.62 3.10
169.00 kg
or 0.169 MT 54737.77 9251
8 Providing PCC M-20 Architectural
coping on the top of wing wall
return wall etc. comp. as per
drawing and technical
specification clause 615 75mm
thick
Parapets and wing walls 2 2.44 4.88 mtr 312.76 1526
9 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
Abutment insides 2 9.2 0.60 11.04
Abutment sides 4 0.91 0.90 3.28
4 0.575 0.200 0.46
Parapet side 4 2.44 0.40 3.90
End sides 4 0.40 0.345 0.55
19.23 sqm 45.76 880
10 Painting of parapet walls of CD
work with cement paint as per
MORD specifications 1701
Parapet top 2 2.44 0.45 2.20
Parapet inside 2 2.44 0.45 2.20End sides 4 0.45 0.345 0.62
5.01 sqm 91.50 458.71
13 Back filling of abettments with
Sandy material
2 5.800 0.175 0.100 0.203 Cum
2 6.700
0.203 Cum 1,752.44 356
Total 88423
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
No.
-
8/13/2019 Harana CD Work
10/114
Sr. No Description of Items
No. Length Breadt
h
Height/
Depth
Qty. Rate
(Rs.)
Amount
(Rs.)
1 Earth work in excavation for
structures as per drawing andtech. specifications clause 305.1
including setting out, const. of
shouring and bracing, removal of
stumps and other deleterious
material and disposal up to a lead
of 50 mar dressing of sides a and
b
Abutment 2 9.400 2.960 1.550 86.254
Wing walls 4 1.760 2.000 1.550 21.824
Curtain walls 2 4.750 0.530 0.775 3.902
Under flooring 1 8.140 3.320 0.175 4.729
116.710 CUM 170.76 19929
2 Plain Cement Concrete M 10
(1:3:6 nominal mix) in leveling
course below open foundation of
Head walls as per drawing and
Technical Specification Clause
1109.
Abutment 2 9.400 2.960 0.200 11.130
Wing walls 4 1.760 2.000 0.200 2.816
Curtain walls 2 5.300 0.530 0.150 0.843
For Bed 1 8.140 6.000 0.100 4.884
19.67 CUM 4308.10 84750
3 Brick Masonry work in cement
mortar 1:4 in foundations
complete except pointing and
plastering as per drawing andtechnical specification Clauses
600,1202 and 1203
ABUTMENTS
1st STEP 2 9.200 2.760 0.150 7.618 CUM
2nd STEP 2 9.200 2.645 0.150 7.300 CUM
3rd STEP 2 9.200 2.530 0.150 6.983 CUM
4th STEP 2 9.200 2.415 0.150 6.665 CUM
5th STEP 2 9.200 2.300 0.150 6.348 CUM
6th STEP 2 9.200 2.185 0.150 6.031 CUM
7th STEP 2 9.200 2.070 0.150 5.713 CUM
8th STEP 2 9.200 1.955 0.150 5.396 CUM
9th STEP 2 9.200 1.840 0.150 5.078 CUM
10th STEP Avg(1.61+0.690)/2=1.15
2 9.200 1.150 2.970 62.845 CUM
Wing walls
1st STEP 4 1.760 1.840 0.450 5.829 CUM
2nd STEP 4 1.760 1.725 0.450 5.465 CUM
3rd STEP 4 1.760 1.610 0.225 2.550 CUM
4th STEP 4 1.760 1.495 0.150 1.579 CUM
5th STEP 4 1.875 1.380 0.150 1.553 CUM
6th STEP 4 1.875 1.265 0.150 1.423 CUM
7th STEP 4 1.875 1.150 0.150 1.294 CUM
8th STEP 4 1.875 1.035 0.150 1.164 CUM
DETAIL ANALYSIS FOR CONST. OF6.00 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M
Detail of Qty
-
8/13/2019 Harana CD Work
11/114
-
8/13/2019 Harana CD Work
12/114
6 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
Abutment 2 9.200 2.970 54.65 SQM
Abutment sides and wing walls 4 2.680 2.970 31.84 SQM
Parapet sides 4 2.105 0.450 3.79 SQM
Parapet Top 4 2.480 0.345 90.28 SQM
Parapet end sides 4 0.345 0.450 125.90 SQM306.45 SQM 45.76 14025
per sqm
7 Providing and fixing in position 20
mm thick pre-molded joint fil ler in
expansion joint for fixed ends of
simply supported spans, covered
with sealant complete as per
drawing and technical
specif ication as per clause 1200
(Rate 210mm deep,Rate is per
mtr per cm depth,10mm wide
hence for 21 cm depth the qnty
will be 2x6.7=
13.4x21x2=563 2 9.2 18.40
For 210 mm deep 2 18.40 21 773 RMT 18.38 14205
8 Providing PCC M-20 Architectural
coping on the top of wing wall
return wall etc. comp. as per
drawing and technical
specification clause 615 75mm
thick
Parapets 4 2.480 9.92 RMT 312.76 3103
9 Painting two coats including
primer coat after filling the surface
with synthetic enamel paint in all
shades on new, plastered /
concrete surfaces as per drawingand Technical Specification
Clause 1701
2x2=4 4 6.90 0.450 12.42 SQM 91.50 1136
per sqm
10 Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete
abutment, wing wall, return wall
with 100 mm dia AC pipe
extending through the full width of
the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing andtechnical specification Clauses
614, 709, 1204.3.7 20 0.69 13.80 RMT 226.41 3124
11 Providing and laying c.c. flooring
1:2:4 for bed protection as per
MORD specifications 1303
Inside of culvert 1 9.20 6.00 0.075 4.14
4.14 cum 4689.96 19416
12 Earth filling for diversion to
continue the traffic
-
8/13/2019 Harana CD Work
13/114
For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518
13 Back filling of abettments with
Sandy material
26.700 0.100 1.350
1.809 Cum
2 6.700 0.115 1.910 2.943 Cum
2 0.172 0.238 1.500 0.123 CUM
2 8.990 0.520 1.500 14.024 Cum
2 6.700 1.645 3.260 71.860 Cum
90.760 Cum
less qnty as per brick work of wingwalls
-26.374 Cum
less Road crust 2 6.7 2.105 0.48 -13.539 Cum
50.847 Cum 1,752.44 89105
14 Wrought iron & Mild steel ladders,
framed grills, gratings etc. with
ends of bars rivetted of molded
forged framed window guards,
barred iron doors stair case iron
railing etc. including cost of bolts
and nuts, screws, welding rod
complete fixing in position
ISA 50 mm X 50 mm X 6 mm
2X10 20 1.38 - - 27.600 m
[email protected] Kg/ m 122.268 KgPipe 33.7mm O/D
2X2 4 31.920 m
[email protected] Kg/ m 93.845 Kg
Total 216.113 Kg
Rate As per CSR 18.4 =
6894.90+16%
or 2.161 Qtl 7,998.08 17285
15 Providing and applying two coats
of ready mix paint including primer
coat of approved brand on steel
surface after through cleaning of
surface to give an even shade as
per drawing and Technical
Specification Clause 1701
Angles
2X10
20 0.45 1.692 Sqm
Pipes
2X2
4 8.10 0.376 Sqm
Total 2.068 Sqm 80.90 167
1284701
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
(7.38+0.30+0.30)
((50+50+44+4
4)/1000)
((3.14X33.7)/
1000)
mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m -
8/13/2019 Harana CD Work
14/114
Sr. No Description of Items
No. Length Breadt
h
Height/
Depth
Qty. Rate
(Rs.)
Amount
(Rs.)
1 Earth work in excavation for
structures as per drawing and
tech. specifications clause 305.1
including setting out, const. of shouring and bracing, removal of
stumps and other deleterious
material and disposal up to a lead
of 50 mar dressing of sides a and
b
Abutment 2 9.400 2.960 1.550 86.254
Wing walls 4 1.760 2.000 1.550 21.824
Curtain walls 2 4.750 0.530 0.775 3.902
Under flooring 1 8.140 0.960 0.175 1.368
113.348 CUM 170.76 19355
2 Plain Cement Concrete M 10
(1:3:6 nominal mix) in leveling
course below open foundation of
Head walls as per drawing and
Technical Specification Clause
1109.
Abutment 2 9.400 2.040 0.200 7.670
Wing walls 4 1.760 2.000 0.200 2.816
Curtain walls 2 5.300 0.530 0.150 0.843
For Bed 1 8.140 3.000 0.100 2.442
13.77 CUM 4308.10 59327
3 Brick Masonry work in cement
mortar 1:4 in foundations
complete except pointing and
plastering as per drawing and
technical specification Clauses
600,1202 and 1203ABUTMENTS
1st STEP 2 9.200 1.840 0.150 5.078 CUM
2nd STEP 2 9.200 1.725 0.150 4.761 CUM
3rd STEP 2 9.200 1.610 0.150 4.444 CUM
4th STEP 2 9.200 1.495 0.150 4.126 CUM
5th STEP 2 9.200 1.380 0.150 3.809 CUM
6th STEP 2 9.200 1.265 0.150 3.491 CUM
7th STEP 2 9.200 1.150 0.150 3.174 CUM
8th STEP 2 9.200 1.035 0.150 2.857 CUM
9th STEP 2 9.200 0.920 0.150 2.539 CUM
10th STEP Avg
(1.61+0.690)/2=1.15
2 9.200 1.150 2.000 42.320 CUM
Wing walls1st STEP 4 1.760 1.840 0.450 5.829 CUM
2nd STEP 4 1.760 1.725 0.450 5.465 CUM
3rd STEP 4 1.760 1.610 0.225 2.550 CUM
4th STEP 4 1.760 1.495 0.150 1.579 CUM
5th STEP 4 1.875 1.380 0.150 1.553 CUM
6th STEP 4 1.875 1.265 0.150 1.423 CUM
7th STEP 4 1.875 1.150 0.150 1.294 CUM
8th STEP 4 1.875 1.035 0.150 1.164 CUM
9th STEP 4 1.875 0.920 0.150 1.035 CUM
10th STEP 4 1.875 0.805 0.150 0.906 CUM
DETAIL ANALYSIS FOR CONST. OF3.00 M SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY 8.50 M
Detail of Qty
-
8/13/2019 Harana CD Work
15/114
11th STEP 4 1.875 0.690 0.150 0.776 CUM
12th STEP 4 1.875 0.575 0.150 0.647 CUM
13th STEP 4 1.875 0.460 0.150 0.518 CUM
14th STEP 4 1.875 0.345 0.150 0.388 CUM
15th STEP 4 2.105 0.345 0.345 1.002 CUM
16th STEP
Avg.(0.230x1.50)/2=0.172 ,
(1.380x0.345)/2=0.238
4 0.172 0.238 1.500 0.246 CUM
Curtain walls2 2.310 0.460 0.230 0.489 CUM
2 2.540 0.345 0.230 0.403 CUM
2 2.770 0.230 0.450 0.573 CUM
2 3.000 0.230 0.100 0.138 CUM
Parapet
4 2.480 0.345 0.450 1.540 CUM
106.12 4327.15 459182
per cum
4 Plain/reinforced cement concrete
(RCC Grade M-25) in sub
structure complete as per
drawings and technical
specification clauses
802,804,805,806,807,1202 and
1204.
FOR DECK SLAB 1 9.200 3.600 0.300 9.94 CUM
For Bed Plates 2 9.200 0.575 0.200 2.12 CUM
Sides of Slab 2 9.200 0.275 0.300 1.52 CUM
Parapet walls 2 3.600 0.115 0.450 0.37 CUM
For Wearing Slab 1 8.970 4.150 0.075 2.79 CUM
16.73 CUM 5454.07 91271
5 Supplying, fitting and placing TMT
bar reinforcement (Fe 500) in
substructure complete as per
drawings and technical
specification clauses 1002,1005,1010 and 1202
Factor
wt. Kgper mtr
16 mm dia bar (main steel) 63 3.560 1.58 354.42 KG
10 mm dia bar (Dist. Steel) 19 9.160 0.62 107.90 KG
10 mm dia bar ( Temp. steel) 19 9.160 0.62 107.90 KG
10 mm dia bar ( Temp. steel) 47 3.560 0.62 103.74 KG
8 mm dia bar (for bed plate)
2x8=16
16 9.160 0.39 57.16 KG
8mm dia bar (for parapet)
2x2x11=44
72 1.000 0.39 28.08 KG
8mm dia bar (for parapet)
2x2x3 =12
12 7.660 0.39 35.85 KG
8mm Ring
(2x35)=70
70 1.87 0.39 51.05 KG
Add 10% for Gradual Overlap 846.10 KG
Add 5% for Chairs 84.61 KG
42.31 KG973.02 KG
0.973 MT 54737.8 53261
6 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
Abutment 2 9.200 2.000 36.80 SQM
-
8/13/2019 Harana CD Work
16/114
-
8/13/2019 Harana CD Work
17/114
2 0.172 0.238 1.500 0.123 CUM
2 8.990 0.520 1.500 14.024 Cum
2 6.700 1.645 3.260 71.860 Cum
90.760 Cum
less qnty as per brick work of wing
walls
-26.374 Cum
less Road crust 2 6.7 2.105 0.48 -13.539 Cum
50.847 Cum 1,752.44 89105
14 Wrought iron & Mild steel ladders,
framed grills, gratings etc. with
ends of bars rivetted of molded
forged framed window guards,
barred iron doors stair case iron
railing etc. including cost of bolts
and nuts, screws, welding rod
complete fixing in position
ISA 50 mm X 50 mm X 6 mm
2X8 16 1.38 - - 22.080 m
[email protected] Kg/ m 97.814 Kg
Pipe 33.7mm O/D2X2 4 31.920 m
[email protected] Kg/ m 93.845 Kg
Total 191.659 Kg
Rate As per CSR 18.4 =
6894.90+16%
or 1.917 Qtl 7,998.08 15329
15 Providing and applying two coats
of ready mix paint including primer
coat of approved brand on steel
surface after through cleaning of
surface to give an even shade as
per drawing and Technical
Specification Clause 1701
Angles
2X8
16 0.45 3.008 Sqm
Pipes
2X2 (3600+300) =3900
4 3.90 1.650 Sqm
Total 4.658 Sqm 80.90 377
879293
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
(7.38+0.30+0.30)
((50+50+44+4
4)/1000)
((3.14X33.7)/
1000
mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m -
8/13/2019 Harana CD Work
18/114
Sr. No Description of Items
No. Length Breadt
h
Height/
Depth
Qty. Rate
(Rs.)
Amount
(Rs.)
1 Earth work in excavation for
structures as per drawing and
tech. specifications clause 305.1
including setting out, const. of shouring and bracing, removal of
stumps and other deleterious
material and disposal up to a lead
of 50 mar dressing of sides a and
b
Abutment 2 11.300 2.960 1.550 103.689
Wing walls 4 1.760 2.000 1.550 21.824
Curtain walls 2 4.750 0.530 0.775 3.902
Under flooring 1 8.140 0.960 0.175 1.368
130.782 CUM 170.76 22332
2 Plain Cement Concrete M 10
(1:3:6 nominal mix) in leveling
course below open foundation of
Head walls as per drawing and
Technical Specification Clause
1109.
Abutment 2 11.300 2.040 0.200 9.221
Wing walls 4 1.760 2.000 0.200 2.816
Curtain walls 2 5.300 0.530 0.150 0.843
For Bed 1 8.140 3.000 0.100 2.442
15.32 CUM 4308.10 66007
3 Brick Masonry work in cement
mortar 1:4 in foundations
complete except pointing and
plastering as per drawing and
technical specification Clauses
600,1202 and 1203ABUTMENTS
1st STEP 2 11.100 1.840 0.150 6.127 CUM
2nd STEP 2 11.100 1.725 0.150 5.744 CUM
3rd STEP 2 11.100 1.610 0.150 5.361 CUM
4th STEP 2 11.100 1.495 0.150 4.978 CUM
5th STEP 2 11.100 1.380 0.150 4.595 CUM
6th STEP 2 11.100 1.265 0.150 4.212 CUM
7th STEP 2 11.100 1.150 0.150 3.830 CUM
8th STEP 2 11.100 1.035 0.150 3.447 CUM
9th STEP 2 11.100 0.920 0.150 3.064 CUM
10th STEP Avg
(1.61+0.690)/2=1.15
2 11.100 1.150 2.000 51.060 CUM
Wing walls1st STEP 4 1.760 1.840 0.450 5.829 CUM
2nd STEP 4 1.760 1.725 0.450 5.465 CUM
3rd STEP 4 1.760 1.610 0.225 2.550 CUM
4th STEP 4 1.760 1.495 0.150 1.579 CUM
5th STEP 4 1.875 1.380 0.150 1.553 CUM
6th STEP 4 1.875 1.265 0.150 1.423 CUM
7th STEP 4 1.875 1.150 0.150 1.294 CUM
8th STEP 4 1.875 1.035 0.150 1.164 CUM
9th STEP 4 1.875 0.920 0.150 1.035 CUM
10th STEP 4 1.875 0.805 0.150 0.906 CUM
DETAIL ANALYSIS FOR CONST. OF3.00 M SPAN SLAB SQEW TYPE CULVERT WITH CARRIAGE WAY 8.50 M
Detail of Qty
-
8/13/2019 Harana CD Work
19/114
11th STEP 4 1.875 0.690 0.150 0.776 CUM
12th STEP 4 1.875 0.575 0.150 0.647 CUM
13th STEP 4 1.875 0.460 0.150 0.518 CUM
14th STEP 4 1.875 0.345 0.150 0.388 CUM
15th STEP 4 2.105 0.345 0.345 1.002 CUM
16th STEP
Avg.(0.230x1.50)/2=0.172 ,
(1.380x0.345)/2=0.238
4 0.172 0.238 1.500 0.246 CUM
Curtain walls2 2.450 0.460 0.230 0.518 CUM
2 2.680 0.345 0.230 0.425 CUM
2 2.910 0.230 0.450 0.602 CUM
2 3.140 0.230 0.100 0.144 CUM
Parapet
4 2.480 0.345 0.450 1.540 CUM
122.02 4327.15 528012
per cum
4 Plain/reinforced cement concrete
(RCC Grade M-25) in sub
structure complete as per
drawings and technical
specification clauses
802,804,805,806,807,1202 and
1204.
FOR DECK SLAB 1 11.100 3.600 0.300 11.99 CUM
For Bed Plates 2 11.100 0.575 0.200 2.55 CUM
Sides of Slab 2 11.100 0.275 0.300 1.83 CUM
Parapet walls 2 3.720 0.115 0.450 0.39 CUM
For Wearing Slab 1 10.870 4.150 0.075 3.38 CUM
20.14 CUM 5454.07 109849
5 Supplying, fitting and placing TMT
bar reinforcement (Fe 500) in
substructure complete as per
drawings and technical
specification clauses 1002,1005,1010 and 1202
Factor
wt. Kgper mtr
16 mm dia bar (main steel) 75 3.680 1.58 436.15 KG
10 mm dia bar (Dist. Steel) 19 11.060 0.62 130.29 KG
10 mm dia bar ( Temp. steel) 19 11.060 0.62 130.29 KG
10 mm dia bar ( Temp. steel) 57 3.560 0.62 125.81 KG
8 mm dia bar (for bed plate)
2x8=16
16 11.060 0.39 69.01 KG
8mm dia bar (for parapet)
2x2x11=44
72 1.000 0.39 28.08 KG
8mm dia bar (for parapet)
2x2x3 =12
12 7.660 0.39 35.85 KG
8mm Ring
(2x35)=70
70 1.87 0.39 51.05 KG
Add 10% for Gradual Overlap 1006.53 KG
Add 5% for Chairs 100.65 KG
50.33 KG1157.51 KG
1.158 MT 54737.8 63359
6 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
Abutment 2 11.100 2.000 44.40 SQM
-
8/13/2019 Harana CD Work
20/114
Abutment sides and wing walls 4 2.680 2.000 21.44 SQM
Parapet sides 4 2.105 0.450 3.79 SQM
Parapet Top 4 2.480 0.345 69.63 SQM
Parapet end sides 4 0.345 0.450 94.86 SQM
234.12 SQM 312.76 73223
per sqm
7 Providing and fixing in position 20
mm thick pre-molded joint fil ler in
expansion joint for fixed ends of simply supported spans, covered
with sealant complete as per
drawing and technical
specif ication as per clause 1200
(Rate 300mm deep,Rate is per
mtr per cm depth,10mm wide
hence for 30 cm depth the qnty
will be 2x11.10=
22.20x30x2=1332 2 11.1 22.20
For300 mm deep 2 22.20 30 1332 RMT 18.38 24484
8 Providing PCC M-20 Architectural
coping on the top of wing wall
return wall etc. comp. as per
drawing and technical
specification clause 615 75mm
thick
Parapets 4 2.480 9.92 RMT 312.76 3103
9 Painting two coats including
primer coat after filling the surface
with synthetic enamel paint in all
shades on new, plastered /
concrete surfaces as per drawing
and Technical Specification
Clause 1701
2x2=4 4 3.600 0.450 6.48
2 3.600 0.115 0.828
7.308 SQM 91.50 66910 Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete
abutment, wing wall, return wall
with 100 mm dia AC pipe
extending through the full width of
the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing and
technical specification Clauses
614, 709, 1204.3.7 20 0.69 13.80 RMT 226.41 3124
11 Providing and laying c.c. flooring
1:2:4 for bed protection as perMORD specifications 1303
Inside of culvert 1 11.20 3.00 0.075 2.52
2.52 cum 4689.96 11819
12 Earth filling for diversion to
continue the traffic
For approaches 1 60 6.7 0.60 241.20 CUM 188.71 45518
13 Back filling of abettments with
Sandy material
26.700 0.100 1.350
1.809 Cum
2 6.700 0.115 1.910 2.943 Cum
-
8/13/2019 Harana CD Work
21/114
2 0.172 0.238 1.500 0.123 CUM
2 8.990 0.520 1.500 14.024 Cum
2 6.700 1.645 3.260 71.860 Cum
90.760 Cum
less qnty as per brick work of wing
walls
-26.374 Cum
less Road crust 2 6.7 2.105 0.48 -13.539 Cum
50.847 Cum 1,752.44 89105
14 Wrought iron & Mild steel ladders,
framed grills, gratings etc. with
ends of bars rivetted of molded
forged framed window guards,
barred iron doors stair case iron
railing etc. including cost of bolts
and nuts, screws, welding rod
complete fixing in position
ISA 50 mm X 50 mm X 6 mm
2X8 16 1.38 - - 22.080 m
[email protected] Kg/ m 97.814 Kg
Pipe 33.7mm O/D2X2 4 18.000 m
[email protected] Kg/ m 52.920 Kg
Total 150.734 Kg
Rate As per CSR 18.4 =
6894.90+16%
or 1.507 Qtl 7,998.08 12056
15 Providing and applying two coats
of ready mix paint including primer
coat of approved brand on steel
surface after through cleaning of
surface to give an even shade as
per drawing and Technical
Specification Clause 1701
Angles
2X8
16 0.45 3.008 Sqm
Pipes
2X2 (3600+300) =3900
4 3.90 1.650 Sqm
Total 4.658 Sqm 80.90 377
1053037
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
(3.90+0.30+0.30)
((50+50+44+4
4)/1000)
((3.14X33.7)/
1000
mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m -
8/13/2019 Harana CD Work
22/114
Sr. No Description of Items
No. Length Breadt
h
Height/
Depth
Qty. Rate
(Rs.)
Amount
(Rs.)
1 Earth work in excavation for
structures as per drawing and
tech. specifications clause 305.1including setting out, const. of
shouring and bracing, removal of
stumps and other deleterious
material and disposal up to a lead
of 50 mar dressing of sides a and
b
Abutment 2 9.400 2.960 1.550 86.254
Pier 1 9.400 2.960 1.550 43.13
Wing walls 4 1.760 2.000 1.550 21.824
Curtain walls 2 4.750 0.530 0.775 3.902
Under flooring 1 8.140 0.960 0.175 1.368
156.475 CUM 170.76 26719
2 Plain Cement Concrete M 10
(1:3:6 nominal mix) in leveling
course below open foundation of
Head walls as per drawing and
Technical Specification Clause
1109.
Abutment 2 9.400 2.040 0.200 7.670
Pier 1 9.400 2.960 1.550 43.13
Wing walls 4 1.760 2.000 0.200 2.816
Curtain walls 2 5.300 0.530 0.150 0.843
For Bed 1 8.140 3.000 0.100 2.442
56.90 CUM 4308.10 245124
3 Brick Masonry work in cement
mortar 1:4 in foundations
complete except pointing andplastering as per drawing and
technical specification Clauses
600,1202 and 1203
ABUTMENTS
1st STEP 2 9.200 1.840 0.150 5.078 CUM
2nd STEP 2 9.200 1.725 0.150 4.761 CUM
3rd STEP 2 9.200 1.610 0.150 4.444 CUM
4th STEP 2 9.200 1.495 0.150 4.126 CUM
5th STEP 2 9.200 1.380 0.150 3.809 CUM
6th STEP 2 9.200 1.265 0.150 3.491 CUM
7th STEP 2 9.200 1.150 0.150 3.174 CUM
8th STEP 2 9.200 1.035 0.150 2.857 CUM
9th STEP 2 9.200 0.920 0.150 2.539 CUM10th STEP Avg
(1.61+0.690)/2=1.15
2 9.200 1.150 2.000 42.320 CUM
PIER
1st STEP 1 9.200 1.840 0.200 3.39 CUM
2nd STEP 1 9.200 1.725 0.200 3.17 CUM
3rd STEP 1 9.200 1.610 0.200 2.96 CUM
4th STEP 1 9.200 1.495 0.200 2.75 CUM
5th STEP 1 9.200 1.380 0.200 2.54 CUM
6th STEP 1 9.200 1.265 0.200 2.33 CUM
7th STEP 1 9.200 1.150 0.150 1.59 CUM
Detail of Qty
DETAIL ANALYSIS FOR CONST. OF3.00 M (DOUBLE SPAN)SPAN SLAB TYPE CULVERT WITH CARRIAGE WAY
-
8/13/2019 Harana CD Work
23/114
8th STEP 1 9.200 1.035 2.000 19.04 CUM
Wing walls
1st STEP 4 1.760 1.840 0.450 5.829 CUM
2nd STEP 4 1.760 1.725 0.450 5.465 CUM
3rd STEP 4 1.760 1.610 0.225 2.550 CUM
4th STEP 4 1.760 1.495 0.150 1.579 CUM
5th STEP 4 1.875 1.380 0.150 1.553 CUM
6th STEP 4 1.875 1.265 0.150 1.423 CUM
7th STEP 4 1.875 1.150 0.150 1.294 CUM8th STEP 4 1.875 1.035 0.150 1.164 CUM
9th STEP 4 1.875 0.920 0.150 1.035 CUM
10th STEP 4 1.875 0.805 0.150 0.906 CUM
11th STEP 4 1.875 0.690 0.150 0.776 CUM
12th STEP 4 1.875 0.575 0.150 0.647 CUM
13th STEP 4 1.875 0.460 0.150 0.518 CUM
14th STEP 4 1.875 0.345 0.150 0.388 CUM
15th STEP 4 2.105 0.345 0.345 1.002 CUM
16th STEP
Avg.(0.230x1.50)/2=0.172 ,
(1.380x0.345)/2=0.238
4 0.172 0.238 1.500 0.246 CUM
Curtain walls
2 2.310 0.460 0.230 0.489 CUM
2 2.540 0.345 0.230 0.403 CUM
2 2.770 0.230 0.450 0.573 CUM
2 3.000 0.230 0.100 0.138 CUM
Parapet
4 2.480 0.345 0.450 1.540 CUM
143.89 = #VALUE!
per cum
4 Plain/reinforced cement concrete
(RCC Grade M-25) in sub
structure complete as per
drawings and technical
specification clauses
802,804,805,806,807,1202 and
1204.FOR DECK SLAB 2 9.200 3.800 0.300 20.98 CUM
For Bed Plates 2 9.200 0.575 0.200 2.12 CUM
For Bed Plate( PIER) 1 9.200 1.035 0.200 1.90 CUM
Sides of Slab 2 9.200 0.275 0.300 1.52 CUM
Parapet walls 4 3.800 0.115 0.450 0.79 CUM
For Wearing Slab 2 8.970 4.075 0.075 5.48 CUM
32.78 CUM 0.00 0
5 Supplying, fitting and placing TMT
bar reinforcement (Fe 500) in
substructure complete as per
drawings and technical
specification clauses 1002,1005,1010 and 1202
Factor
wt. Kgper mtr
16 mm dia bar (main steel) 2X63 126 3.740 1.58 744.68 KG
10 mm dia bar (Dist. Steel) 2X20 40 9.160 0.62 227.17 KG
10 mm dia bar ( Temp. steel) 40 9.160 0.62 227.17 KG
10 mm dia bar ( Temp. steel)
2X47
94 3.740 0.62 217.97 KG
8 mm dia bar (for bed plate)
2x8=16
16 9.160 0.39 57.16 KG
9 mm dia bar (for PIER bed plate) 6 9.160 0.39 21.43 KG
-
8/13/2019 Harana CD Work
24/114
8mm dia bar (for parapet)
2x4x11=88
88 1.000 0.39 34.32 KG
8mm dia bar (for parapet)
2x4x3 =24
24 7.660 0.39 71.70 KG
8mm Ring
(2x35)=70
70 1.87 0.39 51.05 KG
8mm Ring
35
35 2.5 0.39 34.13 KG
Add 10% for Gradual Overlap 1652.64 KGAdd 5% for Chairs 165.26 KG
82.63 KG1900.54 KG
1.901 MT 0.0 0
6 Pointing with Cement Mortar (1:3),
on brickwork as per technical
specification Clause 613.3
Abutment 2 9.200 2.000 36.80 SQM
Pier 2 9.200 2.000 36.80 SQM
Pier 2 1.035 2.000 4.14 SQM
Abutment sides and wing walls 4 2.680 2.000 21.44 SQM
Parapet sides 4 2.105 0.450 3.79 SQM
Parapet Top 4 2.480 0.345 102.97 SQM
Parapet end sides 4 0.345 0.450 128.20 SQM
334.14 SQM 0.00 0
per sqm
7 Providing and fixing in position 20
mm thick pre-molded joint fil ler in
expansion joint for fixed ends of
simply supported spans, covered
with sealant complete as per
drawing and technical
specif ication as per clause 1200
(Rate 300mm deep,Rate is per
mtr per cm depth,10mm wide
hence for 30 cm depth the qntywill be 3x9.20=
27.60x30x2=1656 3 9.2 27.60
For300 mm deep 2 27.60 30 1656 RMT 18.38 30440
8 Providing PCC M-20 Architectural
coping on the top of wing wall
return wall etc. comp. as per
drawing and technical
specification clause 615 75mm
thick
Parapets 4 2.480 9.92 RMT 0.00 0
9 Painting two coats including
primer coat after filling the surface
with synthetic enamel paint in allshades on new, plastered /
concrete surfaces as per drawing
and Technical Specification
Clause 1701
2x2X2=8 8 3.600 0.450 12.96
2x2 =4 4 3.800 0.115 1.748
14.708 SQM 91.50 1346
-
8/13/2019 Harana CD Work
25/114
10 Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete
abutment, wing wall, return wall
with 100 mm dia AC pipe
extending through the full width of
the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing andtechnical specification Clauses
614, 709, 1204.3.7 20 0.69 13.80 RMT 0.00 0
11 Providing and laying c.c. flooring
1:2:4 for bed protection as per
MORD specifications 1303
Inside of culvert 1 9.20 3.00 0.075 2.07
2.07 cum 0.00 0
12 Earth filling for diversion to
continue the traffic
For approaches 1 60 6.7 0.60 241.20 CUM 0.00 0
13 Back filling of abettments with
Sandy material
26.700 0.100 1.350
1.809 Cum
2 6.700 0.115 1.910 2.943 Cum
2 0.172 0.238 1.500 0.123 CUM
2 8.990 0.520 1.500 14.024 Cum
2 6.700 1.645 3.260 71.860 Cum
90.760 Cum
less qnty as per brick work of wing
walls
-26.374 Cum
less Road crust 2 6.7 2.105 0.48 -13.539 Cum
50.847 Cum 0.00 0
14 Wrought iron & Mild steel ladders,
framed grills, gratings etc. with
ends of bars rivetted of molded
forged framed window guards,barred iron doors stair case iron
railing etc. including cost of bolts
and nuts, screws, welding rod
complete fixing in position
ISA 50 mm X 50 mm X 6 mm
2X2X8 32 1.38 - - 44.160 m
[email protected] Kg/ m 195.629 KgPipe 33.7mm O/D
2X2X2 8 18.000 m
[email protected] Kg/ m 52.920 Kg
Total 248.549 Kg
Rate As per CSR 18.4 =6894.90+16%
or 2.485 Qtl 7,998.08 19879
(3.90+0.30+0.30)
mailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20mmailto:[email protected]%20Kg/%20m -
8/13/2019 Harana CD Work
26/114
15 Providing and applying two coats
of ready mix paint including primer
coat of approved brand on steel
surface after through cleaning of
surface to give an even shade as
per drawing and Technical
Specification Clause 1701
Angles2X8
16 0.45 3.008 Sqm
Pipes
2X2 (3600+300) =3900
4 3.90 1.650 Sqm
Total 4.658 Sqm 80.90 377
#VALUE!
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
Sr. No Description of Items
No. Length Breadth Height/D
epth
Qty. Rate
(Rs.)
Amount
(Rs.)
1 Earth work in excavation for structures as
per drawing and tech. specifications clause
305.1 including setting out, const. of
shouring and bracing, removal of stumps
and other deleterious material and disposal
up to a lead of 50 mar dressing of sides a
and b
Abutment 2 10.350 2.300 3.00 142.83
Pier 1 10.350 2.000 3.00 62.10
Wing walls 4 2.100 2.260 3.00 56.95
Toe walls d/s and u/s 4 3.400 0.750 1.00 10.20
For bed 1 2.400 8.750 0.30 6.30278.38 CUM 0.00 0
2 Plain Cement Concrete M 10 (1:3:6
nominal mix) in leveling course below open
foundation of Head wal ls as per drawing
and Technical Specification Clause 1109.
Abutment 2 10.350 2.300 0.20 9.52
Pier 1 10.350 2.000 0.20 4.14
((50+50+44+44)/1000)
((3.14X33.7)/
1000)
DETAIL ANALYSIS FOR CONST. OF3.0 M DOUBLESPAN SLAB TYPE CULVERT WITH CARRIAGFE
Detail of Qty
-
8/13/2019 Harana CD Work
27/114
Wing walls 4 2.100 2.257 0.20 3.79
Toe walls d/s and u/s 4 3.400 0.750 0.20 2.04
For Bed 2 3.000 8.750 0.20 10.50
29.99 CUM 0.00
3 Brick Masonry work in cement mortar 1:4 in
foundations complete except pointing and
plastering as per drawing and technical
specification Clauses 600,1202 and 1203
ABUTMENTS
1st STEP 2 10.150 2.270 0.200 9.22 CUM
2nd STEP 2 9.950 2.170 0.200 8.64 CUM
3rd STEP 2 9.750 2.070 0.200 8.07 CUM
4th STEP 2 9.550 1.970 0.200 7.53 CUM
5th STEP 2 9.350 1.870 0.200 6.99 CUM
6th STEP 2 9.150 1.770 0.200 6.48 CUM
7th STEP 2 8.950 1.670 0.200 5.98 CUM
8th STEP (Av. 1.470+0.70)/2 2 8.750 1.085 1.800 34.18 CUM
1st STEP 1 10.150 1.800 0.200 3.65 CUM
2nd STEP 1 10.050 1.600 0.200 3.22 CUM
3rd STEP 1 9.950 1.400 0.200 2.79 CUM
4th STEP 1 9.850 1.200 0.200 2.36 CUM
5th STEP 1 9.750 1.000 0.200 1.95 CUM
6th STEP 1 9.650 0.900 0.200 1.74 CUM
7th STEP 1 9.550 0.800 0.200 1.53 CUM
8th STEP 1 9.450 0.700 2.500 16.54 CUM
RETURN WALLS
1st STEP 4 2.100 2.057 0.200 3.46 CUM
2nd STEP 4 2.100 1.957 0.200 3.29 CUM
3rd STEP 4 2.100 1.857 0.200 3.12 CUM
Sr. No Description of Items
4th STEP 4 2.100 1.757 0.200 2.95 CUM
5th STEP 4 2.100 1.657 0.200 2.78 CUM
6th STEP 4 2.100 1.557 0.200 2.62 CUM
7th STEP 4 2.100 1.457 0.200 2.45 CUM
8th STEP (Av.4x(2.20+2.80)/2
(1.26+.52)/2
4 2.500 0.890 1.800 16.02 CUM
(4x2.8) , (0.59+.40)/2 4 2.800 0.890 0.500 4.98 CUM
9th Step I Toe walls D/S , U/S
( 0.65+0.45)/2=0.550
4 3.300 0.550 0.800 5.81 CUM
Parapet 2 13.000 0.345 0.450 4.04 CUM
172.36 0.00
per cum
Sr. No Description of Items
No. Length Breadth Height/D
epth
Qty. Rate
(Rs.)
Am
4 Plain/reinforced cement concrete (RCC
Grade M-25) in sub structure complete as
per drawings and technical specif ication
clauses 802,804,805,806,807,1202 and
1204.
For main Slab 2 3.800 8.750 0.300 19.95 CUM
For Bed Plates 2 8.750 0.700 0.200 2.45 CUM
1 8.750 0.600 0.200 1.05 CUM
Front of slab 2 8.750 0.300 0.300 1.58 CUM
25.03 CUM 534.99 1
Detail of Qty
Detail of Qty
-
8/13/2019 Harana CD Work
28/114
5 Supplying, fitting and placing TMT bar
reinforcement (Fe 415) in substructure
complete as per drawings and technical
specification clauses 1002, 1005,1010 and
1202 Factor
20 mm dia bar for Main Slab (Main Bar) 136 3.800 2.470 1276.50 KG
12 mm die bar for Main slab (Distribution
Bar)
42 8.750 0.890 327.08 KG
10 mm dia bar for Main Slab (Surface Slab) 68 2.000 0.620 84.32 KG
24 8.750 0.620 130.20 KG
8mm Ring (2x45)= 90 2.120 0.390 74.41 KG
45 1.455 0.390 25.54 KG
8mm bars (2x9)+(1x8)=26 26 8.750 0.390 88.73 KG
2006.76 KG
For parpet and pillers L.S 350.00 KG
Add 10% for Gradual Overlap 200.68 KG
Add 5% for Chairs 100.34 KG
2657.78 KG
2.66 MT 0.00
6 Plain/reinforced cement concrete (RCCGrade M-25) in sub structure comlete as
per drawings and technical specif ication
clauses 802,804,805,806, 807,1202 and
1204
For Wearing Slab 2 7.850 4.400 0.075 5.18
Total 5.18 Cum 534.99
7 Pointing with Cement Mortar (1:3), on
brickwork as per technical specif ication
Clause 613.3
ABUTMENT 2 8.750 1.8 31.50 SQM
Pier 2 9.450 2.5 47.25 SQM
2 0.700 2.5 3.50 SQMFOR Wing Wall 4 3.500 2.1 29.40 SQM
111.65 SQM 0.00
per sqm
8 Providing and fillling joint sealing
compound as per drawings and technical
specifications with coarse sand and 6 per
cent bitumen by weight.
For 300 mm deep 3 8.750 30 787.5 RMT 0.00
per m/cm
9 Providing PCC M-20 Architectural coping
on the top of wing wall return wall etc.
comp. as per drawing and technical
specification clause 615 75mm thick
Parapets 2 13.000 26 mtr 0.00
10 Plastering with Cement Mortar (1:4), 15 mm
thick on brick work in sub structure as per
technical specification Clause 613.3
Out and side of parapet wall
2x2=
4 13.000 0.450 23.400 SQM
Front side 4 0.345 0.450 0.62124.021 0.00
S N D i ti f It D t il f Qt
-
8/13/2019 Harana CD Work
29/114
-
8/13/2019 Harana CD Work
30/114
Ite
m
N
o
Description Quantity Total Qty. Cost as
per
MORD
Data
Book
Nos. L B H/D Rate Amount1 2 3 4 5 6 7 8 9
1
Earth work in excavation for foundation of
structures upto 3 m depth as per drawing
and technical specification Clause 1 1 04
including setting out, construction of
shoring and bracing, removal of stumps
and other deleterious matter, dressing of
sides and Bottom and back filling with
approved material.
Head Walls (Av. Depth) 2 2.750 0.900 2.000 9.900
Under Pipes 1 5.900 1.070 1.000 6.313
Under Sump SIZE 900X900 mm inside 2 1.229 1.558 0.600 2.29818.51 170.76 3161
cum
2 Plain Cement Concrete M 10 (1:3:6
nominal^nfx) in levelling course below
open foundation of Head walls as per
drawing and Technical Specification
Clause 1109.
Under Pipes 1 6.586 1.07 0.15 1.057
Head Walls 2 2.75 0.9 0.15 0.743
Under Sump 2 1.229 1.558 0.1 0.383
2.183 4,308.10 9402
cum Per cum
3 Providing and laying reinforced cementconcrete pipe NP 3 for culverts on first
class bedding of granular material in
single row including fixing collar with
cement mortar 1:2 but excluding
excavation, protection works, backfilling,
concrete and masonry works in head walls
and parapets Clause 1106.
NP-3 Concrete Pipes 1 7.5 7.500 2,703.82 20279
Metre
4 Brick Masonary work in cement mortar 1
:4 in foundation of Head Walls complete
excluding pointing and plastering as per
drawing and technical specification
Clause 1 109
Net Qty. 7.370 4,543.51 33486
Standard Sub Estimate for Const of 600 mm dia Hume Pipe Culvert..
-
8/13/2019 Harana CD Work
31/114
cum
5 Pointing with Cement Mortar (1:3) on
brickwork as per technical specfication
Clause 613.3
Head Walls outer Side 2 2.45 2.190 10.731
Top & In side 2 2.45 0.690 3.381
Face wall 4 0.345 1.000 1.380
6 Plastring with cement Morter (1:4),15 mmthick on brick work in sub stucture as per
technical specification Clause 613.3
15.492 45.76 709
Bed 2 0.900 0.9 1.620
Top of Walls 4 0.900 0.229 0.824
2 1.358 0.229 0.622
Sides 2 1.587 1.145 3.634
Inside 4 0.900 1.145 4.122
Deduction 2 0.600 1.145 1.374
12.197 135.47 1652
sqm
8 Providing PCC m 20 Architectural Coping
388mm x 75 mm on the top of wing wall,
return wall etc, complete as per drawing
and technical specification clause 612.5.
Top of Parapets 2 2.450 _ _ 4.900 312.76 1533
metre
9 Painting two coats with prime coat after
filling the surface synthetc enamel paint in
all sheds on new plastred concreate
surface. as pec Tech. specification of
MORD 1700.
For Parapet Inside & Outside 4 2.45 0.345 3.381
Top 2 2.45 0.345 1.691For Front Portion 4 0.345 0.345 0.476
5.548 86.80 482
Sqm
Total Rupees 70703
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi BoardPatiala-1 Patiala
-
8/13/2019 Harana CD Work
32/114
S
r.
No.
Description of item No. L B D/H Rate Amount
1 Earth work in excavation for
structures in ordinary soil up to
3m depth as per MORD
specifications 300
Head Wall 2 2.575 0.750 1.650 6.373
For pipe laying 1 8.060 1.350 1.150 12.513
18.89 cum 169.07 3193
2 Providing P.C.C. grade M 10
(Nominal mix 1:3:6) in open
foundations as per MORD
specifications 800&1200
Head Wall 2 2.575 0.750 0.150 0.579
Under R.C.C. Pipe 1 8.060 1.350 0.100 1.088
For Traingular portion with pipe 1 8.060 1.050 0.375 3.174
(1.35+0.75)/2 13151
Deduct pipe
1/2x1/4x22/7x.750x.750x8.06=1.7
81
1 -1.781
3.06 cum 4297.68
3 Providing and Laying 600 mm
Hume pipes including joining
them
3.5
2.500
8.75 m 2703.82 23658
3 Brick masonary work in cement
mortar 1:4 in foundation complete
as per MORD specifications
600&1200Head Walls 1st step 2 2.45 0.8 0.150 0.588
2nd step 2 2.45 0.686 0.150 0.504
3rd step 2 2.45 0.57 0.150 0.419
4th'step 2 2.45 0.457 1.845 4.132
5th step 2 2.45 0.345 0.345 0.583
Deduct Pipe ( - ) 2 3.14 0.144 0.457 0.413
Pye r2
For Sump Bed 2 0.9 0.9 0.075 0.122
DETAIL ANALYSIS FOR CONST. OF 600 mm pipeTYPE CULVERT WITH CARRIAGE WAY 8.75 M
Unit: Each
Qty
-
8/13/2019 Harana CD Work
33/114
Sides 4 0.9 0.229 1.220 1.006
Deduction 2 0.6 0.229 1.220 0.335
8.10 3,636.60 29463
5 Providing PCC M-20
Architectural coping on the top of
wing wall return wall etc. comp.
as per drawing and technical
specification clause 615 75mm
thick
2 2.4 0.345 1.66 mtr 312.76 518
5 Pointing with Cement Mortar (1:3) on
brickwork as per technical specfication
Clause 613.3
Sqm
Head Walls outer Side 2 2.45 2.190 10.731 Sqm
Top & In side 2 2.45 0.690 3.381 Sqm
Face wall 4 0.345 1.000 1.380 Sqm
15.49 Sqm 45.78 709
Painting two coats with prime coat after
filling the surface synthetc enamel paint in
all sheds on new plastred concreate
surface. as pec Tech. specification of
MORD 1700.
sqm
For Parapet Inside & Outside 4 2.45 0.345 3.381 sqmTop 2 2.45 0.345 1.691 sqmFor Front Portion 4 0.345 0.345 0.476 sqm
5.55 sqm 86.80 481.54
1 7.250 1.350 1.150 11.256 Cum
8 Back filling of abettments with
Sand
2 2.575 0.087 0.150 0.067
2 2.575 0.202 0.150 0.156
2 2.575 0.318 0.050 0.082
-1.088
Deduct concrete as per item no 2 -3.560
Deduct pipe
1/4x22/7x.750x.750x8.06=3.56
6.913 Cum 1,128.54 7801.31
Total 78975.46
Executive Engineer ( C )
Sub Division Officer ( C ) Punjab Mandi BoardPb.Mandi Board, Patiala
Samana
-
8/13/2019 Harana CD Work
34/114
Sr. No Description of Items
No. Length Breadth Height/Dept
h
Qty. Rate
(Rs.)
Amount (Rs.)
1
Earth work in excavation for foundation of
structures upto 3 m depth as per
drawing and tech. specifications clause1104 including setting out, const. of
shouring and bracing, removal of stumps
and other deleterious matter,dressing of
sides andbottom and backfilling with
approved material
1 1.000 1.100 0.650 0.715 Cum 170.76 122
2
Brick Masonry work in cement mortar 1:4
in foundations complete except pointing
and plastering as per drawing and
technical specification Clauses 600,1202
and 1203
Base 1 1.000 1.100 0.075 0.083 Cum
Reimbursments 2 1.000 0.225 0.525 0.236 Cum0.319 4,327.15 1379
3
Providing concrete for plain/reinforced
concrete 1:2:4 in open foundations
complete as per drawings and technical
specifications Clause 802, 803, 1202 &
1203
Inside drain 1 1.000 0.450 0.075 0.034for coping 2 1.000 0.225 0.050 0.023
0.056 4,792.85 270
4
Plastering with Cement Mortar (1:4), 15
mm thick on brick work in sub structure
as per technical specification Clause
613.3
Reimbursments in side 2 1.000 0.500 1 Sqm 135.47 135
5 R.C.C. slab for drain 1 1.000 0.900 0.900 Sqm #REF! #REF!Rate of RCC slab is as per sub
estimate #REF!
Cost per metre #REF!
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
DETAIL ANALYSIS FOR
Construction of U-Shaped coveredSide Drain Size (450mmx450mm)
Detail of Qty
-
8/13/2019 Harana CD Work
35/114
-
8/13/2019 Harana CD Work
36/114
Sr. No Description of Items
No. Length Breadth Height/Dept
h
Qty. Rate
(Rs.)
Amount (Rs.)
1
Earth work in excavation for foundation of
structures upto 3 m depth as per drawing and tech. specifications clause
1104 including setting out, const. of
shouring and bracing, removal of stumps
and other deleterious matter,dressing of
sides andbottom and backfilling with
approved material
1 1.000 1.250 0.800 1.000 Cum 170.76 171
2
Brick Masonry work in cement mortar 1:4
in foundations complete except pointing
and plastering as per drawing and
technical specification Clauses 600,1202
and 1203
Base 1 1.000 1.250 0.075 0.094 CumReimbursments
2 1.000 0.225 0.675 0.304 Cum
0.398 Cum 4,327.15 1720
3
Providing concrete for plain/reinforced
concrete 1:2:4 in open foundations
complete as per drawings and technical
specifications Clause 802, 803, 1202 &
1203
Inside drain
1 1.000 0.600 0.075 0.045 Cumfor coping
2 1.000 0.225 0.050 0.023 Cum
0.068 Cum 4,792.85 324
4
Plastering with Cement Mortar (1:4), 15
mm thick on brick work in sub structure
as per technical specif ication Clause
613.3
Reimbursments in side 2 1.000 0.650 1.300 Sqm 135.47 176
2390
Cost per metre 2390
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
DETAIL ANALYSIS FOR
Construction of U-Shaped Side Drain Size (600mmx600mm)
Detail of Qty
-
8/13/2019 Harana CD Work
37/114
Sr. No Description of Items
No. Length Breadth Height/Dept
h
Qty. Rate
(Rs.)
Amount (Rs.)
1
Earth work in excavation for foundation of
structures upto 3 m depth as per
drawing and tech. specifications clause1104 including setting out, const. of
shouring and bracing, removal of stumps
and other deleterious matter,dressing of
sides andbottom and backfilling with
approved material
1 1.000 1.100 0.650 0.715 Cum 170.76 122
2
Brick Masonry work in cement mortar 1:4
in foundations complete except pointing
and plastering as per drawing and
technical specification Clauses 600,1202
and 1203
Base 1 1.000 1.100 0.075 0.083 CumReimbursments 2 1.000 0.225 0.525 0.236 Cum
0.319 4,327.15 1379
3
Providing concrete for plain/reinforced
concrete 1:2:4 in open foundations
complete as per drawings and technical
specifications Clause 802, 803, 1202 &
1203
Inside drain 1 1.000 0.450 0.075 0.034for coping 2 1.000 0.225 0.050 0.023
0.056 4,792.85 270
4
Plastering with Cement Mortar (1:4), 15
mm thick on brick work in sub structure
as per technical specification Clause
613.3
Reimbursments in side 2 1.000 0.500 1 Sqm 135.47 135
1906
Cost per metre 1906
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
DETAIL ANALYSIS FOR
Construction of U-Shaped Side Drain Size (450mmx450mm)
Detail of Qty
-
8/13/2019 Harana CD Work
38/114
Sr. No Description of Items
No. Length Breadth Height/Dept
h
Qty. Rate
(Rs.)
Amount (Rs.)
1
Earth work in excavation for foundation of
structures upto 3 m depth as per
drawing and tech. specifications clause1104 including setting out, const. of
shouring and bracing, removal of stumps
and other deleterious matter,dressing of
sides andbottom and backfilling with
approved material
1 1.000 0.95 0.500 0.475 Cum 170.76 81
3
Brick Masonry work in cement mortar 1:4
in foundations complete except pointing
and plastering as per drawing and
technical specification Clauses 600,1202
and 1203
Base 1 1.000 0.950 0.075 0.071 CumReimbursments 2 1.000 0.225 0.375 0.169 Cum
0.240 Cum 4,327.15 1039
4
Providing concrete for plain/reinforced
concrete 1:2:4 in open foundations
complete as per drawings and technical
specifications Clause 802, 803, 1202 &
1203
Inside drain 1 1.000 0.300 0.10 0.030 Cumfor coping 2 1.000 0.225 0.05 0.023 Cum
0.053 Cum 4,792.85 252
5
Plastering with Cement Mortar (1:4), 15
mm thick on brick work in sub structure
as per technical specif ication Clause
613.3
Reimbursments in side 2 1.000 0.350 0.70 Sqm 135.47 951466
Cost per metre 1466.08
Sub Divisional Officer Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
DETAIL ANALYSIS FOR
Construction of U-Shaped Side Drain Size (300mmx300mm)
Detail of Qty
-
8/13/2019 Harana CD Work
39/114
-
8/13/2019 Harana CD Work
40/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)Amount (Rs.)
12.3 1100
( B ) 1000 mm die
Unit : m
Taking output = 7.50 m
( 3 Pipes of 2.5 m length each)
a) Labour
Mate day 0.09 194.81 17.53
Mason 1st Class day0.25 266.73 66.68
Mazdoor (Unskilled) day2.00 180.06 360.12
b) Material
Sand at site cum 0.04 1,121.47 44.86
Cement at sitet 0.03 5700.00 171.00
R.C.C. pipe NP 3 pipes including collar at
site
m7.50 3800 28,500.00
29,160.19
c) Overheads and Contractor's profit @
12.5% on (a+b) 3,645.02
d) Add Labour cess @ 1% on (a+b+c)328.05
Cost for 7.5 m=( a+b+c)33,133.27
Rate per m = (a+b+c)/7.5 4,417.77
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Analysis of rate for
Providing and laying reinforced cement concrete pipe NP3 as per design in ( 1000 mm dia ) single row
Description
Providing and laying reinforced cement concrete
pipe NP3 for culverts on first class bedding of
granular material in single row including fixing
collar with cement morter 1:2 but excluding
excavation, protection works,backfilling,concrete
and masanory works in the head walls and
parapets Clause 1106
-
8/13/2019 Harana CD Work
41/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)Amount (Rs.)
12.3 1100
( C ) 600 mm dia
Unit : m
Taking output = 7.50 m
( 3 Pipes of 2.5 m length each)
a) Labour
Mate day 0.05 194.81 9.74
Mason 1st Class day 0.15 266.73 40.01
Mazdoor (Unskilled) day 1.20 180.06 216.07
265.82
Less 20% Labour for 600 mm die pipes
iinstead of 750 mm die(-) -53.16
Nett labour for 600 mm dia pipes 212.66
b) Material
Sand at site cum 0.02 1,128.54 27.08
Cement at site t 0.02 5959.00 107.26
R.C.C. pipe NP 3 pipes including collar at
site
m8.75 2000 17,500.00
17,847.00
c) Overheads and Contractor's profit @
12.5% on (a+b)2,230.88
d) Add Labour cess @ 1% on (a+b+c)200.78
Cost for 7.5 m=( a+b+c) 20,278.66
Rate per m = (a+b+c)/7.5 2,703.82
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Samana Patiala
Providing and laying reinforced cement concrete pipe NP3 as per design in ( 600 mm dia ) single row
Description
Providing and laying reinforced cement concrete
Analysis of rate for
-
8/13/2019 Harana CD Work
42/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)Amount (Rs.)
12.3 1100
( C ) 450 mm dia
Unit : m
Taking output = 7.50 m
( 3 Pipes of 2.5 m length each)
a) Labour
Mate day 0.04 194.81 7.79
Mason 1st Class day 0.11 266.73 29.34
Mazdoor (Unskilled) day 0.90 180.06 162.05
b) Material
Sand at site cum 0.024 1,121.47 26.92
Cement at site t 0.018 5700.00 102.60
R.C.C. pipe NP 3 pipes including collar at
site
m7.50 1200 9,000.00
9,328.70
c) Overheads and Contractor's profit @
12.5% on (a+b)1,166.09
d) Add Labour cess @ 1% on (a+b+c)104.95
Cost for 7.5 m=( a+b+c) 10,599.74
Rate per m = (a+b+c)/7.5 1,413.30
Sub Division Officer ( C ) Executive Engineer ( C )Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Providing and laying reinforced cement concrete
Analysis of rate for
Providing and laying reinforced cement concrete pipe NP3 (burried conduits) as per design in (
450 mm dia ) single row
Description
-
8/13/2019 Harana CD Work
43/114
Sr. No Description of Items Quantity Unit Rate
(Rs.)
Amount
(Rs.)
1 Dismentling of 1.50 Mtr.
Span Slab Culvert
No. -6576.58 0
2 Dismentling of 3.00 Mtr.
Span Slab Culvert
1 No. 10890.27 10890
3 Dismentling of
300/450/600mm dia Pipe
Culvert
8 No. -113.25 -906
4 Dismentling of Retaining
Wall Brick Work
Cum 198.09 0
5 Dismentling of RCC
Causeway
Mtr 0.00 0
9984
Sub Divisional Officer( c ) Executive Engineer(C)
Punjab Mandi Board Punjab Mandi Board
Patiala-1 Patiala
Sub Estimate for Dismentling of Existing Structure
-
8/13/2019 Harana CD Work
44/114
-
8/13/2019 Harana CD Work
45/114
Sr.
No.
Referenc
e to
MORD
Specifica
tions
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.9 600
Unit = Nos
Taking output = 30 Nos
a) Material
AC pipe 100 mm dia including wastage
@ 5 per cent. Average length of weep
hole is taken as one metre for thepurpose of estimating
m 31.50 120.00 3,780.00
MS clamps Nos. 30.00 60.00 1,800.00
Cement mortar 1:3 (For rate refer to item
11.5 I)
cum 0.05 4,271.76 213.59
b) Labour
Mate day 0.03 194.81 5.84
Mason 1st Class day 0.50 266.73 133.37
Mazdoor (Unskilled) day 0.25 180.06 45.02
c) Overheads and Contractor's profit @
12.5% on (a+b)
747.23
d) Add Labour cess @ 1% on (
a+b+c )
67.25
Cost for 30 Nos = (a+b+c+d) 6,792.29Rate per No = (a+b+c+d )/30 226.41
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Analysis of rate for
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment,
Description
Providing weepholes in brick masonry/stone
masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe extending
through the full width of the structures with slope of
1(V):20(H) towards drawing face complete as per
drawing and technical specification Clauses 614,
709, 1204.3.7
-
8/13/2019 Harana CD Work
46/114
Sr.
No.
Referenc
e to
MORD
Specifica
tions
Unit QuantityRate
(Rs.)
Amount
(Rs.)
13.16 1200 Filler Joint
IV) Providing and fillling joint sealing
compound as per drawings and
technical specifications with coarse
sand and 6 per cent bitumen by
weight.
Unit = Running m
Taking output = 7.5 m
7.5 m long x 100 mm deep x 10 mm
wide recess
a) Material
Sand cum 0.008 1,121.47 8.97
Volume = 7.5 x 0.1 x 0.01 = 0.008 cum
Weight = 0.008 x 1400 = 11.2 kg
Bitumen-11.2 x 0.06 = 0.672 kg t 0.0007 51,932.21 36.35
b) Labour
Mate day 0.02 194.81 3.90
Mazdoor (Skilled) day 0.50 208.06 104.03
Mazdoor (Unskilled) day 0.10 180.06 18.01
c) Overheads and Contractor's profit @
12.5% on (a+b)
21.41
Cost for 7.5 m with 10 cm depth =a+b+c 192.66
Rate per m with 1 cm depth =
(a+b+c)/75
2.57
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Analysis of rate for
Providing and fillling joint sealing compound as per drawings and technical specifications
-
8/13/2019 Harana CD Work
47/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
13.1 (III) 800 & 1200
1 R.C.C. grade M 30
Unit = cum
a) Material
Cement t 0.43 5,700.00 2,451.00
Coarse sand cum 0.45 1,121.47 504.66
20 mm aggregate cum 0.54 1,160.74 626.80
10 mm aggregate cum 0.36 1,136.08 408.99
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.12 266.73 32.01
Mazdoor (Unskilled) day 1.73 180.06 311.50
Bhisti day 0.27 3.50 0.95
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 10% on (a+b+c) 445.42
e) Overheads and Contractor's profit
@ 12.5% on (a+b+c+d)
612.45
f) Add Labour cess @ 1% on (
a+b+c+d+e )
55.12
Rate per cum = a+b+c+d+e 5,567.21
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Providing concrete for plain/reinforced concrete
in openSub Structures complete as per
drawings and technical specifications Clause802, 803, 1202 & 1203
-
8/13/2019 Harana CD Work
48/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.4 (v) 800 & 1200
1 R.C.C. grade M 25
Unit = cum
a) Material
Cement t 0.404 5,700.00 2,302.80
Coarse sand cum 0.45 1,121.47 504.66
20 mm aggregate cum 0.54 1,160.74 626.80
10 mm aggregate cum 0.36 1,136.08 408.99
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.12 266.73 32.01
Mazdoor (Unskilled) day 1.73 180.06 311.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 3.75% on (a+b+c) 163.64
e) Overheads and Contractor's profit@ 12.5% on (a+b+c+d)
565.92
f) Add Labour cess @ 1% on (
a+b+c+d+e )
50.93
Rate per cum = a+b+c+d+e+f 5,144.18
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Providing concrete for plain/reinforced concrete
in openfoundations complete as per drawingsand technical specifications Clause 802, 803,
1202 & 1203
Analysis of rate for
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
Description
-
8/13/2019 Harana CD Work
49/114
-
8/13/2019 Harana CD Work
50/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.4 (I) 800 & 1200
I. P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement t 0.250 5,700.00 1,425.00
Coarse sand cum 0.48 1,121.47 538.30
40 mm aggregate cum 0.576 1,288.06 741.92
20 mm aggregate cum 0.288 1,160.74 334.29
10 mm aggregate cum 0.096 1,136.08 109.06
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.10 266.73 26.67
Mazdoor (Unskilled) day 1.63 180.06 293.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Mechnical concrete mixer 0.4/0.28
cum capacity fitted with water
measuring device and preferably also
with load cell.
hour 0.40 256.80 102.72
d) Add cost of formwork @ 4% on
above
145.83
e) Overheads and Contractor's profit
@ 12.5%
473.94
f) Add Labour cess @ 1% on (
a+b+c+d+e )
42.65
Rate per cum 4,308.10
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
Description
Providing concrete for plain/reinforced concretein open foundations complete as per drawings
and technical specifications Clause 802, 803,
1202 & 1203
Analysis of rate for
-
8/13/2019 Harana CD Work
51/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.4(II) 800 & 1200
P.C.C grade M 15
(i) Nominal mix 1:2.5:5
Unit = cum
a) Material
Cement t 0.275 5,700.00 1,567.50
Coarse sand cum 0.48 1,121.47 538.30
40 mm aggregate cum 0.480 1,288.06 618.27
20 mm aggregate cum 0.240 1,160.74 278.58
10 mm aggregate cum 0.080 1,136.08 90.89b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.10 266.73 26.67
Mazdoor (Unskilled) day 1.63 180.06 293.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Mechnical concrete mixer 0.4/0.28
cum capacity fitted with water
measuring device and preferably also
with load cell.
hour 0.40 256.80 102.72
d) Add cost of formwork @ 4% on (
a+b+c )
143.63
e) Overheads and Contractor's profit
@ 12.5%
466.78
f) Add Labour cess @ 1% on (
a+b+c+d+e )
42.01
Rate per cum a+b+c+d+e+f 4,243.06
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Providing concrete for plain/reinforced concretein open foundations complete as per drawings
and technical specifications Clause 802, 803,
1202 & 1203
Analysis of rate for
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
-
8/13/2019 Harana CD Work
52/114
-
8/13/2019 Harana CD Work
53/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.4 (iv) 800 & 1200
R.C.C. grade M 20
Unit = cum
a) Material
Cement t 0.35 5,700.00 1,995.00
Sand cum 0.45 1,121.47 504.66
20 mm aggregate cum 0.54 1,160.74 626.80
10 mm aggregate cum 0.36 1,136.08 408.99
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.12 266.73 32.01
Mazdoor (Unskilled) day 1.73 180.06 311.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 4 % on (a+b+c) 162.24
e) Overheads and Contractor's profit
@ 12.5% on (a+b+c+d)
527.27
f) Add Labour cess @ 1% on (
a+b+c+d+e )
47.45
Rate per cum = a+b+c+d+e+f 4,792.85
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Providing concrete for plain/reinforced concrete
in openfoundationscomplete as per drawings
and technical specifications Clause 802, 803,1202 & 1203
Analysis of rate for
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
Description
-
8/13/2019 Harana CD Work
54/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.5(v) 800 & 1200
R.C.C. grade M 20
Unit = cum
a) Material
Cement t 0.35 5,700.00 1,995.00
Sand cum 0.45 1,121.47 504.66
20 mm aggregate cum 0.54 1,160.74 626.80
10 mm aggregate cum 0.36 1,136.08 408.99
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.12 266.73 32.01
Mazdoor (Unskilled) day 1.73 180.06 311.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 10 % on (a+b+c) 405.59
e) Overheads and Contractor's profit
@ 12.5% on (a+b+c+d)
557.68
f) Add Labour cess @ 1% on (
a+b+c+d+e )
50.19
Rate per cum = a+b+c+d+e+f 5,069.36
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Providing concrete for plain/reinforced concrete
in openSub Structure complete as per
drawings and technical specifications Clause
802, 803, 1202 & 1203
-
8/13/2019 Harana CD Work
55/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.4(iii) 800 & 1200
III. P.C.C. grade M 20
(i) Nominal mix (1:2:4)
Unit = cum
a) Material
Cement t 0.33 5,700.00 1,881.00
Sand cum 0.45 1,121.47 504.66
40 mm aggregate cum 0.36 1,288.06 463.70
20 mm aggregate cum 0.36 1,160.74 417.87
10 mm aggregate cum 0.18 1,136.08 204.49
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.10 266.73 26.67
Mazdoor (Unskilled) day 1.63 180.06 293.50
Bhisti day 0.27 217.13 58.63
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 4 % on (a+b+c) 158.75
e) Overheads and Contractor's profit
@ 12.5% on (a+b+c+d)
515.95
f) Add Labour cess @ 1% on (
a+b+c+d+e )
46.44
Rate per cum = a+b+c+d+e+f 4,689.96
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Providing concrete for plain/reinforced concrete
in open foundationscomplete as per drawings
and technical specifications Clause 802, 803,1202 & 1203
Analysis of rate for
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
-
8/13/2019 Harana CD Work
56/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.5(iii) 800 & 1200
III. P.C.C. grade M 20
(i) Nominal mix (1:2:4)
Unit = cum
a) Material
Cement t 0.33 5,700.00 1,881.00
Sand cum 0.45 1,121.47 504.66
40 mm aggregate cum 0.36 1,288.06 463.70
20 mm aggregate cum 0.36 1,160.74 417.87
10 mm aggregate cum 0.18 1,136.08 204.49
b) Labour
Mate day 0.08 194.81 15.58
Mason (1st Class) day 0.10 266.73 26.67
Mazdoor (Unskilled) day 1.63 180.06 293.50Bhisti day 0.27 217.13 58.63
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 256.80 102.72
d) Formwork @ 10 % on (a+b+c) 396.88
e) Overheads and Contractor's profit
@ 12.5% on (a+b+c+d)
545.71
f) Add Labour cess @ 1% on (
a+b+c+d+e )
49.11
Rate per cum = a+b+c+d+e+f 4,960.53
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Providing concrete for plain/reinforced concrete
in openSub Structurecomplete as per
drawings and technical specifications Clause
802, 803, 1202 & 1203
-
8/13/2019 Harana CD Work
57/114
-
8/13/2019 Harana CD Work
58/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.5 600
II. In 1:5 Cement mortar
Unit = cum
a) Material
Bricks Nos. 500.00 4.797 2,398.45
Cement mortar cum 0.24 3,131.76 751.62
b) Labour
Mate day 0.09 194.81 17.53
Mason 1st Class day 0.80 266.73 213.38
Mazdoor (Unskilled) day 1.60 180.06 288.10
Bhisti day 0.20 217.13 43.43
c) Overheads and Contractor's profit
@ 12.5% on (a+b)
464.06
d) Add Labour cess @ 1% on (
a+b+c+d )
41.77
Rate per cum = a+b+c+d 4,218.34
Sub-analysis
Cement mortar 1:5 (1 cement :
5 sand)Unit = cum
a) Material
Cement t 0.31 5,700.00 1,767.00
Sand cum 1.05 1,121.47 1,177.54b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 3,131.76
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Analysis of rate for
Description
Brick masonry work in cement mortar in
foundationcomplete excepting pointing andplastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
Brick masonry work in cement mortar 1:5 in substructure complete excepting pointing and plastering,
-
8/13/2019 Harana CD Work
59/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.1 600
II. In 1:4 Cement mortar
Unit = cum
a) Material
Bricks Nos. 500.00 4.797 2,398.45
Cement mortar
(Rate as in item 11.5 II) cum 0.24 3,530.76 847.38
b) Labour
Mate day 0.09 194.81 17.53
Mason 1st Class day 0.80 266.73 213.38
Mazdoor (Unskilled) day 1.60 180.06 288.10
Bhisti day 0.20 217.13 43.43
Add for scaffolding @ 5 per cent of
cost of materials and labour (a+b)
190.41
c) Overheads and Contractor's profit
@ 12.5% on (a+b)
499.84
d) Add Labour cess @ 1% on (
a+b+c+d )
44.99
Rate per cum = a+b+c+d 4,543.51
Sub-analysis
Cement mortar 1:4 (1 cement :
4 sand)Unit = cum
a) Material
Cement t 0.38 5,700.00 2,166.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 3,530.76
Sub Division Officer ( C ) Executive Engineer ( C )Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Description
Brick masonry work in cement mortar in
substructurecomplete excepting pointing and
plastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
Analysis of rate for
Brick masonry work in cement mortar 1:4 in substructure complete excepting pointing and plastering,
as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
-
8/13/2019 Harana CD Work
60/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.1(i) 600
II. In 1:3 Cement mortar
Unit = cum
a) Material
Bricks Nos. 500.00 4.797 2,398.45
Cement mortar
(Rate as in item 11.5 II) cum 0.24 4,271.76 1,025.22
b) Labour
Mate day 0.09 194.81 17.53
Mason 1st Class day 0.80 266.73 213.38
Mazdoor (Unskilled) day 1.60 180.06 288.10
Bhisti day 0.20 217.13 43.43
Add for scaffolding @ 5 per cent of
cost of materials and labour (a+b)
199.31
c) Overheads and Contractor's profit
@ 12.5% on (a+b)
523.18
d) Add Labour cess @ 1% on (
a+b+c+d )
47.09
Rate per cum = a+b+c+d 4,755.68
Sub-analysis
Cement mortar 1:3 (1 cement :
3 sand)Unit = cum
a) Material
Cement t 0.51 5,700.00 2,907.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 4,271.76
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Analysis of rate for
Brick masonry work in cement mortar 1:3 in substructure complete excepting pointing and plastering,
Description
Brick masonry work in cement mortar in
substructure complete excepting pointing andplastering, as per drawing and technical
specification Clauses 602, 603, 604, 1202 & 1204
-
8/13/2019 Harana CD Work
61/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.13 600
Unit = Running m
Taking output = 1 m
Assume wall thickness = 345 mm
Quantity = 1 x 0.395 x 0.150 = 0.059
PCC M-20 Grade (1:2:4) Nominal
Mix
As per item No. 12.5 (II)(i) cum 0.059 4,819.15 284.33
Add 10 per cent extra of cost of (a)being architectural coping
28.43
Cost of 1 m = a 312.76
Rate per m = a 312.76
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Samana Patiala
Providing PCC M-20 architectural coping on the
top of wing wall, return wall etc. complete as per
drawing and technical specification Clauses 615,
710 and 1204.3.11
Analysis of rate for
Projection of the coping will be 25 mm wide on both
side of the wall = 345 + 50 = 395 mm
Description
-
8/13/2019 Harana CD Work
62/114
-
8/13/2019 Harana CD Work
63/114
CEMENT MORTAR
1:4
Sub-analysis
Cement mortar 1:4 (1 cement : 4sand)
Unit = cum
a) Material
Cement t 0.38 5,700.00 2,166.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 3,530.76
1:3
Sub-analysis
Cement mortar 1:3 (1 cement : 3
sand)
Unit = cum
a) Material
Cement t 0.51 5,700.00 2,907.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 4,271.76
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
-
8/13/2019 Harana CD Work
64/114
-
8/13/2019 Harana CD Work
65/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
12.3 600
Unit = 10 sqm
Taking output = 10 sqm
a) Material
Cement mortar 1:3 (Rate as in sub
estimate )
cum 0.24 4,271.76 1,025.22
b) Labour
Mate day 0.06 194.81 11.69
Mason 1st Class day 0.60 266.73 160.04
Mazdoor (Unskilled) day 0.60 180.06 108.04
Bhisti day 0.30 217.13 65.14
c) Overheads and Contractor's profit@ 12.5% on (a+b)
171.27
d) Add Labour cess @ 1% on (
a+b+c )
15.41
Rate per 10 sqm = a+b+c 1,556.80
Rate per sqm 155.68
Sub-analysis
Cement mortar 1:3 (1 cement :
3 sand)Unit = cum
a) Material
Cement t 0.51 5,700.00 2,907.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 4,271.76
Sub Division Officer ( C ) Executive Engineer ( C )
Pb.Mandi Board, Punjab Mandi Board
Patiala -1 Patiala
Analysis of rate for
Plastering with cement mortar (1:3), 15 mm thick on brickwork in substructure as per technical specification
Description
Plastering with cement mortar (1:3), 15 mm thick
on brickwork in substructureas per technicalspecification Clauses 613.4 & 1204
-
8/13/2019 Harana CD Work
66/114
-
8/13/2019 Harana CD Work
67/114
Sr.
No.
Reference to
MORD
Specifications
Unit QuantityRate
(Rs.)
Amount
(Rs.)
11.5(ii) 600 & 1200
Unit = cum
II. Brick masonry in 1:4 cement
mortarUnit = cum
a) Material
Brick Nos. 500.00 4.797 2,398.45
Cement mortar 1:4 cum 0.24 3,530.76 847.38
Rates as per sub-analysis
b) Labour
Mate day 0.09 194.81 17.53
Mason (1st Class) day 0.80 266.73 213.38Mazdoor (Unskilled) day 1.60 180.06 288.10
Bhisti day 0.20 217.13 43.43
c) Overheads and Contractor's profit
@ 12.5% on (a+b)
476.03
d) Add Labour cess @ 1%n on (
a+b+c)
42.84
Rate per cum = a+b+c 4,327.15
Sub-analysis
Cement mortar 1:4 (1 cement : 4
sand)
Unit = cum
a) Material
Cement t 0.38 5,700.00 2,166.00
Sand cum 1.05 1,121.47 1,177.54
b) Labour
Mate day 0.04 194.81 7.79
Mazdoor (Unskilled) day 0.90 180.06 162.05
Bhisti day 0.08 217.13 17.37
Total material and labour = (a+b) 3,530.76
Sub Division Officer ( C ) Executive