Handout 2 Project Identification & Screening

download Handout 2 Project Identification & Screening

of 5

Transcript of Handout 2 Project Identification & Screening

  • 8/13/2019 Handout 2 Project Identification & Screening

    1/5

    Course Coordinator: Dr. Parikshit Charan

    Course: Project Management

    1

    PROJECT MANAGEMENT

    Project Identification and

    Screening

    2

    PROJECT SELECTION

    Project Identification

    Project Appraisal

    Project Selection based on

    criteria

    3

    PROJECT IDENTIFICATION

    OBJECTIVES

    STRENGTHS WEAKNESSES

    THREATS OPPORTUNITIES

    ALTERNATIVE

    PROJECT POSSIBILITIES4

    SEARCH NEW IDEAS

    What are the objectives?

    Brainstorm to generate alternative solutions.

    Emerging market trends.

    SWOT analysis.

    Other constraints

    Shortlist candidate ideas for detailed

    scrutiny.

    5

    MOTIVATION

    Projects are a means to accomplish

    Individual or family objectives

    Organizational objectives

    National or global objectives

    Project Identification begins in response

    to the specific need or the objectives

    OBJECTIVES

    To increase profits

    To minimize threats of losses

    To become more competitive To provide help after a disaster

    To train people in a new area

    To reduce pollution in Noida

    To become a successful entrepreneur

    6

  • 8/13/2019 Handout 2 Project Identification & Screening

    2/5

  • 8/13/2019 Handout 2 Project Identification & Screening

    3/5

    Course Coordinator: Dr. Parikshit Charan

    Course: Project Management

    13

    BRAINSTORMING

    A good means to generate new project ideas Focus on uninhibited participation by a

    group

    Listing of ideas without suppressing

    creativity at source

    List of ideas subjected to screening and

    evaluation subsequently

    14

    SCREENING OF IDEAS

    Poor Fair Good Vgood Excellent (1) (2) (3) (4) (5) Weight

    Cost * 20%

    Risk * 30%

    Return * 40%

    Hazard * 10%

    (score = 2x0.2+3x0.3+4x0.4+2x0.1= 3.1)

    15

    CRITERIA IN SCREENING

    PROJECTS

    Investment

    Rate of return

    Risk

    Likely profit

    Payback

    Similarity to

    existing business

    Expected life

    Flexibility

    Environment

    impact

    Competition

    16

    MORTALITY OF NEW

    PROJECT IDEAS

    Number

    of project

    ideas

    PLC stages

    17

    MORTALITY OF NEW

    PRODUCT IDEAS

    One study indicated that out of 35 new

    ideas only 1 made it to the final product

    18

    REDUCE VEHICULAR

    POLLUTION IN NOIDA

    1 Restrict registration of new vehicles

    2 Enforce strict emission regulations for

    vehicles

    3 Ban diesel run vehicles on road

    4 Introduce MRTS for the city

    5 Encourage use of car pools

    6 Grow more trees/ green belts in the city

  • 8/13/2019 Handout 2 Project Identification & Screening

    4/5

    Course Coordinator: Dr. Parikshit Charan

    Course: Project Management

    19

    REDUCE VEHICULAR

    POLLUTION IN NOIDA-II

    7 Declaring no traffic zones in the city

    8 Ban vehicles with an age of ten or more

    years from plying on the roads

    These and more ideas could be generated

    through a Brainstorming exercise

    20

    SCREENING OF IDEAS

    Criteria chosen for screening: Effectiveness to achieve objective

    Cost of the proposal

    Ease of implementation

    Time needed

    This is an illustrative list. Other criteria

    could be added, if needed.

    21

    SCALE OF EVALUATION

    v poor poor fair average good excellent

    (0) (1) (2) (3) (4) (5)

    Low Effectiveness High

    High Cost Low

    Difficult Implementation Easy

    Maximum Time Minimum

    22

    SCORING OF ALTERNATIVE

    PROJECTS(Effectiveness/Cost /Implementation/Time)

    1 Restrict registration

    of new vehicles

    2 Enforce strict

    emission regulations

    on vehicles

    3 Ban diesel run

    vehicles on the road

    4 Introduce MRTS for

    the city

    3 1 1 2 7

    4 5 4 5 18

    3 1 1 2 7

    4 0 1 0 5

    23

    SCORING OF ALTERNATIVE

    PROJECTS(Effectiveness/Cost/Implementation/Time)

    5 Encourage use of car

    pools

    6 Grow moretrees/green belts in the

    city

    7 Declaring no traffic

    zones in the city

    8 Ban 10 year and

    older vehicles

    2 5 4 4 15

    4 3 3 3 13

    2 3 2 2 9

    3 2 3 3 11

    24

    RESULTS OF SCREENING

    Project No.2: Enforce strict emission

    regulations on vehicles (18 points)

    Project No. 5: Encourage use of car pools

    (15 points)

    Project No. 6: Grow more trees/green belts

    in the city (13 points)

  • 8/13/2019 Handout 2 Project Identification & Screening

    5/5

    Course Coordinator: Dr. Parikshit Charan

    Course: Project Management

    25

    PROJECT IDENTIFICATION

    Objectives

    Internal

    SWOT Brainstorming

    External

    Project possibilities

    Criteria Screening

    Candidate project proposals

    26

    SUMMARY

    Project identification is generally done bybrainstorming

    Broad objectives guide the brainstorming

    Introspection is necessary to identify the

    strengths and weaknesses of the system

    Looking outside towards the environment

    provides new opportunities and threats

    27

    SUMMARY

    (Continued)

    Evaluation of ideas is suspended during

    brainstorming to encourage creativity

    A subsequent screening on relevant criteria

    produces a candidate set of projects for

    detailed scrutiny

    An exercise to illustrate the procedure was

    undertaken