Handbook of Suggested Practices for the Design and Installat

download Handbook of Suggested Practices for the Design and Installat

of 89

Transcript of Handbook of Suggested Practices for the Design and Installat

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    1/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    2/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    3/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    4/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    5/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    6/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    7/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    8/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    9/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    10/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    11/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    12/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    13/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    14/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    15/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    16/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    17/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    18/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    19/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    20/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    21/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    22/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    23/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    24/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    25/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    26/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    27/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    28/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    29/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    30/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    31/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    32/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    33/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    34/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    35/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    36/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    37/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    38/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    39/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    40/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    41/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    42/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    43/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    44/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    45/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    46/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    47/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    48/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    49/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    50/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    51/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    52/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    53/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    54/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    55/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    56/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    57/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    58/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    59/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    60/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    61/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    62/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    63/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    64/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    65/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    66/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    67/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    68/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    69/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    70/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    71/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    72/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    73/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    74/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    75/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    76/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    77/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    78/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    79/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    80/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    81/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    82/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    83/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    84/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    85/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    86/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    87/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    88/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    89/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    90/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    91/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    92/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    93/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    94/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    95/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    96/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    97/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    98/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    99/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    100/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    101/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    102/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    103/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    104/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    105/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    106/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    107/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    108/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    109/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    110/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    111/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    112/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    113/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    114/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    115/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    116/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    117/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    118/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    119/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    120/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    121/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    122/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    123/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    124/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    125/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    126/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    127/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    128/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    129/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    130/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    131/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    132/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    133/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    134/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    135/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    136/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    137/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    138/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    139/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    140/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    141/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    142/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    143/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    144/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    145/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    146/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    147/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    148/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    149/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    150/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    151/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    152/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    153/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    154/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    155/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    156/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    157/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    158/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    159/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    160/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    161/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    162/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    163/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    164/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    165/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    166/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    167/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    168/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    169/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    170/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    171/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    172/225

    INDEX TO MATRICES 1 THROUGH 40

    166

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    173/225

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted: casing diameter 2 inches or less; totalwell depth O to 15 feet.

    DRILLINGMETHODS

    Hand Auger 1 5 9 10 5 9 6 4 49

    Driving 1 1 10 10 5 5 1 4 37Jetting 2 1 8 10 5 1 1 1 29

    Solid Flight 3 4 7 9 10 4 5 2 44Auger

    Hollow Stem 10 10 9 9 10 8 10 9 75Auger

    Mud Rotary 8 10 8 10 7 4 10 5 62

    Air Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary with 7 5 6 4 6 9 10 10 57Casing Hammer

    Dual Wall Rotary 7 6 6 1 6 9 56Cable Tool 9 10 5 7 4 10 10 10 65

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. The shallow depth of up to 15 feet, and small completed well diameter of 2 inches or less allows maximum flexibility in equipment.

    167

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    174/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    175/225

    MATRIX NUMBER 3

    General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted; casing diameter 2 inches or less; totalwell depth greater than 150 feet.

    DRILLINGMETHODS

    NA NA NA NA NA NA NANA NA

    Hand Auger

    NA NA NA NANA NA NA NA NA

    DrivingNA NA NA NA NA NA

    NA NA NAJetting

    Solid Flight NA NA NA NANA NA NA NA NA

    Auger

    Hollow Stem NA NA NA NANA NA NA NA NA

    Auger

    Mud Rotary 10 1 10 10 95 10 6 61

    NA NA NA NA NA NA NANA NA

    Air Rotary

    6 5 4 7 10 101 0 60

    Air Rotary with 8Casing Hammer

    10 8 1 10 10 10 1069

    Dual Wall Rotary 108 5 7 4 9 10

    10 62Cable Tool 9

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction4. Where dual-wall air techniques are used, completion is through the bit.5. Depths greater than 150 feet limit technique choices.

    169

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    176/225

    MATRIX NUMBER 4General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted; casing diameter 2 to 4 inches; totalwell depth O to 15 feet.

    DRILLINGMETHODS

    Hand Auger NA NA NA NA NA NA NA NA NA

    Driving 1 1 10 10 5 5

    1 4 37

    Jetting 2 1 8 10 5 2 1 1 30

    Solid Flight 1 4 7 9 10 4Auger

    4 2 41

    Hollow Stem 8 10 7 9 10Auger

    8 8 8 68

    Mud Rotary 7 10 7 10 7 4 10 5 60

    Air Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary with 8 5 6 4 6 9 10 10Casing Hammer

    58

    Dual Wall Rotary 10 8 5

    16

    108 8 56

    Cable Tool 10 10 5 7 4 9 10 10 65

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Four-inch casing diameter limits technique choices even though depths are shallow (15 feet or less). Large diameter (I. D.)

    hollow-stem augers required. Solid flight augers require open-hole completion in potentially unstable materials.

    170

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    177/225

    MATRIX NUMBER 5General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted; casing diameter 2 to 4 inches; totalwell depth 15 to 150 feet.

    DRILLINGMETHODS

    Hand Auger NA NA NA NA NA NA NA NA NA

    Driving 1 1 2 10 1 5 1 4 25

    Jetting 1 1 3 10 3 1 1 1 21

    Solid Flight 3 3 2 9 7 4 2 2 32Auger

    Hollow Stem 5 10 8 9 9 8 5 5 59Auger

    Mud Rotary 10 10 10 10 10 4 10 5 69

    Air Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary with 8 5 5 4 9 9 10 10 60Casing Hammer

    Dual Wall Rotary 10 8 8 1 8 10 8 8 61

    Cable TooI 9 10 5 7 5 9 10 10 65

    EXPLANATORY NOTES:1.

    2.3,4.

    5,

    Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.Borehole stability problems are potentially severe.The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.Four-inch casing diameter limits technique choice even though depths are 15 to 150 feet. Large diameter (I. D.) hollow-stems arerequired. Solid flight augers require open-hole completion in potentially unstable materials.With increasing depth, mud rotary, dual-wall rotary and cable tool techniques become favored.

    171

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    178/225

    MATRIX NUMBER 6General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted; casing diameter 2 to 4 inches; totalwell depth greater than 150 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Four-inch casing diameter and depths greater than 150 feet limit technique choices,5. With increasing depth, mud rotary, dual-wall rotary and cable tool techniques become favored.

    172

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    179/225

    MATRIX NUMBER 7General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid permitted; casing diameter 4 to 8 inches; totalwell depth O to 15 feet.

    DRILLINGMETHODS

    Hand Auger NA NA NA NA NA NA NA NA NA

    Driving NA NA NA NA NA NA NA NA NAJetting NA NA NA NA NA NA NA NA NA

    Solid Flight NA NA NA NA NA NA NA NA NAAuger

    Hollow Stem NA NA NA NA NA NA NA NA NAAuger

    Mud Rotary 10 10 10 10 8 6 10 3 67

    Air Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary with 8 8 6 7 10 10 10 10 69Casing Hammer

    Dual Wall Rotary NA NA NA NA NA NA NA NA NA

    Cable Tool 8 10 4 7 4 8 10 10 61

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Casing diameter 4 to 8 inches requires up to 12-inch borehole size and eliminates all techniques except mud rotary, cable tool and

    air rotary w!th casing hammer (that can usually drive large 0.0. casing to shallow depth).

    173

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    180/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    181/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    182/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    183/225

    MATRIX NUMBER 11General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid not permitted; casing diameter 2 inches or less;total well depth 15 to 150 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.

    2. Borehole stability problems are potentially severe.3. The anticipated use of the monitoring well prohibits the use of drillinq fluid and additives in construction.4. As depth increases the relative advantage of hollow-stem augering decreases.5. Jetting and mud rotary methods would require the addition of fluid.6. When using cable-tool drilling in saturated formations, it is assumed that no drilling fluid needs to be added in permeable materials

    and that small volumes of drilling fluid are permissible in less permeable materials.

    177

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    184/225

    MATRIX NUMBER 12General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid not permitted: casing diameter 2 inches or iess;total well depth greater than 150 feet.

    DRILLINGMETHODS

    Hand Auger NA NA NA NA NA NA NA NA NA

    Driving NA NA NA NA NA NA NA NANA

    Jetting NA NA NA NA NA NA NA NA NA

    Solid Flight NA NA NA NAAuger

    NA NA NA NA NA

    Hollow Stem NA NA NA NA NA NAAuger

    NA NA NA

    Mud Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary NA NA NA NA NA NA NA NA NA

    Air Rotary with 8 6 10 7 10 8 10 10 69Casing Hammer

    Dual Wall Rotary 10 10 9 4 10 10 109

    72

    Cable Tool 9 6 7 10 6 8 10 10 66

    EXPLANATORY NOTES:1.

    2.3.4.5.

    Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.Borehole stability problems are potentially severe.The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in construction.Jetting and mud rotary methods would require the addition of fluid,When using cable-tool drilling in saturated formations, it is assumed that no drilling fluid needs to be added in permeable materialsand that small volumes of drilling fluid are permissible in less permeable materials.

    178

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    185/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    186/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    187/225

    MATRIX NUMBER 15General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; saturated; invasion of formation by drilling fluid not permitted; casing diameter 2 to 4 inches;total well depth greater than 150 feet.

    1.

    2.3.4.5.

    6.

    EXPLANATORY NOTES:

    Unconsolidated formations, predominantly saturated, with saturation exerting significant influence on the choice of drillingtechnology.Borehole stability problems are potentially severe.The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in constructionIncreasing diameter and depth favor cable tool and air rotary with casing hammer techniques.Jetting and mud rotary methods would require the addition of fluid.When using cable-tool drilling in saturated formations, it is assumed that no drilling fluid needs to be added in permeable materialsand that small volumes of drilling fluid are permissible in less permeable materials.

    181

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    188/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    189/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    190/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    191/225

    MATRIX NUMBER 19General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted: casing diameter 2 inches or less;total well depth 1O to 15 feet.

    DRILLINGMETHODS

    Hand Auger 4 5 9 10 5 9 6 6 54

    Driving 7 1 10 10 6 5 1 4 44

    Jetting 3 1 8 8 5 1 1 5 32

    Solid Flight 8 10 10 9 10 8 10 5 70Auger

    Hollow Stem 10 10 10 9 10 10 10 10 79Auger

    Mud Rotary 8 10 7 10 8 4 10 5 62

    Air Rotary 5 5 8 8 8 7 8 4 53

    Air Rotary with 9 8 6 4 3 9 10 1 0 59Casing Hammer

    Dual Wall Rotary 9 9 6 1 3 9 10 10 57

    Cable Tool 6 10 3 7 2 9 10 7 54

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g., dense, silt/clay) to severe (e.g., coarse gravel and boulders).3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.

    185

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    192/225

    MATRIX NUMBER 20General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted; casing diameter 2 inches or less;total well depth 15 to 150 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g., dense, silt/clay) to servere (e.g., coarse gravel and boulders).3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Solid-flight and hollow-stem augers are favored to the limit of their depth capability

    186

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    193/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    194/225

    MATRIX NUMBER 22General Hydrogeologic Conditions& Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted; casing diameter 2 to 4 inches; totalwell depth O to 15 feet.

    188

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    195/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    196/225

    MATRIX NUMBER 24General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted; casing diameter 2 to 4 inches; totalwell depth greater than 150 feet,

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g., dense, silt/clay) to severe (e.g., coarse gravel and boulders).3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Air rotary method requires generally very difficult open-hole completion. The borehole may, however, be stabilized with fluid after

    drilling is complete.

    190

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    197/225

    MATRIX NUMBER 25General Hydrogeologic Condtions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted; casing diameter 4 to 8 inches; totalwell depth 0 to 15 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g., dense, silt/clay) to severe (e.g., coarse gravel and boulders).3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Diameter requirements limit the equipment that can be utilized.5. Solid-flight augers require very difficult open-hole completion. Hollow-stem auger technique requires open-hole completion

    for casing sizes greater than 4 inches.

    191

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    198/225

    MATRIX NUMBER 26General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated unsaturated: invasion of formation by drilling fluid permitted; casing diameter 4 to 8 inches; totalwell depth 15 to 150 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g., dense, silt/clay) to servere (e.g., coarse gravel and boulders).3. The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.4. Diameter of borehole, and depth, eliminates most options.5. Air rotary with casing hammer and dual-wall rotary are applicable for 4-inch casing.

    192

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    199/225

    MATRIX NUMBER 27

    General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid permitted; casing diameter 4 to 8 inches; totalwell depth greater than 150 feet.

    EXPLANATORY NOTES:1.

    2.

    3.4.

    Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual,relatively isolated, saturated

    zones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.Borehole stability problems vary from slight (e.g., dense, silt/clay) to servere (e.g., coarse gravel and boulders).The anticipated use of the monitoring well permits the use of drilling fluid and additives in construction.Diameter of borehole, and depth, eliminates most options.

    193

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    200/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    201/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    202/225

    MATRIX NUMBER 30General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid not permitted; casing diameter 2 inches orless; total well depth greater than 150 feet.

    EXPLANATORY NOTES:

    1.

    2.3.4.5.

    6.7.

    Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.Borehole stability problems vary from slight (e.g. dense, silt/clay) to severe (e.g. coarse gravel and boulders).The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in construction.The depth requirement and the decision not to utilize drilling fluid limit equipment options.Jetting, mud rotary, and cable tool methods would require the addition of fluid.

    Air rotary with casing hammer requires driving 6-inch or greater diameter casing and completion by pullback.Air rotary completion possible only if unsupported borehole is stable.

    196

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    203/225

    MATRIX NUMBER 31

    General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid not permitted: casing diameter 2 to 4 inches;total well depth O to 15 feet.

    DRILLINGMETHODS \

    Hand AugerDriving

    Jetting

    Solid FlightAuger

    Hollow StemAuger

    MudRotary

    Air Rotary

    Air Rotary with

    Casing Hammer

    Dual Wall Rotary

    Cable Tool

    NA

    1

    NA

    8

    10

    NA

    5

    9

    9

    NA

    NA

    10

    NA

    10

    10

    NA

    8

    4

    1

    NA

    NA

    5

    NA

    10

    10

    NA

    8

    6

    6

    NA

    NA

    5

    NA

    8

    10

    NA

    7

    9

    9

    NA

    NA

    1

    NA

    7

    9

    NA

    8

    10

    9

    NA

    NA

    4

    NA

    5

    8

    NA

    4

    10

    10

    NA

    TOTAL

    NA

    37

    NA

    68

    77

    NA

    53

    62

    59

    NA

    EXPLANATORY NOTES:

    1, Unconsolidated formations, predominantly unsaturated,with monitoring conducted in individual, relatively isolated, saturated

    zones. Drilling is through primarily unsaturated material,but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g. dense, silt/clay) to severe (e.g. coarse gravel and boulders).3. The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in construction.4. Jetting, mud rotary and cable tool methods would require the addition of fluid.5. Air rotary with casing hammer requires driving 8-inch or greater casing and completion by pullback.6. Air rotary and solid-flight auger completion possible only if unsupported borehole is stable.

    197

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    204/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    205/225

    MATRIX NUMBER 34General Hydrogeologic Conditions & Well Design Requirements

    Unconsolidated; unsaturated; invasion of formation by drilling fluid not permitted; casing diameter 4 to 8 inches;total well depth O to 15 feet.

    EXPLANATORY NOTES:

    1. Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones, Drilling is through primarily unsaturated material, but completion is in a saturated zone.

    2. Borehole stability problems vary from slight (e.g. dense, silt/clay) to severe (e.g. coarse gravel and boulders).3. The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in construction.4. Diameter and no drilling fluid minimizes options5. Jetting, mud rotary and cable tool methods would require the addition of fluid.

    6. Air rotary with casing hammer requires driving 12-inch or greater diameter casing and completion by pullback.7. Air rotary completion possible only if unsupported borehole is stable.

    200

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    206/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    207/225

    MATRIX NUMBER 36

    General Hydrogeologic Conditions & Well Design RequirementsUnconsolidated; unsaturated; invasion of formation by drilling fluid not permitted; casing diameter 4 to 8 inches;total well depth greater than 150 feet.

    EXPLANATORY NOTES:1.

    2.3.4.5.6.7.8.

    9.

    Unconsolidated formations, predominantly unsaturated, with monitoring conducted in individual, relatively isolated, saturatedzones. Drilling is through primarily unsaturated material, but completion is in a saturated zone.Borehole stability problems vary from slight (e.g. dense, silt/clay) to severe (e.g. coarse gravel and boulders),The anticipated use of the monitoring well prohibits the use of drilling fluid and additives in construction.No drilling fluid, depth and diameter requirements have eliminated options.Oversize drillpipe and/or auxiliary air probably required.Jetting, mud rotary and cable tool methods would require the addition of fluid.Air rotary completion possible only if unsupported borehole is stable.Air rotary with casing hammer unlikely to penetrate to specified depths with 12-inch diameter outer casing that is required for8-inch diameter casing and screen completion.If borehole is unstable, for 8-inch diameter casing there is no method that can be used to fulfill the requirements as stated above.Therefore, fluid would be necessary to install the well and invasion-permitting matrices will apply.

    202

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    208/225

    MATRIX NUMBER 37

    GeneraI Hydrogeologic Conditions& Well Design Requirement

    Consolidated; invasion of formation by drilling fluid permitted; casing diameter 4 inches or less.

    EXPLANATORY NOTES:1.

    2.3.4.5.

    Consolidated formations, all typesThe anticipated use of the monitoring well permits the use of drilling fluid and additives in constructionBoreholes are expected to be sufficiently stable to permit open-hole completion.Core sampling will improve the relative value of the mud rotary method.Where dual-wall air is available it becomes an equally preferred method with air rotary.

    203

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    209/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    210/225

    MATRIX NUMBER 39

    General Hydrogeologic Conditions & Well Design Requirements

    Consolidated; invasion of formation by drilling fluid not permitted; casing diameter 4 inches or less.

    I

    EXPLANATORY NOTES:

    205

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    211/225

    MATRIX NUMBER 40General Hydrogeologic Conditions & Well Design Requirements

    Consolidated; invasion of formation by drilling fluid not permitted; casing diameter 4 to 8 inches.

    EXPLANATORY NOTES:1.

    2.3.4.5.

    Consolidated formations, all typesThe anticipated use of the monitoring well does not permit the use of drilling fluid and additives in construction,Boreholes are expected to be sufficiently stable to permit open hole completion.Both mud rotary and cable tool methods are potentially invasive, thereby reducing options to air drilling methods,Air rotary may require extra air and/or special drill pipe.

    206

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    212/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    213/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    214/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    215/225

    Artificial Filter PackSee Grovel Pack.

    AttenuationThe reduction or removal of constituents in the ground

    water by the sum of all physical, chemical and biological eventsacting upon the ground water.

    Auger Flights

    Winding metal strips welded to the auger sections thatcarry cuttings to the surface during drilling.

    Backwash (Well Development)The surging effect or reversal of water flow in a well that

    removes fine-grained material from the formation surroundingthe borehole and helps prevent bridging (Driscoll, 1986).

    BackwashingA method of filter pack emplacement whereby the filter

    pack material is allowed to fall freely through the annulus whileclean fresh water is simultaneously pumped down the casing.

    Bailer

    A long, narrow bucket-like device with an open top and acheck valve at the bottom that is used to remove water and/orcuttings from the borehole.

    Bailing (Well Development)A technique whereby a bailer is raised and lowered in the

    borehole to create a strong outward and inward movement of water from the borehole to prevent bridging and to remove finematerials.

    Barium SulfateA natural additive used to increase the density of drilling

    fluids.

    BentoniteA hydrous aluminum silicate available in powder,granular or pellet form and used to provide a tight seal between

    the well casing and borehole. Bentonite is also added to drillingfluid to impart specific characteristics to the fluid.

    BiodegradationThe breakdown of chemical constituents through the bio-

    logical processes of naturally occuring organisms.

    BitThe cutting tool attached to the bottom of the drill stem. Bit

    design varies for drilling in various types of formations andincludes roller, cone and drag-type bits.,Bit, Auger

    Used for soft formations with auger drill (Ingersoll-Rand,1985).

    BoreholeA hole drilled or bored into the earth, usually for explor-

    atory or economic purposes, such as a water well or oil well(united States Environmental Protection Agency, 1986).

    Borehole GeophysicsTechniques that use a sensing device that is lowered into

    borehole for the purpose of characterizing geologic formatioand their associated fluids. The results can be interpreted todetermine lithology, geometry Resistivity, bulk density,pcmsipermeability, and moisture content and to define the source,movement, and physical/chemical characteristics of groundwater (United States Environmental Protection Agency, 198

    Bridge SealAn artificial plug set to seal off specific zones in the

    abandonment of a well.

    Bridge-Slot IntakeA well intake that is manufactured on a press from flat

    sheets that are perforated, rolled and seam welded where theslots are vertical and occur as parallel openings longitudinaaligned to the well axis.

    BridgingThe development of gaps or obstructions in either grout

    filter pack materials during emplacement. Bridging of particin a naturally developed or artificial gravel pack can also occ

    during development.Cable Tool Drilling

    A drilling technique whereby a drill bit attached to thebottom of a weighted drill stem is raised and dropped to cruand grind formation materials.

    Calcium ChlorideA soluble calcium salt added to cement slurries to accele

    ate the setting time, create higher early strength and to minimmovement of the cement into zones of coarse material.

    Calcium HydroxideA primary constituent of wet cement.

    Caliper LoggingA logging technique used to determine the diameter of a

    borehole or the internal diameter of casing through the use oprobe with one to four spring expanding prongs. Caliper log-ging indicates variations in the diameter of the vertical profi

    Capillary FringeThe pores in this zone are saturated but the pressure hea

    are less than atmospheric.

    CasingAn impervious durable pipe placed in a well to prevent th

    borehole walls from caving and to seal off surface drainage or

    undesirable water, gas, or other fluids and prevent their en-trance into the well. Surface or temporary casing means atemporary casing placed in soft, sandy or caving surface formtion to prevent the borehole from caving during drilling. Pro-tective casing means a short casing installed around the wellcasing. Liner pipe means a well casing installed without driviwithin the casing or open borehole.

    210

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    216/225

    Casing, Flush-CoupledFlush-coupled casing is joined with a coupling with the

    same outside diameter as the casing, but with two femalethreads. The inside diameterof the coupling is approximately 3/ 16 inch smaller than that of the casing. Flush-coupled casinghas thinner walls than flush-joint casing (Ingersoll-Rand, 1985).

    Casing, Flush-JointFlush-joint casing has a male thread at one end and a female

    thread at the other. No coupling is used (Ingersoll-Rand, 1985).

    Casing DriverA device fitted to the top-head drive of a rotary rig that is

    used to advance casing into the subsurface.

    Cation Exchange Capacity (CEC)The measure of the availability of cations that can be

    displaced from sites on surfaces or layers and which can beexchanged for other cations. For geologic materials, CEC isexpressed as the number of milliequivalents of cations that canbe exchanged in a sample with a dry mass of 100 grams.

    CementA mixture of calcium aluminates and silicates made by

    combining lime and clay while heating and which is emplacedin the annular space to form a seal between the casing and theborehole.

    Cement Bond LogA logging device that uses acoustical signals to determine

    the integrity of the cement bond to the casing.

    Cement, Quick-SettingCement of special composition and freeness of grind that

    sets much quicker than ordinary cement. This cement is used fordeviating holes and plugging cavities (Ingersoll-Rand, 1985).

    Cementing

    The emplacement of a cement slurry by various methods sothat it fills the space between the casing and the borehole wallto a prdetermined height above the bottom of the well. Thissecures the casing in place and excludes water and other fluidsfrom the borehole.

    Center PlugA plug within the pilot assembly of a hollow-stem auger

    that is used to prevent formation materials from entering thestem of the lead auger during drilling.

    Center RodA rod attached to the pilot assembly that facilitates removal

    from the lead end of the hollow-stem auger.

    CentralizerSpring-loaded guides that are used to center the casing in

    the borehole to ensure effective placement of filter pack orgrout.

    Check ValveBall and spring valves on core barrels, rods and bailers that

    are used to control water flow in one direction only.

    CirculateTo cycle drilling fluid through the drill pipe and bo

    while drilling operations are temporarily suspended to condi-tion the drilling fluid and the borehole before hoisting pipe and to obtain cuttings from the bottom of the welldrilling proceeds (Ingersoll-Rand, 1985).

    CirculationThemovement of drilling fluid from the suction pit th

    the pump, drill pipe, bit and annular space in the borehback again to the suction pit. The time involved is usuallyreferred to as circulation time (Ingersoll-Rand, 1985).

    Circulation, Loss of The l0SSof drilling fluid into the formation through

    ices or by infiltration into a porous media.

    ClayA plastic, soft, variously colored earth, commonly a hy-

    drous silicate of alumina, formed by the decomposition of feldspar and other aluminum silicates (Ingersoll-Rand,

    Collapse StrengthThe capabilityof a casing or well intake to resist col

    by any or all external loads to which it is subjected durafter installation.

    Compressive StrengthThe greatest compressive stress that a substance can b

    without deformation.

    ConductivityA measure of the quantity of electricity transferred

    unit area per unit potential gradient per unit time. It is thereciprocal of Resistivity.

    Cone of DepressionA depression in the ground-water table or potentiometric

    surface that has the shape of an inverted cone and developsaround a well from which water is being withdrawn. It the area of influence of a well (Driscoll 1986).

    Cone of ImpressionA conical mound on the water table that develops in

    response to well injection whose shape is identical to thof depression formed during pumping of the aquifer.

    Confined AquiferAn aquifer which is bounded above and below by low-

    permeability formations.

    Confined Bed

    The relatively impermeable formation immediatelylying or underlying a confined aquifer.

    ContaminantAny physical, chemical, biological or radiological sub-

    stance or matter in water that has an adverse impact.

    ContaminationContamination is the introduction into ground water

    211

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    217/225

    chemical material, organic material, live organism or radioac-tive material that will adversely affect the quality of the groundwater.

    Continuous Sampling Tube SystemThin-wall sampling tube attached in advance of the cutting

    head of the hollow-stem auger that allows undisturbed samplesto be taken continuously while the augers are rotated.

    Continuous Slot Wire-Wound IntakeA well intake that is made by winding and welding trian-

    gular-shaped, cold-rolled wire around a cylindrical array of rods. The spacing of each successive turn of wire determines theslot size of the intake.

    CoreA continuous columnar sample of the lithologic units

    extracted from a borehole. Such a sample preserves strati-graphic contacts and structural features (United States Envi-ronmental Protection Agency, 1986).

    Core BarrelA reaming shell and length of tubing used during air or mud

    rotary drilling to collect formation samples in both consolidatedand unconsolidated formations. Core barrels may be single ordouble walled and of a swivel or rigid type.

    Core LifterA tapered split ring inside the bit and surrounding the core.

    On lifting the rods, the taper causes the ring to contract indiameter, seizing and holding the core (Ingersoll-Rand, 1985).

    CorrosionThe adverse chemical alteration that reverts elemental

    metals back to more stable mineral compounds and that affectsthe physical and chemical properties of the metal.

    Cost-Plus ContractDrilling contracts that list specific costs associated withperforming the work and include a percentage of those costs asan additional amount that will be paid to perform a job.

    CouplingA connector for drill rods, pipe or casing with identical

    threads, male and/or female, at each end (Ingersoll-Rand,1985).

    Cross ContaminationThemovement of contaminants between aquifers or water-

    bearing zones through an unsealed or improperly sealed bore-hole.

    C u t t e r H e a dThe auger head located at the lead edge of the auger column

    that breaks up formation materials during drilling.

    CuttingsFormation particles obtained from a borehole during the

    drilling process.

    DecontaminationA variety of processes used to clean equipment that has

    contacted formation material or ground water that is known tobe or suspected of being contaminated.

    Dennison SamplerA specialized sampler of a double-tube core design with

    thin inner tube that permits penetration in extremely stiff orhighly cemented unconsolidated deposits while collecting a

    thin-wall sample.Density

    Theweight of a substance per unit volume.

    DevelopmentTheact of repairing damage to the formation caused durin

    drilling procedures and increasing the porosity and permeabity of the materials surrounding the intake portion of the well(Driscoll, 1986).

    Diatomaceous EarthA cement additive composed of siliceous skeletons of

    diatoms used to reduce slurry density, increase water demandand thickening time while reducing set strength.Differential Pressure

    Thedifference in pressure between the hydrostatic head othe drilling fluid-filled or empty borehole and the formationpressure at any given depth (Ingersoll-Rand, 1985).

    Direct Mud RotaryA drilling technique whereby a drilling fluid is pumped

    down the drill rod, through the bit and circulates back to thesurface by moving up the annular space between the drill roand the borehole.

    DispersionA process of contaminant transport that occurs by me-

    chanical mixing and molecular diffusion.

    DissociationThesplitting up of a compound or element into two or mor

    simple molecules, atoms or ions. Applied usually to the effectof the action of heat or solvents upon dissolved substances. Treaction is reversible and not as permanent as decomposition;that is, when the solvent is removed, the ions recombine(Ingersoll-Rand, 1985).

    DNAPLSAcronym for dense, nonaqueous-phase liquids.

    DowngradientIn the direction of decreasing hydrostatic head (United

    States Environmental Protection Agency, 1986).

    Downgradient WellA well that has been installed hydraulically downgradie

    of the site and is capable of detecting the migration of contamnants from a regulated unit. Regulations require the installati

    212

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    218/225

    213

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    219/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    220/225

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    221/225

    Heaving SandSaturated sands encountered during drilling where the

    hydrostatic pressure of the formation is greater than the bore-hole pressure causing the sands to move up into the borehole.

    High-Yield Drilling ClayA classification given to a group of commercial drilling

    clay preparations having a yield of 35 to 50 bbl/ton andintermediate between bentonite and low-yield clays. High-yield drilling clays are usually prepared by peptizing low-yieldcalcium montmorillonite clays or, in a few cases, by blendingsome bentonite with the peptized low-yield clay (Ingersoll-Rand, 1985).

    Hollow-Stem Auger DrillingA drilling technique in which hollow, interconnected flight

    augers, with a cutting head, are pressed downward as the augeris rotated.

    HomogeneousExhibiting a uniform or similar nature.

    Hydraulic ConductivityA coefficient of proportionality that describes the rate at

    which a fluid can move through a permeable medium. It is afunction of both the media and of the fluid flowing through it(United States Environmental Protection Agency, 1986).

    Hydraulic GradientThe change in static head per unit of distance in a given

    direction. If not specified, the direction generally is understoodto be that of the maximum rate of decrease in head.

    Hydrostatic HeadThe pressure exerted by a column of fluid, usually ex-

    pressed in pounds per square inch (psi). To determine thehydrostatic head at a given depth in psi, multiply the depth infeet by the density in pounds per gallon by 0.052 (Ingersoll-

    Rand, 1985).Immiscible

    Constituents that are not significantly soluble in water.

    Incrustation (Encrustation)The process by which a crust or coating is formed on the

    well intake and/or casing, typically through chemical or bio-logical reactions.

    Induction ToolA geophysical logging tool used to measure pore fluid

    conductivity.

    Inhibitor (Mud)Substances generally regarded as drilling mud contami-nants, such as salt and calcium sulfate, are called inhibitorswhen purposely added to mud so that the filtrate from thedrilling fluid will prevent or retard the hydration of formationclays and shales (Ingersoll-Rand, 1985).

    IsotropicA medium whose properties are the same in all directions.

    Jet PercussionA drilling process that uses a wedge-shaped drill bit that

    discharges water under pressure while being raised andto loosen or break up material in the borehole.

    KellyHollow steel bar that is in the main section of drill

    which power is directly transmitted from the rotary table torotate the drill pipe and bit (Driscoll, 1986).

    KetonesClass of organic compounds where the carbonyl group is

    bonded to two alkyl groups (United States EnvironmentaProtection Agency, 1986).

    Knock-Out PlateA nonretrievable plate wedged within the auger head tha

    replaces the traditional pilot assembly and center rod that isused to prevent formation materials from entering the hollowauger stem.

    Logging, RadioactiveThe logging process whereby a neutron source is l

    down the borehole, followed by a recorder, to determiture content and to identify water-bearing zones.Lost Circulation

    Theresult of drilling fluid escaping from the borehthe formation by way of crevices or porous media (Driscoll1986).

    Louvered IntakeA well intake with openings that are manufactured

    wall metal tubing by stamping outward with a punch againsdies that control the size of the openings.

    Low-Solids MudsA designation given to any type of mud where high-

    performing additives have been partially or wholIy sufor commercial or natural clays (Ingersoll-Rand, 1985).

    Low-Yield WellA relative term referring to a well that cannot recover in

    sufficient time after well evacuation to permit the immediatecollection of water samples (United States EnvironmentaProtection Agency, 1986).

    Machine-Slotted IntakeWell intakes fabricated from standard casing where

    a predetermined width are cut into the casing at regular using machining tools.

    Male and Female ThreadsNow called pin and box threads, as in the oil industry(Ingersoll-Rand, 1985).

    Marsh FunnelA device used to measure drilling fluid viscosity w

    time required for a known volume of drilling fluid to drainthrough an orifice is measured and calibrated against a

    215

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    222/225

    conditions to the point where there is no lowering of the watertable or potentiometric surface (Driscoll, 1986).

    ReamerA bit-like tool, generally run directly above the bit, used to

    enlarge and maintain a straight borehole (After Ingersoll-Rand,1985).

    Reaming

    A drilling operation used to enlarge a borehole.

    RehabilitationThe restoration of a well to its most efficient condition

    using a variety of chemical and mechanical techniques that areoften combined for optimum effectiveness.

    ResistivityThe electrical resistance offered to the passage of a current,

    expressed in ohm-meters; the reciprocal of conductivity. Fresh-water muds are usually characterized by high Resistivity; salt-water muds, by low Resistivity (Ingersoll-Rand, 1985).

    Reverse Circulation

    A method of filter pack emplacement where the filter packmaterial is fed into the annulus around the well intake concur-rently with a return flow of water. The water is pumped to thesurface through the casing.

    In dual-wall reverse circulation rotary drilling, the circul-ating fluid is pumped down between the outer casing and innerdrill pipe, and then up and out through the drill bit to thesurface.

    RigThe machinery used in the construction or repair of wells

    and boreholes.

    Rotary Table DriveHydraulic or mechanical drive on a rotary rig used to rotate

    the drill stem and bit.

    RVCMResidual vinyl chloride monomer.

    SamplesMaterials obtained from the borehole during the drilling

    and/or formation sampling process that provide geologicalinformation. May also refer to water from completed well usedfor hydrogeochemical analysis.

    Saturated Zone (Phreatic Zone)

    The subsurface zone in which all pore spaces are filled withwater.

    SchedulingStandardization of casing diameters and wall thicknesses

    where wall thickness increases as the scheduling number in-creases.

    ScreenSee Well Intake.

    SealThe impermeable material, such as cement grout, bento-

    nite or pudded clay, placed in the annular space between theborehole wall and the permanent casing to prevent the downholemovement of surface water or the vertical mixing of water-bearing zones.

    SegregationThe differential settling of filter pack or other materials that

    occurs in the annular space surrounding the intake duringplacement by gravity (free fall).

    Set CasingTo install steel pipe or casing in a borehole.

    Shale ShakerVibratory screen connected in line to the circulation sys-

    tem of a mud rotary rig through which the drilling fluid passesand where suspended material is separated and samples arecollected.

    Shelby Tube

    Device used in conjunction with a drilling rig to obtain anundisturbed core sample of unconsolidated strata (United StatesEnvironmental Protection Agency, 1986).

    Sieve AnalysisDetermination of the particle-size distribution of soil,

    sediment or rock by measuring the percentage of the particlesthat will pass through standard sieves of various sizes (Driscoll,1986).

    Single-Riser/Limited-Interval WellAn individual monitoring well installed with a limited-

    length well intake that is used to monitor a specific zone of aformation.

    SinkersDense-phase organic liquids that coalesce in an immiscible

    layer at the bottom of the saturated zone (United States Envi-ronmental Protection Agency, 1986).

    Slip-Fit Box and Pin ConnectionsA type of coupling used to join two hollow-stem auger

    sections.

    Slotted CouplingsA device attached to the knock-out plate at the base of the

    lead auger that allows water to pass into the center of the augerduring drilling while preventing the entrance of sediment or

    sand into the hollow stem.Slotted Well Casing

    Well intakes that are fabricated by cutting slots of prede-termined width at regular intervals by machining tools.

    Slug TestA single well test to determine the in-situ hydraulic con-

    ductivity of typically low-permeability formations by the in-stantaneous addition or removal of a known quantity (slug) of

    218

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    223/225

    water into or from a well, and the subsequent measurement of the resulting well recovery (United States EnvironmentalProtection Agency, 1986).

    SlurryA thin mixture of liquid, especially water, and any of

    several finely divided substances such as cement or clay par-ticles (Driscoll, 1986).

    SmectiteAcommonly used name for clay minerals that exhibit high

    swelling properties and a high cation exchange capacity.

    Sodium BentoniteA type of clay added to drilling fluids to increase viscosity.

    Solids Concentration or ContentThe total amount of solids in a drilling fluid as determined

    by distillation that includes both the dissolved and the suspendedor undissolved solids. The suspended solids content maybe acombination of high and low specific gravity solids and nativeor commercial solids. Examples of dissolved solids are thesoluble salts of sodium, calcium and magnesium. Suspendedsolids make up the mudcake dissolved solids remain in thefiltrate. The total suspended and dissolved solids contents arecommonly expressed as percent by weight (Ingersoll-Rand,1985).

    Solid-Flight AugerA solid-stem auger with a cutting head and continuous

    flighting that is rotated by a rotary drive head at the surface andforced downward by a hydraulic pulldown or feed device.

    SolvationThe degradation of plastic well casing in the presence of

    very high concentrations of specific organic solvents.

    Solvent CementingA method of joining two sections of casing where solvent

    is applied to penetrate and soften the casing pieces and fuses thecasing together as the solvent cement cures.

    SorptionThe combined effect of adsorption and/or absorption.

    Specific CapacityThe rate of discharge of water from a well per unit of

    drawdown of the water level, commonly expressed in gpm/ft orm3 /day/m, and that varies with the duration of discharge(Driscoll, 1986).

    Specific YieldThe ratio of the volume of water that a given mass of

    saturated rock or soil will yield by gravity to the volume of themass expressed as a percentage (Driscoll, 1986).

    Split-Spoon SamplerA hollow, tubular sampling device driven by a 140-pound

    weight below the drill stem to retrieve sample of the formation,

    Spudding BeamSeeWalking Beam.

    Standard Dimension RatioA ratio expressed as the outside diameter of casing d

    by the wall thickness.

    Static Water LevelThe distance measured from the established ground sur-

    face to the water surface in a well neither being pumped norunder the influence of pumping nor flowing under artesianpressure.

    Surface SealThe seal at the surface of the ground that prevents the

    intrusion of surficial contaminants into the well or borehole.

    SurfactantA substance capable of reducing the surface tension of a

    liquid in which it is dissolved. Used in air-based drillingto produce foam, and during well development to disagclays (Driscoll, 1986).

    Surge BlockA plunger-like tool consisting of leather or rubber discs

    sandwiched between steel or wooden discs that maybe valved that is used in well development.

    SurgingA well development technique where the surge block is

    alternately lifted and dropped within the borehole above oradjacent to the screen to create a strong inward and outwardmovement of water through the well intake.

    Swivel, WaterA hose coupling that forms a connection between th

    pumps and the drill string and permits rotation of the dri(Ingersoll-Rand, 1985).

    TeflonTrade name for fluoropolymer material.

    TelescopingA method of fitting or placing one casing inside an

    of introducing screen through a casing diameter larger diameter of the screen (United States Environment ProtectionAgency, 1975).

    Temperature SurveyAn operation to determine temperatures at various

    in the wellbore, typically used to ensure the proper cemof the casing or to find the location of inflow of water borehole (Ingersoll-Rand, 1985).

    Tensile StrengthThegreatest longitudinal stress a substance can bea

    out pulling the material apart.

    Test HoleA hole designed to obtain information on ground-wate

    quality and/or geological and hydrological conditions States Environmental Protection Agency, 1975).

    219

  • 7/26/2019 Handbook of Suggested Practices for the Design and Installat

    224/225

    Thermoplastic MaterialsMan-made materials often used for well casing that are

    composed of different formulations of large organic moleculesthat are softened by heating and hardened by cooling and can beeasily molded andextruded.

    Thin-Wall SamplersA hollow tubular sampling device that is pressed into the

    formation below the drill stem to retrieve an undisturbedsample.

    Top-Head DriveA drive for the drill stem where the bottom sub of the

    hydraulic drive motor is connected directly to the drill rod.

    Total Dissolved Solids (TDS)A term that expresses the quantity of dissolved material in

    a sample of water.

    TransmissivityThe rate at which water is transmitted through a unit width

    of an aquifer under a unit hydraulic gradient. Transmissivityvalues are given in gallons per day through a vertical section of an aquifer one foot wide and extending the full saturated heightof an aquifer under hydraulic gradient of 1 in the EnglishEngineering System; in the International System, transmissiv-ity is given in cubic meters per day through a vertical section inan aquifer one meter wide and extending the full saturatedheight of the aquifer under a hydraulic gradient of 1 (Driscoll,1986).

    Tremie MethodMethod whereby filter pack is emplaced or bentonite/

    cement slurries are pumped uniformly into the annular space of the borehole through the use of a tremie pipe.

    Tremie PipeA device, usually a small-diameter pipe, that carries grout-

    ing materials to the bottom of the borehole and that allowspressure grouting from the bottom up without introduction of appreciable air pockets (United States Environmental Protec-tion Agency, 1975).

    TurbiditySolids and organic matter suspended in water.

    Unconfined AquiferAn aquifer not bounded above by a bed of distinctly lower

    permeability than that of the aquifer and containing ground

    water below a water table under pressure approximately equalto that of the atmosphere.

    Unconsolidated FormationUnconsolidated formations are naturally-occurring earth

    formations that have not been lithified; they may includealluvium, soil, gravel, clay and overburden, etc.

    UnderreamerA bit-like tool with expanding and retracting cutters for

    enlarging a drill hole below the casing (Ingersoll-Rand, 1985).

    Unified Soil Classification SystemA standardized classification system for the description o

    soils that is based on particle size and moisture content.

    Uniformity CoefficientA measure of the grading uniformity of sediment defined

    as the 40-percent retained size divided by 90-percent retainedsize.

    Unit-Price ContractsDrilling contracts that establish a fixed price for material

    and manpower for each unit of work performed.

    Upgradient WellOne or more wells that are placed hydraulically upgradien

    of the site and are capable of yielding ground-water samplesthat are representative of regional conditions and are not affecby the regulated facility (United States Environmental ProtectiAgency, 1986).

    Vadose Zone (Unsaturated Zone)

    A subsurface zone above the water table in which theinterstices of a porous medium are only partially filled withwater (United States Environmental Protection Agency, 1986

    Vicksburg SamplerA strong thin-walled sampler for use in stiff and highly

    cemented unconsolidated deposits.

    ViscosityThe resistance offered by the drilling fluid to flow.

    Volatile OrganicsLiquid or solid organic compounds with a tendency to pas

    into the vapor state (United States Environmental Protection

    Agency, 1986).Walking Beam (Spudding Beam)

    The beam of a cable tool rig thatpivots at one end while theother end connected to the drill line is moved up and down,imparting the spudding action of the rig.

    Water SwivelSee Swivel, Water.

    Water TableThe upper surface in an unconfined ground water body at

    which the pressure is atmospheric (United States EnvironmentProtection Agency, 1975).

    WeightReference to the density of a drilling fluid. This is normally

    expressed in either lb/gal, lb/cu ft, or psi hydrostatic pressureper 1000 ft of depth.

    WellAny test hole or other excavation that is drilled, cored,

    bored, washed, fractured, driven, dug, jetted or otherwiseconstructed when intended use of such excavation is for thelocation, monitoring, dewatering, observation, diversion, artficial recharge. or acquisition of ground water or for conductin

    22 0