Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be...

31
Hampton Roads Bridge-Tunnel Expansion Project DBE/SWaM Opportunity Event September 11, 2019

Transcript of Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be...

Page 1: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

Hampton Roads Bridge-Tunnel Expansion Project

DBE/SWaM Opportunity EventSeptember 11, 2019

Page 2: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

2

Introduction- Our Team: Hampton Roads Connector Partners (HRCP)

HRBT Expansion Project Overview- Scope- Benefits- Timeline and Milestones

Public Outreach

Small Business Opportunity

Q&A Session

2

Presentation Outline

Page 3: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

3

3

Our Team

Page 4: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

4

First Hampton Roads Bridge-Tunnel (current westbound tunnel) opened in November 1957

Eastbound tunnel opened in November 1976

December 2016 - Commonwealth Transportation Board approved expansion of the Hampton Roads Bridge-Tunnel

4

The Hampton Roads Bridge-Tunnel

Page 5: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

5

55555555

Hampton Roads Transportation Fund to fund 95 percent of the project

Monies raised through regional gas and sales taxes

Other project funding includes $200 million from the Commonwealth’s SMART SCALE program

$108 million from VDOT to fund replacement of the Norfolk Side Trestle Bridges in Norfolk

5

HRBT Expansion ProjectProject Funding

Page 6: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

6

6

Comprehensive Agreement between Commonwealth of Virginia and Hampton Roads Connector Partners (HRCP) signed in April 2019

HRCP CJV Partners: Dragados, VINCI Construction, Flatiron Constructors, Dodin Campenon Bernard

Expansion is a design-build project

Designers: HDR and Mott MacDonald

Project Cost: $3.8 Billion

HRBT Expansion Project The Current Design-Build Project

Page 7: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

7

77

HRBT Expansion Project Project Benefits

Ease major congestion

Enhance travel time reliability

Support emergency evacuation

Improve safety

Increase capacity

Update transportation management systems

7

Page 8: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

8

888

This is the fourth bored roadway tunnel project in the U.S.

Twin two-lane tunnels to be built west of existing eastbound tunnel (Navy side) to carry all eastbound traffic

Existing eastbound tunnel and current westbound tunnel will accommodate all westbound traffic upon project completion

Diameter of each new tunnel: approx. 45 feet (second largest tunnel opening for a Tunnel Boring Machine in North America)

8

HRBT Expansion ProjectAbout the Tunnels

Page 9: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

9

9999

HRBT Expansion ProjectThe North Island

North Island Expansion Work (purple shaded area)

Legend:

General Purpose Lane

HOT Lane

Part Time Shoulder HOT Lane

Page 10: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

10

1010101010Illustration of twin bored-tunnels between North and South Islands

HRBT Expansion ProjectThe Tunnels Section

Tunnel Boring Machine will launch first from the South Island and bore toward North Islandand then turnaround and bore toward the South Island

NORTH

ISLAND

SOUTH

ISLAND

Page 11: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

11

111111111111

HRBT Expansion ProjectThe South Island

South Island Expansion (purple shaded area) and New South Trestle

Legend:

General Purpose Lane

HOT Lane

Part Time Shoulder HOT Lane

Page 12: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

12

121212121212

Two lanes of traffic to be maintained in both eastbound and westbound directions

Pre-positioned wrecker service along the project 24 hours/day

Active public outreach campaigns throughout duration of project

12

HRBT Expansion ProjectMitigating Traffic Impacts

During Construction Phase

Page 13: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

13

13131313131313

2019 2020 2025

Anticipated JPA Approval Date= NTP

540 days (18 months) after LNTP1= October 2020

2021 2022 2023 2024

Design and Investigation Works for Environmental Permitting

LNTP 3

LNTP2 + LNTP39 months after LNTP 1

= January 2020

Substantial Completion

06/30/25

LNTP3 : Launching Pit Construction to start

Permanent Works over 55 months

6 MONTHS OF SCOPE VALIDATION

LNTP 2 LNTP2 : Authorization for TBMProcurement

Contractual - Substantial Completion Deadline 09/01/25

Contractual - Final CompletionDeadline 11/01/25

Interior Works Tunnels

Commissioning and Testing North & South Marine Trestles

Land Works I-64 Widening

Launch & Receiving pit ready for TBM

TBM Assembly and Mining

13

HRBT Expansion ProjectThe Project Timeline

Contract Execution + LNTP1

04/15/19

LNTP 1

Current

Status

Page 14: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

14

14141414141414141414

PUBLIC OUTREACH

VDOT has participated in more than 65 public outreach events about the HRBT Expansion Project since May 2017

HRCP has begun coordinating activities with City officials (Public Works, Emergency Services)

Will continue throughout life of project

Tunnel Boring Machine naming contest to include local school-age children 14

HRBT Expansion ProjectPublic Outreach

Page 15: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

DBE/ SWaM Opportunities

DBE/SWaM Opportunity EventSeptember 11, 2019

Page 16: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

16

161616161616161616o DBE (Disadvantaged Business Enterprise)· 12% Project Goal

16

HRBT Expansion ProjectSmall Business Opportunities: Project Goals

o SWaM (Small, Women and Minority-Owned Business)· 20% Project Goal

Page 17: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

17

171717171717171717

HRCP-sponsored DBE/SWaM outreach events

Participation in VDOT and other community partner outreach events

Multi-tier DBE/SWaM opportunities DBE/SWaM-specific opportunities Break scope packages into

appropriate smaller packages to provide more opportunities and maximize participation.

HRCP Team adheres to all Federal, State and City regulations in order to provide a comprehensive DBE/SWaMcompliance program on the project.

Document all Good Faith Efforts taken to achieve the goal.

17

HRBT Expansion ProjectSmall Business Opportunities: Approach

Page 18: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

18

181818181818181818

o Geotechnical Innovation PLLC (Gti)o Fishburne Drilling, Inc. o Air Water & Soil Laboratories, Inc.o 10 10 LLC DBA MinuteMan Presso iCivil, Inc.o Straughan Environmentalo Business Interiors & Moving Serviceso A-1 Environmental Services, Inc.

18

HRBT Expansion ProjectSmall Business Opportunities: Current Firms

o TreKnot Organization LLCo Uptime Solutions Professional Services

Group, Inc.

o NET100, Ltd.o Harris Miller Miller & Hanson Inco Coastal Resources, Inc.o Mid-Atlantic Drilling, Inc.o Precision Measurements, Inc.

36 DBE/SWaM Firms Already Participating

Page 19: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

19

191919191919191919

o Bryant Ritter Electrical Corp.o Chesapeake Environmental

Communicationso A&A Consultants, Inc.o Froehling & Robertson, Inc.o REMSA, Inc.

19

HRBT Expansion ProjectSmall Business Opportunities: Current Firms

Current DBE/SWaM Firms Continued…

o Daniel Consultants, Inco Ron & Sons Janitorial Service, LLCo Grubb Printing & Stamp Co., Inc.o Wendt Productions, Inc.o Endesco, Inc.o Floura Teeter Landscape Architects, Inc.o Mattern & Craig, Inc.o Best Employment Solutions, LLCo EBA Engineering, Inc.o Engineering & Testing Serviceso Gall Zeidler Consultantso MAP Environmental, Inc.o GET Solutions, Inc.o Klein Engineering P.S.C. P.C.o Rinker Design Associates, P.C.o T3 Design Corporation

Page 20: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

20

202020202020202020

From October 2018

20

HRBT Expansion ProjectSmall Business Opportunities: Original

Engineering & Design Specialty

Geotechnical Instrumentation, Monitoring and Investigations

Material Testing

QC/QA

Diving Services

Surveying

Interior Building Specialties

Waterproofing

SIP Deck Forms

Mechanical, Electrical, Plumbing, ITS, SCADA, Signage and Lighting

Reinforcing Steel

Site-work & Paving

Demolition & Sawcutting

Traffic Control & Devices

Guardrails and Fencing

Trucking

Seeding/Sodding/Landscaping

Marine Construction

Signage

Utilities

Concrete Flatwork & Structural

Page 21: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

21

212121212121212121

NOW (New)

21

HRBT Expansion ProjectSmall Business Opportunities: Now

Engineering & Design Specialty

Roadway

Marine

Bridge

AutoCAD / Microstation

Commercial Printing

Furniture

Geotechnical Instrumentation, Monitoring and Investigations

IT

Supplies

Installation

Material Testing

Promotional Items

Safety Supplies

QC/QA

Drainage Cleaning / Video

Diving Services

Drone Services

Surveying

Interior Building Specialties

Janitorial

Waterproofing

Landscaping

SIP Deck Forms

Mechanical, Electrical, Plumbing, ITS, SCADA, Signage and Lighting

Rebar

Reinforcing Steel

Remediation Services

Site-work & Paving

Demolition & Sawcutting

Design

Construction

Traffic Control & Devices

Lead and Asbestos Inspections

Guardrails and Fencing

Traffic Engineering

Trucking

Fuel Supply

Seeding/Sodding/Landscaping

Moving Services

Marine Construction

MOT

Signage

Sweeper Truck

Utilities

Waste Management

Concrete Flatwork & Structural

Video Production

Web Development

Page 22: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

22

22222222222222222222

HRBT Expansion ProjectSmall Business Opportunities: Construction

Project Opportunities

o Ground Improvementso Rebar Supply & Assemblyo Roadway Constructiono Marine Workso Asphalt Pavingo Sound Wallso MOT Deviceso Mechanicalo Electricalo Plumbingo Fire Protectiono ITS & Scadao Building Constructiono Bridge Repairso Utility Relocation

Page 23: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

23

23232323232323232323

HRBT Expansion ProjectSmall Business Opportunities: Construction

Project Opportunities: Materials

o Ready Mix Concreteo Aggregateo Rebar Supplyo Precast Girderso Precast Concrete Pileso Quarry Materialso Sound Wallso MOT Deviceso Bridge Consumableso RCP Pipes & Manholeso Cemento Fuel

Page 24: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

24

24242424242424242424

HRBT Expansion ProjectSmall Business Opportunities: Materials 1

Item Quantity Unit

Sand & Bund Fill 206,203 Cubic Yards Armor Stones & Underlayers 349,213 Tons

Marine Trestle 1,738,354 Square Feet

Armor Stones & Underlayers 304,051 Tons

Excavation 73,452 Cubic Yards

Embankment 52,619 Cubic Yards

Pavement 222,815 Square Feet

Noise Walls 727,245 Square Feet

Retaining Walls 124,327 Square Feet

ISLAND EXPANSIONS

BRIDGES

BRIDGES

MATERIALS

Page 25: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

25

25252525252525252525

HRBT Expansion ProjectSmall Business Opportunities: Materials 2

Item Quantity Unit

TUNNEL 15,800 Linear Feet

Excavation 555,383 Cubic Yards

Concrete 117,529 Cubic Yards

GROUND IMPROVEMENT

Jet Grouting Plugs 107,366 Cubic Yards

Cutter Soil Mixing 54,872 Cubic Yards

TUNNEL APPROACH STRUCTURE

Excavation 201,149 Cubic Yards

Concrete Works 201,149 Cubic Yards

EXCAVATION

Tunnel & Tunnel Approach Structures 756,532 Cubic Yards

Roadway 73,452 Cubic Yards

MATERIALS

Page 26: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

26

26262626262626262626

HRBT Expansion ProjectSmall Business Opportunities: Materials 3

Item Quantity Unit

CONCRETE

Cast In Place (Incl. Mass Concrete) 222,840 Cubic Yards

Precast Elements (Incl. Segments, Piles, Girders) 51,381 Cubic Yards

Ballast 67,995 Cubic Yards

REBAR

Rebar (not incl. Precast) 107,366 Tons

Black 3,037 Tons

CRR Class I 700 Tons CHROMX 9100 11,944 Tons

CRR Class II 47 Tons CRR Class III 18,531 Tons

EMBANKMENT & FILL

Roadway 52,619 Cubic Yards

Sand & Bund 206,203 Cubic Yards

Stones & Armor Stones 349,213 Tons

MATERIALS

Page 27: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

27

27272727272727272727

HRBT Expansion ProjectSmall Business Opportunities: Smart Bid

Page 28: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

28

28282828282828282828

HRBT Expansion ProjectSmall Business Opportunities: Design

Current Progress

• Scope Validation (Geotechnical, Survey, Traffic Counts, etc.)

• Environmental Permitting (Joint Permit Application, Nationwide

Permit 6, etc.)

Potential Upcoming Opportunities

• Bridge

• Roadway/Civil

• Environmental

• Tunnel Approach Structure/Bored Tunnel

• Electrical/SCADA/ITS

• Facility Structural

• Fire-Life Safety

• Island Septic Systems

• General CAD and Administrative Support

Page 29: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

29

29292929292929292929

HRBT Expansion ProjectSmall Business Opportunities: Design

Discussion Points to Consider:

o Firm Capacity

o Identified Staff

o Experience

Relevant?

Local?

VDOT?

Design-Build?

o Ability to Co-Locate

o Commercial Terms

o Your Ideas

Page 30: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

30

30303030303030303030

HRBT Expansion ProjectSmall Business Opportunities: Exhibitors

Page 31: Hampton Roads Bridge-Tunnel Expansion Project...2019/09/11  · 12 12 Two lanes of traffic to be maintained in both eastbound and westbound directions Pre-positioned wrecker service

31

3131313131313131313131

PROJECT WEBSITE: www.hrbtexpansion.org

HRBT Expansion ProjectContact Information

HRCP Purchasing Contact

John Gray

HRCP Purchasing Manager

phone: (757) 328-6866

email: [email protected]

HRCP DBE/SWaM Contact

Malcolm Kates

HRCP DBE/SWaM Compliance Manager

phone: (757) 439-7166

email: [email protected]