Michigan Department of Transportation Macomb Transportation Service Center 26170 21 Mile Road Chesterfield Township, MI 48051 Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\M-59 Macomb (1/17 kh) Construction and Motorist Information March 2017 - October 2018 How Will We Keep Motorists Informed? For up-to-date information on this project, go to www.michigan.gov/drive or download the free Mi Drive app from iTunes and Google Play. Additional project information can be found at www.MovingMacomb.org, www.facebook.com/MvgMacomb, and www.twitter.com/MovingMacomb. M-59 Hall Road Reconstruction Project Cities of Sterling Heights and Utica, and Shelby, Macomb, and Clinton townships MDOT: Providing the highest quality integrated transportation services for economic benefit and improved quality of life. For More Information Call the MDOT construction office at 586-201-3867. [email protected] www.MovingMacomb.org Visit MDOT's Website at: www.michigan.gov/mdot Stamp

Transcript of Hall Road Reconstruction Project - Moving...

Mic

higa

n D

epar

tmen

t of T

rans

port

atio

nM

acom

b Tr

ansp

orta

tion

Ser

vice

Cen

ter

2617

0 21

Mile

Roa

dC

hest

erfie

ld T

owns

hip,

MI 4

8051

Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\M-59 Macomb (1/17 kh)

Construction and Motorist Information

March 2017 - October 2018

How Will We Keep Motorists Informed?For up-to-date information on this project, go to www.michigan.gov/drive or download the free Mi Drive app from iTunes and Google Play.

Additional project information can be found at www.MovingMacomb.org, www.facebook.com/MvgMacomb, and www.twitter.com/MovingMacomb.

M-59Hall Road

Reconstruction ProjectCities of Sterling Heights

and Utica, and Shelby, Macomb, and Clinton townships

MDOT: Providing the highest quality integrated transportation services for economic benefit

and improved quality of life.

For More InformationCall the MDOT construction office at

586-201-3867.

[email protected] www.MovingMacomb.org

Visit MDOT's Website at:

www.michigan.gov/mdot

Sta

mp

DELCO

BOULEVARD

SCHOENHERR RO

AD

HAYES ROAD

DALCO

MA D

RIVE

TILCH

ROAD

CANAL ROAD

Utica

Area of Construction

Lakeside Mall

59

53

HALL ROAD

HAYES ROAD

DALCO

MA D

RIVE

GARFIELD RO

AD

TILCH ROAD

59HALL ROAD

ROM

EO PLANK RO

AD

The Mall atPartridge Creek

PHASE 1 - 2017PHASE 2 - 2018

BRIDGEWORK

Macomb County Community College

1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites

1.

2.

4.

3.

5.

6.

Henry FordMacombHospital

19 MILE ROAD

Lowe’s HomeImprovement

WalmartSupercenter

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

PHASE 2 - 2018

What is Being Done?The Michigan Department of Transportation (MDOT) will be reconstructing 3.7 miles of M-59 in the cities of Sterling Heights and Utica, and Shelby, Macomb, and Clinton townships. The project will be completed in two phases:

Phase 1• Concrete roadway will be replaced by asphalt• Install new modern signals• Improve drainage• Improve ramps and sidewalks to be compliant

with the Americans with Disabilities Act (ADA)• Replace signs• Fill sidewalk gaps• Add plants, trees and shrubs

Phase 2• Add a fourth lane on both sides of M-59

between Garfield and Romeo Plank roads• Same improvements as Phase 1

When Will This Be Done?Phase 1 is scheduled for March - October 2017.Phase 2 is scheduled for March - September 2018.

How Will Traffic Be Affected?Three lanes will be open in each direction through the reconstruction area 6 a.m. - 9 p.m. daily. Only two lanes will be open in each direction on M-59 over M-53 through mid-summer 2017. Work will occur day and night. Business and pedestrian access will be maintained throughout the project.

Long-term BenefitsThis project will extend the life of the roadway and allow for better traffic flow along Macomb County’s Golden Corridor.

GARFIELD RO

AD

ROM

EO PLANK

ROAD

DELCO

BOULEVARD

SCHOENHERR

ROAD

HAYES ROAD

DALCO

MA D

RIVE

HALL ROAD

PHASE 1 - 2017 Delco Boulevard to Dalcoma Drive

PHASE 2 - 2018 Dalcoma Drive to Romeo Plank RoadConstruction Starts March 2018

Completed September 2018

Construction Starts March 2017 Completed October 2017

59

Sterling Heights, Utica, Shelby Township,Macomb Township, and Clinton Township

MacombCounty

DELCO

BOULEVARD

SCHOENHERR RO

AD

HAYES ROAD

DALCO

MA D

RIVE

TILCH

ROAD

CANAL ROAD

Utica

Area of Construction

Lakeside Mall

59

53

HALL ROAD

HAYES ROAD

DALCO

MA D

RIVE

GARFIELD RO

AD

TILCH ROAD

59HALL ROAD

ROM

EO PLANK RO

AD

The Mall atPartridge Creek

PHASE 1 - 2017PHASE 2 - 2018

BRIDGEWORK

Macomb County Community College

1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites

1.

2.

4.

3.

5.

6.

Henry FordMacombHospital

19 MILE ROAD

Lowe’s HomeImprovement

WalmartSupercenter

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

DELCO

BOULEVARD

SCHOENHERR RO

AD

HAYES ROAD

DALCO

MA D

RIVE

TILCH

ROAD

CANAL ROAD

Utica

Area of Construction

Lakeside Mall

59

53

HALL ROAD

HAYES ROAD

DALCO

MA D

RIVE

GARFIELD RO

AD

TILCH ROAD

59HALL ROAD

ROM

EO PLANK RO

AD

The Mall atPartridge Creek

PHASE 1 - 2017PHASE 2 - 2018

BRIDGEWORK

Macomb County Community College

1. Staybridge Suites2. Courtyard3. Holiday Inn Express and Suites4. Hyatt Place5. La Quinta Inn and Suites6. Comfort Inn7. Marriott Towne Place Suites

1.

2.

4.

3.

5.

6.

Henry FordMacombHospital

19 MILE ROAD

Lowe’s HomeImprovement

WalmartSupercenter

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

7.

MarriottTowne PlaceSuites

Windwood

East

broo

kD

rive

Driv

e

PHASE 1 - 2017