Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M...

16
Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All ETSI Standardization ETSI Standardization Activities on M2M Activities on M2M communications communications Joachim Koss, Joachim Koss, ETSI Board Member ETSI Board Member Document No: GSC16-PLEN-13 Source: ETSI Contact: Joachim Koss GSC Session: PLENARY Agenda Item: 6.9

Transcript of Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M...

Page 1: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

ETSI Standardization Activities ETSI Standardization Activities on M2M communicationson M2M communications

Joachim Koss,Joachim Koss,

ETSI Board MemberETSI Board Member

Document No:

GSC16-PLEN-13

Source: ETSI

Contact: Joachim Koss

GSC Session:

PLENARY

Agenda Item:

6.9

Page 2: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

2

Highlight of Current Activities (1)Highlight of Current Activities (1)

• ETSI is– developing standards to support an M2M architecture

and a set of capabilities for M2M services– promoting innovation across the industry by providing

an end-to-end generic vision of the M2M communications and services

The multiple vertical applications will be easily deployed

in a general framework, allowing development of

services independently of the underlying network

Page 3: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

3

• European Commission Mandates on– Smart Metering (M/441)– Smart Grid (M/490)– Charging of Electrical Vehicles (M/468)

• Multi Vendor interoperability DEMObased on Release 1 set of specifications

Highlight of Current Activities (2)Highlight of Current Activities (2)

TC M2M is leading TC,co-ordinates all ETSITCs, which contribute

Page 4: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

4

ETSI TC M2M (1)ETSI TC M2M (1)• specifies the interconnection fabric:

– capillary technologies provide device-M2M network communications

• has active delegates from Europe, North America, China, Korea, and Japan and currently about 30% Operators, 60% Manufacturers and 10% others

• has initiated active liaisons and cooperation with many other SDOs and consortia (e.g. TIA, OMA, BBF) and in particular has close relationship to 3GPP– processes an open approach:

• published and draft TR/TS are available on the public side of the ETSI server http://docbox.etsi.org/M2M/Open/

Page 5: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

5

ETSI TC M2M (2)ETSI TC M2M (2)• Working Groups

1. Use Cases & Requirements

2. Architecture & Network Interworking

3. Protocols & Interfaces

4. Security Aspects

5. Management Aspects

• Release 1 set of specifications will be approved in 11/2011

Page 6: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

6

ETSI TC M2M (3)ETSI TC M2M (3)

• 8 plenary meetings per year plus numerous ad-hoc meetings

• several conference calls per week• constantly increasing the number of documents per

meeting (250 +)• constantly increasing plenary participation (70 +)• growing membership in M2M email list (395+)

Page 7: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

7

ETSI TC ERMETSI TC ERM

• TG28– has specific work items in support of

additional spectrum designations for key M2M market segments:

• Short Range Device standards essential for efficient capillary network deployment

• Work items for wireless smart metering/smart grid systems

Page 8: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

8

Strategic DirectionStrategic Direction

• Identify gaps where existing standards do not fulfil the requirements

• Avoid overlapping of standardization

• Involve representatives across vertical market solutions and industry segments

Page 9: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

9

ChallengesChallenges• Multitude of technical solutions and dispersed

standardization activities result in the slow development of the global M2M market, consolidation required

• End-to-end view for a globally interoperable framework to facilitate Machine-to-Machine (M2M) business, flexible for enhancements

• Timely availability, M2M solution fragmentation and dispersing standardization is permanently proceeding

• Way to engage representatives of vertical ICT and non ICT market/industry segments (convince by benefits, collect and include their specific needs/requirements)

• Create global applicable standards also meeting the specific regional and vertical segment needs (e.g. by adaptations)

Page 10: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

10

Next Steps / ActionsNext Steps / Actions

• Attract further liaisons and co-operations

• Involve more M2M stakeholders

• ETSI TC M2M will open Release 2 set of specifications in its October meeting

Page 11: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

11

Proposed Resolution (changes)Proposed Resolution (changes)

• Modifications proposed to existing Resolution GSC-15/30 Machine to Machine– Editorial update to current meeting data– Adaptation of text concerning M2M Standardization

Task Force (MSTF) since it is already established– Further content enhancements

• see separate document

Page 12: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

12

Supplementary SlidesSupplementary Slides

Page 13: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

13

ETSI TC M2M - Specifications WorkETSI TC M2M - Specifications Work

Page 14: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

14

TC M2M – High Level ArchitectureTC M2M – High Level Architecture

mId

mId

mIa

dIa

M2MApplication Server #1

M2M Service Capabilities

Layer (SCL)

M2M GatewayM2M Device

M2M SCL

M2M Device

WIRELESS

MOBILE

FIXED

.. OTHER

M2M AREA

NETWORK

App. Client

(Device)

M2M SCL

App. Client

(Gateway)

App. Client

(Device)dIa

dIa

M2MApplication Server #2

M2MApplication Server #n

Proprietary

M2M Device

Prop

rieta

ry In

terfa

ce

WIDE AREA NETWORK

Page 15: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

15

ETSI M2M - ETSI M2M - Major industry eventsMajor industry events

• October 2010 : 1st ETSI M2M Workshop. Sophia Antipolis.– More than 220 participants,– Collected output fed into ETSI M2M requirements.

• April 2011 : 1st ETSI Smart Grid Workshop. Sophia Antipolis.– More than 280 participants,– Examining the architecture for Smart Grids,– Presentations from EU (Commission), US (NIST), China (State

Grid) and Japan .• 26 – 27 Oct 2011 : 2nd ETSI M2M Workshop. Sophia Antipolis.

– Presenting the M2M Release 1 package,– Examining future requirements of M2M standardization,– Feedback from early implementations of M2M solutions,– Multi Vendor interoperability DEMO.– Information on events http://

www.etsi.org/WebSite/NewsandEvents/events

Page 16: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC16-PLEN-13

16

TC M2M – Links and CollaborationsTC M2M – Links and Collaborations