HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim...

70
HAJXY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase Boring NO. DP00066 File No.: 32486 - Sheet No.: 1 of 3 Start: August 31,2005 Finish: September 2, 2005 Sampler G 1 314 Push TY Pe Inside Diameter (in.) Hammer Weight (Ib.: Hammer Fall (in.) Barrel Drilling Equipment and Procedures Driller: Casing - - T Thin Wall Tube U Undisturbed Sample Rig Make & Model: GeoProbe Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic H&A Rep.: C. Canfield Elevation Datum Location N - E - E g g .s? fia 2 2 - a E, 3 CH Visual-Manual Identification and Description (Density,wnsistency, color, GROUP NAME, max. particle sire'*, structure, odor moisture, optional descriptions, geologic interpretation) NOTE: 8 in. concrete above start of boring at 0 ft. b Field Test s 8 - 0 Gravel 3 8 + 5 s 100 Sand = q- S E * - 2 ND r s .g F a n:hG 8 + m b: $ 5 ' ' 0 -cB%!ac 5 000 ,oii,eeE? $5 2 + - as 5 8 0.0 - 0.3 f +

Transcript of HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim...

Page 1: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

HAJXY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring NO. DP00066

File No.: 32486 - Sheet No.: 1 of 3 Start: August 31,2005 Finish: September 2, 2005

Sampler

G

1 314

Push

TY Pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Barrel Drilling Equipment and Procedures Driller: Casing

- -

T Thin Wall Tube

U Undisturbed Sample

Rig Make & Model: GeoProbe Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic

H&A Rep.: C. Canfield Elevation Datum Location N - E -

E g g

. s ? f i a

2 2

-

a E,

3 CH

Visual-Manual Identification and Description

(Density,wnsistency, color, GROUP NAME, max. particle sire'*, structure, odor moisture, optional descriptions, geologic interpretation)

NOTE: 8 in. concrete above start of boring at 0 ft.

b

Field Test

s 8

- 0

Gravel

3 8 +

5 s

100

Sand

=

q - S E * -

2 ND

r s

.g F a

n : h G 8 +

m b:

$ 5 ' ' 0

- c B % ! a c

5 000

, o i i , e e E ? $ 5

2 +

- a s

5 8 0.0 - 0.3

f +

Page 2: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 3: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 4: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 5: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Drilling Equipment and Procedures

Bit Type: Cutting Head

T Thin Wall Tube

U Undisturbed Sample

Page 6: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Bit Type: Cutting Head --

Borehole filled with bentonite chips upon completion.

Page 7: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

: September 7, 2005

T Thin Wall Tube

U Undisturbed Sample

Page 8: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00071

Page 9: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

g Equipment and Procedu

Inside Diameter (in.)

Borehole filled with bentonite chips upon completion.

T Thin Wall Tube

Page 10: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 11: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00075

File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005

TY pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Gravel Sand Field Test A , 0 Z ? Visual-Manual Identification and Description

- 0 I

poO.01 0.0 - 0.3 ML Dark brown, SILT, moist, no odor, no stain. 100

T Thin Wall Tube

U Undisturbed Sample

Finish: September 7, 2005 Barrel Drilling Equipment and Procedures Driller: Casing

-

-

Sampler

G

1 314

Push

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic

1 H a Rep.: C. Canfield Elevation Datum Location N - E -

Page 12: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00076

File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005 Finish: September 7, 2005 Driller:

HALm& TEST BORING REPORT ALDRK~H Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing

TY Pe

Inside Diameter (in.)

Hammer Weight (Ib.; Hammer Fall (in.)

Sampler

Gravel Sand Visual-Manual Identification and Description

- 0 I

Xl0.01 0.0 - 0.3 ML Dark brown, SILT, moist, no odor, no stain, no structure

T Thin Wall Tube

U Undisturbed Sample

G

1 314

Push

Barrel -

Drilling Equipment and Procedures

- -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud:

Casing: Macrocore HoistIHammer: Hydraulic

H&A Rep.: C. Canfield - Elevation Datum Location N - E -

Page 13: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 14: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

=& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring NO. DP00078

File No.: 32486 - Sheet No.: 1 of 1 Start: September 7, 2005 Finish: September 7, 2005

TY pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Sampler

G

1 314

Push

Casing Barrel Drilling Equipment and Procedures Driller:

- -

I

Gravel

a E g g a ,

3 E,

T -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisUHammer: Hydraulic

Sand

% S Visual-Manual Identification and Description

H&A Rep.: C. Canfield Elevation Datum Location N - E -

Field Test U) z 0

; g 0" 0 . 2

ML

= 2 a ,

- 0

3 (Densitylconsistency, color, GROUP NAME, max. particle size",

structure, odor, moisture, optional descriptions, geologic interpretation)

Medium stiff to soft, dark brown to brown, SILT with trace SAND, moist to dry, no odor, no structure.

3 1

o c - a t j 6 I

g g r ' . g 5 s

O.*

2 I

6 s

a

E g g v,

000

cn a 2- C L T

a0

0.0 - 0.3

5.*s.8$8 i s -

10 90

Page 15: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring NO. DP00079

File No.: 32486 - Sheet No.: 1 of 1 Start: September 9, 2005 Finish: September 9, 2005 Driller:

HALEY& TEST BORING REPORT ALDRISH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing

TY pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Sampler

~ravel l Sand , Field Test - - -. Visual-Manual Identification and Description I

- 0 0.0 - 0.4 SM Medium dense, dark brown, silty fine SAND, moist, no odor, no

stain.

NOTE: Borehole filled with bentonite chips upon completion.

T Thin Wall Tube

U Undisturbed Sample

G

1 314

Push

Barrel Drilling Equipment and Procedures

- -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic

H&A Rep.: C. Canfield

Elevation Datum Location N - E -

Page 16: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

H.ALE'Y& TEST BORING REPORT Boring NO. DP00080 ALMUCH Project: Former Anaheim Battery Operations 1201 N. Magnolia File No.: 32486 - Client: Delphi Corporation Sheet No.: 1 of 1 Contractor: Interphase Start: August 31, 2005

Finish: August 31, 2005 Casing Sampler Barrel Drilling Equipment and Procedures Driller:

TY pe G Rig Make & Model: GeoProbe H&A Rep.: C. CanfieId

Inside Diameter (in.) 1 314 Bit Type: Cutting Head Elevation Drill Mud: Datum

Hammer Weight (Ib.: Push - Casing: Macrocore Location Hammer Fall (in.) N - - HoistIHammer: Hydraulic E -

E g x Gravel Sand , Field Test ,- 0 z " Visual-Manual Identification and Description $ 5

$ a 5 . u s S U)

Z ~ Q Q ~ s e * (Densitylwnsistency. color. GROUP NAME, max. particle size", $ , E $ r , ~ , f $'! $ + j , , 0 % , , 3 cn '), c 5 gg = 5- o 8 v, v,o 2 ag," structure, odor, moisture, optional descriptions, geologic interpretation) s s s s = 2 S $

C ~ I - L L W

- 0 --300 000 0.0 - 0.3 SM NOTE: 8 in. concrete above start of boring at 0 ft. 60 40

NOTE: Borehole filled with bentonite chips upon completion.

0 Open End Rod

T Thin Wall Tube Rock Cored (lin. ft.)

Page 17: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00081

File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: August 31, 2005 Driller:

rn& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing

TY Pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Drilling Equipment and Procedures Sampler Barrel

G

1 314

Push - -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud:

Casing: Macrocore HoisUHammer: Hydraulic

NOTE: Borehole filled with bentonite chips upon completion.

H&A Rep.: C. Canfield - Elevation Datum Location N - E -

E g g g a , .- =

- - S k s giQ

Gravel

a,

8

Field Test '0

$ o 3 = =I 2 o z h z

NOTE: 8 in. concrete above start of boring at 0 ft.

", E, 0 z

g , 6 s

b: 5 s

Visual-Manual Identification and Description

2 q 5

- O J

- ss Q=

Sand

(Densitylwnsistency, wlor, GROUP NAME, max particle size**. structure, odor, moisture, optional descriptions. geologic interpretation)

6 s

I

)00.01 SM 0.0 - 0.3

a , E $ I $

s

a,

if s

Page 18: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

NOTE: Borehole filled with bentonite chips upon completion.

0 Open End Rod

T Thin Wall Tube

U Undisturbed Sample

TY pe

Inside Diameter (in.)

Hammer Weight (lb.;~

Hammer Fall (in.)

Boring No. DP00082

File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: August 31, 2005 Driller: H&A Rep.: C. Canfield

Elevation Datum Location N - E -

Casing

Gravel

6 s

Sampler -

G

1 314

Push

s

Sand

r . 2 ;i:

40

g q 5 -

CI)

=

- - 2 z 4 6

s

Barrel

-

Drilling Equipment and Procedures

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisffHammer: Hydraulic

- 0

Q

5 a

E

2

Field Test - 1 Visual-Manual Identification and Description -

gs QJ=

g a s

60

- 5 a SM ND

(Densitylconsistency. color, GROUP NAME, max. partide size*., structure. odor, moisture, optional descriptions, geologic interpretation) -

NOTE: 8 in. concrete above start of boring at 0 ft.

5 o

Xf3.01

5 L? n + a w

0.0 - 0.3

Page 19: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 20: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP86 I

Page 21: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00088

File No.: 32486 - Sheet No.: 1 of 1 Start: August 31, 2005 Finish: Aug~~t31 ,2005 Driller:

HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing Barrel

TY pe

Inside Diameter (in.)

Hammer Weight (Ib.;

Hammer Fall (in.)

Sampler

Gravel Sand Field Test Visual-Manual Identification and Description

6

- 0 I I

000 0.0 - 0.3 SM Dark brown, silty fine SAND, moist, no odor, no stain. 60 40

T Thin Wall Tube

U Undisturbed Sample

Drilling Equipment and Procedures

G

1 314

Push - -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic

H&A Rep.: C. Canfield

Elevation Datum Location N - E -

Page 22: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00089 I

Page 23: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT 1 Boring No. DP00090 I

Page 24: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00091

Page 25: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00093

Page 26: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00094

Page 27: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT 1 Boring No. DPOOOBS I

- --

Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

- .

Bit Type: Cutting Head Drill Mud:

Hammer Weight (Ib. Casing: Macrocore

Casing

Hammer Fall (in.) I 1 I - 1 ~oisu~arnmer: Hydraulic

File No.: 32486 - Sheet No.: 1 of 1 Start: September 2,2005 Finish: September 2, 2005 Driller: HBA Rep.: C. Canfield

Elevation Datum Location N - E -

G Rig Make & Model: GeoProbe

Sampler Barrel Drilling Equipment and Procedures

Page 28: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00096

File No.: 32486 - Sheet No.: 1 of 3 Start: September 1, 2005 Finish: September 1, 2005 Driller: %A Rep.: C. Canfield

HALEX& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TY Pe

Inside Diameter (in.)

Hammer Weight (Ib.;

Hammer Fall (in.)

Casing

1 314

Push

Sampler

G

- -

Barrel

- 6

- 9

-10 - I

0 Open End Rod Overburden (tin. ft.) T Thin Wall Tube

U Undisturbed Sample

S Split Spoon

Drilling Equipment and Procedures ---

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHammer: Hydraulic

E g F g

g .s' 0 = $

- Gravel

6 s

10

Elevation Datum Location N - E -

e s

20

20

2 5 V,

0 J

- 1

- 2

- 3

- 4

- 5 -

- 6

- 7

- g e 6

s

30

20

b s

5

Visual-Manual Identification and Description

5 - 2

(Densityhnsistency. color, GROUP NAME, max. pa.cIe size*., structure, odor, moisture, optional descriptions, geologic interpretation)

Medium dense, light brown to tan, poorly graded fine to coarse SAND with some gravel, moist, no odor, no stain.

Sam wi th lo percent pebbles.

000

m5

0 z & g * s s

L1

5 U)

Sand

a 5 2 (:

25

15

0.0 - 0.3

5,0 - 5.3

q

C L C

5 5 $ . $ 6 . $ $ %

if s

20

10

=

SP

SP

I

n Y a 5 B el

$ Z

Field In

P

"

Test

8 o r 2 5

* f 2 9

Page 29: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 30: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 31: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 32: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 33: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 34: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 35: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 36: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 37: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 38: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 39: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 40: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 41: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00103

Page 42: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 43: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00104

File No.: 32486 - Sheet No.: 1 of 2 Start: September 1, 2005 Finish: September 1, 2005 Driller:

rn& TEST BORING REPORT ALDRCH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing

Type

Inside Diameter (in.)

Hammer Weight (lb.;~

Hammer Fall (in.)

Sampler

Gravel Sand 0

Field Test h 6 z - 4= Visual-Manual Identification and Description "- g a 2- - g s Q QC 0

g p E E P - (Density/consistency. color. GROUP NAME, ma*. p a l d e size'..

, , , g 2 a - 0 ,

XX).OI 0.0 - 0.3 SM Medium dense, dark brown, silty fine SAND, moist, no odor, no 60 40 stain.

0 Open End Rod

T Thin Wall Tube

U Undisturbed Sample

G

1 314

Push

Barrel Drilling Equipment and Procedures

- -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistIHarnmer: Hydraulic

H&A Rep.: C. Canfield Elevation Datum Location N - E -

Page 44: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 45: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 46: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 47: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

HiUJiX& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

NOTE: Borehole filled with bentonite chips upon completion.

T Thin Wall Tube

U Undisturbed Sampl

Boring NO. DP00106

File No.: 32486 - Sheet No.: 1 of 1 Start: September 1, 2005 Finish: September 1 , 2005 Driller: H&A Rep.: C. Canfield Elevation Datum Location N - E -

Barrel

- -

Sampler

G

1 314

Push

TY pe

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Drilling Equipment and Procedures --

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoisffHammer: Hydraulic

Casing

ii

10

Gravel Sand

8 J:

20

a g m e g - is3

0) .-

2 E J:

10

Field Test -

- 0

$ . % e m s $ ! f J:

20

8 J:

20

a =

$ $

g SP

- ~ S Q

a

0 z

E n s

62

000

% g 2 J:

20

Visual-Manual Identification and Description

(Density1conYstency. caor, GROUP NAME, m a . partide sizett structure, odor, moisture, optional descriptions, geologic interpretation)

Gray to brown, poorly graded fine to coarse SAND with gravel, dry,

- PC

5 5 an

0.0 - 0.3

m

3 ak?L$65

r i s 9

Page 48: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 49: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 50: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00109

File No.: 32486 - Sheet No.: 1 of 2 start: September 1 , 2005 Finish: September 1, 2005 Driller:

HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Casing

Inside Diameter (in.)

Hammer Weight (Ib.:

Hammer Fall (in.)

Sampler

$ 5 2 Gravel Sand

0 Field Test " - z " &, % Visual-Manual Identification and Description

& % a , a , s E 2 9 Q QC z g UY

UY (Density/consistency. color, GROUP NAME, max. particle size", B p 0 v, g no gg ie2

= : - 0 structure, odor, moisture, optional descriptions, geologic interpretation)

- 0 -1 ND 000 0.0 - 0.3 SM Soft to medium stiff, dark brown, silty fine SAND, moist, no odor, 60 40

no stain.

**Redrilled 8-12 ft.

0 Open End Rod

T Thin Wall Tube

U Undisturbed Sample

G

1 314

Push

Barrel Drilling Equipment and Procedures

- -

Rig Make & Model: GeoProbe

Bit Type: Cutting Head Drill Mud: Casing: Macrocore HoistlHamrner: Hydraulic

H&A Rep.: C. Canfield Elevation Datum Location N - E -

Page 51: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 52: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 53: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 54: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 55: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00112

Page 56: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 57: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00113

Page 58: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 59: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 60: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 61: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 62: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TEST BORING REPORT Boring No. DP00115

Page 63: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 64: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 65: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 66: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 67: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 68: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 69: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase
Page 70: HAJXY& ALDRICH TEST BORING REPORT Boring...HAJXY& ALDRICH TEST BORING REPORT Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

Boring No. DP00118

File No.: 32486 - Sheet No.: 1 of 2 Start: September 2, 2005 Finish: September 2, 2005 Driller:

HALEY& TEST BORING REPORT ALDRICH Project: Former Anaheim Battery Operations 1201 N. Magnolia Client: Delphi Corporation Contractor: Interphase

TY pe G Rig Make & Model: GeoProbe H&A Rep.: C. Canfield

Inside Diameter (in.) 1 314 Bit Type: Cutting Head Elevation Drill Mud: Datum

Hammer Weight (Ib.: Push - Casing: Macrocore Location

Hammer Fall (in.) N - - HoistIHammer: Hydraulic E -

Gravel Sand Field Test 0 Visual-Manual Identification and Description

- 0 000 0.0 - 0.5 SP Loose, black stained, poorly graded, fine to medium SAND, strong 40 50 10

hydrocarbon odor.

Color grading to dark brown.

Slight oil stain, hydrocarbon odor.

T Thin Wall Tube

U Undisturbed Sample

Drilling Equipment and Procedures Casing Sampler Barrel