VietnamH 18 – Riverpark Residence Project referenceSteel sheet piling with strut systemFoundation contractor: OSP Vietnam
Project in BriefH 18 Riverpark ResidenceStarted: 30/10/2009Address: PHU MY HUNG Dist 7 HCMCScales: VND350 Billion, 16,747.5 m2 floor,
02 basements, Block A (13 storey), Block B (24 storey),Block C (16 storey) Total: 69,277.26 m2.
Package: Supply, Install of H 350 bracing systemClient: COTECCONSInvestor: Phu My Hung JVFoundation: OSP Vietnam Consultant: SFCCDuration: 22 months
OSP feasibility proposalH 18 Riverpark Residence
Plan view of project & excavation level
H 18 Riverpark Residence
5
H 18 Riverpark Residence
Install of bracing system @ -2.0m from 1st Nov – 11th Nov 2009
6
H 18 Riverpark Residence
Install of bracing system OT 22 kingpost at block B
7
H 18 Riverpark Residence
Completed strut work at Block A
8
H 18 Riverpark Residence
On-going conrete work at Block A
9
H 18 Riverpark Residence
Incident strut & knee due to careless connection weld
Detail
10
H 18 Riverpark Residence
Block B overview
11
H 18 Riverpark Residence
Completely install of bracing system on 18th Dec 2009