Section 16010 General conditions for electrical work Part I - General: 1-1 items covered: A - all electrical work shown on the drawings or that can be drawn, including 0 1-2 to ensure quality: A - general conditions contained in this section match is part of any and every section of the specifications, section (16) electrical work 0 B - contractor to make sure materials, devices, equipment and tools supplied by The installed under this contract, meet the code requirements and specifications, and will accept the card or a list of laboratories those specifications (ANDRE Raeters) to be identical to those requirements and instead of the existing card or provide proof of independent contractor CONSIDERED BY The engineer supervising the materials, devices and equipment conform to specifications known and include the testing methods used in the country of origin 0 C - as well as the requirements described or defined in the contract documents, all equipment should be manufactured and tested and installed according to the latest versions of the specifications listed below 0 1) SASO: Specification Authority Saudi Arabia 0 2) IEC: International Narcotics Alkahruffineh 0 3) the owner of Industry and Electricity, Saudi Arabia 0 4) SCECO: Saudi Electricity Company Consolidated 0 5) ASTM: American Society for Testing and materials 0 6) IPCEA: Association of Energy Engineers cables isolated 0 7) UL: laboratories guarantors (ANDRE Rider of Europe Aturiz) 0

Transcript of h-16010

Page 1: h-16010

Section 16010 General conditions for electrical work Part I - General: 1-1 items covered: A - all electrical work shown on the drawings or that can be drawn, including 0 1-2 to ensure quality: A - general conditions contained in this section match is part of any and every section of the specifications, section (16) electrical work 0 B - contractor to make sure materials, devices, equipment and tools supplied by The installed under this contract, meet the code requirements and specifications, and will accept the card or a list of laboratories those specifications (ANDRE Raeters) to be identical to those requirements and instead of the existing card or provide proof of independent contractor CONSIDERED BY The engineer supervising the materials, devices and equipment conform to specifications known and include the testing methods used in the country of origin 0 C - as well as the requirements described or defined in the contract documents, all equipment should be manufactured and tested and installed according to the latest versions of the specifications listed below 0 1) SASO: Specification Authority Saudi Arabia 0 2) IEC: International Narcotics Alkahruffineh 0 3) the owner of Industry and Electricity, Saudi Arabia 0 4) SCECO: Saudi Electricity Company Consolidated 0 5) ASTM: American Society for Testing and materials 0 6) IPCEA: Association of Energy Engineers cables isolated 0 7) UL: laboratories guarantors (ANDRE Rider of Europe Aturiz) 0 8) ANSI: American National Institute of Standards 0 9) LEEE: Institute of Electrical and Electronic Engineers 0        10) LES: General Engineering lighting 0        11) NFPA - 70: erratic electrical national (Nick) 0 12) ANSI-C2: National Electrical Safety System 0 13) NFBA: National Association for the prevention of fires 0 14) NFBA-78: prevention of unjust lightening 0 15) BS: British Specification 0 16) VDE: Association of German Electrical Engineers 0 And such other specifications contained recognized world-wide 0 D - regulations and specifications contained in the sections of the specifications are intended to provide an acceptable standard of quality

Page 2: h-16010

materials and products, the contractor may propose regulations and specifications provided that the alternative will be similar or better quality of regulations and specifications of reference, and to submit for consideration and adoption by the engineer supervising 0 E - include all the items of labour and materials required to match those levels of standard and regulations in conformity with the requirements of the contract documents, and will invoke the specifications and / or graphics in the case of whether the quantities and sizes and other requirements based on the drawings more than the record levels requirements and regulations are introduced, including the Specifications and / or graphics 0 And - the purpose of the drawings that show the electrical design general outline of the various items of equipment but the outline design of equipment and supplies, characteristics and showing the routes unless graphic shows and / or define its dimensions in particular 0 G - a year of installation of electrical circuits and equipment, as shown on the detailed drawings and proposed changes in accordance with realistic field conditions or other reasons submit to the engineer supervising the study, and the contractor to examine thoroughly all drawings and be responsible for proper installation of materials and equipment at the site, as indicated, without 0 substantial amendments, as the contractor careful examination of the conditions of construction and finishing affecting his work, and arrange the work accordingly, the supply of those fixtures supplies as necessary to meet those conditions 0 H - Energy rates engines and machinery W shown on the drawings are considered discretionary, and the contractor to confirm harmonized standards for nutrients and electrical equipment specific to serve, was to secure the engines and appliances with the greatest rates of years if necessary to meet the requirements of various sections in which they are made of specifications and whenever insurance Larger engines or equipment coming from rates and the largest, is similarly nutrients and electrical equipment are serviced by the increase in Energy nutrients and equipment without additional costs in return for the employer 0 1-3 offerings: A - Executive Graphics: Graphics contractor provides a detailed operational specific dimensions as provided for in other sections of Part 16 - electrical work, the engineer supervisor for examination and the contractor to prepare these drawings based on the instructions of installation production companies

Page 3: h-16010

should not be remnants or refurbished versions of the graphics design And take into account in the preparation of drawings that define the operational levels of business lines and renovated in the specifications, drawings and vet college to avoid overlap with features of construction work and other activities. Submission of materials: provide material for three different companies 0 give priority to materials and equipment that provide energy 0 graphics are operational and / or documents data The information contained in the specifications, as shown in the drawings, which are evident all information and data necessary for production and installation complete 0 B - the company producing publications: provide documentation of data available to the company producing illustrated Installation dimensions and weights and the necessary materials and information implementation, and includes full implementation of electrical data including conditions of energy, species and distinctive figures as available graphs necessary electrical, has given the above information through papers and catalogs and sales of standard distinctive mark indicating the type of equipment that had been submitted 0 C - operating and maintenance instructions: The contractor providing models, which covers data, species and serial numbers and capabilities, as well as maintenance and operation of each of the main equipment and appliances in accordance with the requirements of the contract documents, covering all phases of operating instructions control 0 D - Parts: The contractor as part of this decade sufficient quantity of spare parts for maintenance for two years after the handover of the project and also provides lists of parts required patches as recommendations maintenance company 0 1-4 handling and storage products: A - the contractor responsible for the conservation of materials and equipment stored in buildings in places clean and orderly manner 0 B - The contractor cleaning the exposed surfaces of the destruction of paths and networks of pipes or prevention equipment that might be covered in dirt and remnants Plastering or any other materials during handling and construction and before the preparation of such surfaces for the final finish, paint, or kept within the plant buildings 0 C - The contractor cleaning and maintenance work in accordance with the requirements of the contract 0 1-5 protection: A - preserves the contractor all channels of electric wires and tubes to the wire

Page 4: h-16010

by a protective seals or blankets to prevent the entry of foreign matter 0 covers all fixtures, equipment and devices as necessary B - the seals and covers species that prevent conversion of flood waters into any conduct or pipe or channel protecting wires, and any fixtures, equipment or devices inflict damage before final acceptance of the appropriation shall be returned to their original condition or replaced entirely by the contractor, and cleaned fixtures and equipment College upon completion of the work 0 C - The contractor responsible for all the damage that occur until all its acceptance of final 1-6 Coordination: A - The contractor responsible for the coordination of all phases of work under this contract 0 lies with the contractor responsible for coordinating the work and equipment as specified here and work to be performed and equipment to be provided by other sections of these specifications to ensure the installation of a full and patients. 1-7 quality equipment: The quality of the best level for each type or category, even though the quality may not be identified, in particular in the specifications, and are all materials and products, new products are well-known companies, and should be sound and uniform quality and size, shape, color and content, and be free of Althqqat and Warp And other defects. The equipment must be energy-consuming type, which provides energy wherever used such equipment. 1-8 interim energy: A - a contractor to supply and install all the electric utilities include temporary lamps for the construction and operation safety, and lost the equipment owned by the contractor and remain after the completion of the permanent wiring, and if found during the construction process that temporary facilities installed after overlap with other construction operations, the contractor may be Those facilities is transferred to an approved manner elsewhere, may not use any wires or bars or any distribution of electrical equipment are part of a network of electric permanently in temporary electrical services for construction and wiring be temporary safe and identical to the master accepted, the contractor responsible for any harm caused to equipment The result of those articles and inaccuracies in the protection of temporary installations, and are all costs of materials and fixtures for temporary electric utilities and energy necessary to operate the contractor died 0 B - provides Welders Electricians who work in the installation of an independent Taris, directly related to establishment, which is where it Aktar

Page 5: h-16010

Men welding pipes and tubes prevention neighbouring 000 etc. 0 1-9 paintings name of the company producing: Clarifies name of the company producing both an essential part of the equipment, as well as the address and number of models and rate, recorded at the plate installed in place of the provisions of the apparent eyewitness, does not accept the panel on behalf of the Under-distribution, as well as embossed rates regimes secretary or any other data engraved on the surface equipment, placed in Place to facilitate his vision 0 1-10 - Terms of Service site: All existing equipment be able to work abroad in ever lost the following conditions: 1 - elevation 600 m 2 2 - Weather: dirt, but saline In the case of application of these specifications in different climates due to the aforementioned standard specifications 0 3 - the prevailing maximum temperature: 46 C Joe dry 0 4 - temperature prevailing micro: zero degrees Celsius air dry 0 5 - maximum relative humidity: 45% 0 1-11 electric utilities: A - site energy supply 13800 volts 3 wins, 60 hertz +5% overlap into line with the company's supply room pressure is low. B - The contractor linking with the main lines of communication within the manner described on the site drawings 0 Part II - Products: 2-1 year: A - All goods and products covered by these specifications in the case offered to buy from one of the producing company in Saudi Arabia, while purchases of all goods and products from abroad must be adopted by the engineer supervising Fbl 0 B - with the exception of those items which are within the specifications of Part III of this section, refer to the second part of the various sections of the specifications of section 16, electrical 0 Part III - Implementation: 1-3 Factory: The installation of all materials, products and equipment supplied by the contractor, and all work will be implemented at the level of first class from the factory, according to the best of their assets, according to directives print production companies and the client and knowing that skilled workers equipped to achieve satisfactory results, in a safe and concrete opinions to

Page 6: h-16010

avoid unnecessary and Be stable enough to prevent unwanted dislocation so as not to overlap with that of other activities, including creating the appearance elegant and structured, and facilitate the operation and service and maintenance and repairs 0 3-2 excavation and filling: Were digging and filling in trenches for the installation of electrical services and networks tract and lower the protective tubes in the building, and delivery of electrical services in accordance with the lower external specifications 0 contractor must be asked to approve extensions in writing before the landfill 0 3-3 foundations and pillars: A - a contractor to supply the concrete pillars, rules and supporter and friezes and the masses of installation, nails and installation, tiles and concrete results and presentation of the commentary, and channels and incubators specifications in various sections of the specifications, section 16, electrical 0 B - be supporting the concrete at 150 mm, unless otherwise specified, and be complete iron and nails fixtures for 000 etc., in the case of a supporter of concrete directly on the concrete ground needed to connect Dsaer installed base of land and extend those supporting 100 mm, at least until after the borders Equipment on all four aspects 0 C - are provided Alamaalk individual, Amaalk Aturabiz (semi-deviant) and the existing fixtures to install protective tubes and wires are all spare parts and scrap metal plated zinc (Cilvenh). D - installing pipes and rods tapes commentary by inserts in the concrete nails or extension, and prove the templates blocks by nails and extension Brick construction Discharger by nails Arawi, are not used Charges wood and shields in Thiebaud sectors pipes and Alamaalk 0 E - do not use any routes and delivery pipes and mechanical equipment to support electric utilities 0 3-4 sleeves and Thelma and openings: A - be a pipe sleeves of all preventable electrical pipes pass through the barriers and walls and ceilings, floors, etc. 000 of sufficient length to extend through the full thickness of construction, with the late Mtsatha with Finishing on each side, unless otherwise indicated 0 B - works contractor Thelma and the necessary openings in walls and barriers and floors to accommodate its 0 C - Thelma and packaged sleeves and openings in walls and floors of fire resistance (in conference rooms telephone and electrical 000 etc.) and will serve the separation Sophie acceptable or metal barriers

Page 7: h-16010

D - if necessary to penetrate any work in the electric grid insulator against any leakage of water, this work carefully and lead after the network had a part in place during the separation, and the openings that are isolated against water leakage provisions 0 3-5 slash-and-promotion: A - provides the contractor Thelma and holes and openings for installation carefully created and then corrected and restore it, and in a way that makes another currency acceptable 0 B - the supply and installation of all the sleeves and inserts for that work and are cutting operations and Patching any part of the construction after examination by the engineer supervising 0 3-6 sheets of access: Ride the boards where access is clear and needed to reach the equipment and devices, whether boards are required to enter - from the viewpoint of the contractor - but not shown on the drawings for the contractor to submit their counterparts and convey the position of the drawings "By implementation" 0 3-7 paints: A - all products of the factory-installed equipment and Alcilvenh or painted or painted finish to set a record, will be cleaned and give the painting paint factory of lead-free basis, prior to delivery to the site, may not under any circumstances cover plate proud or card or the hallmark of any equipment Paints site 0 B - are finishing the outer surface of the paintings electricity distribution panels, cabs and a key focal chapter, transformers and similar gray applied the standard ANSI-16 The internal surfaces greasy white or light-colored 0 3-8 finalized: A - paint: Cleaning and painting are the basis for any painting materials already professionally different metal factory and destroyed or paint were not enough, as well as all surfaces that can reach the site of the welds and bolts of any delivery, and have painted the finishing touches on Substances that essential fatty painting factory and nails-Alcilvenh of the same paint used in Taliani core factory 0 B - Gulf (hero zinc): Almkhaddoucheh completely cleaned surfaces or otherwise damaged during the extradition process, discharge or installation, so Ptfrc region speculation wire brushing to remove the effects of broken and cracked and Almkhaddoucheh, then fat areas that have been cleared painted zinc rich

Page 8: h-16010

Almgelovn of zinc-organic compound composed of zinc dust and zinc oxide, The proportion of zinc content of the soil of 75% or more weight of the total content of non-volatile materials, fat painting of pretending finalized Almgelovn thin thickness of not less dry out after the 0.75 mm 0 3-9 tests: A - before the start of electrical installations should be the contractor that investigates the validity of voltages, stages and consumption trend of all-use equipment to be delivered, it must be all the wire services subsidiary and voltage, circuit sufficient in each case 0 B - the contractor's supply of any materials or equipment or employment of the crisis, and testing various specific sections within the specifications section (16), as deemed necessary for the implementation of these actions are properly 0 C - is knowing the contractor's expense and without any increase in contract prices repair any defects or Anagaed discovered as a result of those tests 0 operation, and be sure that all the equipment and machinery operated in accordance with the requirements contained in the contract documents, and conducted tests presence of the engineer supervising, and the contractor providing electrical power , Tools and workers needed to perform various tests 0 3-10 connections equipment and operation of motor starters: A - in addition to electrical work, the contractor implement all electrical wiring for mechanical equipment to be supplied under sections contained within section (15) and private affaires mechanical 0 B - unless stated otherwise in the specifications, the contractor install and align all Bwade operation and control devices and safety switches and other electrical equipment on both the specifications contained within this section or other sections specifications 0 Mia except those items that have been installed in the plant mobile equipment The installation and alignment engines and Bwade operation, and control equipment and other equipment in which nutrients closed keys to safety specifications as contained in later sections is covered under section (15) Special mechanical work containing the specifications for motor-000 engines, etc. 0-capable (5) Kilowatt or above must be provided with equipment Starr Delta Works 0 C - unless stated otherwise in the specifications, the contractor should be given all the supplies wire including protective tubes and wires and junction boxes, and the keys to separate the grain, and increased protection from Trend 000, etc., etc., which was not defined elsewhere in the specifications of those

Page 9: h-16010

specifications and the necessary To deliver to and between all the engines and Bwade operation and control devices and all related electrical equipment, whether received in this section specifications or specifications of other sections, with the exception of those items which were supplied and installed wire factory on mobile equipment, wires and all extensions of the points mentioned above endpoints to the Engine and Bwade operation and control equipment for equipment mentioned, are covered 0 D - are extensions of specifications for wiring equipment to control temperature within this section 0 E - unless stated otherwise in the specifications, are all extensions of Teslic engines and control devices and related electrical equipment within the protective metal pipes and strong connections with flexible where necessary, be protective of the wire tubes to absorb nutrients large engines, and Altaarb conductors, wires and control whether Or have not been identified on the drawings for the Decade, and the sizes of wires as indicated or as required by the international code IEC 0

3-11 installation of equipment: A - General: The installation of all electrical equipment or set up in accordance with the recommendations of the company's productive assets to good electrical engineering, drawings and specifications related B - disparities are allowed in places: Be developed within the limits of the equipment (3 mm) variation on the specific situation on the contract drawings, unless otherwise permitted by the engineer supervising 0 C - lubricants: The contractor providing the agenda and all lubricating oils and lubricants and other types of lubricants according to the manufacturer's recommendations, and approval of the engineer supervising 0 D - oil isolation: The contractor to provide oil separation equipment required for the isolated oil, and the contractor's test samples under the specifications of ASTM - D 877 to accept the insulation and electrical specifications under ASTM - D - 117 if there were other tests required by the engineer supervising 0 3-12 electrical connections installed with nails: A - General: 1) are full of cleaning aluminum surfaces where there are proven links with

Page 10: h-16010

nails with aluminum surfaces, and will be cleaning brushes wire, and then painting Bmrkp commas then SIDACTION well again on the boat, and then add another boat and install partitions with nails 2) are full of cleaning metal surfaces where there are proven links between the roofs of copper nails red and yellow, and then painting Bmrkp anti-corrosion 0 3) is to ensure that during the installation of equipment and delivery of the provisions of each nail installed in each link in the electric plant installed with nails 0 4) falls within the responsibility of the contractor to endorse the terms of each nail installed in all electrical connections installed with nails, or at the factory site in accordance with the recommendations of the company producing 0 5) are the provisions of the electrical connections installed with nails wrenches hand, and be built to link the keys to show vision or hearing determined the required provisions, and are investigating the accuracy of every key link through the testing laboratory acceptable by the engineer supervising, before direct use in equipment that is Installed under those specifications 0 B - criteria for the determination of provisions: -- If not contain instructions for the equipment manufacturer's recommendations on tightening standards intention of nails or did not specify an alternative method for wiring provisions tightening the criteria for the determination of tensile strength, according to those listed on the table entitled "criteria for the determination of Lhd nails dry-coated, non-greasing" C - make sure the provisions of nails links: 1) are checked nails court in random testing of electrical connections as determined engineer supervising the examination to be in his presence, and the contractor providing wrenches manual calibration and platforms necessary equipment and people needed to check indiscriminate 0 2) The number of nails that are being tested acceptable to the engineer supervising the basis of nails in each link, at a minimum nail in each link 0 3) The contractor responsible for coordinating the process of examining the provisions of nails so that there is only minimal overlap with the delivery and installation of equipment, the process of removing blankets or things like that mask equipment, including allowing the test engineer supervisor watching provisions nails covered links, part of the business covered Within those specifications 0 4) intended to examine the provisions of the electrical connections in the presence of the engineer supervising the contractor to help avoid the costs of repairing mistakes delivery charge, but will not exempt from this screening

Page 11: h-16010

contractor full responsibility for the integration of electrical connections 0 3-13 Palace Service studies and coordinate preventive devices: A - the contractor's responsibility to ensure the information given to the tender documents and special beans and vibration with the electricity company and confirm this in writing to the supervisor engineer 0 B - must protect all links and devices against excess current and severity depending on the current Elmar 0 protection equipment installed in places arrived organs and electric power connections 0 C - bringing the number (4) booklets, each of which includes studies on the palace and coordination with the coordination of preventive devices and curves of the current time the entire power distribution network 0 D - to study ways to limit the availability of appreciation and assumptions, the base case quantities chosen, and graphs with a single line, and data source Amaaogah include characteristics of the electricity grid and graphs of Amaaogah, estimates the typical, and scheduling estimates of quantities, results and conclusions and recommendations, calculated break Palace Service (number Thought) and duties Instantness about the alleged failure of the current three-stage, in line each group keys points and separation of high voltage, and at terminals high voltage unit conversion station, the line set keys points and chapter low voltage, and keyboards, and motor control center, distribution panels, boards Chambers Sub-related and other prominent places in all other parts of the network, is being studied malfunction Earth every medium voltage network and includes graphs related and private Bamaaogah sequence of zero, and included in the tables Amaaogah holidays, and rates from X to R, and asymmetry factors, the contribution of the engines , And the Palace Kilovolt Ampere, and similar trends holidays and asymmetric 0 E - to study the coordination of preventive services, provide curves log time chart showing the proposed coordination of the network, based on traditional forms of full-size, and included with every paper curve full title and a chart single line with the manual explains the specific part of the network covered by the paper curve in particular, And include a detailed description of each organ and identify preventive function and type, manufacturer and the characteristics of the current schedule, and scheduled the recommended intakes unloading devices, disk time, capture, and the circumstances of the immediate and delayed timetable 0 And - to include the papers curves relays the electricity company and the characteristics of the smelter, a high voltage transformer equipment and characteristics of the smelter, and characteristics of the vehicle for equipment

Page 12: h-16010

low voltage, and characteristics of the smelter, and organs Circuit and the release of their own generators, and characteristics of other preventive devices for carrying the network and include a set of shoulder and damage to properties within the smelter by 150 - 400 and 600% of current and ending curves characteristic of organs from the point of maximum reflect the current malfunction Analog subjected to body 0 G - select all primary and preventive apparatus required for each connection "DELTA - WYE" converter so that the advantages of frequencies or operated within the comprehensive qualities of the converter or containing a point equal to 58% of the points with ANSI to ensure prevention malfunction line - 0 In the case of a land where it was not the primary organ Properties within the converter shows curves transformer malfunction 0 separation device characteristics apparatus prevention statute Niño additional 16% to ensure consistency and adequate protection in case of breakdowns line - the line separating 0 characteristics curves of the high-voltage curves other organs reserve time for not less than (4) seconds 0 H - all included in the booklet features a full range of current timetable of individual protective equipment to assets transparent 0 I - may limit the preparation of studies and preventive services through the web or computer analysis to a number, or the computer in translation, but should include estimates of the faults as set out specifications for each group proposed energy source and final 0 J - charts showing the general requirements or specifications for electrical equipment provided under this contract, and may propose changes and additions on the characteristics of equipment through the results of the studies Palace coordinate preventive devices, and provide such changes and additions as part of the brochure study materials, and will be implemented field conditions necessary for organs , As well as minor changes and modifications of equipment so as to achieve compatibility with the Palace and the Chamber approved studies coordinate preventive devices, the company producing particular implementation or contractor without any additional cost to the employer 0 3-14 test equipment and processing of operation: A - General: Tests include all electrical equipment is not to be confined to the items listed below, in addition to conducting the tests specified within the specifications in paragraph 3-8 or elsewhere of those specifications must be electric installations in laboratories and facilities under the requirements of the

Page 13: h-16010

specifications Saudi Arabia 0 1) public scrutiny of equipment 0 2) make sure the site wiring and terrestrial network 0 3) tests isolate Mosul 0 4) control equipment 0 Is the contractor responsible for arrangements to provide energy required for the purposes of testing and experimental operation, and the process of testing an ongoing process kept pace with the timetable for construction to the satisfaction of the engineer supervising, who has the full right of entry to note all the tests, and should examine all terminals and connectors and accessories and all Insulation blankets, tools and seals, and supplies of scrap metal and supplies installed at the site in order to ensure the accuracy provisions 0 B - transformers installed at the base: Includes testing of transformers installed at the base include but are not limited to: 1) measured insulation resistance of the first stage of recycling and secondary to the ground is the first to the secondary 2) does not change the test to empty loads at each location to ensure proper operation under instructions employer 0 tests are being conducted Catalytic converters with revitalizing 0 3) must examine all rates smelter 0 4) examine the keys to oil and circuit breakers to ensure proper operation 0 5) must be tested oil 0 C - set points and chapter installed on base: Test series includes keys points and chapter erected on the base include but are not Limited to: 1) All the keys are being tested mechanically chapter in the development of an operational sure: A - health alignment 0 B - Health Works Mgalk Dovetailing 0 C - Health Works tools pin and Conquest mechanical 0 2) insulation resistance of each bar to the distribution of the process is being developed to Earth with a key chapter in the development of "open" 0 3) Examine all rates smelter 0 D - Cable: Test all the cables that were supplied and installed in accordance with these specifications applied to the Section (16050) and Section (16060) and Section

Page 14: h-16010

(290 16) 0 E - Altaarb: The process for testing and earthed equipment and cables include, but are not limited to: 1) tests are Altaarb continuity between each item of equipment and basic ground rules approved it, and on the basis of ground rods Altaarb 0 2) resistance rods Altaarb selected orbit: All measurements are resisting the Earth-Earth system ends a three-terminal type of "Major", which applies to AC Alambrordat which indicates the time of writing trend continued and used two of the sensors ground reference, and all the tests conducted in accordance with the instructions of the manufacturer of the equipment and conduct tests for resistance to the ground 0 3) Before delivering rods Altaarb terrestrial network should receive the contractor access to information about the resistance of the ground measured individually rods Altaarb selected, and such information is collected and classified and registered under the supervision of the engineer supervising and send the results to engineer supervisor within five days 0 After the delivery of the rods Altaarb Hassira Altaarb in each hole inspection, the contractor used for measurements of the Earth resistance plate Mtsatha with Earth, and that information be compiled and classified and registered, and send the results to engineer supervisor within five days The information shows that measures ground resistance rods Altaarb ground necessary and the contractor to supply, install and deliver additional bus bars as directed by the engineer supervising And - control operation: Puts the engineer supervising a system of control (control) for operating the equipment is permanent and updated devices capable of generating electric 0 The system consists of marking the occasion every item of equipment and every part of the network, to clarify the status of current patents and requires authorization from the persons concerned operator, and provide energy or remove from service the equipment, devices and switches to control the group include the following phases: 1 - updated equipment and devices to the extent that it can provide them with him from power or air pressure and operation, without having examined, is marking the source of energy or pressure determines the mark and steers do not function without the specific authorization parts 0 2 - after the initial operation of the equipment or apparatus, are set forth in labelling (1) and operating parts designated only by the persons concerned by

Page 15: h-16010

the engineer supervising 0 3 - and thus placed tags on equipment and appliances released, and only operated by persons appointed by the engineer supervising, or the ones removing from service, tend marks All of the keys to control sources of energy or pressure are not operating under any circumstance and is entitled only to persons who have placed labels on the devices that already after those devices from service 0 Puts the engineer supervising the procedures and details concerning the network operational control, be informed engineer supervising any notifications on the status of current applications and operating permits should follow those procedures established