Approved by FAO: L. Eadie Last Updated: Jul 13 2006 6:58AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003
STS-121/ULF1.1 FD 10 Execute Package
MSG Page(s) Title
089A --- FD10 Summary Timeline (pdf)
079A 1 - 11 FD10 Flight Plan Revision (pdf)
080 12 - 13 FD10 Mission Summary (pdf)
081 14 - 15 FD10 Transfer Message (pdf)
082 16 FD10 Water Summary (pdf)
085A 17 - 18 Prep WLES Laptops for Transfer Procedure Update (pdf)
086 19 - 23 Return Stowage Maps (pdf)
087 24 - 27 FES Troubleshooting Overview and Procedure (pdf)
088A 28 FD10 Stack Repress (pdf)
090 29 - 30 FD09 MMT Summary (pdf)
Page 1 of 1STS-121 FD 10 Execute Package
7/13/2006https://ops1.jsc.nasa.gov/apps/jedi/msg_status/gui_sts_grnd_xpkg.asp?ID=17&XID=160
07/12/06 19:33:34
FLT PLN/121/FLIGHT 2-34
LINDSEY
KELLY
FOSSUM
NOWAK
WILSON
SELLERS
FD10
Reiter
REPLANNED
STS-121
ISS
STS
07 08 09 10 11 12 13 14 15 16 17 18GMT 07/13/06 (194) 12 13 14 15 16 17 18 19 20 21 22 23 009/00
MET Day 008
CDR CNFG MPLM RACKSMEALEXERCISEPOST SLEEP MPLMCLNUPOFF DUTY OFF DUTYPFC
OCA
OFFDUTY
PLT POST SLEEP MEAL OFF DUTYOFF DUTY EXERCISE OFF DUTY PFCOCA
ILLUM
CWC
TRM14
CWC
INI14
OIU^
LDRI*
VID^
STACKRPRS
CAMR*
MS1 POST SLEEP PRESLEEP
760FLASHCAMRT/D
OFF DUTY MEALEXERCISE PFCOCA
OFF DUTYOFF DUTY
PAO
EVENT
GVNRCALL
OFFDUTY
MS2 POST SLEEP PRESLEEPMEALEXERCISEOFF DUTY OFF DUTY OFF DUTY PFC
OCA
PAO
EVENT
OFF DUTY
MS3 POST SLEEP MEAL CNFG MPLM RACKSEXERCISEOFF DUTY OFF DUTY OFF DUTYPFCOCA
MS4 PRESLEEPPOST SLEEP MEAL OFF DUTYEXERCISEOFF DUTY OFF DUTY PFC
OCA
PRNTRSWAP
A31PXFEROFF DUTY
ISS CDR POSTSLEEP
PREPWK
PREPDPC
DPC
H/O
H/OPAO PAOS/U
♣NOA1
C/OСОГСБПАMNT
СОГСБПАMNT
⊕ETD
TVIS MIDDAY-MEAL СОЖ IMS CUL CDRQUEST
СРВКБРПК MNT VELO + HC
TVIS*
Ф СВЦВMNT
EVEPREP WK
FE-1 POSTSLEEP
MORNPREPWK
PREPDPC
DPC
PAO PAOSSC4
W-MAP
TVIS RED H/O MIDDAY-MEAL
MELFIRACKSTRPINST
SMVIDEOS/U
CPA INST
DWNLD
PRNTRSWAP
♦AVU
EVEPREP WK
FE-2 POSTSLEEP
PREPWK
PREPDPC
DPC
NOA1
PAO PAOS/U
NOA1C/O ETD-EXE1_FE2 H/O MIDDAY-MEAL СОЖ IMS CPA INST
DWNLD
VELOEVEPREPWK
DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143
TDRSW -171E - 46Z -275
ORB ATT BIAS -XLV -ZVV
NOTES
♣NOA MEAS⊕БИТС-РАЗЪЕМ-ТМИ-CNCT ♦CSA/CP ^ACT*STATUS CK^CNFG
*DCS 760 T/D
*WKLY-MNT
2-34
LINDSEY
KELLY
FOSSUM
NOWAK
WILSON
SELLERS
FD10
Reiter
REPLANNED
STS-121
ISS
STS
07 08 09 10 11 12 13 14 15 16 17 18GMT 07/13/06 (194) 12 13 14 15 16 17 18 19 20 21 22 23 009/00
MET Day 008
CDR CNFG MPLM RACKSMEALEXERCISEPOST SLEEP MPLMCLNUPOFF DUTY OFF DUTYPFC
OCA
OFFDUTY
PLT POST SLEEP MEAL OFF DUTYOFF DUTY EXERCISE OFF DUTY PFCOCA
ILLUM
CWC
TRM14
CWC
INI14
OIU^
LDRI*
VID^
STACKRPRS
CAMR*
MS1 POST SLEEP PRESLEEP
760FLASHCAMRT/D
OFF DUTY MEALEXERCISE PFCOCA
OFF DUTYOFF DUTY
PAO
EVENT
GVNRCALL
OFFDUTY
MS2 POST SLEEP PRESLEEPMEALEXERCISEOFF DUTY OFF DUTY OFF DUTY PFC
OCA
PAO
EVENT
OFF DUTY
MS3 POST SLEEP MEAL CNFG MPLM RACKSEXERCISEOFF DUTY OFF DUTY OFF DUTYPFCOCA
MS4 PRESLEEPPOST SLEEP MEAL OFF DUTYEXERCISEOFF DUTY OFF DUTY PFC
OCA
PRNTRSWAP
A31PXFEROFF DUTY
ISS CDR POSTSLEEP
PREPWK
PREPDPC
DPC
H/O
H/OPAO PAOS/U
♣NOA1
C/OСОГСБПАMNT
СОГСБПАMNT
⊕ETD
TVIS MIDDAY-MEAL СОЖ IMS CUL CDRQUEST
СРВКБРПК MNT VELO + HC
TVIS*
Ф СВЦВMNT
EVEPREP WK
FE-1 POSTSLEEP
MORNPREPWK
PREPDPC
DPC
PAO PAOSSC4
W-MAP
TVIS RED H/O MIDDAY-MEAL
MELFIRACKSTRPINST
SMVIDEOS/U
CPA INST
DWNLD
PRNTRSWAP
♦AVU
EVEPREP WK
FE-2 POSTSLEEP
PREPWK
PREPDPC
DPC
NOA1
PAO PAOS/U
NOA1C/O ETD-EXE1_FE2 H/O MIDDAY-MEAL СОЖ IMS CPA INST
DWNLD
VELOEVEPREPWK
DAY/NIGHTORBIT 135 136 137 138 139 140 141 142 143
TDRSW -171E - 46Z -275
ORB ATT BIAS -XLV -ZVV
NOTES
♣NOA MEAS⊕БИТС-РАЗЪЕМ-ТМИ-CNCT ♦CSA/CP ^ACT*STATUS CK^CNFG
*DCS 760 T/D
*WKLY-MNT
07/12/06 19:33:34
FLT PLN/121/FLIGHT 2-36
FD10
LINDSEY
KELLY
FOSSUM
NOWAK
WILSON
SELLERS
Reiter
ISS EXTERNAL SURVEY
REPLANNED
STS-121
ISS
STS
19 20 21 22 23 07/14 01 02 03 04 05 06GMT 07/13/06 (194) 009/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 009
CDRCNFGMPLMRACKS
PRE SLEEP SLEEPPRESLEEP POST SLEEPPMC
A/G
PLT POST SLEEPDSO
SLEEPPRE SLEEP
ILLUM
MS1 POST SLEEPDSO
PRE SLEEP SLEEP
MS2 POST SLEEPPRE SLEEP SLEEP
MS3 POST SLEEPPRE SLEEP SLEEPCNFGMPLMRACKS
MS4 POST SLEEPDSO
PRE SLEEP SLEEP
ISS CDRDPC
EVEPREPWK
PRE SLEEP-ISS SLEEP POST SLEEP
FE-1DPC
EVEPREPWK
RENAL
PRE SLEEP-ISS SLEEP POST SLEEP
FE-2DPC
XFER
BRIEF
PRE SLEEP-ISS SLEEP POST SLEEP
DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151
TDRSW -171E - 46Z -275
ORB ATT BIAS -XLV -ZVV
NOTES
2-36
FD10
LINDSEY
KELLY
FOSSUM
NOWAK
WILSON
SELLERS
Reiter
ISS EXTERNAL SURVEY
REPLANNED
STS-121
ISS
STS
19 20 21 22 23 07/14 01 02 03 04 05 06GMT 07/13/06 (194) 009/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 009
CDRCNFGMPLMRACKS
PRE SLEEP SLEEPPRESLEEP POST SLEEPPMC
A/G
PLT POST SLEEPDSO
SLEEPPRE SLEEP
ILLUM
MS1 POST SLEEPDSO
PRE SLEEP SLEEP
MS2 POST SLEEPPRE SLEEP SLEEP
MS3 POST SLEEPPRE SLEEP SLEEPCNFGMPLMRACKS
MS4 POST SLEEPDSO
PRE SLEEP SLEEP
ISS CDRDPC
EVEPREPWK
PRE SLEEP-ISS SLEEP POST SLEEP
FE-1DPC
EVEPREPWK
RENAL
PRE SLEEP-ISS SLEEP POST SLEEP
FE-2DPC
XFER
BRIEF
PRE SLEEP-ISS SLEEP POST SLEEP
DAY/NIGHTORBIT 143 144 145 146 147 148 149 150 151
TDRSW -171E - 46Z -275
ORB ATT BIAS -XLV -ZVV
NOTES
MSG 079A - FD10 FLIGHT PLAN REVISION
END OF PAGE 1 OF 11, MSG 079A
1 MSG INDEX 2 3 MSG NO. TITLE 4 79 FD10 Flight Plan Revision 5 80 FD10 Mission Summary (13-0664) 6 81 FD10 Transfer Message (13-0665) 7 82 FD10 Water Summary 8 83 FD10 MSNBC-Fox News Event Summary Message 9 84 FD10 Governor Rick Perry VIP Call Event Summary Message 10 85 Prep WLES Laptops for Transfer Procedure Update 11 86 Return Stowage Maps 12 87 FES Troubleshooting Overview and Procedure 13 88 FD10 Stack Repress 14 89 FD10 Summary Timeline 15 90 FD09 MMT Summary (13-0669) 16 17 18 1. HAZMAT DATA FILE 19
20 The MCC has uplinked the latest HazMat data file to all networked PGSCs onboard. 21 Updates include materials for the Soyuz lamp and Orlan Gloves that were transferred. 22
23 2. PFC WORDS 24
25 For your Private Family Conferences scheduled for later today, please use the RPOP 26 PGSC. If you would rather use the KFX PGSC, just let us know before the event. The 27 ground has to change its configuration based on which PGSC you use onboard. A/G 2 28 will be used for the audio portion of the event. Your families will be located in the 29 Quarantine Facility. 30 31
3. WORDS FOR FUTURE EMU/EVA TOOLS TRANSFERS 32 33
Outstanding job on all three spectacular EVAs. You are always ahead of the timeline 34 which allows you to get additional tasks done, bravo! You have a much deserved day 35 off to enjoy being on-orbit. We are working on minor deltas to transfer and stowage 36 plans for EMU and EVA tool hardware which you can expect in your FD11 Exec Pkg. 37 38 39
4. REPLACE PAGES 3-102 THROUGH 3-111. 40 41 42 43 44 45 46 47 48 49 50
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-102
09
LINDSEY KELLY NOWAK
~
ISSEXTERNALSURVEY
REPLANNEDSTS-121/ULF 1.1 (FD )
03:00
04:00
05:00
06:00
GMT
Date07/13(194)
08:00
09:00
10:00
11:00
12:00
MET
Day 008W E Z
TDRS
~
~
~
ORB
133
134
135
ORB ATT~
~
BIAS -XLV -ZVV
CDR
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
PLT
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS2
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MCC NOTES
3-102
09
LINDSEY KELLY NOWAK
~
ISSEXTERNALSURVEY
REPLANNEDSTS-121/ULF 1.1 (FD )
03:00
04:00
05:00
06:00
GMT
Date07/13(194)
08:00
09:00
10:00
11:00
12:00
MET
Day 008W E Z
TDRS
ORB
133
134
135
ORB ATT~
~
BIAS -XLV -ZVV
CDR
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
PLT
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS2
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MCC NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-103
09
FOSSUM WILSON SELLERS
REPLANNED
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
DSO 493 SALIVA CLCT (ORB OPS, DSOs)
STS-121/ULF 1.1 (FD )
03:00
04:00
05:00
06:00
GMT
Date07/13(194)
08:00
09:00
10:00
11:00
12:00
MET
Day 008W E Z
TDRS
~ ~
~
ORB
133
134
135
ORB ATT~
~
BIAS -XLV -ZVV
MS1
EVA CREW: TAKE 1 ASPIRIN (325mg) DSO 493 SALIVA CLCT (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS3
DSO 493 SALIVA CLCT (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS4
EVA CREW: TAKE 1 ASPIRIN (325mg)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
NOTES
3-103
09
FOSSUM WILSON SELLERS
REPLANNED
DSO 634 FLT SLP LOG (ORB OPS, DSOs)
DSO 493 SALIVA CLCT (ORB OPS, DSOs)
STS-121/ULF 1.1 (FD )
03:00
04:00
05:00
06:00
GMT
Date07/13(194)
08:00
09:00
10:00
11:00
12:00
MET
Day 008W E Z
TDRS
ORB
133
134
135
ORB ATT~
~
BIAS -XLV -ZVV
MS1
EVA CREW: TAKE 1 ASPIRIN (325mg) DSO 493 SALIVA CLCT (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS3
DSO 493 SALIVA CLCT (ORB OPS, DSOs)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS4
EVA CREW: TAKE 1 ASPIRIN (325mg)
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-104
10
LINDSEY KELLY NOWAK
FD10 EZ ACTIVITIESHARD REBOOT PGSCs (NOT WLES,RPOP2)TEPC (STATUS CK) (ORB OPS, CREW SYS)OCAC FILTER INSPECT L17 Check MCIU Filter Screen
REPLANNEDSTS-121/ULF 1.1 (FD )
07:00
08:00
09:00
10:00
GMT
Date07/13(194)
12:00
13:00
14:00
15:00
16:00
MET
Day 008W E Z
TDRS
~
~
~
ORB
135
136
137
138
ORB ATT~
~
BIAS -XLV -ZVV
CDR
EXERCISE
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
PLT
R14 ALL PLB CAM ILLUM - OFF
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS2
EXERCISE
~
OFF DUTY
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MCC NOTES
3-104
10
LINDSEY KELLY NOWAK
FD10 EZ ACTIVITIESHARD REBOOT PGSCs (NOT WLES,RPOP2)TEPC (STATUS CK) (ORB OPS, CREW SYS)OCAC FILTER INSPECT L17 Check MCIU Filter Screen
REPLANNEDSTS-121/ULF 1.1 (FD )
07:00
08:00
09:00
10:00
GMT
Date07/13(194)
12:00
13:00
14:00
15:00
16:00
MET
Day 008W E Z
TDRS
ORB
135
136
137
138
ORB ATT~
~
BIAS -XLV -ZVV
CDR
EXERCISE
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
PLT
R14 ALL PLB CAM ILLUM - OFF
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS2
EXERCISE
~
OFF DUTY
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MCC NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-105
10
FOSSUM WILSON SELLERS
REPLANNEDSTS-121/ULF 1.1 (FD )
07:00
08:00
09:00
10:00
GMT
Date07/13(194)
12:00
13:00
14:00
15:00
16:00
MET
Day 008W E Z
TDRS
~ ~
~
ORB
135
136
137
138
ORB ATT~
~
BIAS -XLV -ZVV
MS1
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS3
EXERCISE
~
OFF DUTY
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS4
EXERCISE
OFF DUTY
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
NOTES
3-105
10
FOSSUM WILSON SELLERS
REPLANNEDSTS-121/ULF 1.1 (FD )
07:00
08:00
09:00
10:00
GMT
Date07/13(194)
12:00
13:00
14:00
15:00
16:00
MET
Day 008W E Z
TDRS
ORB
135
136
137
138
ORB ATT~
~
BIAS -XLV -ZVV
MS1
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS3
EXERCISE
~
OFF DUTY
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS4
EXERCISE
OFF DUTY
OFF DUTY
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-106
10
LINDSEY KELLY NOWAK
REPLANNEDSTS-121/ULF 1.1 (FD )
11:00
12:00
13:00
14:00
GMT
Date07/13(194)
16:00
17:00
18:00
19:00
20:00
MET
Day 008W E Z
TDRS
~
~ ~
~
ORB
138
139
140
ORB ATT~
~
BIAS -XLV -ZVV
CDR
MEAL
OFF DUTY
~
OFF DUTY
OFF DUTY
~
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PLT
EXERCISE
MEAL
OFF DUTY
~
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
MS2
EXERCISE
~
MEAL
OFF DUTY
OFF DUTY
~
MCC NOTES
OCA-PFC
OCA-PFC
3-106
10
LINDSEY KELLY NOWAK
REPLANNEDSTS-121/ULF 1.1 (FD )
11:00
12:00
13:00
14:00
GMT
Date07/13(194)
16:00
17:00
18:00
19:00
20:00
MET
Day 008W E Z
TDRS
ORB
138
139
140
ORB ATT~
~
BIAS -XLV -ZVV
CDR
MEAL
OFF DUTY
~
OFF DUTY
OFF DUTY
~
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PLT
EXERCISE
MEAL
OFF DUTY
~
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
MS2
EXERCISE
~
MEAL
OFF DUTY
OFF DUTY
~
MCC NOTES
OCA-PFC
OCA-PFC
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-107
10
FOSSUM WILSON SELLERS
REPLANNED
OCA-PFC
OCA-PFC
STS-121/ULF 1.1 (FD )
11:00
12:00
13:00
14:00
GMT
Date07/13(194)
16:00
17:00
18:00
19:00
20:00
MET
Day 008W E Z
TDRS
~
~
~
~
ORB
138
139
140
ORB ATT~
~
BIAS -XLV -ZVV
MS1
EXERCISE
MEAL
OFF DUTY~
OFF DUTY
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference~
MS3
EXERCISE~
MEAL
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
MS4
MEAL
OFF DUTY
~
OFF DUTY
~
NOTES
3-107
10
FOSSUM WILSON SELLERS
REPLANNED
OCA-PFC
OCA-PFC
STS-121/ULF 1.1 (FD )
11:00
12:00
13:00
14:00
GMT
Date07/13(194)
16:00
17:00
18:00
19:00
20:00
MET
Day 008W E Z
TDRS
ORB
138
139
140
ORB ATT~
~
BIAS -XLV -ZVV
MS1
EXERCISE
MEAL
OFF DUTY~
OFF DUTY
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference~
MS3
EXERCISE~
MEAL
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
MS4
MEAL
OFF DUTY
~
OFF DUTY
~
NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-108
10
LINDSEY KELLY NOWAK
REPLANNED
760 EVA-CAMR ONLY DISASSY (PHOTO/TV, DCS 760 EVA CAMR) Perform POST-EVA
SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report B/C and S/N to MCC
A L10 MUX/VTR/C PWR - OFF (LED off) VTR/CC PWR - OFF (LED off) VIP PWR - OFF (LED off)
R14 ALL PLB CAM ILLUM - ONVIDEO CONFG A
STS-121/ULF 1.1 (FD )
15:00
16:00
17:00
18:00
GMT
Date07/13(194)
20:00
21:00
22:00
23:00
00:00
MET
Day 008W E Z
TDRS
~ ~
~
ORB
141
142
143
ORB ATT~
~
BIAS -XLV -ZVV
CDR
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
MPLM CLEANUP Ref. MPLM RTN TL items: 775-778
OFF DUTY
~
PLT
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) INIT #14 Ref. MSG 082
R12(VPU) GREEN JMPR-LDRI/ITVCR12(OBSS) ITVC ENA - ON
OFF DUTY
~
SSP1 OIU PWR - OIU 1 ON (tb-UP)
STACK REPRESS Ref. MSG 088
~
MS2
OFF DUTY
~
OFF DUTY
PUBLIC AFFAIRS EVENT ISS KU AVAIL: 22:44-23:10 Ref: MSG 083
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MCC NOTES
OCA-PFC
3-108
10
LINDSEY KELLY NOWAK
REPLANNED
760 EVA-CAMR ONLY DISASSY (PHOTO/TV, DCS 760 EVA CAMR) Perform POST-EVA
SHUTTLE/ISS H2O CONT FILL (ORB OPS, ECLS) TERM Report B/C and S/N to MCC
A L10 MUX/VTR/C PWR - OFF (LED off) VTR/CC PWR - OFF (LED off) VIP PWR - OFF (LED off)
R14 ALL PLB CAM ILLUM - ONVIDEO CONFG A
STS-121/ULF 1.1 (FD )
15:00
16:00
17:00
18:00
GMT
Date07/13(194)
20:00
21:00
22:00
23:00
00:00
MET
Day 008W E Z
TDRS
ORB
141
142
143
ORB ATT~
~
BIAS -XLV -ZVV
CDR
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
MPLM CLEANUP Ref. MPLM RTN TL items: 775-778
OFF DUTY
~
PLT
SHUTTLE/ISS H2O CNTR FILL (ORB OPS, ECLS) INIT #14 Ref. MSG 082
R12(VPU) GREEN JMPR-LDRI/ITVCR12(OBSS) ITVC ENA - ON
OFF DUTY
~
SSP1 OIU PWR - OIU 1 ON (tb-UP)
STACK REPRESS Ref. MSG 088
~
MS2
OFF DUTY
~
OFF DUTY
PUBLIC AFFAIRS EVENT ISS KU AVAIL: 22:44-23:10 Ref: MSG 083
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MCC NOTES
OCA-PFC
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-109
10
FOSSUM WILSON SELLERS
REPLANNED
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference OCA-PFC
OCA-PFC
STS-121/ULF 1.1 (FD )
15:00
16:00
17:00
18:00
GMT
Date07/13(194)
20:00
21:00
22:00
23:00
00:00
MET
Day 008W E Z
TDRS
~
~
~
ORB
141
142
143
ORB ATT~
~
BIAS -XLV -ZVV
MS1
760 EVA-CAMR W/FLASH DISASSY (PHOTO/TV, DCS 760 EVA CAMR) Perform POST-EVA
GOVERNOR'S CALL (PAO EVENT)KU AVAIL: 22:12 - 22:37, TDRZRef. MSG 084
OFF DUTY
PUBLIC AFFAIRS EVENT ISS KU AVAIL: 22:44-23:10 Ref: MSG 083
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS3
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
OFF DUTY
~
MS4
PREP WLES LAPTOPS FOR XFER Ref. MDDK TL items: 6 & 7 Ref. MSG 085
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
ISS & STS PRINTER EXCHANGE (ASSY OPS, TRANSFER)Steps B,C,D Ref. MDDK TL, Swap Tab items: 54,709
NOTES
3-109
10
FOSSUM WILSON SELLERS
REPLANNED
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference OCA-PFC
OCA-PFC
STS-121/ULF 1.1 (FD )
15:00
16:00
17:00
18:00
GMT
Date07/13(194)
20:00
21:00
22:00
23:00
00:00
MET
Day 008W E Z
TDRS
ORB
141
142
143
ORB ATT~
~
BIAS -XLV -ZVV
MS1
760 EVA-CAMR W/FLASH DISASSY (PHOTO/TV, DCS 760 EVA CAMR) Perform POST-EVA
GOVERNOR'S CALL (PAO EVENT)KU AVAIL: 22:12 - 22:37, TDRZRef. MSG 084
OFF DUTY
PUBLIC AFFAIRS EVENT ISS KU AVAIL: 22:44-23:10 Ref: MSG 083
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
MS3
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
OFF DUTY
~
MS4
PREP WLES LAPTOPS FOR XFER Ref. MDDK TL items: 6 & 7 Ref. MSG 085
OFF DUTY
~
OFF DUTY
NETMEETING VIDEO CONF (ORB OPS, PGSC) Private Family Conference
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
ISS & STS PRINTER EXCHANGE (ASSY OPS, TRANSFER)Steps B,C,D Ref. MDDK TL, Swap Tab items: 54,709
NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-110
10
LINDSEY KELLY NOWAK
TFL 199
√ HUM SEP FOR H20 ACCUMULATION
WAKEUP @ MET 9/10:30
~
ISSEXTERNALSURVEY
REPLANNEDSTS-121/ULF 1.1 (FD )
19:00
20:00
21:00
22:00
GMT
Date07/13(194)
00:00
01:00
02:00
03:00
04:00
MET
Day 009W E Z
TDRS
~ ~
~
ORB
143
144
145
146
ORB ATT~
~
BIAS -XLV -ZVV
CDR
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
06 √UHF MODE - OFF PRIVATE MEDICAL CONFERENCE
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
PLT
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
STACK REPRESS Ref. MSG 088
~
MS2
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MCC NOTES
3-110
10
LINDSEY KELLY NOWAK
TFL 199
√ HUM SEP FOR H20 ACCUMULATION
WAKEUP @ MET 9/10:30
~
ISSEXTERNALSURVEY
REPLANNEDSTS-121/ULF 1.1 (FD )
19:00
20:00
21:00
22:00
GMT
Date07/13(194)
00:00
01:00
02:00
03:00
04:00
MET
Day 009W E Z
TDRS
ORB
143
144
145
146
ORB ATT~
~
BIAS -XLV -ZVV
CDR
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
06 √UHF MODE - OFF PRIVATE MEDICAL CONFERENCE
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
PLT
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
STACK REPRESS Ref. MSG 088
~
MS2
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MCC NOTES
07/12/06 21:16:05
FLT PLN/121/FLIGHT 3-111
10
FOSSUM WILSON SELLERS
WAKEUP @ MET 9/10:30
REPLANNEDSTS-121/ULF 1.1 (FD )
19:00
20:00
21:00
22:00
GMT
Date07/13(194)
00:00
01:00
02:00
03:00
04:00
MET
Day 009W E Z
TDRS
~
~
~
ORB
143
144
145
146
ORB ATT~
~
BIAS -XLV -ZVV
MS1
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS3
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
MS4
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
NOTES
3-111
10
FOSSUM WILSON SELLERS
WAKEUP @ MET 9/10:30
REPLANNEDSTS-121/ULF 1.1 (FD )
19:00
20:00
21:00
22:00
GMT
Date07/13(194)
00:00
01:00
02:00
03:00
04:00
MET
Day 009W E Z
TDRS
ORB
143
144
145
146
ORB ATT~
~
BIAS -XLV -ZVV
MS1
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
MS3
S&M: 1.251 ISIS DRAWER RMVL/INSTL Steps 3.2-3.4 for drawers in MPL1A3_C1,MPL1A3_D1,MPL1A3_D2
S&M: 1.260 CONFIG MPLM RACKSFOR ENTRY
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
SLEEP
~
MS4
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYS)
~
SLEEP
~
NOTES
MSG 080 (13-0664) - FD10 MISSION SUMMARY Page 1 of 2
Page 1 of 2, MSG 080 (13-0664)
Good morning, Discovery. 1 2 Since today is an off-duty day for you, the planning shift team has come up with a few ideas* 3 to help you pass the time; 4
1) Who can toss the laptop the furthest down the station before it bounces off the 5 wall (of course, we would appreciate it if you use Station assets for this one). 6
2) Arm wrestling: Big arm vs. little arm, David and Goliath II, the battle begins. 7 3) Boom toss – toss the boom between arms (just don’t tell the Canadians if you 8
lose it) 9 4) Take all the CWCs into the Crew Lock, close the hatch, empty the CWCs and go 10
for a swim (PBAs might be needed). 11 5) Lawn darts (if you need a target, remember that’s an Aggie compatible task) 12 6) Marco polo (the whole fish-out-of water thing would need to be tweaked though) 13 7) We could up-link a few appropriate computer games for you if you like – 14
Asteroids, Space Invaders, or Star Wars’ Wing Commander. 15 16 And last but not least, here’s a haiku from our GC, 17
Day of Freedom Launch 18 Leonardo and Spacewalks 19 Crew now Chillaxin’ 20
21 Enjoy your day off, it’s well deserved. 22 23 *None of these ideas have been approved by the MMT 24 25 YOUR CURRENT ORBIT IS: 191 X 177 NM 26 27 NOTAMS: 28 29 ORMOND BEACH (KOMN) – TAC (OMN CH 73) AZIMUTH OUT OF SERVICE UFN 30 LAJES – TACAN 45X OUT OF SERVICE TIL 8 SEP 31 KING KHALID - VORTAC CH 92X OPERATIONAL BUT CAUTION ADVISED DUE TO NO 32 MONITORING 33 GUAM (GUA) – RWY 06L/24R CLOSED UNTIL 31 JULY 34 AMBERLEY (AMB) – CLOSED 35 RIO GALLEGOS (AWG) - NOT APPROVED 36 ISTRES (FMI) – 33 RWY REMAINING MARKERS AVAIL ARE 300,600,900M 37 38 NEXT 2 PLS OPPORTUNITIES: 39 40 EDW22 ORB 142 – 8/22:18 (FEW100 240@5P10) 41 EDW22 ORB 157 – 9/21:06 (FEW060 FEW150 230@5P10) 42 43 OMS TANK FAIL CAPABILITY: 44 45 L OMS FAILS: NO 46 R OMS FAILS: NO 47 48 LEAKING OMS PRPLT BURN: 49 50 L OMS LEAK: ALWAYS BURN RETROGRADE 51 R OMS LEAK: ALWAYS BURN RETROGRADE 52
MSG 080 (13-0664) - FD10 MISSION SUMMARY Page 2 of 2
Page 2 of 2, MSG 080 (13-0664)
1 OMS QUANTITIES (%) 2 3 L OMS OX = 34.6 R OMS OX = 37.2 4 FU = 35.1 FU = 37.9 5 6 SUBTRACT I’CNCT COUNTER FOR CURRENT OMS QUANTITIES 7 8 DELTA V AVAILABLE: 9 10 OMS 336 FPS 11 ARCS (TOTAL ABOVE QTY1) 24 FPS 12 TOTAL IN THE AFT 360 FPS 13 14 ARCS (TOTAL ABOVE QTY2) 54 FPS 15 FRCS (ABOVE QTY 1) 33 FPS 16 17 AFT QTY 1 84 % 18 AFT QTY 2 46 % 19 20 SYSTEM FAILURE IMPACT WORK AROUND
APU 1 Pressure decay in APU 1 fuel tank that is not associated with temperature changes.
N2 or Hydrazine leak at a decay rate of ~3 psi/day.
None. Current margins support all entry operations. Tank pressures can be monitored via SPEC 86: APU FUEL TK P 1 and APU FUEL OUT P 1.
APU 3 APU HTR GAS GEN/FUEL PUMP 3 loss of primary thermostat control on both A and B heater strings.
Overtemp thermostat controlling temps on APU 3 fuel pump and gas generator valve module.
None. Elevated temps can be seen on the following: SPEC 86 PUMP/VLV PMP T 3 PUMP/VLV VLV T 3 SPEC 88 APU FUEL T PUMP OUT 3, PUMP BYP LN 3, and GG SPLY LN 3.
WLES While downlinking raw window from Port Unit 1021, WLES software locked up on prime laptop
Temporarily unable to command to and receive data from the WLES sensors as backup WLES laptop was also unusable (LRU inadvertently disconnected)
Recovered after LRU was re-installed on backup, both laptops were rebooted and WLES software restarted.
21 22 23
MSG 081 (13-0665) - FD10 TRANSFER MESSAGE Page 1 of 2
Page 1 of 2, MSG 081 (13-0665)
1 Good morning Thomas, Stephanie, and Steve, 2 3 Thanks for your work with the new return items yesterday. 4 5 Information for crew: 6 No new transfer items today! We are still working on adding the UCB s/n 1089 to return in 7 the middeck. 8 9 Stephanie, for the Mddk Transfer List, we’ve uplinked the remaining pages that contain 10 items that have been already called down. There are also a few pages with additional 11 changes to replace in this book. We will send up Return Sort pages for this book on FD11. 12 Hope we got it right this time! 13 14 Thomas, for the MPLM Transfer List Books, we only uplinked Return Sort pages. These are 15 for your reference when verifying rack contents during MPLM Config for Entry. We had no 16 other change pages for these books. We did not uplink any more pages for these books 17 that only reflect calldowns. Please let us know if you’d like us to send you anything else. 18 19 Stephanie, regarding the information you are receiving in MMT Summaries about transfer – 20 the MMT report’s “preliminary estimates from FD9” are actually our analysis from the FD8 21 calldown because our XFR BRIEFs have been occurring after the inputs for daily MMT 22 Summaries are due. This results in the transfer information being a day old by the time it 23 gets to you. 24 25 The information we reported based on the FD8 calldown is as follows: 26
FD8 MPLM Transfer Status - 90% of total MPLM Transfers are complete (93% of MPLM 27 Resupply and 89% of MPLM Return). 28 29 FD8 Middeck Transfer Status – 80% of total Middeck Transfers are complete (75% of 30 Middeck Resupply and 86% of Middeck Return). 31
32 The information we reported based on the FD9 calldown is as follows: 33
FD9 MPLM Transfer Status - 96% of total MPLM Transfers are complete (96% of MPLM 34 Resupply and 96% of MPLM Return). 35 36 FD9 Middeck Transfer Status – 80% of total Middeck Transfers are complete (75% of 37 Middeck Resupply and 86% of Middeck Return). 38
39 FD10 Choreography 40 – Pack used EVA LiOHs (CCCs) 41 – Install ZSR on front of P3 RSR. 42 – Install ZSR on front of S2 RSR 43 – Configure MPLM racks and verify rack contents. 44 – MPLM Cleanup (return bungees, seat track studs, CTB with pivot pins to ISS) 45 – Transfer/swap/configure STS and ISS printers 46 47 The Transfer List Excel file, FD10_TransferList_STS121.xls, is located on the KFX machine 48 in C:\OCA-up\transfer. 49 50 (continued on next page) 51
MSG 081 (13-0665) - FD10 TRANSFER MESSAGE Page 2 of 2
Page 2 of 2, MSG 081 (13-0665)
1 For ISS, the Transfer List Excel file, FD10_TransferList_STS121.xls, is located in K:\OCA-2 up\transfer. 3 4 Please incorporate uplink pages as follows (call us with any questions): 5 6 In the MDDK Transfer List Book 7 RESUPPLY tab, Replace the following pages: 8
Page Resupply 1 9 Page Resupply 6 10
MDDK RSPLY REALTIME ADDITIONS tab, Replace Page Resupply 9 11 RETURN tab, Replace the following pages: 12
Page Return 1 13 Page Return 4 14 Page Return 7 15
MDDK RTN REALTIME ADDITIONS tab, Replace Page Return 8 16 17 In the MPLM Return Transfer List Book 18 RETURN SORT tab 19 Remove all pages and insert the following pages: 20
Page Rtn Loc 5 - Page Rtn Loc 19 21 22 -The Transfer Team- 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
MSG082 - FD10 Water Summary
1 2 3 4 5
Today there will be 1 CWC fill. The Shuttle/ISS H2O Container Fill initiation scheduled for PLT at MET 8/22:20 should contain the following details:
6 SHUTTLE/ISS H2O CONT FILL INIT #14 (ORB OPS, ECLS) 7
8 Ag Biocide is req'd. Sample is not req'd. 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
Fill Duration: ~50 minutes Report Serial Number and Barcode to MCC. After fill is complete, transfer the CWC to the water wall (NOD1P2) at MET 09/15:55 per the flight plan. If there is insufficient room for the bag at this ISS location, store CWC on the FGB Floor and report to MCC.
END OF PAGE 1 OF 1, MSG 082
MSG 085A - PREP WLES LAPTOPS FOR TRANSFER PROCEDURE UPDATE
END OF PAGE 1 OF 2, MSG 085A
1 1. DEACTIVATE WLE SENSORS LAPTOP(S) 2 A31p ‘Enhanced Wideband MicroTAU – WLEFlight 2.2’ 3 4
For each WLES A31p in use: 5 Click ‘Exit’ 6 At prompt ‘Are you sure you want to exit?’ 7 click ‘Yes’ 8
Click ‘Start’>‘Shutdown’ 9 Disconnect Laptop Receiver Unit from A31p Serial port 10 Remove Laptop Receiver Unit from Velcro on A31p 11
12 2. CONNECT LRU TO ‘NEW’ PRIME WLES LAPTOP 13 STS8 Click ‘Start’>‘Shutdown’ 14
Connect LRU to A31p Serial port 15 Secure LRU to A31p with Velcro 16 17
3. CONNECT LRU TO ‘NEW’ BACKUP WLES LAPTOP 18 STS5 Click ‘Start’>‘Shutdown’ 19
Connect LRU to A31p Serial port 20 Secure LRU to A31p with Velcro 21
22 4. LAUNCH WLE SOFTWARE 23
Perform for both laptops: 24 A31p pwr – On 25 Select clock from system tray 26 Verify time is set to GMT (Casablanca, Monrovia), adjust if necessary 27 Click ‘OK’ 28 Double click ‘Shuttle Apps’>‘EWBMTAU-WLEFlight’ 29
30 ‘Backup Mode Selection’ 31 For prime laptop, select ‘Primary’ 32 For backup laptop, select ‘Secondary’ 33
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
Cont next page 50 FS 1-1 51
MSG 085A - PREP WLES LAPTOPS FOR TRANSFER PROCEDURE UPDATE
END OF PAGE 2 OF 2, MSG 085A
1 5. VERIFY COMM WITH RELAY UNITS 2
Use prime WLES laptop 3 4 ‘Main’ 5 Click ‘Unit List’ (left side of display) 6
√Cabin Relay Units Unit ID 1664 and 1728 (2) present on display in first 7 column; scroll down as necessary 8
For each Cabin Relay Unit: 9 √Unit ID present 10 √Type: ‘Relay-GL’ 11 √Last Update: time is updating 12 √Via: ‘RF’ 13 √Mode: ‘Idle’ 14
15 NOTE
‘Last Update’ times nominally update every 5 to 15 sec
16 If no time updates after 2 min, contact MCC-H 17
18 6. ENABLE DATA FILE BACKUP 19
Use prime WLES laptop 20 21 ‘Main’ 22 Click ‘System Settings’ (left side of display) 23 24 ‘Directories’ 25 At the line ‘Backup Directory’ click ‘Browse…’ 26 Navigate to the “R” drive, the mapped drive for the backup WLES laptop 27 Navigate to ‘Program Files’>‘Invocon’>‘EWBMTAU-WLEFlight’ 28 Click ‘OK’ 29 30 Click ‘Status’ (left side of display) 31 32 Notify MCC-H: “WLES laptop prep for transfer complete” 33 34 35 36 37 38 39 40 41 42 43 44 45 46
FS 1-2 47
MSG 086 - RETURN STOWAGE MAPS
END OF PAGE 1 OF 5, MSG 086
1
AIRLOCK FLOOR BAG (C)
• “EYES” OF KURS FACE UP AS SHOWN • EXCESS CUSHION CAN BE STOWED IN BAG I
DITCH BAG CONFIGURATION
3RD EMU E
F
I
D
A
B
SC1 PC1
PC2
SF2
SF1
PF2
PF1
PBA CUSHION
KURS
PHOTO/TV
PBA CUSHION
2 3 4 5 6
MSG 086 - RETURN STOWAGE MAPS
END OF PAGE 2 OF 5, MSG 086
1
2 3
4 5 6 7
MSG 086 - RETURN STOWAGE MAPS
END OF PAGE 3 OF 5, MSG 086
1
2 3
4 5 6 7
MSG 086 - RETURN STOWAGE MAPS
END OF PAGE 4 OF 5, MSG 086
1
2 3 4
5 6
MSG 086 - RETURN STOWAGE MAPS
END OF PAGE 5 OF 5, MSG 086
1
2 3
MSG 087 - FES TROUBLESHOOTING OVERVIEW AND PROCEDURE
END OF PAGE 1 OF 4, MSG 087
FES Troubleshooting Overview: 1 The initial setup steps configure the Supply H2O tanks to tie TK B to the FES and allow the 2 Fuel Cell water to flow into TKC and TKD. This will allow the MCC to calculate accurate 3 water rates that the FES is using. In addition, the water pressures (V64P0201A, not 4 available onboard) in the Supply H2O system will provide insight into FES Hi Load 5 operations. The motors for the Auto A rad controllers will be disabled to minimize switch 6 throws during the procedure. 7 8 The FES Pri A controller will be run through a series of heat load changes to evaluate how 9 the FES performs during the changes. The test begins with high temperatures at the FES 10 inlet, both the Hi Load and Topping FES will be required. This configuration is maintained 11 for 5 minutes and then one of the Freon Loops is taken to the Rads High temperature (57 12 deg). The FES inlet temperature will be moderate, which is the temperature range where 13 FES Pri B shut down on FD1. This configuration will be held for 5 minutes and then the 14 second Freon Loop will be taken to the Rads High temperature. The FES inlet temperature 15 will be low, the FES controller logic should stop the Hi Load FES from providing cooling at 16 this temperature range. The FES will remain in this configuration for 7 minutes and then 17 FES Pri B will be put through the same sequence of steps. 18 19 The FES Secondary will be tested after the FES Pri A and Pri B steps are complete. The 20 temperature range at the FES inlet for the FES Secondary check is high for the entire FES 21 Secondary test. The FES Secondary Hi Load A and B supply valves will be tested. 22 Following completion of the FES Secondary Hi Load steps, the Supply H2O tanks will be 23 reconfigured to obtain accurate Supply H2O use rates from the Topper A and Topper B 24 spray valves. The Topper A spray valves will use Supply H2O from TKB and the Topper B 25 spray valves will use Supply H2O from TKC. 26 27 Following the FES Secondary test, the Freon Loop and FES systems will be reconfigured 28 back to nominal orbit ops. 29 30 The expected Supply H2O usage rates based on the FES inlet temperatures for each 31 portion of the test will be calculated. The amount of water used from the Supply H2O tanks 32 will then be calculated and the two sets of data compared and used with the Supply H2O 33 pressure oscillations to pinpoint failure modes within the FES. 34 35 The FES troubleshooting procedure was run through a PV session in the SMS. The 36 execution of the procedure took ~ 90 minutes. The procedure is included to provide a good 37 idea of what to expect when the final procedure is uplinked. Currently, FAO has the FES 38 test placed on FD13 following FCS Checkout. 39 40 The current plan is to use FES PRI A for Entry. 41 42 43 44 45 46 47 48 49 50 51
MSG 087 - FES TROUBLESHOOTING OVERVIEW AND PROCEDURE
END OF PAGE 2 OF 4, MSG 087
1 FES TROUBLESHOOTING (PRELIMINARY) 2
3 WARNING 4
5 To protect against a potential undertemp condition, 6 if a S88 EVAP OUT T 1(2) msg occurs at any time 7 due to low EVAP OUT T, immediately perform 8 9 L1 H2O PUMP LOOP 1 – ON 10
11 Initial Setup: 12 ML31C 1. SPLY H2O TK D OUTLET - CL (tb-CL) 13 L1 2. TOP EVAP HTR DUCT sel – A/B 14 FLASH EVAP CNTLR SEC - B SPLY 15 L4:P 3. cb AC2 ΦB RAD CNTLR 1A – op 16 L4:P cb AC3 ΦB RAD CNTLR 2A – op 17 R11L 4. SPLY H2O TK B INLET - CL (tb-CL) 18 R11L SPLY H2O TK C OUTLET - CL (tb-CL) 19 20 Adjust Hardware C&W, MCC will TMBU Software limits: 21 R13U 5. 22 23 24 25 6. √DAP: A/AUTO/ALT(PRI) 26 CRT SM 88 APU/ENVIRON THERM 27 28 FES Pri A: 29 L1 7. FLASH EVAP CNTLR PRI A - OFF 30 RAD CNTLR LOOP 1,2 (two) - OFF, AUTO A 31 32 When S88 RAD OUT T 1,2 decr (~110 sec), 33 8. RAD CNTLR LOOP 1,2 (two) – OFF 34 RAD CNTLR OUT TEMP - HIGH 35 HI LOAD EVAP - ENA 36 FLASH EVAP CNTLR PRI A - ON 37 38 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, 39 9. RAD CNTLR LOOP 2 - AUTO A 40 41 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, 42 10. RAD CNTLR LOOP 1 - AUTO A 43 44 After 7 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, proceed 45
to FES Pri B step 11. 46 47 48 49
Continued next page 50
PARAMETER NAME C/W CH UPPER LIMIT FREON LOOP 1 EVAP OUT T 107 4.3V/115.2 deg FREON LOOP 2 EVAP OUT T 117 4.3V/115.2 deg
MSG 087 - FES TROUBLESHOOTING OVERVIEW AND PROCEDURE
END OF PAGE 3 OF 4, MSG 087
FES Pri B: 1
2 3 L1 11. FLASH EVAP CNTLR PRI A - OFF 4 RAD CNTLR LOOP 1,2 (two) - OFF, AUTO A 5 6 When S88 RAD OUT T 1,2 decr (~110 sec), 7 12. RAD CNTLR LOOP 1,2 (two) – OFF 8 FLASH EVAP CNTLR PRI B - ON 9 10 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, 11 13. RAD CNTLR LOOP 2 - AUTO A 12 13 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, 14 14. RAD CNTLR LOOP 1 - AUTO A 15 16 After 7 minutes, √ S88 EVAP OUT T 1,2 ~ 39 deg and stable then, proceed 17
to FES Secondary step 15. 18 19 FES Secondary: 20 L1 15. FLASH EVAP CNTLR PRI B – OFF 21 RAD CNTLR LOOP 1,2 (two) – OFF, AUTO A 22 23 When S88 RAD OUT T 1,2 decr (~110 sec), 24 16. RAD CNTLR LOOP 1,2 (two) – OFF 25
FLASH EVAP CNTLR SEC – ON 26 27 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 62 deg and stable then, 28 17. FLASH EVAP CNTLR SEC - A SPLY 29
FLASH EVAP CNTLR SEC – OFF, ON 30 31 After 5 minutes, √ S88 EVAP OUT T 1,2 ~ 62 deg and stable then, 32 L1 18. FLASH EVAP CNTLR SEC – OFF 33 HI LOAD EVAP – OFF 34 35 R11L 19. SPLY H2O XOVR VLV – CL (tb-CL) 36 R11L 19. SPLY H2O TKC INLET – CL (tb-CL) 37 R11L 19. SPLY H2O TKC OUTLET – OP (tb-OP) 38 39 L1 20. FLASH EVAP CNTLR SEC – ON 40 41 After 7 minutes, √ S88 EVAP OUT T 1,2 ~ 62 deg and stable then, 42 43 Reconfigure for Nom Ops: 44 21. RAD CNTLR LOOP 1,2 (two) - AUTO A 45
Continued next page 46
NOTE If the FES Pri B controller shuts down during the FES Pri B portion of the test, the controller can be cycled one time. If another shut down is observed prior to the end of the wait period, √ MCC.
MSG 087 - FES TROUBLESHOOTING OVERVIEW AND PROCEDURE
END OF PAGE 4 OF 4, MSG 087
1 After 5 minutes, perform the following 2 L4:P 22. cb AC2 ΦB RAD CNTLR 1A – cl 3 L4:P cb AC3 ΦB RAD CNTLR 2A – cl 4 L1 23. RAD CNTLR OUT TEMP – NORM 5 TOP EVAP HTR DUCT sel – B 6 R11L 24. SPLY H2O TK B INLET – OP (tb-OP) 7 R11L SPLY H2O TK C INLET – OP (tb-OP) 8 R11L SPLY H2O XOVR VLV – OP (tb-OP) 9 ML31C 25. SPLY H2O TK D OUTLET – OP (tb-OP) 10 On MCC call, 11 L1 FLASH EVAP CNTLR PRI A – ON 12 13 Adjust Hardware C&W, MCC will TMBU Software limits: 14 R13U 26 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
PARAMETER NAME C/W CH UPPER LIMIT FREON LOOP 1 EVAP OUT T 107 1.9V/64.8 deg FREON LOOP 2 EVAP OUT T 117 1.9V/64.8 deg
MSG 088A - FD10 STACK REPRESS
END OF PAGE 1 OF 1, MSG 088A
1 To maintain the stack pressures above 14.0 psia, perform the following steps. The repress 2 is expected to take approximately 36 minutes; however, a pause may be required to allow 3 for mixing. 4 5 Caution: Do not remain in WCS area during the repress, as introduction of N2 may cause 6 hypoxia. 7 8 Expect 'S66 CAB N2, O2 1 FLO' messages 9 10 Using SM 66 ENVIRONMENT, 11 12 13 OCAC PWR - OFF 14 MO10W 14.7 CAB REG INLET SYS 1 vlv - OP 15 L2 O2/N2 CNTLR VLV SYS 1 - OP 16 17 When CABIN PRESS = 14.24 psia, or on MCC call: 18 L2 O2/N2 CNTLR VLV SYS 1 - CL 19 20 If at any time 'S78 CABIN O2 CONC': 21 MO10W 14.7 CAB REG INLET SYS 1 vlv - CL 22 On MCC call: 23 MO10W 14.7 CAB REG INLET SYS 1 vlv - OP 24 25 When CABIN PRESS = 14.48, or on MCC call: 26 L2 O2/N2 CNTLR VLV SYS 1 - OP 27 28 When Cabin PRESS = 14.68 psia, or on MCC call: 29 MO10W 14.7 CAB REG INLET SYS 1 vlv - CL 30 OCAC PWR - ON 31 L2 O2/N2 CNTLR VLV SYS 1 - AUTO 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
MSG 090 (13-0669) - FD09 MMT SUMMARY Page 1 of 2
Page 1 of 2, MSG 090 (13-0669)
1 FD9 MMT Crew Summary 2
3 At the FD9 MMT both Programs were extremely happy with the results of EVA 3 including 4 the get-ahead task of transferring the grapple bar to ISS. FYI-The spatula that was released 5 inadvertently during the EVA is well clear of the orbiter and ISS. It was 4 miles in front of the 6 ISS/Shuttle at crew sleep on FD9 and continues to move in front of and below the ISS with 7 the distance increasing about 2 miles each rev. Overnight, we were able to get additional 8 video of the SSRMS LEE snare cable using orbiter cameras A, B and C. With these 9 pictures, we were able to clear the SSRMS for all FD11 activities including the MPLM and 10 SSRMS walk off activities. The pictures confirm that the cable is not far enough out of the 11 groove to interfere with grapple operations. There is no concern with MPLM reberth. The 12 MMT also reviewed the late inspection analysis and reporting timeline and the details of that 13 discussion are included below. The most significant item of discussion was two separate, 14 distinct, unrelated APU problems: APU 1 fuel tank pressure decay and the APU 3 heater 15 issues. More details on this subject and a few others are provided below. 16 17 Late Inspection – As you know LDRI will be used on FD11 to inspect the port wing and 18 after undock on FD12 to inspect the starboard wing and nose cap. The imagery team and 19 Debris Assessment Team (DAT) are estimating no more than 15 hours to review the port 20 wing data. The starboard wing and nose cap should take no more than 18 hours. The DAT 21 recommendation for entry will be provided to the flight control team no later than 11/19:30 22 MET which is in the middle of the crew day on FD13. The crew and MCC ops team will 23 press on with the nominal day before entry activities and will only change course of action if 24 formally notified by the MMT. The MMT stressed that this activity cannot and will not 25 interfere with normal entry planning and preparation unless there is a significant item 26 uncovered in the LDRI data. The good news is that the DAT and Imagery teams did a great 27 job on FD2 and on FD4 and will have the data and experience from these earlier inspections 28 to draw upon for the late inspection. 29 30 Transfer – The preliminary estimates from FD9 are that the MPLM is still ahead of schedule 31 with about 90% of the total MPLM transfer complete with approximately 93% of the re-32 supply and 89% of the return compete. The middeck transfer is ahead of schedule and is 33 ~80% complete (75% re-supply/86% return complete) based on the data presented at the 34 MMT. The MPLM weight will be ~55 lbs greater than what was analyzed pre-flight but the 35 cg and individual rack mass properties are within VLA tolerances and all loads remain valid 36 with positive margin. Additionally a total of 70-75 lbs of N2 has been transferred to the ISS. 37 38 APU 1 Tank Pressure Decay – The APU 1 fuel pressure is decaying differently than the 39 other two tanks which is indicative of a small N2 or hydrazine leak. The data is very subtle 40 so it has taken eight days to detect this change in slope between the three APU fuel tank 41 plots. APU 2 and APU 3 shows a normal pressure decay of 6 psi over the eight days of the 42 mission. This is due to the temperature change in the tanks which is caused by a 9-10 43 degrees Fahrenheit decrease in the tank temperatures as the aft structure cools. It takes 44 some time to see this change because ascent does a good job of warming up this part of the 45 vehicle. APU 1 Tank pressure has dropped a total of 22 psi over these eight days which is 46 indicative of a leak which is most likely N2. The Entry Flight Director, CB Reps, and the 47 entire APU community are meeting several times daily to understand the data and 48 determine a forward plan of action. There was an N2 leak at the QD panel during a portion 49 of the STS-121 OPF flow that was later fixed; that has many in the community thinking that 50 the leak is N2. Analysis is in work to determine if it is feasible to leak hydrazine based on 51
MSG 090 (13-0669) - FD09 MMT SUMMARY Page 2 of 2
Page 2 of 2, MSG 090 (13-0669)
the very slow leak rate and the propensity of hydrazine to freeze and slow an actual fuel 1 leak. We hope to have more details on this subject tomorrow but as of today there is no 2 change to any mission plans based on the data collected. The APU is not considered failed 3 and the N2 pressure will be more than 100 psi above the lower operating limit at EOM. 4 5 APU 3 GG/Fuel Line/Pump/Valve Heater – Both the A and B heaters appear to be 6 controlling at their upper limit on the overtemp thermostat. Initially the B heater appeared to 7 fail ON, as indicated by the Supply Line Temp, increasing from ~82 deg F to 190 deg F. 8 The heater then operated nominally for two cycles, and then failed ON again. MMACS 9 asked to reconfigure the heater to the A system, where it is also operating on the overtemp 10 thermostat. There are a few theories on the failure mode that could affect both the A and B 11 heaters. This area was reworked before STS-121 with a new sealant such that the heaters 12 were removed and rewrapped. If the wrap came loose on orbit, it would bias both 13 thermostats cold and would appear as a failed on heater. If the heater is debonded, a 14 similar signature would be expected. The teams continue to meet multiple times each day 15 on this topic and additional data will be provided as the analyses mature. APU 3 is not 16 considered failed for entry at this time and there are no significant impacts to entry 17 operations. 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51