GUANGZHOU UNDERGROUND GUANGZHOU UNDERGROUND GUANGZHOU UNDERGROUND GUANGZHOU UNDERGROUND RAILWAY RAILWAY RAILWAY RAILWAY 2 EARTH PRESSURE BALANCED TBMs - Ø 6.28 m G STRUCTURE uangzhou, third largest city in China with 7 million inhabitants and which benefits economically of the proximity of Hong-Kong and of the special economical area of Shenzhen, decided to enlarge is metro with creating a new line (the 3 rd one). The work has begun in 2002 for a public opening of this new line in 2007. THE CONTRACTOR: Work carried out using the TBMs The 3 rd line will be of 34.7 km in tunnel with 17 stations. The 2 NFM Technologies / Wirth machines will drive 2 parallel tunnels of 1928 m in length. This part of the line will connect Hanxi and Shiqiao stations. Geology mainly consists of soft sands, sandy clay, chalk, silk as well as weathered rock. OVERALL PROJECT: Drilled length: 2 x 1,928 m Soils: soft sand, sandy clay, chalk, silt, weathered rock. Roofing: 6.5 m to 56 m Minimum radius of curvature: 300 m Maximum slope: 3% Overall inner diameter: 5.4 m Liner used for tunnel segments: Number/shape: 5 + 1 key joint Thickness: 300 mm Length: 1.5 m GUANGZHOU METRO 3th line bored with NFM Technologies' TBMs (MOR) Chinese Ministry of Railway, 14 th Bureau.

Transcript of Guangzhou line3 ang

Page 1: Guangzhou line3 ang

GUANGZHOU UNDERGROUNDGUANGZHOU UNDERGROUNDGUANGZHOU UNDERGROUNDGUANGZHOU UNDERGROUND

RAILWAYRAILWAYRAILWAYRAILWAY

2 EARTH PRESSURE BALANCED TBMs - Ø 6.28 m

G

STRUCTURE

uangzhou, third largest city in China with 7 million inhabitants and which benefits economically of the proximity of Hong-Kong and of the special economical area of Shenzhen, decided to enlarge is metro with creating a new line (the 3rd

one). The work has begun in 2002 for a public opening of this new line in 2007.

THE CONTRACTOR:

Work carried out

using the TBMs

The 3rd line will be of 34.7 km in

tunnel with 17 stations. The 2

NFM Technologies / Wirth

machines will drive 2 parallel

tunnels of 1928 m in length.

This part of the line will connect

Hanxi and Shiqiao stations.

Geology mainly consists of soft

sands, sandy clay, chalk, silk as well as weathered rock.

OVERALL PROJECT:

Drilled length: 2 x 1,928 m

Soils: soft sand, sandy clay,

chalk, silt, weathered rock.

Roofing: 6.5 m to 56 m

Minimum radius of curvature: 300 m

Maximum slope: 3%

Overall inner diameter: 5.4 m

Liner used for tunnel segments:

Number/shape: 5 + 1 key joint

Thickness: 300 mm

Length: 1.5 m

GUANGZHOU METRO

3th line bored with

NFM Technologies' TBMs(MOR) Chinese Ministry of Railway,

14th Bureau.

Page 2: Guangzhou line3 ang

THE TUNNELLING

MACHINES

• Type: EPB

• Cutting head: 6 arms

• Cutting tools: 110, variable overcuts 1 + 1

• Hydraulical powered

• Articulated shields

• Evacuation of spoil: screw conveyor and belt conveyor

• Erector: 6 degrees of freedom - stroke +/- 220 °

CHARACTERISTICS OF THE MACHINES

NFM TECHNOLOGIESTunnelling Machines Department: 90, rue Robert – 69456 LYON Cedex 06 - France

Phone: +33 426 848 752 - Fax +33 426 848 716 - E-mail: [email protected]

Website: www.nfm-technologies.com

GEOLOGICAL PROFILE

THE WORK SITE

• Excavation diameter: 6.28 m

• Head Type: soft ground or rock configuration

• Total length: 95 m

• Shield weight: 320 t

• Drive unit power: 945 kW

• Cutterhead drive unit: 6 hydraulic motors

• Head rotation speed: 3.75 rpm

• Maximal nominal torque: 7,340 kN.m

• Maximal breakout torque: 9,550 kN.m

• Total thrust: 36,100 kN

• Maximal speed of advance> 6 cm/min

• Articulation traction: 10,100 kN

• Installed power: 1,600 kVA

1st tube

2nd tube

Chorismite slightly weatheredChorismite

highly weathered Chorismite medium weathered

Plastic residual soilAlluvial silty

sand

Sandy clay