VALUE Unit
21 MW
3 NOS.
6.2 MW
2.4 MW
6.661 MW
22000 Kwh
Sr.No Description Unit Value
1Any Three GTGs are running in parallel with Grid at
6.2MW Load. (TOTAL LOAD ON GTGs)Kwh 18600
2 Constant Import from Grid @ 2.4MW KWh 2400
3To Generate 6.2MW load, required heat input is
( Data Taken From Graph)Kwh 22000
4
Per Hour NG Flow to generate 4.5MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 2057
5 Per day Generation by Three GTGs. Kwh 446400
6 Per Day Import Grom Grid. Kwh 57600
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 49357
14 Per day Natural Gas Consumption for THREE GTGs. Sm3 / Day 148071
15Natural Gas Cost to Petronet (Considered USD 8 /
mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 6.661
19 Per day NG cost for Three GTGs for above Generation. Rs / Day 2161624
20 Per day Import Cost From Grid.. Rs / Day 383673.6
21 Total Cost of Power with above Scenario. Rs / Day 2545297
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 5.050
8 USD / mmbtu
1 mm btu = 27.40 SM3.
Heat Input @6.2MW load @35 Deg C.
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
CASE 1: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 8 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
LOAD ON EACH GTGs
IMPORT FROM GRID
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 2/12
VALUE Unit
21 MW
4 NOS.
5 MW
1 MW
7.036 MW
19100 Kwh
Sr.No Description Unit Value
1Any Four GTGs are running in parallel with Grid at
5MW Load. (TOTAL LOAD ON GTGs)Kwh 20000
2 Constant Import from Grid @ 1.0MW KWh 1000
3To Generate 5.0MW load, required heat input is
( Data Taken From Graph)Kwh 19100
4
Per Hour NG Flow to generate 5.0MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 1785
5 Per day Generation by Four GTGs. Kwh 480000
6 Per Day Import Grom Grid. Kwh 24000
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 42851
14 Per day Natural Gas Consumption for four GTGs. Sm3 / Day 171404
15Natural Gas Cost to Petronet (Considered USD 8 / mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 7.036
19 Per day NG cost for Four GTGs for above Generation. Rs / Day 2502243
20 Per day Import Cost From Grid.. Rs / Day 168864
21 Total Cost of Power with above Scenario. Rs / Day 2671107
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 5.300
CASE 2: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 8 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
8 USD / mmbtu
1 mm btu = 27.40 SM3.
LOAD ON EACH GTGs
IMPORT FROM GRID
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
Heat Input @5.0MW load @35 Deg C.
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 3/12
VALUE Unit
21 MW
4 NOS.
4.65 MW
2.4 MW
6.661 MW
18500 Kwh
Sr.No Description Unit Value
1Any Four GTGs are running in parallel with Grid at
4.65MW Load. (TOTAL LOAD ON GTGs)Kwh 18600
2 Constant Import from Grid @ 1.0MW KWh 2400
3To Generate 4.65MW load, required heat input is
( Data Taken From Graph)Kwh 18500
4
Per Hour NG Flow to generate 5.0MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 1729
5 Per day Generation by Four GTGs. Kwh 446400
6 Per Day Import Grom Grid. Kwh 57600
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 41505
14 Per day Natural Gas Consumption for four GTGs. Sm3 / Day 166019
15Natural Gas Cost to Petronet (Considered USD 8 / mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 6.661
19 Per day NG cost for Three GTGs for above Generation. Rs / Day 2423638
20 Per day Import Cost From Grid.. Rs / Day 383673.6
21 Total Cost of Power with above Scenario. Rs / Day 2807312
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 5.570
CASE 3: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 8 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
8 USD / mmbtu
1 mm btu = 27.40 SM3.
LOAD ON EACH GTGs
IMPORT FROM GRID
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
Heat Input @4.65MW load @35 Deg C.
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 4/12
VALUE Unit
19 MW
3 NOS.
6 MW
1 MW
7.036 MW
21400 Kwh
Sr.No Description Unit Value
1Any Three GTGs are running in parallel with Grid at
6.0MW Load. (TOTAL LOAD ON GTGs)Kwh 18000
2 Constant Import from Grid @ 1.0MW KWh 1000
3To Generate 6.0MW load, required heat input is :
( Data Taken From Graph)Kwh 21400
4
Per Hour NG Flow to generate 6.0 MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 2000
5 Per day Generation by Three GTGs. Kwh 432000
6 Per Day Import Grom Grid. Kwh 24000
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 48011
14 Per day Natural Gas Consumption for THREE GTGs. Sm3 / Day 144033
15Natural Gas Cost to Petronet (Considered USD 8 / mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 7.036
19 Per day NG cost for Three GTGs for above Generation. Rs / Day 2102670
20 Per day Import Cost From Grid.. Rs / Day 168864
21 Total Cost of Power with above Scenario. Rs / Day 2271534
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 4.981
8 USD / mmbtu
1 mm btu = 27.40 SM3.
CASE 4: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 7 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
LOAD ON EACH GTGs
IMPORT FROM GRID
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
Heat Input @6.0MW load @35 Deg C.
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 5/12
VALUE Unit
19 MW
3 NOS.
5.533 MW
2.401 MW
6.661 MW
20500 Kwh
Sr.No Description Unit Value
1Any Three GTGs are running in parallel with Grid at
5.533MW Load. (TOTAL LOAD ON GTGs)Kwh 16599
2 Constant Import from Grid @ 2.40MW KWh 2401
3To Generate 5.533MW load, required heat input is :
( Data Taken From Graph)Kwh 20500
4
Per Hour NG Flow to generate 5.533MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 1916
5 Per day Generation by Three GTGs. Kwh 398376
6 Per Day Import Grom Grid. Kwh 57624
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 45992
14 Per day Natural Gas Consumption for THREE GTGs. Sm3 / Day 137975
15Natural Gas Cost to Petronet (Considered USD 8 / mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 6.661
19 Per day NG cost for Three GTGs for above Generation. Rs / Day 2014240
20 Per day Import Cost From Grid.. Rs / Day 383833
21 Total Cost of Power with above Scenario. Rs / Day 2398074
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 5.259
CASE 5: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 7 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
8 USD / mmbtu
1 mm btu = 27.40 SM3.
LOAD ON EACH GTGs
IMPORT FROM GRID
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
Heat Input @5.533MW load @35 Deg C.
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 6/12
VALUE Unit
19 MW
4 NOS.
4.5 MW
1 MW
7.036 MW
17900 Kwh
Sr.No Description Unit Value
1Any Four GTGs are running in parallel with Grid at
4.5MW Load. (TOTAL LOAD ON GTGs)Kwh 18000
2 Constant Import from Grid @ 1.0MW KWh 1000
3To Generate 4.5MW load, required heat input is :
( Data Taken From Graph)Kwh 17900
4
Per Hour NG Flow to generate 4.5MW power
(Considered NG NHV is 9200 Kcal / SM3).
(GHV = 40000 BTU / SCM)
Sm3 / HR 1673
5 Per day Generation by FOUR GTGs. Kwh 432000
6 Per Day Import Grom Grid. Kwh 24000
13 Per day Natural Gas Consumption for one GTG. Sm3 / Day 40159
14 Per day Natural Gas Consumption for FOUR GTGs. Sm3 / Day 160635
15Natural Gas Cost to Petronet (Considered USD 8 / mmbtu)
161 mm btu is equal to 27.40 SM3 with considering NHV
is 9200 Kcal / SM3. (GHV = 40000 BTU / SCM)
17 Per SM3
NG cost is Rs. ( 1 USD = 50 INR) Rs / Sm3 14.60
18Per Unit Power Import charges from Grid.(Excluding
Demand Charges)Rs / Kwh 7.036
19Per day NG cost for FOUR GTGs for above
Generation.Rs / Day 2345034
20 Per day Import Cost From Grid.. Rs / Day 168864
21 Total Cost of Power with above Scenario. Rs / Day 2513898
22 Per Kwh Power cost with above Scenario. Rs./ Kwh 5.513
8 USD / mmbtu
1 mm btu = 27.40 SM3.
CASE 6: GTG + GRID OPERATION PHILOSOPHY
PLANT OPERATING CONDITIONS
TOTAL PLANT LOAD : (When 7 HPs are running)
NO OF GTGs RUNNING IN REMOTE WITH GRID
LOAD ON EACH GTGs
IMPORT FROM GRID
Per unit Import charges at above load (Calculated based on
GEB bill Philosophy)
Heat Input @4.5MW load @35 Deg C.
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 7/12
Nos of HP
pump
Runnings.
Total Plantload in MW.
Nos of GTGRunning
Load on
each GTG
in MW
Import
fromGRID in
MW
CASE-1 8 21 3 6.20 2.40
CASE-2 8 21 4 5.00 1.00
CASE-3 8 21 4 4.65 2.40
CASE-4 7 19 3 6.00 1.00
CASE-5 7 19 3 5.53 2.40
CASE-6 7 19 4 4.50 1.00
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 8/12
Daily
Geneatio
n in KWh
Per Unit
Power cost
(Rs./Kwh)
Daily
Generation
+ Import
Cost (Rs in
Lacs.)
Monthly
Cost in
Lacs.
504000 5.05 25.45 789
504000 5.30 26.71 828
504000 5.57 28.07 870
456000 4.98 22.71 704
456000 5.26 23.98 743
456000 5.51 25.14 779
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 9/12
Contract 85%OF ACTUAL BILLING KVAH
Demand C.D. MAX. DEMAND DEMAND
2500 2125 -- 2500 --
KVA KVA KVA KVA UNITS
A TOTAL UNITS CONSUMED ( KWh)
D
E ONE THIRD OF TOTAL UNITS (KWh)
(AA) DEMAND CHARGES
FOR THE FIRST 500 KVA
FOR NEXT 500 KVA
FOR NEXT 1000 KVA
TOTAL DEMAND CHARGES (Rs.)
(BB) ENERGY CHARGES :
FOR BULK ALL UNITS
ENERGY CHARGES (Rs.)
(CC) TOTAL ENERGY CHARGES
REBATE ON P.F. ADJUSTMENT CHARGES ( E.C) ( Rs.)
REBATE ON EHV LINE (ONLY ON E.C) (Rs.)
TIME OF USE CHARGES (KWh)
TIME OF USE OF UNITS (Units consumed from 07.00Hrs to 11.00Hrs + 18
1/3rd of Total Units)
ESTIMATED GEB B
PETRONET
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 10/12
FUEL SURCHARGE ON UNITS CONSUMED
TOTAL ENERGY CHARGES (Rs.)
TOTAL BILL AMOUNT BEFORE TAX (Rs.)
(AA+BB+CC)
ELECTRICITY DUTY (@25%) ON TOTAL BILL AMOUNT
Meter charges
Total bill
Addition/deletion
Actual bill paid
COST OF GEB POWER PER KWH,
( Rs. PER KWh ) :
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 11/12
IMPORT 2.4 MW
P.F 0.99
BILLING DEMAND 2500 KVA
KVARH KWH AVG. P.F.
-- 1,785,600 0.9900
UNITS UNITS
KWH
1,785,600
595,200
595,200
KVA Rs/KVA Rs.
500 100 50000
500 200 100000
1500 270 405000
2500 555,000
KWH Rs./KWh Rs.
1,785,600 4.10 7,320,960.00
1,785,600 7,320,960.00
RATE (Rs.) AMOUNT (Rs.)
7,320,960 2.000% (146,419.20)
7,320,960 1.00% (73,209.60)
595,200 0.75 446,400.00
.00Hrs to 22.00Hrs.), KWh (Approximately
LL
8/3/2019 GTG and Grid
http://slidepdf.com/reader/full/gtg-and-grid 12/12
1,785,600 0.79 1,410,624.00
1,637,395
9,513,355.20
9,513,355.20 0.25 2,378,339
1,500.00
11,893,194.00
11,893,194.00
6.661