GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

31
GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center

description

GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011. Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center. Outline. GCC Progress Since November 2010 Update of GSICS Operation Plan GEO-LEO Baseline Algorithm Implementation - PowerPoint PPT Presentation

Transcript of GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

Page 1: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

GSICS Coordination Center UpdateGSICS Executive Panel Meeting 10

6 June 2011

Fuzhong Weng and Bob Iacovazzi, Jr.GSICS Coordination Center

Page 2: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 2

Outline

GCC Progress Since November 2010•Update of GSICS Operation Plan•GEO-LEO Baseline Algorithm Implementation• Product Quality Assurance Activities

GSICS Procedure for Product Acceptance Implementation•GSICS Instrument Event Log Activities• GSICS Quarterly• GCC Meeting Support: Joint GRWG-VI and GDWG-V

Meeting, and GRWG and GDWG Web Meetings GCC Near-term Goals for 2011

Page 3: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 3

Post Joint Meeting Update of GSICS Operation Plan

All actions from the Joint GRWG-VI and GDWG-V Meeting posted

Actions now separated by GSICS organizational entity – Exec Panel&WMO, GCC, GRWG, GDWG, and GPRCs (One sheet per entity)

For a given organizational entity, actions are separated by action type

Considering using Google Docs to update the plan

Page 4: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 4

GEO-LEO Baseline Algorithm Implementation Status

Jan07 Jan08 Jan09 Jan10 Jan11

GOES-11

Jun/07

Aug/08

MTSAT-1R

Nov/09

FY-2D

GOES-12

GOES-13

Meteosat-7/9

FY-2C

AIRS IASI

MTSAT-2

Page 5: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 5

MTSAT-1R

FY-2C

AIRS IASI

Nov/09

GOES-10

GOES-8

Aug2003 Jun2007

Aug/08Meteosat-7

Jun06

GOES-12Jun/07

Jan07 Jan08 Jan09 Jan10 Jan11GOES-11

Jun06

Meteosat-8 Aug/08

Jan2004

Oct2004

Jun2005

105W

Back Process Plan @ Univ. Wisconsin

GEO-LEO Baseline AlgorithmBack Processing Plan @ Univ. Wisconsin

Page 6: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 6

GEO-LEO Baseline Algorithm Back Processing

Jan03 Jan04 Jan05 Jan06 Jan07

GOES-10

AIRS

Page 7: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 7

NOAA has two MTSAT-2 water vapor channel SRFs, the original one from the package NOAA received about 5 years ago (black line)

The newer SRF (blue line) is not the same as the original SRF (in black), but the original looks more realistic, as the one in blue has a straight line at the left shoulder position.

The different SRF causes about 0.5K difference at the homogeneous scenes

GEO-LEO Baseline Algorithm MTSAT-2 H2O Channel SRF?

New MTSAT SRF Applied to AIRS

Old MTSAT SRF Applied to IASI

Page 8: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 8

Stray light?

GEO-LEO Baseline Algorithm Fengyun-2D: Stray Light and SRF?

Non-linear issue?

Page 9: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 9

GSICS Procedure for Product Acceptance (GPPA) - Current Product Status

Progress of Potential Products in Demonstration Phase• GL01.1.0 - GSICS Correction for EUMETSAT SEVIRI IR Channels based on IASI• GL02.1.0 - GSICS Correction for MTSAT Imager IR Channels based on AIRS and IASI• GL03.1.0 - GSICS Correction for GOES Imager IR Channels based on AIRS and IASI Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT ATBD and Traceability to SI Standards documents were accepted as of March 3, 2011 Documentation of use of associated radiative transfer models and cal/val supporting

measurements under review Testing by two or more potential users of product

GL01.1.0 and GL03.1.0 - Results under review GL02.1.0 – Results Due mid-June

• LL01.1.0 - Patmos-X AVHRR solar reflective channel corrections based on MODIS Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT Under testing by three or more potential users of product Submitted ATBD and Traceability to SI Standards documents

Page 10: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 10

GPPA: Road to Pre-Operational Phase Collect and disseminate user

feedback regarding product's data usability and format

[GL02.1.0 and GL03.1.0 late due to reviewer delays]

Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements)

• Who: Product users and GCC Director

• Due: April 2011

• Who: GPAT, product provider, and GCC Director

• Due: June 2011

Page 11: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 11

GPPA: Road to Pre-Operational Phase Collect and disseminate user

feedback regarding product's data usability and format

Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements)

[Under current revision to consolidate into one document for all GEO-LEO IR GSICS Correction products]

• Who: Product users and GCC Director

• Due: April 2011

• Who: GPAT, product provider, and GCC Director

• Due: June 2011

Page 12: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 12

GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus

decision whether or not to continue the product acceptance process

Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document

Examine and remediate the submitted product quality document

• Who: GPAT and Executive Panel

• Due: June 2011

• Who: Product provider and

GCC Director • Due: June 2011

• Who: GPAT, product provider, and GCC Director

• Due: August 2011

Page 13: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 13

GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus

decision whether or not to continue the product acceptance process

Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document

Examine and remediate the submitted product quality document

• Who: GPAT and Executive Panel

• Due: June 2011

• Who: Product provider and

GCC Director • Due: June 2011

• Who: GPAT, product provider, and GCC Director

• Due: August 2011

Page 14: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 14

GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus

decision whether or not to continue the product acceptance process

Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document

Examine and remediate the submitted product quality document

• Who: Product provider • Due: June 2011

• Who: Product users and GCC Director

• Due: June 2011

• Who: GPAT, product provider, and GCC Director

• Due: August 2011

Page 15: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 15

GPPA: Road to Pre-Operational Phase

Enter Pre-Operational Phase – August 2011

Page 16: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 16

GPPA: Road to Operational Phase Obtain product feedback from the Executive

Panel and remediate product based on this feedback

Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC

Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)

• Who: Product provider

• Due: November 2011

• Who: Product users and GCC Director

• Due: December 2011

• Who: GPAT, product provider, and GCC Director

• Due: February-March 2012

Page 17: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 17

GPPA: Road to Operational Phase Obtain product feedback from the Executive

Panel and remediate product based on this feedback

Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC

Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)

• Who: Product provider

• Due: November 2011

• Who: Product users and GCC Director

• Due: December 2011

• Who: GPAT, product provider, and GCC Director

• Due: February-March 2012

Page 18: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 18

GPPA: Road to Operational Phase Obtain product feedback from the Executive

Panel and remediate product based on this feedback

Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC

Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)

• Who: Product provider

• Due: November 2011

• Who: Product users and GCC Director

• Due: December 2011

• Who: GPAT, product provider, and GCC Director

• Due: February-March 2012

Page 19: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 19

GPPA: Road to Pre-Operational Phase

Enter Operational Phase - February-March 2012

Page 20: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 20

GPPA: Future Plans

In the Next Year …All Four Current Potential Products in Pre-Operational Phase

New Potential Product Submissions:GSICS Correction for CMA VISSR IR channels based on IASIGSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on MODISGSICS Correction for MSU/AMSU-A data based on SNO

Page 21: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 21

GSICS Instrument Event Log Activities: Past Efforts

Feedback About Instrument Monitoring and Anomaly Reporting at Joint GRWG-IV/GDWG-III Workshop

All GSICS partners shall propose contents of the performance monitoring pages which they intend to display on their own web sites.

ACTION GDWG03_06

NOAA has up-and-running monitoring systems for GEO and LEO satellites Attempts have been made during the course of 2009 to solicit

instrument monitoring or anomaly information web sites from members There has been a lack of response The GCC would like a way forward for Action GDWG03_06.

Page 22: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 22

GSICS Instrument Event Log Activities: 17/02/2011 Web Meeting & 25/03/2011 Joint Meeting

Clarified that this activity is related to an action on the GSICS Exec Panel from CGMS to "define what should be the key factors that need to be displayed in the GSICS Instrument Monitoring web sites".

Resolved the initial requirements for the GSICS instrument event logsThe GSICS instrument event logs for a given satellite instrument shall:Provide sufficient information for the user to

• Gain awareness of anomalies, maneuvers and other events associated with that instrument

• Resolve, adapt to and/or mitigate errors in their data processing streams caused by these events

Not overwhelm the user with information that is not understandable (acronyms etc.). Link to more details such as daily email notifications Be hosted by each GPRC

Action JOINT06_03 - Provision of a draft template for the instrument event log by 31 May 2011

Page 23: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 23

Each GSICS GPRC will us a web interface to created, archived, and disseminated provide information on instrument event and calibration updates.

Web page structure• The front web page for these logs will allow users to link to the satellite and instrument for

which they require information• The back web pages will allow the users to access information to scheduled and anomalous

instrument events and calibration updates that significantly affect data quality The web pages are to be accessible, at minimum, to GSICS members The dissemination of instrument information that violates the national

export control laws of each participating GSICS member is discouraged

GSICS Instrument Event Log Activities: GCC Proposed Concept of Operations

Page 24: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 24

Satellite/Instrument Event and Calibration Update Logs

GEO SatellitesGEO Satellite Series #1 (e.g. GOES 10-15)

Satellite Name Instrument #1 Instrument #2 Instrument #N

Satellite #1 (e.g., GOES-10) (e.g., Imager) (e.g., Sounder) …

Satellite #2 (e.g., GOES-11) (e.g., Imager) (e.g., Sounder) …

…Satellite #N (e.g., GOES-15)

…(e.g., Imager)

…(e.g., Sounder)

LEO Satellite Series #1 (e.g. NOAA-6-14 )Satellite Name Instrument #1 Instrument #2 Instrument #3 Instrument #N

Satellite #1 (e.g., NOAA-6) (e.g., AVHRR) (e.g., HIRS) (e.g., MSU) (e.g., SSU)

…Satellite #N (e.g., NOAA-14)

…(e.g., AVHRR)

…(e.g., HIRS)

…(e.g., MSU)

…(e.g., SSU)

LEO Satellite Series #2 (e.g. NOAA-15-19 )LEO Sat. Table …

GEO Satellite Series #2 (e.g. GOES-16-17 )GEO Sat. Table …

LEO Satellites CLICK

Front Page

Page 25: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 25

GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log

Scheduled Satellite/Instrument EventsEvent Description Data Impact Event Outcome Begin Date End Date

Event #1 Data Impact #1 Event Outcome #1 BD #1 ED #1

Event #2 Data Impact #2 Event Outcome #2 BD #2 ED #2

…Event #N

…Data Impact #N

…Event Outcome #N

…BD #N

…ED #N

CLICK to More Comprehensive Description of

Event

Example Events:PTC-Patch Temperature ChangeDC-DecontaminationCSP-Change Satellite PositionOM-Other Manuever

Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)

Example Data Impacts:O-OutageDQD-Data Quality Deterioration

Back Page #1

Page 26: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 26

GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log

Anomalous Satellite/Instrument EventsEvent Description Data Impact Event Outcome Begin Date End Date

Event #1 Data Impact #1 Event Outcome #1 BD #1 ED #1

Event #2 Data Impact #2 Event Outcome #2 BD #2 ED #2

…Event #N

…Data Impact #N

…Event Outcome #N

…BD #N

…ED #N

CLICK to More Comprehensive Description of

Event

Example Events:AS-Anomalous ShutdownPM-High RadiationAIP-Anomalous Instrument Performance

Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)

Example Data Impacts:O-OutageDQD-Data Quality DeteriorationNDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set)

Back Page #2

Page 27: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 27

GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log

Calibration Algorithm/Parameter UpdatesUpdate Description Data Impact Event Outcome Begin Date End Date

Update #1 Data Impact #1 Event Outcome #1 BD #1 ED #1

Update #2 Data Impact #2 Event Outcome #2 BD #2 ED #2

…Update #N

…Data Impact #N

…Event Outcome #N

…BD #N

…ED #N

CLICK to More Comprehensive Description of

Update

Example Updates:UCC-Updated Calibration CoefficientsURVS-Updated Response vs. Scan angleUDM-Updated Detector Map

Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)

Example Data Impacts:O-OutageDQD-Data Quality DeteriorationNDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set)

Back Page #3

Page 28: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 28

Is the list of possible events or updates complete? Is it possible to create an e-mail notification if significant events or

calibration updates occur? How do we acquire the information? Often this information may be

buried in much longer reports that would have to be manually extracted to keep the event/calibration update logs up-to-date

Do we do this for historical instruments, or just moving forward? Will we be competing with our own operational agencies in providing

this service? Is it even possible to make the event logs private to GSICS Members

only, or do we even need this level of privacy?

Instrument Event and Calibration Update Logs: Questions, Concerns, and Comments

Page 29: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 29

GSICS Quarterly Newsletter

GSICS Quarterly Volume 4 Issue 4 and Volume 5 Issue 1 is complete

Volume 5 Issue 2 is under development. Ideas for upcoming issues include a synopsis of

the GSICS plans for development of reflective solar band channels, or the GSICS Procedure for Product Acceptance

Page 30: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 30

Meeting Support

GSICS Meetings GSICS Joint GRWG-VI and GDWG-V

Meeting – March, 2011, Daejeon, Republic of Korea

GSICS Executive Panel IX – Nov. 2010, New Delhi, India

Centra web meetings hosted by EUMETSAT: Two meetings of the GSICS Microwave Sub-Group and three GRWG/GDWG meetings

Page 31: GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011

21 April 2023Slide: 31

Near-term 2010-11 Goals Implement Procedure for Product Acceptance

• Shepherd All Four Current Demo Phase Potential Products to Pre-Operational Phase or Beyond

• Potential Product Submissions GSICS Correction for CMA VISSR IR Channels based on IASI GSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on

MODIS GSICS Correction for MSU/AMSU-A data based on simultaneous nadir overpasses

GSICS Baseline Algorithm • Continue to coordinate efforts to establish the GSICS baseline algorithm at NOAA GPRC

GSICS Instrument Event Logs• Hold a web meeting with the GRWG and GDWG regarding this issue to get feedback on

prototype designsGSICS Quarterly

• Continue to create and distribute this important link to the GSICS communityGCC Web Site

• Make changes to GCC web site based on recommendations made at the Joint meeting.Meeting Support

• GSICS 3rd Users Workshop ( 6 September 2011), QA4EO Workshop (18 - 20 October 2011), and GSICS Web Meetings