GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

42
G R O W T H M A N A G E M E N T Transit & Growth Management Tara Bartee –FDOT Public Transit Office

Transcript of GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

Page 1: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Transit & Growth Management

Tara Bartee –FDOT Public Transit Office

Page 2: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Presentation Overview• Transit Basics

• Proportionate Fair-Share Equation

• Examples

Page 3: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Why Growth Management? To try to manage sprawl

Page 4: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

• What works where

• Cost of Transit

• Transit is flexible

Page 5: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Page 6: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Page 7: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Automobile Space

Page 8: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Person (automobile) Space

Page 9: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Pedestrian / Bicycle Space

Page 10: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Person/Bus Space

Page 11: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

What is Transit-Oriented Development?

Comp Plan Language

What is TOD?

• Define the 3Ds

Design

Diversity

Density

Page 12: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Definition

• “Transit-Oriented Development (TOD) is moderate to higher-density development, located within an easy walk of a major transit stop, generally with a mix of residential, employment and shopping opportunities designed for pedestrians without excluding the auto. TOD can be new construction or redevelopment of one or more buildings whose design and orientation facilitate transit use.”Caltrans

Design

Diversity

Density

Page 13: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Design for people

What is a transit-oriented development?

Page 14: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Density

Page 15: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

TOD is development that:

– Contains a rich mix of uses – retail, residential, workplaces.

– Has appropriate treatment of parking.

Office

Retail

Residential

Diversity

Diversity

Page 16: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Outcome

One separates thestation from thecommunity

One encouragesTOD at the station

Page 17: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

• Fronton in Miami

• Land use doesn’t support transit

• I’ve got the map

Page 18: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Denver, CO Neighborhood to Urban TOD

Neighborhood Urban

Page 19: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Where money is spent to improve mobilityRoadway Where money is spent

to improve mobilityTransit Sidewalk Land Use

F Improved Transit w/ Operating costs

A A Urban Core

E B B Urban Center

D C C General Urban

C D D Sub-urban

B E E Rural Reserve

A Roads F F Rural Preserve

Shelters

Bus Priority

Signal &

Intersection

Improvements

Page 20: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Transit Development Plan (TDP)

• Look at:

– Specific requirement to look at goals and policies of the comp plan and LRTP.

– Public Involvement

– Adopted by Governing bodies (county commission)

– 10 year needs plan

– Financially feasible to 3 years

TransportationElement

CIE FLUM

TDP LRTP

Page 21: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Calculating the Costs

– Roadway improvement can be isolated to the “significantly” impacted area

– Transit costs can’t be limited to one hour a day and .74 miles

… O H, R E A L L Y ? ? ? ?

Transit and roadways are different

Page 22: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Transit Prop Share

Number of Project Trips

Change in Peak Hour Max Service VolumeCost = Proportionate Share

Page 23: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Proposed Methodology – Project Trips

Number of Project Trips

Change in Peak Hour Max Service VolumeCost = Proportionate Share

10 project trips = 10 needed seats/passengers on a bus

Page 24: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Proposed Methodology – Change in Max Service Volume

• Fundamental Assumption: Providing capacity on transit satisfies identified roadway capacity issue– Does not address issue of use/ridership of service

Number of Project Trips

Change in Peak Hour Max Service VolumeCost = Proportionate Share

Typical value of 40 seats per bus

Page 25: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Proposed Methodology - Cost

– 3 years when TQOS A or B,

– 5 years when TQOS C or D,

– 7 years E or F or new service

– Capital Investments

– Technology Implementation

– Operating and maintenance

Number of Project Trips

Change in Peak Hour Max Service VolumeCost = Proportionate Share

Time (years)

(Capital + Operating) $

= Cost

Transit Corridor StudyAverage Cost/Revenue Hour

Page 26: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Proposed Methodology - Cost

Initial Assumption: Entire length of transit route (sum of both directions) included in cost calculation

Page 27: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Example Applications

Page 28: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Small Development

• Development adding 50 new peak hour trips to one segment of a constrained four-lane facility in urban area

Development on ‘Failing’ Facility

Page 29: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Small Development• Agency agreement that no roadway capacity projects are planned or could

reasonably be constructed

• Existing transit service on Main Street = LOS B– 10 minute headways, 6 buses per hour

• Cost per operating hour = $75

• Length of existing bus route = 10 miles (20 miles round trip)

Page 30: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationSmall Development

50 passengers_peak hour

passengers_bus

= 1.25 bus _peak hour

40

cost .hour

number of peak hours .year

Duration ofFunding (yrs) =

IMPROVEMENTCOST

cost .hour

520 peak hours .year

3 years =$75

Page 31: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationSmall Development

50 passengers_peak hour

passengers_bus

= 1.25 bus _peak hour

40

Page 32: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Medium Development

• Development adding peak hour trips to several segments of a constrained six-lane facility in suburban area

Development on ‘Failing’ Facility

Page 33: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Medium Development (Your turn)

• Development adding peak hour trips to several segments of a constrained six-lane facility in suburban area

Development on ‘Failing’ Facility

Page 34: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Medium Development

• Agency agreement that no roadway capacity projects could reasonably be constructed

• Existing transit service on SR X = LOS D• Length of existing bus route = 10 miles (20

miles round trip)

Development on ‘Failing’ Facility

Local government and transit agency review site plan and negotiate so that TOD principles are included.

Page 35: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationMedium Development

Page 36: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationMedium Development

Page 37: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Large Development

• Development adding peak hour trips to several segments of a constrained six-lane facility, segments of a constrained four-lane facility, and segments to an unconstrained facility

Development on ‘Failing’ Facilities

Page 38: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Large Development• Agency agreement that no roadway capacity projects could

reasonably be constructed on constrained facilities (SR X)

• Existing transit service on SR X = LOS D• Length of existing bus routes = 10 miles (20 miles round trip)

Page 39: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationLarge Development

SR X

Page 40: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Sample CalculationLarge Development

Jon Street

Page 41: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Questions?

Page 42: GROWTH MANAGEMENT Transit & Growth Management Tara Bartee –FDOT Public Transit Office.

GR

OW

TH

MANAG

EMENT

Additional Information or Questions

Karl Passetti, P.E.Kittelson & Associates, [email protected]