Foundation in Natural and Built Environment (FNBE)
Introduction to the Construction Industry [ QSB30105 ]
Final project:
Development Proposal
Name : Ong Jie En (0323835) ;
Shum Li Sze (0322822)
Tutor : Puan Hasmanira Mokhtar
Submission date: 27 July 2015
SITE INTRODUCTION
For this project, we need to select a specific empty land which is between
2500km² to 3500km² to initiate a small construction project. Then, we need to come
out with proposals and plans of our construction project base on 1 or 2 combination of
purpose such as recreational area, commercial area, industrial area, agricultural area,
tourism area and residential area.
For the site we have selected, it is located at Persiaran Damai Utama 2, Taman
Damai Utama, 47180 Puchong Selangor. It is a 3070km² site and it is a bare and
undeveloped land. The site is located at the residential area at Puchong and it is
potential to be developed.
There are residential areas like Kinrara Residence and PUJ residential. There
are shoplots and restaurants around the site and there is an abandoned lake at the
North of the proposed site. There are bus stops near the proposed area for the
residents and there is a forest at the west of the proposed site.
Proposed site : Persiaran
Damai Utama 2, Taman
Damai Utama, 47180
Puchong, Selangor.
Size: 30.7km²
SITE CONTEXT
1
2
2
2 3
2
2
2
Proposed site
Shop lots
( commercial area )
Houses (Residential
area )
Lake
1
2
3
2
2
2
LEGEND
Site Observation
This is the drain infront of our site there’s a TNB station beside our site
This two images above show the shop lots opposite our site across a roadway.
This is our site. It covers by a land of tiny small stones.
This is the view of our site from the opposite row of shop lots.
This is another residential area nearby, This is a Car Wash Centre nearby.
named Taman Damai Utama.
This is a church nearby Bandar Kinrara.
This is a restricted area, an unwanted lake is fenced.
SITE ANALYSIS
North point, Sun Path and Wind Path
The sun travels from west to east at the proposed site. The site receives maximum
sunlight at 12pm and the hottest area of the site is at the east as there are minimum
of plants. The site is windy and the wind flows from the south.
N
8am 6pm
Sun path
Wind
path
Topography
Selected site
The topography of
the selected site is a
flat ground and has a
slight slope which is
around 5 degree.
Lower area Slope
Higher area
Topography of the surrounding of the selected site
Ground
Landscape and Existing Structure
The landscape of the site is not managed and the vegetation of the site is not
specific and not well-maintained. They are mainly wild plants.
Climbing plants Bushes and wilt turfs Wooden trees
The ground of the selected site is covered with stones, rocks and sand.
The site has no existing structure except for the main drainage that surrounds the
site.
Circulation, traffic and accessibility
The traffic flow is usually fast in the site area as the site is surrounded by residential
areas and shop lots. The residents at the site usually travel with bicycle and cars.
Weekdays morning Weekdays evening
Weekend morning Weekend evening
Traffic flow legend Fast Slow
There are no
rapid station or
bus station and
other access at
the site except for
the bus stop.
Public amenities Distance from proposed site
Walking time Driving time
School ( SMK Seksyen 4 Bandar Kinrara )
2.9km 35min 5min
Clinic ( Poliklinik Soo )
0.5km 5min 2min
Supermarket ( MyMydin )
0.35m 3min 1min
Mosque 2.5km 30min 5min
Police station Puchong
2km 30min 4.5min
Bomba ( Balai Bomba dan Penyelamat Bukit Jalil )
4.6km 1 hour 8min
Weakness and Strength of proposed site
1.The TNB sub power station is a constraint
to the site as it will emit radioactive that will
affect the humans’ health. The TNB sub
power station is a disturbing view to the
landscape of the site too.
2.The drainage system around the selected site is also a
constraint to the site as the unpleasant odour that is produced
by the drain water will affect the residents’ health. Other than
that, it also affect the visual landscape of the site.
3.The crossroad near the site is
one of the strength as it increase
the population and cars to go to
the selected site.
WEAKNESS
STRENGTH
1
3
2
Proposed site