Group 1 Municipality Kampot Eng. IUT 28-11-2012

download Group 1 Municipality Kampot Eng. IUT 28-11-2012

of 20

Transcript of Group 1 Municipality Kampot Eng. IUT 28-11-2012

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    1/20

    KINGDOM OF CAMBODIA

    Kampot Province

    Nation Religion King

    Proposed Outline of

    an Urban Planning

    Strategy

    KAMPOT CITY

    Korea 28 November 2012

    CAMBODIA

    Prepared by : Sovannary

    Kysras

    Ram Laxmi

    Subedi

    Group A

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    2/20

    2

    1-Backg round / Prof i le

    - Country : Cambodia

    - Capital City : Phnom Penh

    - City : Kampot-Municipality

    (It is a southwestern province next to the sea coast and as far

    as 148 km from Phnom Penh)

    - The Land Administration : Kampot Municipality is 54Km and devided

    into 5 Sang Khat and 15 villages.- Populations: 34,575 p, Density:Averages 640 persons/km2(2011)

    - Household : 6,820 with the average household size of 5 persons.

    - Population growth: 1.5% and GDP 6.2% (36,01 Millions)

    Kingdom of Cambodia

    1- Central Government First tier Governor (Ministries)

    2. Sub-National Government Capital City , Province 23, Municipality26/

    District 159,Khan 8 and Commune1417, Sang Khat 204 &Villages14,073

    . For KPT Mun.- is 3. Tier Government have 13 City Counciler from 2Parties and 5 Board of Governor for KPT- Muni. 33 Commune Counciler

    for 5 SK forth tier G.,the first Number of Counciler is the commune Leader

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    3/20

    3

    System of Goverment

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    4/20

    4

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    5/20

    5

    2- Statement o f the Prob lem

    1-Urban planning Settlement

    - Waste management Problem

    - Infrastructure

    - Illegal Settlement

    - The Lack of Public Awareness.

    - The Lack of Disaster Reduction

    policy of local government (DRP)There is most probality of Tsunami

    in Kampot City.

    Propose Housing Planning

    Before After

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    6/20

    6

    3- Rationale

    To secure and provide the modern Eco-friendly city to the peopleimproving the lively hood by preserving and creating of EcologicalValues.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    7/20

    7

    4- Objec tives

    - To preserve the public land from slum settlement.

    - To create and settle the new sustainable Eco-friendly city

    5- Expected Ou tpu t / Goal Stt ing

    - To develop a new sustainable, Eco-friendly Green City with

    all types of amenities.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    8/20

    8

    6- Visio n Mission Statement

    6.1. Phi losophy

    Development of social, religlious, traditional and

    culturals management.

    6.2. Values

    To Develop Eco-Tourism Kampot City:

    Increase the religlious, social, economical and

    traditional assets.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    9/20

    9

    7- Mapp ing of Assets B ridge the Gap

    7.1 Natural Assets

    _Rice, Paddy 428,578 Ton

    _Subsidery to other crops 24,434 Ton

    _Fruits and permanent crops 25,284H

    _Forestry area 227,715H_Main mineral production 250,000m

    _Salt 82,500Ton/year

    _Fishery 16,090Ton/year

    7.2 Historical and Eco-tourism

    Phnom Chhgnok Temple, Phnom Kampong Trach,

    Phnom Kjong Temple, Tek Chu Resort, Nataya Resort,

    Nataya Resort, Nataya Resort, Phnom Dong, Anlung Pring

    Management and Conservation Area for Sarus Crane and Other

    Birds, Prek Thnout Tourism Community, Tomnup Mlich, Tomnup

    Prateak Krola, Trapeang Sangke Tourism Community.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    10/20

    10

    8- Organize the strategic Plan Methodolog y Time Line

    1- To arrange the meeting with central level (Government)2- To arrange the meeting with provincial (Regional) level

    3- To arrange the meeting with local level (Political parties)

    4- At last to held the meeting with local people

    5- Then make the final decision to develop the Kampot City.

    - Strategic Plan

    - Methodology1- To call meeting with commune level and inform them about

    above strategic plan (to develop the Kampot Green Eco-tourism

    city and to give assurance about them save the settlement.

    2- To call planners meeting with personals (Engineers and

    Architects)3- To call meeting with specialists (Economists, Geo-economist,

    financial specialists etc.)

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    11/20

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    12/20

    12

    9- Harmon ize the Strategic Plan w ith exis t ing Poli t ic,

    Cul tural and Rel ig iousConsult with political parties, commune peoples, cultural and religiousgroups frequently.

    9.1 Paradigm Shift (Environmental vs. Social)

    To maintain social values and to prevent existing environment

    for bio-diversity.9.2 Socio-Cultural Action Plan

    To prevent social and cultural values.9.3 Vertical vs. Horizon

    Most of the building should not be a high rised (Sky scraper)

    9.4 Urban Bio-diversity Action Plan

    Our city will be on the best of all types of eco-system base alltypes of living creatures.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    13/20

    13

    10- Sell you Strategic A ct ion Plan

    10.1 To get a approval letter from central Government.

    10.2 To publish by different types of media.

    10.3 To present the plan to INGOS, regional government

    and other types of UN agencies.

    Collect the main source from central government,

    regional government, INGO`S, World bank, ADB etc.

    11- Fund Sou rce

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    14/20

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    15/20

    15

    Expected Benef i ts:

    1. This project able to create a new settlementfor approx. 10,000 families with an adequate amenities.

    (Road, water, drainage, Cable, electricity and security etc.)

    2. This project will develop a Eco friendly Kampot City.

    3. This project will fully help to promote the nations tourist industry

    also.

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    16/20

    16

    Expected Benef i ts:

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    17/20

    17

    Expected Benef i ts:

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    18/20

    18

    Expected Benef i ts:

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    19/20

    19

    Expected Benef i ts:

  • 8/10/2019 Group 1 Municipality Kampot Eng. IUT 28-11-2012

    20/20

    20

    Any Suggestions or Feedback?

    Kampot City is well recognized for its beautifulsetting and relaxed atmosphere. To built on thesequalities and further improve public open spaces,preserve and develop green areas and natural featureswithin the city have high priority for increasing the

    livability for its residents as well as its attractiveness forits visitors. These activity would not be developedwithout avoiding the slum settlement from the city.Therefore the authorities agree the furtherdevelopment of the Kampot City.

    THANK YOU!

    Suggestions from Professor KIM